TANAMAN HIAS DAN TAMAN

HSPK
2018
No Nama Barang Satuan
Daerah Daerah
Datar Pegunungan
1 2 3 4 5

2.2.4 BIBIT TANAMAN HIAS DAN TAMAN


2.2.4.1 TANAMAN PENUTUP TANAH
2.2.4.1.1 Rumput Embun Lempengan M2 23,000.00 23,000.00
2.2.4.1.2 Rumput jepang M2 23,000.00 23,000.00
2.2.4.1.3 Rumput Manila Lempengan M2 40,000.00 40,000.00
2.2.4.1.4 Rumput Mutiara M2 10,000.00 10,000.00
2.2.4.1.5 Rumput Putih M2 10,000.00 10,000.00
2.2.4.1.6 Rumput Golf M2 20,000.00 20,000.00
2.2.4.1.7 Rumput Lumut Serpen Lempengan M2 25,000.00 25,000.00
2.2.4.1.8 Rumput Manila Tandus M2 30,000.00 30,000.00
2.2.4.1.9 Rumput Paitan Lempengan M2 32,000.00 32,000.00
2.2.4.1.10 Rumput Paitan Tandus M2 10,000.00 10,000.00
2.2.4.1.11 Rumput sawah M2 8,000.00 8,000.00
2.2.4.1.12 Rumput Swiss M2 32,000.00 32,000.00
2.2.4.1.13 Gajah mini M2 25,000.00 25,000.00

2.2.4.2 TANAMAN PENUTUP TANAH BERGUNA


2.2.4.2.1 Bayam Merah (tinggi= 0.5 m) Polibag 5,000.00 5,000.00
2.2.4.2.2 Bludru Coklat Pot 7,000.00 7,000.00
2.2.4.2.3 Bludru Hijau Pot 7,000.00 7,000.00
2.2.4.2.4 Cendrawasih Pot 6,000.00 6,000.00
2.2.4.2.5 Cengger Ayam Air Mancur Besar Pot 6,000.00 6,000.00
2.2.4.2.6 Cengger Ayam Air Mancur Kecil Pot 6,000.00 6,000.00
2.2.4.2.7 Cengger Ayam Pot Rol Besar Pot 30,000.00 30,000.00
2.2.4.2.8 Cengger Ayam Pot Rol Kecil Pot 25,000.00 25,000.00
2.2.4.2.9 Cocor Bebek Pot 20,000.00 20,000.00
2.2.4.2.10 Kucai Polibag 4,000.00 4,000.00
2.2.4.2.11 Lili Paris Bintang Pot 4,000.00 4,000.00
2.2.4.2.12 Lili Paris Kasar Pot 4,000.00 4,000.00
2.2.4.2.13 Lili Paris Kucai Pot 4,000.00 4,000.00
2.2.4.2.14 Lili Paris Umbi Pot 4,000.00 4,000.00
2.2.4.2.15 Meotan Pot 3,500.00 3,500.00
2.2.4.2.16 Mirten Perak Pot 6,000.00 6,000.00
2.2.4.2.17 Mirten Rebah Pot 7,000.00 7,000.00
2.2.4.2.18 Nanas Kerang Pot 11,000.00 11,000.00
2.2.4.2.19 Nanas Merah Pot 14,000.00 14,000.00
2.2.4.2.20 Pakis Gunung Pot 7,000.00 7,000.00
2.2.4.2.21 Pakis Kelabang Pot 7,000.00 7,000.00
2.2.4.2.22 Pakis Krol Batang 11,000.00 11,000.00
2.2.4.2.23 Pakis Moos Pot 16,000.00 16,000.00
2.2.4.2.24 Pakis Perak Pot 23,000.00 23,000.00
2.2.4.2.25 Pangkas Kuning Pot 4,000.00 4,000.00
2.2.4.2.26 Seruni Pot 25,000.00 25,000.00
2.2.4.2.27 Sugi Putih Pot 17,000.00 17,000.00
2.2.4.2.28 Sutra Bombay Banci Pot 25,000.00 25,000.00

1
2018
No Nama Barang Satuan
2.2.4.2.29 Kacang - kacangan Polibag 5,000.00 5,000.00
2.2.4.2.30 Heliconica Polibag 11,000.00 11,000.00
2.2.4.2.31 Kembang kertas Polibag 23,000.00 23,000.00
2.2.4.2.32 Krokot Polibag 5,000.00 5,000.00
2.2.4.2.33 Pacar banyu Polibag 13,000.00 13,000.00

2.2.4.3 TANAMAN DALAM RUANG


2.2.4.3.1 Anggrek Bulan Pot 150,000.00 150,000.00
2.2.4.3.2 Anggrek Dangless Pot 60,000.00 60,000.00
2.2.4.3.3 Anggrek Dekorobium Pot 75,000.00 75,000.00
2.2.4.3.4 Anthurium Uk. 30 - 60 cm Pot 75,000.00 75,000.00
2.2.4.3.5 Anthurium Uk. 60 - 80 cm Pot 150,000.00 150,000.00
2.2.4.3.6 Anthurium Uk. 80-100 cm Pot 200,000.00 200,000.00
2.2.4.3.7 Balanceng Bintik Pot 75,000.00 75,000.00
2.2.4.3.8 Balanceng Putih Pot 150,000.00 150,000.00
2.2.4.3.9 Begonia Daun Besar Pot 100,000.00 100,000.00
2.2.4.3.10 Begonia Kecil Pot 25,000.00 25,000.00
2.2.4.3.11 Begonia Perak Pot 30,000.00 30,000.00
2.2.4.3.12 Beras Tumpah Pot 45,000.00 45,000.00
2.2.4.3.13 Golden Shower Pot 50,000.00 50,000.00
2.2.4.3.14 Kuping Gajah Pot 40,000.00 40,000.00
2.2.4.3.15 Kuping Keledai Pot 67,000.00 67,000.00
2.2.4.3.16 Maustera Pot 17,000.00 17,000.00
2.2.4.3.17 Simbar Menjangan Pot 17,000.00 17,000.00
2.2.4.3.18 Sri Rejeki Pot 50,000.00 50,000.00
2.2.4.3.19 Suplir Foster Pot 75,000.00 75,000.00
2.2.4.3.20 Suplir Halus Pot 50,000.00 50,000.00
2.2.4.3.21 Tanduk Rusa (rumpun) /mata tunas 20,000.00 20,000.00
2.2.4.3.22 Wali Songo Pot 50,000.00 50,000.00

