6 Sheet

(with cover)

Owner : PT. Petrokimia Gresik

Customer : PT. Hamon Indonesia

Project : Ammonia Urea – Petrokimia Gresik

Item Name : Fabrication Motor Frame & Support


Job No. : OP. 013 - 2016

HANDLING PROCEDURE OF
BASE FRAME

Distribution
Dept. Copy

PT. HAMON INDONESIA Client


Prod.
QAC

PT.TUBAN STEEL WORK PPIC


ENGINEERING DEPARTMENT File
Rev. No. A 0 1 2 3
Prepared by AR.W

Checked by AR.W

Approved by DJ.S

Doc. No. : 013-16 – ENG.Pro. - 003


Sheet No. :
HANDLING PROCEDURE OF 2 of 6
PT. TUBAN STEEL WORK
BASE FRAME/SUPPORT
Doc. No.:
Job No. : OP - 013 013 -16 - Eng.Pro.- 003

This page is a record all of revision of the Fabrication Procedure and the following
revision (s) had (have) been made to the documents.

Rev. No Description Page No.

0 Original Issue All


Sheet No. :
HANDLING PROCEDURE OF 3 of 6
PT. TUBAN STEEL WORK BASE FRAME/SUPPORT
Doc. No.:
Job No. : OP - 013 013-16 - Eng.Pro. - 003

No. Description Sheet No.

1 GENERAL 4 of 6

2 APPLICABLE SPECIFICATION, CODE & STANDARD 4 of 6

3 APPLICACBLE ITEM 4 of 6

4 APPLICATION 4 of 6

5 HANDLING 4 of 6

6 HANDLING SKETCH 6 of 7
Sheet No. :
HANDLING PROCEDURE OF 4 of 6
PT. TUBAN STEEL WORK
BASE FRAME/SUPPORT
Doc. No.:
Job No. : OP - 013 013 -16 Eng.Pro - 003

1. GENERAL
This procedure covers minimum requirements of handling / lifting Fabrication Base
Frame & Support , which fabricated by PT. TUBAN STEEL WORK.

2. APPLICABLE SPECIFICATION, CODE AND STANDARD

 PT. Tuban Steel Work’s Preservation & Packing Standard


 Base Frame & Supp. Assembly (Doc No. ESD-2016/013/201485/E2110-11/01 )
3. APPLICABLE ITEM
 Base Frame & Supp. Assembly for Ammonia ( 201485-E21101-11 )
 Base Frame & Supp. Assembly for Urea ( 201485-E21201-11 )
4. APPLICATION
a) Estabilish Lift procedure
Lift procedure is specified by the attached Sketch drawing.
b) Calculate weight to be lifted
- For item Base Frame ( 201485-E21101-11 )
Empty weight of equipment 3548 kg/unit
Apply impact factor minimum 1.5 , unless otherwise specified.
Then, lifting weight of equipment = 1.5 x 3548 kg = 5323 kg
c) Minimum capacity of crane
- For item Base Frame ( 201485-E21101-11 )
Selection T minimum crane with 2 slings capacity each 4 ¾ T minimum, based on
lifting weight of equipment less than 9.5 Ton.
d) Preparation & Safe use of sling
 Sling that are damaged or defective should not be used.
 Sling used has been tested and certified by inspector.
 Sling should not be shortened with knots or bolts or other makeshift devices.
 Sling length should not be kinked.
 Sling used in a basket hitch should have the loads balanced to prevent
slippage.
 Sling should be securely attached to their loads.
 Sling should be padded or protected from sharp edges of their loads.
 Suspended loads should be kept clear from all obstructions.
 All personnel’s should be kept clear from loads about to be lifted and of suspended
loads.
 Shock loading is prohibited.
Sheet No. :
HANDLING PROCEDURE OF 5 of 6
PT. TUBAN STEEL WORK
BASE FRAME/SUPPORT
Doc. No.:
Job No. : OP - 013 013-16 – Eng.Pro - 003

e) Types of slings
Slings are available, wire rope or steel rope core, or Polyester Webbing Sling. Slings
should be used in accordance with manufacture’s recommendations and regulatory
requirements, Webbing or sling with safety factor minimum 7:1 and wire rope sling
safety factor 5:1

5. HANDLING
a. Used 2 slings and type of sling : Wire rope steel sling.
b. All paint structure without lifting lugs will be lifted by round sling or webbing sling to
protect from damage
c. Equipment will be loaded into truck in according with drawing sketch. Lifting marking
indicating item number, size ( L x W x T ), indication of COG (Center of Gravity), and
weight, name of client and project item Name to be marked on the package.

6. HANDLING SKETCH (ATTACHMENT)


See shipping style Drawing No : ESD-2016/013/201485/E2110-11/07a & 07b.