Procedure Handling Pt. Hamon
Procedure Handling Pt. Hamon
(with cover)
HANDLING PROCEDURE OF
BASE FRAME
Distribution
Dept. Copy
Checked by AR.W
Approved by DJ.S
This page is a record all of revision of the Fabrication Procedure and the following
revision (s) had (have) been made to the documents.
1 GENERAL 4 of 6
3 APPLICACBLE ITEM 4 of 6
4 APPLICATION 4 of 6
5 HANDLING 4 of 6
6 HANDLING SKETCH 6 of 7
Sheet No. :
HANDLING PROCEDURE OF 4 of 6
PT. TUBAN STEEL WORK
BASE FRAME/SUPPORT
Doc. No.:
Job No. : OP - 013 013 -16 Eng.Pro - 003
1. GENERAL
This procedure covers minimum requirements of handling / lifting Fabrication Base
Frame & Support , which fabricated by PT. TUBAN STEEL WORK.
e) Types of slings
Slings are available, wire rope or steel rope core, or Polyester Webbing Sling. Slings
should be used in accordance with manufacture’s recommendations and regulatory
requirements, Webbing or sling with safety factor minimum 7:1 and wire rope sling
safety factor 5:1
5. HANDLING
a. Used 2 slings and type of sling : Wire rope steel sling.
b. All paint structure without lifting lugs will be lifted by round sling or webbing sling to
protect from damage
c. Equipment will be loaded into truck in according with drawing sketch. Lifting marking
indicating item number, size ( L x W x T ), indication of COG (Center of Gravity), and
weight, name of client and project item Name to be marked on the package.