2.2.4.4 TANAMAN PERDU SEMAK


2.2.4.4.1 Agave Kodok Pot 60,000.00 60,000.00
2.2.4.4.2 Agave Strip Pot 50,000.00 50,000.00
2.2.4.4.3 Aglonema Pohon 250,000.00 250,000.00
2.2.4.4.4 Amarilis Polibag 2,500.00 2,500.00
2.2.4.4.5 Andong merah Pohon 12,000.00 12,000.00
2.2.4.4.6 Andong merah (tinggi= 0.5 m) Polibag 12,000.00 12,000.00
2.2.4.4.7 Anggrek Tanah Pohon 16,000.00 16,000.00
2.2.4.4.8 Anjuang Hijau Pot 10,000.00 10,000.00
2.2.4.4.9 Aralea Polibek 25,000.00 25,000.00
2.2.4.4.10 Bendron (tinggi=0,5m) Polibag 15,000.00 15,000.00
2.2.4.4.11 Bougenville Berbunga Penuh Pohon 75,000.00 75,000.00
2.2.4.4.12 Bougenville Berbunga Penuh (tinggi= 0.5 m) Polibag 75,000.00 75,000.00
2.2.4.4.13 Bougenville Besar Pot 250,000.00 250,000.00
2.2.4.4.14 Bougenville Hawai Pot 250,000.00 250,000.00
2.2.4.4.15 Bougenville Kecil Pot 40,000.00 40,000.00
2.2.4.4.16 Daun pandan wangi Glangsing 25,000.00 25,000.00
2.2.4.4.17 Drasaena Pohon 20,000.00 20,000.00
2.2.4.4.18 Jamburan Polibag 2,500.00 2,500.00
2.2.4.4.19 Kaca Piring Pohon 25,000.00 25,000.00
2.2.4.4.20 Kaktus Centong Pohon 150,000.00 150,000.00
2.2.4.4.21 Kaktus Tiang Pentung Pohon 180,000.00 180,000.00
2.2.4.4.22 Kamboja Merah Hati 1 - 1,5 m Pohon 150,000.00 150,000.00

2
2018
No Nama Barang Satuan
2.2.4.4.23 Kamboja Merah Hati 2 - 2,5 m Pohon 850,000.00 850,000.00
2.2.4.4.24 Kamboja Pantai Pohon 750,000.00 750,000.00
2.2.4.4.25 Kamboja Putih Pohon 350,000.00 350,000.00
2.2.4.4.26 Kana Biasa (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2.2.4.4.27 Kana Jepang Pot 18,000.00 18,000.00
2.2.4.4.28 Kastuba Pohon 37,000.00 37,000.00
2.2.4.4.29 Kalatea merah, puti Polibag 12,500.00 12,500.00
2.2.4.4.30 Kalatea loreng Polibag 15,000.00 15,000.00
2.2.4.4.31 Kalatea silver Polibag 20,000.00 20,000.00
2.2.4.4.32 Kembang Sepatu (tinggi= 0.5 m) Polibag 40,000.00 40,000.00
2.2.4.4.33 Kembang Sepatu 8 - 20 cm Polibag 35,000.00 35,000.00
2.2.4.4.34 Kembang Sepatu Putih Pohon 35,000.00 35,000.00
2.2.4.4.35 Kenanga Pohon 25,000.00 25,000.00
2.2.4.4.36 Kol Ganda Pohon 35,000.00 35,000.00
2.2.4.4.37 Korombusa Hijau Polibag 10,000.00 10,000.00
2.2.4.4.38 Korombusa Putih Besar Polibag 35,000.00 35,000.00
2.2.4.4.39 Korombusa Putih Kecil Polibag 15,000.00 15,000.00
2.2.4.4.40 Krisan Polibag 35,000.00 35,000.00
2.2.4.4.41 Lamtama Polibag 2,500.00 2,500.00
2.2.4.4.42 Lantana Pagar Pohon 7,000.00 7,000.00
2.2.4.4.43 Lavender Polibag 17,000.00 17,000.00
2.2.4.4.44 Lidah mertua (tinggi= 0.5 m) Polibag 20,000.00 20,000.00
2.2.4.4.45 Lusiana Tinggi Pohon 20,000.00 20,000.00
2.2.4.4.46 Lusiana Tinggi 1 m Pohon 50,000.00 50,000.00
2.2.4.4.47 Lusiana Tinggi 2 m Pohon 150,000.00 150,000.00
2.2.4.4.48 Mawar / Dendros Pohon 7,000.00 7,000.00
2.2.4.4.49 Mawar / Rose Hybrida Pohon 10,000.00 10,000.00
2.2.4.4.50 Mawar Jambe (tinggi= 0.5 m) Polibag 500,000.00 500,000.00
2.2.4.4.51 Melati Cina (tinggi= 0.5 m) Polibag 11,000.00 11,000.00
2.2.4.4.52 Nusa Indah (tinggi= 0.5 m) Polibag 20,000.00 20,000.00
2.2.4.4.53 Nusa Indah Putih Pohon 20,000.00 20,000.00
2.2.4.4.54 Palem Udang Pohon 60,000.00 60,000.00
2.2.4.4.55 Panca warna Polibag 20,000.00 20,000.00
2.2.4.4.56 Pandan Belgi (tinggi= 0.5 m) Polibag 17,000.00 17,000.00
2.2.4.4.57 Pandan Suci (tinggi= 0.5 m) Polibag 7,000.00 7,000.00
2.2.4.4.58 Pohon Pangkas (tinggi = 0,5 m) Pohon 20,000.00 20,000.00
2.2.4.4.59 Pohon Pangkas (tinggi = 1 m) Pohon 50,000.00 50,000.00
2.2.4.4.60 Pucuk Merah (tinggi= 0,5 m) Polibag 25,000.00 25,000.00
2.2.4.4.61 Pucuk Merah (tinggi= 1 m) Polibag 75,000.00 75,000.00
2.2.4.4.62 Pucuk Merah (tinggi= 2 m) Polibag 250,000.00 250,000.00
2.2.4.4.63 Puring Banci Pohon 15,000.00 15,000.00
2.2.4.4.64 Puring Bangkok (tinggi= 0.5 m) Polibag 100,000.00 100,000.00
2.2.4.4.65 Puring Bor (tinggi=0,5m) Polibag 15,000.00 15,000.00
2.2.4.4.66 Puring Buntut Ayam Pohon 15,000.00 15,000.00
2.2.4.4.67 Puring Gelatik Pohon 15,000.00 15,000.00
2.2.4.4.68 Puring Jet (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2.2.4.4.69 Puring Ketapang Pohon 20,000.00 20,000.00
2.2.4.4.70 Puring Lancur Polibag 15,000.00 15,000.00
2.2.4.4.71 Puring Nuri Pohon 15,000.00 15,000.00
2.2.4.4.72 Rosalia (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2.2.4.4.73 Rosindah Pohon 15,000.00 15,000.00
2.2.4.4.74 Sablo Pohon 15,000.00 15,000.00
2.2.4.4.75 Sakura tinggi 60cm Pohon 15,000.00 15,000.00

