Professional Documents
Culture Documents
Estimate For Print
Estimate For Print
Estimate For Print
General Requirements
Excavation
Earth Fill
Gravel Bedding
Hauling of Debris
Soil Poisoning
Termite Treatment
Demolotion
Sub Total
150mm thick CHB Wall w/ mortars, bars, tie wires, stiffener col/beams
Sub total
Carpentry Works (Kitchen Cabinetries)
Built in Cabinets/ Counters/Shelves incl all accessories (including Hardwares & Accessories and finishing duco)
Others
Sub total -
Finishes
Flooring
600x 1200 ceramic tiles @ Living room, Dining area and Kitchen
Prepare floor slab to receive self levelling screed prior to installation of floor tiles.
Ceiling
a. CF-1 12mm thick Gypsum board in metal furring painted white (Boysen hygienic)
Wall Paints
Roofing
c. Roof Gutters
d. Insulation
Sub total
Doors and Windows including hardwares and finishes
GROUND FLOOR
BEDROOM DOOR
BALCONY DOOR
Windows
Entrance Door
Metal Works
Towel Rail Silk by American Standard
Stair Handrail
Balusters
Sub total
Welding works
Plumbing Works
Water distribution System pipes/ fitting
Plumbing Fixtures
ELECTRICAL WORKS
a. Roughing Ins
c. Lighting Fixtures
d. Wiring Devices
e. Panel Boards
f. Others
GLAZING WORKS
a. 12mm laminated glass @ balcony with framing
Subtotal
SUMMARY OF WORK ITEMS
DIV. SCOPE OF WORKS SUB-TOTALS LUMP SUM
and SPECIFICATIONS COST
01 GENERAL REQUIREMENTS 725,000.00 725,000.00
02 DEMOLITION & SITE PREPARATIONS - -
03 CONCRETING & MASONRY WORKS - -
04 CARPENTRY WORKS - -
05 FINISHES - -
06 a - -
07 METAL WORKS - -
08 TINSMITHRY & WATERPROOFING - -
09 PLUMBING WORKS - -
10 ELECTRICAL - -
11 GLAZING WORKS - -
TOTAL DIRECT COST : 725,000.00 725,000.00
MARK-UP : 108,750.00 108,750.00
A. Profit / Mark-up 21,750.00 21,750.00
B. VAT 87,000.00 87,000.00
Notes:
All prices are subject to change without prior notice due to
change in detail in plans, design, specification, and currency fluctuation.
Terms of Payment:
5% Acceptance Fee
45% Downpayment
50% Progress Billing