List of Input Files Available For UTCHEM Version 9.82 Series I: Oil Reservoir Applications

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

List of input files available for UTCHEM Version 9.

82
Series I: Oil Reservoir Applications

Run number Simulation No. of Process


time gridblocks CPU time, sec
Marathon1 Windows2
EX01 1500 days 11x11x2 Surfactant/polymer
55 141
EX02 1540.75 days 15x15x2 Polymerflood (based on
Chateaurenard field test) 2229 5968
EX04 816 days 14x13x2 In-depth gel treatment (non-
isothermal) 479.7 1303
EX05 3.9 days 35x1x4 Single well tracer (non-isothermal,
radial grid) 42.3 104
EX06 3.7386 PV 80x1x1 ASP core flood 136.6 324
EX07 551 days 19x19x3 Pilot-scale ASP 2183 ---
EX08 360 days 19x19x3 Water flood 24.1 68.2
EX09 1.15 PV 13x7x8 Surfactant /polymer (curvilinear
grid) 239 617
EX10 2.5 PV 26x1x8 Water flood (non-isothermal) 8.1 17.5
EX11 2.5 PV 26x1x8 Surfactant /polymer 10.6 25.5
EX12 4.002 days 80x1x1 High pH alkaline core flood 10.4 24
EX13 1 day 100x1x1 Water flood (gas present) 39.7 91
EX14 200 days 28x1x10 Tracer flood (variable width grid
option) 2359 6,504
EX15 2526 days 31x45x3 Interwell tracer test 1655.4 6590
EX16 60,000 days 10x10x1 Tracer in fractured media 32.2 68
EX17 50,000 days 100x1x1 Tracer in fractured media 117.8 282
EX18 2 PV 20x1x1 Foam/surfactant 97.8 237
Waterflooding of a mixed-wet
EX19 1500 days 40x1x1 reservoir (hysteretic mixed-wet
Pc-Kr-Sw) 2.6 5.8
EX54 730 days 10x20x4 Barium sulfate precipitation 2465 6518
BATCH 120 days 5x1x1 Batch calculation to obtain Hand's
parameters 0.26 0.37
1DBL 0.1 days 200x1x1 Buckley Leverett problem (with
known analytical solution) 5.4 11
1DTRACER 50 days 100x1x1 Single phase tracer (with known
analytical solution) 0.56 1.1
2DTRACER 137 days 30x30x1 Quarter of a 5-spot tracer (with
known analytical solution) 102 275
1: Dec Alpha (DEC/Compaq XP1000)
2: Dell GX1p, 450 mHz, 256MB RAM
List of input files available for UTCHEM version 9.82
Series II: Groundwater Applications

Run number Simulation time No. of Process CPU times, sec


gridblocks Marathon1 Windows2
EX20 8.15 days 14x11x18 PITT (include vadose zone) 1205.2 2882
EX21 30 days 49x1x24 PCE infiltration 14.1 41
EX22 270 days 49x1x24 SEAR of EX21 241 653
(Restart from EX21)
EX23 0.62 days 20x1x7 Cosolvent flushing in a sandbox 44.4 98.3
EX24 0.003587 days 72x1x50 Kueper's sandbox infiltration 69.4 164
EX25 42 days 25x25x16 PITT in a PCE site 8666 25,495
EX27 30 PV 1x1x50 SEAR in column (mass transfer 60.1 144.8
correlation)
EX29 250 days 49x1x10 TCE infiltration (linear adsorption) 3305 1395
EX30 120 days 20x1x1 SEAR of a multiple organic NAPL 5.1 12.2
EX31 250 days 49x1x10 TCE infiltration (irreversible 477 1252
Langmuir adsorption isotherm)
EX33 1 day 20x1x1 Biodegradation in a column (single 2.25 5.0
substrate by one biological species)
EX35 1 day 1x1x1 Biodegradation of DNAPL by 0.063 0.09
aerobic cometabolism (batch
calculation)
EX45 150 days 100x1x1 Geochemical, heavy metal 10.6 24
EX46 0.4166 days 17x1x20 LNAPL filtration in vadose zone 96.5 255
(Van Genuchten Pc-kr-Sw
function)
EX48 23 days 32x19x12 PITT using radioactive tracers (Hill 6072 16,908
AFB site)
EX47 20 days 11x11x2 Water flood (initial aqueous phase 0.27 0.55
composition option)
EX50 106.5 days 20x17x6 PITT (Hill AFB OU2 test) 1325 3343
EX51 22.4 days 20x17x6 SEAR (Hill AFB OUT test, phase 10,260 24,388
II)
EX52 140 days 25x25x16 SEAR (Camp Lejeune test) 56,913 163,499
EX53 227 days 20x17x6 Biodegradation after Hill AFB test 58,202 ---
1: Dec alpha (DEC/Compaq XP1000)
2: Dell GX1p, 450 mHz, 256 MB

You might also like