3
2018
No Nama Barang Satuan
2.2.4.4.76 Sakura tinggi 75cm Pohon 25,000.00 25,000.00
2.2.4.4.77 Sakura tinggi 100cm Pohon 35,000.00 35,000.00
2.2.4.4.78 Sambang Darah Besar Polibag 80,000.00 80,000.00
2.2.4.4.79 Sambang Darah Sedang Polibag 50,000.00 50,000.00
2.2.4.4.80 Schefflera Arboricol Pohon 50,000.00 50,000.00
2.2.4.4.81 Siklok (tinggi=0,5m) Polibag 15,000.00 15,000.00
2.2.4.4.82 Soka Bangkok Pohon 10,000.00 10,000.00
2.2.4.4.83 Soka Jepang Pohon 15,000.00 15,000.00
2.2.4.4.84 Soka Philipina Pohon 15,000.00 15,000.00
2.2.4.4.85 Soka Singapura Pohon 15,000.00 15,000.00
2.2.4.4.86 Soka Srantan Pohon 15,000.00 15,000.00
2.2.4.4.87 Spider Leli (tinggi= 0.5 m) Polibag 6,000.00 6,000.00
2.2.4.4.88 Terang Bulan Pohon 7,000.00 7,000.00
2.2.4.4.89 Tombak Raja Pohon 25,000.00 25,000.00
2.2.4.4.90 Tri colour (tinggi=05m) Polibag 15,000.00 15,000.00
2.2.4.4.91 Brokoli (tinggi = 0,5m) Polibag 10,000.00 10,000.00
2.2.4.4.92 Prambosa hijau (tinggi 0,5m) Polibag 20,000.00 20,000.00
2.2.4.4.93 Prambosa Silver (tinggi 0,5m) Polibag 20,000.00 20,000.00
2.2.4.4.94 Prambosa Kuning (tinggi 0,5m) Polibag 20,000.00 20,000.00
2.2.4.4.95 Cemara Kipas K (tinggi 0,5m) Polibag 25,000.00 25,000.00
2.2.4.4.96 Cemara Kipas B (tinggi 0,5m) Polibag 35,000.00 35,000.00
2.2.4.4.97 Song of India K (tinggi 0,5m) Polibag 8,000.00 8,000.00
2.2.4.4.98 Song of India B (tinggi 0,5m) Polibag 75,000.00 75,000.00
2.2.4.4.99 Bulu ayam 20cm Polibag 4,000.00 4,000.00
2.2.4.4.100 Puring bali Polibag 15,000.00 15,000.00
2.2.4.4.101 Puring kirana besar Polibag 60,000.00 60,000.00
2.2.4.4.102 Soka India Pohon 25,000.00 25,000.00
2.2.4.4.103 Soka merah muda Pohon 25,000.00 25,000.00
2.2.4.4.104 Bunga telek - telekan Polibag 10,000.00 10,000.00
2.2.4.4.105 Bunga tapak dara Polibag 10,000.00 10,000.00
2.2.4.4.106 Sikas tinggi 10 cm Glangsing 200,000.00 200,000.00
2.2.4.4.107 Sikas tinggi 40 cm Glangsing 600,000.00 600,000.00
2.2.4.4.108 Sikas tinggi 70 cm Glangsing 750,000.00 750,000.00
2.2.4.4.109 Seribu bintang Polibag 10,000.00 10,000.00
2.2.4.4.110 Samsiver variadata Pot 100,000.00 100,000.00
2.2.4.4.111 Rombusa hijau Polibag 60,000.00 60,000.00
2.2.4.4.112 Rombusa putih besar Polibag 75,000.00 75,000.00
2.2.4.4.113 Rombusa putih kecil Polibag 50,000.00 50,000.00
2.2.4.4.114 Rosalia (tinggi= 0.5 m) Polibag 15,000.00 15,000.00

2.2.4.5 TANAMAN MERAMBAT


2.2.4.5.1 Air Mata Pengantin Pot 20,000.00 20,000.00
2.2.4.5.2 Alamanda Pot 15,000.00 15,000.00
2.2.4.5.3 Mandivila Pot 25,000.00 25,000.00
2.2.4.5.4 Sirih Gading Pot 250,000.00 250,000.00
2.2.4.5.5 Stepanut Pot 25,000.00 25,000.00
2.2.4.5.6 Stepanut Ungu Pot 30,000.00 30,000.00

2.2.4.6 TANAMAN EKSOTIS ( A )


2.2.4.6.1 Agave (tinggi= 0.5 m) Polibag 35,000.00 35,000.00
2.2.4.6.2 Agave Putih Pohon 25,000.00 25,000.00
2.2.4.6.3 Bakung Pohon 30,000.00 30,000.00
2.2.4.6.4 Cemara Norfolk Pohon 50,000.00 50,000.00

4
2018
No Nama Barang Satuan
2.2.4.6.5 Tiris (tinggi= 0.5 m) Polibag 4,000.00 4,000.00

