Intermediate Well Control Equipment Inspection Criteria

Equipment Group : Kelly Cocks, Gray valves and drop in subs

Drilling Contractor :
Rig Unit Number – Contractor :
Rig Unit Number – PDO :
Present Well Location :
Date

Make/Brand:
Type :
Serial Number :
Year of Manufacturing
When : Conducted by :
Last Major Maintenance
Last Intermediate Maintenance

Kelly Cocks, Gray valves, drop in subs & floats ( 6 monthly)


References: Visual Correct / Comments
API RP 7G Inspection Done ?
DS-1 cat 3 YES NO
1 Visual check for damage including Kelly Cock
Key and Gray valve rod
2 Visual check for damage, wear & corrosion on
body, threads, stress relief groove and
numbering.
3 MPI threads according to API RP 7G
4 Measure threads for pin stretching and
counter bore diameter/ box for swelling.
5 Pressure test Kelly cock, Gray valve and drop
in sub to the rated working pressure in the
direction of flow
6 Function test valves without excessive force
7 For Drop in sub check dart lock and seals
8 Floats of float sub to be visually inspected

Well Control Equipment Intermediate Inspection: Kelly Cocks, Gray valves & drop in subs Generated by : WCF
Page 1 of 2
All above Name : Company : Date : Signature :
Inspections &
Tests conducted
by :
(Authorized Third
Party Inspection
Company)
Agreed by :
(Contractor Rig
Manager)
Verified by :
(PDO Site
Representative)
Authorized by :
(Contractor DS)
Seen by :
(PDO SWE)

Well Control Equipment Intermediate Inspection: Kelly Cocks, Gray valves & drop in subs Generated by : WCF
Page 2 of 2