2.2.4.7 TANAMAN EKSOTIS ( B )


2.2.4.7.1 Beringin Bonsai Pohon 100,000.00 100,000.00
2.2.4.7.2 Beringin Bonsai Bentukan Pohon 270,000.00 270,000.00
2.2.4.7.3 Bonsai Serut Pohon 2,500,000.00 2,500,000.00
2.2.4.7.4 Bonsai Sianton Pohon 2,000,000.00 2,000,000.00
2.2.4.7.5 Cemara Norfolk Pohon 50,000.00 50,000.00
2.2.4.7.6 Cemara Pipa Mas Pohon 2,000,000.00 2,000,000.00
2.2.4.7.7 Hebbra Pohon 3,000,000.00 3,000,000.00
2.2.4.7.8 Jambu Bangkok Pohon 500,000.00 500,000.00
2.2.4.7.9 Jeruk Lingkit Pohon 400,000.00 400,000.00
2.2.4.7.10 Jeruk Sunkist Pohon 150,000.00 150,000.00
2.2.4.7.11 Pakis Monyet Pohon 360,000.00 360,000.00
2.2.4.7.12 Palem Putri Pot 80,000.00 80,000.00
2.2.4.7.13 Palem Ratu Pohon 250,000.00 250,000.00
2.2.4.7.14 Palem Regu Pot 70,000.00 70,000.00
2.2.4.7.15 Pinang Merah Pohon 1,500,000.00 1,500,000.00
2.2.4.7.16 Pisang Kipas 30 cm Pohon 1,500,000.00 1,500,000.00
2.2.4.7.17 Pisang Kipas 50 cm Pohon 3,100,000.00 4,000,000.00
2.2.4.7.18 Pule lingkar pohon 1 m Pohon 7,500,000.00 7,500,000.00
2.2.4.7.19 Pule lingkar pohon 2 m Pohon 15,000,000.00 15,000,000.00
2.2.4.7.20 Pule lingkar pohon 3 m Pohon 25,000,000.00 25,000,000.00
2.2.4.7.21 Pule lingkar pohon 4 m Pohon 35,000,000.00 35,000,000.00
2.2.4.7.22 Pule lingkar pohon 30 cm Pohon 750,000.00 825,000.00
2.2.4.7.23 Pule lingkar pohon 50 cm Pohon 3,100,000.00 3,410,000.00

2.2.4.8 TANAMAN BORDER


2.2.4.8.1 Anjuang Kribo, Srikit, Pakis, Gonongkes I Teduh M2 120,000.00 120,000.00
2.2.4.8.2 Balanceng Marandra, Dinding Klas II Teduh M2 85,000.00 85,000.00
2.2.4.8.3 Nusa Indah, Kelabang, Krokot Klas II Panas M2 90,000.00 90,000.00
2.2.4.8.4 Puring-puring Gelatik, Pakis Rol Klas I Panas M2 100,000.00 100,000.00

2.2.4.9 TANAMAN POHON PELINDUNG


2.2.4.9.1 Akasia Pohon 75,000.00 75,000.00
2.2.4.9.2 Angsana Ø20 cm tinggi= 3 m Pohon 75,000.00 75,000.00
2.2.4.9.3 Beringin 1,5 - 2 m Pohon 150,000.00 150,000.00
2.2.4.9.4 Beringin 10 - 30 cm Pohon 50,000.00 50,000.00
2.2.4.9.5 Bintaro Ø20 tinggi = 3 m Pohon 150,000.00 150,000.00
2.2.4.9.6 Bunga Sapu Tangan Pohon 150,000.00 150,000.00
2.2.4.9.7 Bungur Pohon 150,000.00 150,000.00
2.2.4.9.8 Dadap Kuning 8 - 20 cm Pohon 750,000.00 750,000.00
2.2.4.9.9 Dadap Merah 1,5 - 2 m Pohon 75,000.00 75,000.00
2.2.4.9.10 Dadap Merah 8 - 20 cm Pohon 75,000.00 75,000.00
2.2.4.9.11 Dipsul Pohon 75,000.00 75,000.00
2.2.4.9.12 Glodongan Pohon 75,000.00 75,000.00
2.2.4.9.13 Glodongan 3 M Pohon 150,000.00 150,000.00
2.2.4.9.14 Glodongan 4 M Pohon 250,000.00 250,000.00
2.2.4.9.15 Glodongan Tiang Tinggi Pohon 400,000.00 400,000.00
2.2.4.9.16 Jetrofa Ø20 cm tinggi= 2.5 m Pohon 250,000.00 250,000.00
2.2.4.9.17 Johar Pohon 80,000.00 80,000.00
2.2.4.9.18 Kayu Manis Pohon 50,000.00 50,000.00
2.2.4.9.19 Kayu Manis 10 - 25 cm Pohon 30,000.00 30,000.00

5
2018
No Nama Barang Satuan
2.2.4.9.20 Kayu Putih Pohon 50,000.00 50,000.00
2.2.4.9.21 Kembang kupu - kupu 1,5 2 m Pohon 60,000.00 60,000.00
2.2.4.9.22 Kembang kupu - kupu 10 - 20 cm Pohon 35,000.00 35,000.00
2.2.4.9.23 Kiara Payung Pohon 50,000.00 50,000.00
2.2.4.9.24 Kobanda 10 - 20 cm Pohon 30,000.00 30,000.00
2.2.4.9.25 Kupu-kupu Ø15 cm tinggi= 2.5 m Pohon 75,000.00 75,000.00
2.2.4.9.26 Mahoni Pohon 40,000.00 40,000.00
2.2.4.9.27 Matua Ø30 cm tinggi=3 m Pohon 150,000.00 150,000.00
2.2.4.9.28 Sepatu Dia 1,5 - 2 m Pohon 80,000.00 80,000.00
2.2.4.9.29 Sono Keling Pohon 100,000.00 100,000.00
2.2.4.9.30 Spathodeta Pohon 85,000.00 85,000.00
2.2.4.9.31 Tabir Buya 1,5 - 2,5 m Pohon 20,000.00 20,000.00
2.2.4.9.32 Tabir Buya Merah ø 15 Pohon 150,000.00 150,000.00
2.2.4.9.33 Tabir Buya Merah ø 20 Pohon 250,000.00 250,000.00
2.2.4.9.34 Tabir Buya Merah ø 30 Pohon 400,000.00 400,000.00
2.2.4.9.35 Tanjung Pohon 80,000.00 80,000.00
2.2.4.9.36 Trembesi Ø10 cm tinggi= < 3 m Pohon 180,000.00 180,000.00
2.2.4.9.37 Yanglu Pohon 350,000.00 350,000.00
2.2.4.9.38 Flamboyan Pohon 90,000.00 90,000.00

2.2.4.10 TANAMAN JENIS PALEM


2.2.4.10.1 Kelapa Sawit Pohon 1,500,000.00 1,500,000.00
2.2.4.10.2 Palem Anggur Pohon 3,000,000.00 3,000,000.00
2.2.4.10.3 Palem Bismar Æ 100cm (tinggi=2m) Pohon 2,500,000.00 2,500,000.00
2.2.4.10.4 Palem Botol Pohon 250,000.00 250,000.00
2.2.4.10.5 Palem Jepang Pohon 150,000.00 150,000.00
2.2.4.10.6 Palem Kol Pohon 60,000.00 60,000.00
2.2.4.10.7 Palem Kuning Pohon 60,000.00 60,000.00
2.2.4.10.8 Palem Kuning Pohon 60,000.00 60,000.00
2.2.4.10.9 Palem Phoenix Pohon 250,000.00 250,000.00
2.2.4.10.10 Palem Raja Pohon 250,000.00 250,000.00
2.2.4.10.11 Palem Sading Pohon 350,000.00 350,000.00
2.2.4.10.12 Palem Weregu Pohon 100,000.00 100,000.00
2.2.4.10.13 Wali Songo 0,5 - 1 m Pohon 80,000.00 80,000.00
2.2.4.10.14 Rumpun pinang merah kecil Pohon 500,000.00 500,000.00
2.2.4.10.15 Rumpun pinang merah sedang Pohon 2,000,000.00 2,000,000.00
2.2.4.10.16 Rumpun pinang merah besar Pohon 3,500,000.00 3,500,000.00
2.2.4.10.17 Palem doria Pohon 100,000.00 100,000.00
2.2.4.10.18 Palem ekor tupai Pohon 200,000.00 200,000.00

2.2.4.11 TANAMAN BAMBU CEMARA


2.2.4.11.1 Bambu Jepang Pohon 60,000.00 60,000.00
2.2.4.11.2 Bambu Kuning Pohon 30,000.00 30,000.00
2.2.4.11.3 Cemara Angin Pohon 75,000.00 75,000.00
2.2.4.11.4 Cemara Gembel Pohon 90,000.00 90,000.00
2.2.4.11.5 Cemara Halus Pohon 150,000.00 150,000.00
2.2.4.11.6 Cemara Natal Pohon 500,000.00 500,000.00
2.2.4.11.7 Pinus Pohon 500,000.00 500,000.00

2.2.4.12 BUNGA POTONGAN


2.2.4.12.1 Anggrek Macan Tangkai 75,000.00 75,000.00
2.2.4.12.2 Anyelir Tangkai 50,000.00 50,000.00
2.2.4.12.3 Apel Blossom Tangkai 30,000.00 30,000.00

6
2018
No Nama Barang Satuan
2.2.4.12.4 Aster Tangkai 30,000.00 30,000.00
2.2.4.12.5 Bunga Rangkaian Buket 200,000.00 200,000.00
2.2.4.12.6 Denrobium Tangkai 30,000.00 30,000.00
2.2.4.12.7 Douglas Tangkai 30,000.00 30,000.00
2.2.4.12.8 Fortulaka Tangkai 25,000.00 25,000.00
2.2.4.12.9 Gladiol Tangkai 25,000.00 25,000.00
2.2.4.12.10 Golden Shower Tangkai 50,000.00 50,000.00
2.2.4.12.11 Krisan Tangkai 35,000.00 35,000.00
2.2.4.12.12 Mawar Tangkai 60,000.00 60,000.00

2.2.4.13 ALAT PEMBERSIH PERTAMANAN


2.2.4.13.1 Cangkul Bh 90,000.00 90,000.00
2.2.4.13.2 Cetok Bh 35,000.00 35,000.00
2.2.4.13.3 Cikrak Bh 25,000.00 25,000.00
2.2.4.13.4 Cikrak seng Bh 35,000.00 35,000.00
2.2.4.13.5 Cikrak Seret Bh 200,000.00 200,000.00
2.2.4.13.6 Cintung riol Bh 50,000.00 50,000.00
2.2.4.13.7 Gagang cangkul Bh 40,000.00 40,000.00
2.2.4.13.8 Gagang sapu Bh 25,000.00 25,000.00
2.2.4.13.9 Ganco Bh 80,000.00 80,000.00
2.2.4.13.10 Garuk Bh 85,000.00 85,000.00
2.2.4.13.11 Kain pel Lbr 15,000.00 15,000.00
2.2.4.13.12 Karung plastik Bh 15,000.00 15,000.00
2.2.4.13.13 Keranjang Bh 30,000.00 30,000.00
2.2.4.13.14 Keranjang bambu Bh 35,000.00 35,000.00
2.2.4.13.15 Keranjang sampah Bh 50,000.00 50,000.00
2.2.4.13.16 Linggis Bh 160,000.00 160,000.00
2.2.4.13.17 Pacul Bh 70,000.00 70,000.00
2.2.4.13.18 Parang Bh 50,000.00 50,000.00
2.2.4.13.19 Rajut Sampah Bh 500,000.00 500,000.00
2.2.4.13.20 Sabit besar Bh 70,000.00 70,000.00
2.2.4.13.21 Sabit kecil Bh 60,000.00 60,000.00
2.2.4.13.22 Sapu lidi ikat 7,000.00 7,000.00
2.2.4.13.23 Skrop Bh 75,000.00 75,000.00
2.2.4.13.24 Tali ikat sapu Bh 5,000.00 5,000.00
2.2.4.13.25 Timbo Bh 25,000.00 25,000.00
2.2.4.13.26 Timbo cor Bh 12,000.00 12,000.00
2.2.4.13.27 Wangkil Bh 45,000.00 45,000.00
2.2.4.13.28 Mesin Potong Rumput Dorong Unit 3,500,000.00 3,500,000.00
2.2.4.13.29 Mesin Potong Rumput Gendong Unit 2,000,000.00 2,000,000.00
2.2.4.13.30 Mesin Potong Pohon / Senso Unit 16,000,000.00 16,000,000.00
2.2.4.13.31 Mesin Potong Pohon / Senso kecil Unit 3,500,000.00 3,500,000.00
2.2.4.13.32 Mata pisau potong rumput gendong Bh 45,000.00 45,000.00
2.2.4.13.33 Rantai senso kecil Bh 170,000.00 170,000.00
2.2.4.13.34 Kikir besar Bh 15,000.00 15,000.00
2.2.4.13.35 Kikir besar Bh 15,000.00 15,000.00
2.2.4.13.36 Gerobak dorong satu roda Unit 400,000.00 400,000.00
2.2.4.13.37 Senso telescopic unit 17,500,000.00 17,500,000.00
2.2.4.13.38 Breaker unit 22,000,000.00 22,000,000.00
2.2.4.13.39 Mata bor Breaker Bh 350,000.00 350,000.00

2.2.4.14 PAKAIAN KERJA LAPANGAN ( Pertamanan )


2.2.4.14.1 Helm Bh 150,000.00 150,000.00

7
2018
No Nama Barang Satuan
2.2.4.14.2 Jas hujan Bh 70,000.00 70,000.00
2.2.4.14.3 Kaos Bh 65,000.00 65,000.00
2.2.4.14.4 Masker Bh 20,000.00 20,000.00
2.2.4.14.5 Pakaian kerja lapangan Stel 140,000.00 140,000.00
2.2.4.14.6 Sarung tangan Psg 20,000.00 20,000.00
2.2.4.14.7 Sepatu karet Psg 80,000.00 80,000.00
2.2.4.14.8 Sepatu lapang Psg 75,000.00 75,000.00
2.2.4.14.9 Topi Bh 35,000.00 35,000.00

2.2.4.15 POT BUNGA


2.2.4.15.1 Pot bunga Ø 30 cm Set 50,000.00 50,000.00
2.2.4.15.2 Pot bunga Ø 40 cm Set 95,000.00 95,000.00
2.2.4.15.3 Pot bunga Ø 50 cm Set 125,000.00 125,000.00
2.2.4.15.4 Pot bunga Ø 60 cm Set 170,000.00 170,000.00
2.2.4.15.5 Polibag 20 x 20 kg 28,000.00 28,000.00
2.2.4.15.6 Polibag 30 x 30 kg 28,000.00 28,000.00
2.2.4.15.7 Polibag 40 x 40 kg 28,000.00 28,000.00
2.2.4.15.8 Polibag 50 x 50 kg 30,000.00 30,000.00
2.2.4.15.9 Polibag 50 x 60 kg 30,000.00 30,000.00

2.2.4.16 PUPUK TANAMAN


2.2.4.16.1 Pupuk NPK sak 120,000.00 120,000.00
2.2.4.16.2 Pupuk urea sak 80,000.00 80,000.00
2.2.4.16.3 Pupuk ZA sak 90,000.00 90,000.00
2.2.4.16.4 Pupuk SP 36 kg 100,000.00 100,000.00
2.2.4.16.5 Pupuk organik sak 25,000.00 25,000.00
2.2.4.16.6 Pupuk phonska kg 7,500.00 7,500.00
2.2.4.16.7 Pupuk kompos bungkus 17,000.00 17,000.00

2.2.4.17 OBAT HAMA TANAMAN


2.2.4.17.1 Puradan kg 15,000.00 15,000.00
2.2.4.17.2 Matador 250ml 51,000.00 51,000.00
2.2.4.17.3 Marshal kg 85,000.00 85,000.00
2.2.4.17.4 Racumin kg 9,000.00 9,000.00
2.2.4.17.5 Reagen kg 35,000.00 35,000.00

2.2.4.18 ALAT-ALAT PERSAMPAHAN


2.2.4.18.1 Alat pencacah Sampah organik Unit 25,410,000.00 25,410,000.00
2.2.4.18.2 Alat pengayak kompos Unit 17,325,000.00 17,325,000.00
2.2.4.18.3 Bin Container 3R Unit 2,541,000.00 2,541,000.00
2.2.4.18.4 Gerobak sampah 3R Unit 4,500,000.00 4,500,000.00
2.2.4.18.5 Gerobak Sampah PKL Unit 4,500,000.00 4,500,000.00
2.2.4.18.6 Kotak fermentasi Bh 462,000.00 462,000.00

2.2.4.19 PERLENGKAPAN KOLAM


2.2.4.19.1 Servis + Gulung Pompa Set 400,000.00 400,000.00
2.2.4.19.2 Laker Set 35,000.00 35,000.00
2.2.4.19.3 Kapasitor Set 40,000.00 40,000.00
2.2.4.19.4 Selang - -
2.2.4.19.4a - Spiral luar m 35,000.00 35,000.00
2.2.4.19.4b - Spiral dalam m 65,000.00 65,000.00
2.2.4.19.4c - Selang 3/4 dim rol 550,000.00 550,000.00
2.2.4.19.4d - Selang 5/8 dim rol 300,000.00 300,000.00

8
2018
No Nama Barang Satuan
2.2.4.19.4e - Selang 1 1/2 dim rol 800,000.00 800,000.00
2.2.4.19.5 Pompa Speroni unit 3,200,000.00 3,200,000.00
2.2.4.19.6 Diesel Honda 2 dim unit 3,300,000.00 3,300,000.00
2.2.4.19.7 Diesel Honda 3 dim unit 3,700,000.00 3,700,000.00

9
PENENTUAN HSPK PADA DINAS PU- BINA MARGA DAN CIPTA KARYA
TAHUN ANGGARAN 2016 KABUPATEN TULUNGAGUNG
(BULAN PEBRUARI 2018)

HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5

1.2.7 UPAH KERJA


1.2.7.1 Buruh semi terlatih 1 Oh 74,250.00 74,250.00
1.2.7.2 Buruh terlatih 1 Oh 77,000.00 77,000.00
1.2.7.3 Kepala Tukang 1 Oh 93,500.00 93,500.00
1.2.7.4 Kernet 1 Oh 71,500.00 71,500.00
1.2.7.5 Mandor 1 Oh 94,500.00 94,500.00
1.2.7.6 Mekanik terlatih 1 Oh 89,500.00 89,500.00
1.2.7.7 Mekanik semi terlatih 1 Oh 84,000.00 84,000.00
1.2.7.8 Operator semi terlatih 1 Oh 89,500.00 89,500.00
1.2.7.9 Operator terlatih 1 Oh 94,500.00 94,500.00
1.2.7.10 Pekerja / Buruh tak terlatih 1 Oh 68,500.00 68,500.00
1.2.7.11 Pembantu Sopir 1 Oh 68,500.00 68,500.00
1.2.7.12 Pembantu operator 1 Oh 68,500.00 68,500.00
1.2.7.13 Penganyam 1 Oh 68,500.00 68,500.00
1.2.7.14 Penjaga 1 Oh 68,500.00 68,500.00
1.2.7.15 Sopir 1 Oh 81,500.00 81,500.00
1.2.7.16 Tukang batu 1 Oh 79,000.00 79,000.00
1.2.7.17 Tukang besi 1 Oh 84,000.00 84,000.00
1.2.7.18 Tukang cat 1 Oh 79,000.00 79,000.00
1.2.7.19 Tukang kayu 1 Oh 89,500.00 89,500.00
1.2.7.20 Tukang pipa 1 Oh 79,000.00 79,000.00
1.2.7.21 Tukang las 1 Oh 89,500.00 89,500.00
1.2.7.22 Juru Ukur Bangunan 1 Oh 100,000.00 100,000.00
1.2.7.23 Tenaga Fasilitator Lapangan 1 Ob 1,000,000.00 1,000,000.00
1.2.7.24 Penyapu Jalan 1 Ob 1,000,000.00 1,000,000.00
1.2.7.25 Perawat Taman 1 Ob 1,000,000.00 1,000,000.00
1.2.7.26 Teknisi PJU 1 Ob 1,000,000.00 1,000,000.00
- -
2.2 BAHAN BANGUNAN - -
2.2.1 BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN - -
2.2.1.1 Aspal Curah Kg 7,000.00 7,000.00
2.2.1.2 Aspal Kemas Kg 8,000.00 8,000.00
2.2.1.3 Batu marmo warna M2 117,800.00 129,580.00
2.2.1.4 Batu amyang Kg 4,300.00 4,730.00
2.2.1.5 Batu andesit M2 163,700.00 180,070.00
2.2.1.6 Batu andesit bakar M2 190,600.00 209,660.00
2.2.1.7 Batu Andesit alur M2 268,600.00 295,460.00
2.2.1.8 Batu Andesit Alur hitam M2 274,600.00 302,060.00

1
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.1.9 Batu andesit hitam bakar M2 264,100.00 290,510.00
2.2.1.10 Batu andesit hitam M2 213,000.00 234,300.00
2.2.1.11 Batu Andisit Hijau M2 196,400.00 216,040.00
2.2.1.12 Batu apung 3 - 5 cm M3 294,800.00 324,280.00
2.2.1.13 Batu Bali Green M2 129,600.00 142,560.00
2.2.1.14 Batu Bata / Merah Bj 900.00 990.00
2.2.1.15 Batu Bobos M2 146,100.00 160,710.00
2.2.1.16 Batu candi M2 141,400.00 155,540.00
2.2.1.17 Batu candi hitam M2 141,400.00 155,540.00
2.2.1.18 Batu granit black gold M2 2,310,000.00 2,541,000.00
2.2.1.19 Batu granit motif M2 220,100.00 242,110.00
2.2.1.20 Batu guary/batu besar ( uk. Crussher) M3 275,000.00 302,500.00
2.2.1.21 Batu koral putih M2 183,400.00 201,740.00
2.2.1.22 Batu koral sikat 179,100.00 197,010.00
2.2.1.23 Batu koral warna M2 190,900.00 209,990.00
2.2.1.24 Batu lempeng M2 111,000.00 122,100.00
2.2.1.25 Batu lempeng hijau M2 109,800.00 120,780.00
2.2.1.26 Batu lempeng coklat M2 75,100.00 82,610.00
2.2.1.27 Batu marmo biasa M2 93,400.00 102,740.00
2.2.1.28 Batu paras putih M2 127,100.00 139,810.00
2.2.1.29 Batu paras grobongan M2 110,100.00 121,110.00
2.2.1.30 Batu pecah 0,5-1 cm M3 340,000.00 350,000.00
2.2.1.31 Batu pecah 1-2 cm M3 340,000.00 350,000.00
2.2.1.32 Batu pecah 2-3 cm M3 300,000.00 320,000.00
2.2.1.33 Batu pecah 3-5 cm M3 285,000.00 300,000.00
2.2.1.34 Batu pecah 5-7 cm M3 250,000.00 265,000.00
2.2.1.35 Batu pecah 8-10 cm M3 275,000.00 302,500.00
2.2.1.36 Batu pecah 10-15 cm (15-20) M3 275,000.00 302,500.00
2.2.1.37 Batu plontos 5/7 cm M3 192,500.00 211,750.00
2.2.1.38 Batu putih / gunung M3 192,500.00 211,750.00
2.2.1.39 Batu putih pecah , 5 - 7 cm M3 185,000.00 205,000.00
2.2.1.40 Batu susun sirih M2 451,000.00 496,100.00
2.2.1.41 Batu Volcano 10-15 cm M3 467,500.00 514,250.00
2.2.1.42 Batu warna ( hias ) Zak 93,100.00 102,410.00
2.2.1.43 Grasak M3 147,300.00 162,030.00
2.2.1.44 Ijuk Kg 7,700.00 8,470.00
2.2.1.45 Kapur Batu ( sirih ) Kg 1,800.00 1,980.00
2.2.1.46 Kapur Batu m3 1,270,500.00 1,397,550.00
2.2.1.47 Kerikil halus 0.4 / 0.4 (hitam ) Kg 5,200.00 5,720.00
2.2.1.48 Kerikil halus 0.4 / 0.4 (putih ) Kg 3,300.00 3,630.00
2.2.1.49 Kerikil halus 0.4 x 0.4 ( hijau) Kg 1,800.00 1,980.00
2.2.1.50 Pasir pasang / beton M3 264,000.00 290,400.00
2.2.1.51 Pasir Urug M3 173,300.00 190,630.00

2
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.1.52 PC / Portland cement Kg 1,400.00 1,540.00
2.2.1.53 Semen Merah M3 150,200.00 165,220.00
2.2.1.54 Semen Putih / warna Kg 3,000.00 3,300.00
2.2.1.55 Sirtu royalti M3 187,000.00 205,700.00
2.2.1.56 Sirtu Urug M3 187,000.00 205,700.00
2.2.1.57 Susun Sirih, andisit hitam uk. 3 x 20 cm M2 181,500.00 199,650.00
2.2.1.58 Susun Sirih, andisit hitam uk. 3 x 30 cm M2 181,500.00 199,650.00
2.2.1.59 Susun Sirih, andisit hitam uk. 3 x 40 cm M2 181,500.00 199,650.00
2.2.1.60 Tali ijuk Kg 11,000.00 12,100.00
2.2.1.61 Tanah liat M3 49,500.00 54,450.00
2.2.1.62 Tanah urug M3 82,500.00 90,750.00
2.2.1.63 Urugan Taman M3 104,500.00 114,950.00
2.2.1.64 Tanah subur ( humus ) rit 231,000.00 254,100.00
2.2.1.65 Pasir putih halus rit 1,045,000.00 1,149,500.00
2.2.1.66 Solar ltr 6,200.00 6,820.00
- -
2.2.2 BAHAN KAYU DAN BAMBU : - -
2.2.2.1 Arang kayu Kg 4,100.00 4,510.00
2.2.2.2 Bambu (Dia 6 - 8 cm x 600cm) Btg 12,100.00 13,310.00
2.2.2.3 Bambu Ori (Dia 10-12 x 600 cm) Btg 28,900.00 31,790.00
2.2.2.4 Bambu Petung (p = 6 m) Ljr 31,200.00 34,320.00
2.2.2.5 Batang kelapa dia 30 cm M' 86,700.00 95,370.00
2.2.2.6 Betek / sesek kasar Uk. 2m x 3m Lbr 69,300.00 76,230.00
2.2.2.7 Bilik bambu Uk. 2m x 3m Lbr 30,000.00 33,000.00
2.2.2.8 Dolken bambu panjang 3 m Btg 46,200.00 50,820.00
2.2.2.9 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg 173,300.00 190,630.00
2.2.2.10 HPL 253,000.00 278,300.00
2.2.2.11 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg 20,800.00 22,880.00
2.2.2.12 Kayu bakar M3 187,000.00 205,700.00
2.2.2.13 Kayu Balau Balok M3 10,725,000.00 11,797,500.00
2.2.2.14 Kayu Balau Papan M3 11,825,000.00 13,007,500.00
2.2.2.15 Kayu bekisting M3 3,465,000.00 3,811,500.00
2.2.2.16 Kayu Jati Balok eks. Bojonegoro M3 30,800,000.00 33,880,000.00
2.2.2.17 Kayu Jati Balok lokal M3 20,900,000.00 22,990,000.00
2.2.2.18 Kayu Jati Papan eks. Bojonegoro M3 36,850,000.00 40,535,000.00
2.2.2.19 Kayu jati papan lokal M3 22,550,000.00 24,805,000.00
2.2.2.20 Kayu Kamper Balok M3 10,450,000.00 11,495,000.00
2.2.2.21 Kayu Kamper papan M3 11,550,000.00 12,705,000.00
2.2.2.22 Kayu kelapa / glugu 8/10 cm M' 77,000.00 84,700.00
2.2.2.23 Kayu kelapa / glugu Ø 20 cm M' 79,800.00 87,780.00
2.2.2.24 Kayu kelapa / glugu Ø 30 cm M' 85,300.00 93,830.00
2.2.2.25 Kayu kelapa / glugu Ø 40 cm M' 93,500.00 102,850.00
2.2.2.26 Kayu kelapa / glugu Ø 50 cm M' 99,000.00 108,900.00

3
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.2.27 Kayu kelapa / glugu usuk 4/6 cm M' 13,800.00 15,180.00
2.2.2.28 Kayu Kempas Balok M3 7,425,000.00 8,167,500.00
2.2.2.29 Kayu Kempas Papan M3 8,525,000.00 9,377,500.00
2.2.2.30 Kayu Kruing Balok M3 6,875,000.00 7,562,500.00
2.2.2.31 Kayu Kruing Papan M3 7,975,000.00 8,772,500.00
2.2.2.32 Kayu Meranti Balok M3 5,500,000.00 6,050,000.00
2.2.2.33 Kayu Meranti Papan M3 6,050,000.00 6,655,000.00
2.2.2.34 Kayu Tahun Balok ( Mauni/ Akasia ) M3 4,950,000.00 5,445,000.00
2.2.2.35 Kayu Tahun papan ( Mauni/akasia) M3 5,225,000.00 5,747,500.00
2.2.2.36 Kornis kayu jati lebar 10 cm + Finishing m' 110,000.00 121,000.00
- -
2.2.3 BAHAN PLAFOND, KERANGKA ATAP & PENUTUP ATAP: - -
2.2.3.1 Asbes Datar / Eternit 100 x 100 tbl = 3 mm Lbr 22,000.00 24,200.00
2.2.3.2 Asbes Datar / Eternit 40 x 200 tbl = 6 mm Lbr 65,000.00 71,500.00
2.2.3.3 Asbes Datar / Eternit 60 x 180 tbl = 4 mm Lbr 94,300.00 103,730.00
2.2.3.4 Asbes Datar / Eternit 60 x 180 tbl = 5 mm Lbr 155,500.00 171,050.00
2.2.3.5 Asbes Datar / Eternit 60 x 180 tbl = 6 mm Lbr 189,000.00 207,900.00
2.2.3.6 Asbes Datar / Eternit 60 x 200 tbl = 4 mm Lbr 21,700.00 23,870.00
2.2.3.7 Asbes Datar / Eternit 60 x 200 tbl = 5 mm Lbr 64,900.00 71,390.00
2.2.3.8 Asbes Gelombang besar 110 x 200 tbl = 5 mm Lbr 99,300.00 109,230.00
2.2.3.9 Asbes Gelombang besar 110 x 225 tbl = 5 mm Lbr 105,200.00 115,720.00
2.2.3.10 Asbes Gelombang besar 110 x 250 tbl = 5 mm Lbr 115,500.00 127,050.00
2.2.3.11 Asbes Gelombang besar 110 x 300 tbl = 5 mm Lbr 109,500.00 120,450.00
2.2.3.12 Asbes Gelombang besar 150 x 305 tbl = 5 mm Lbr 79,300.00 87,230.00
2.2.3.13 Asbes Gelombang besar 92 x 250 tbl = 5 mm Lbr 115,500.00 127,050.00
2.2.3.14 Asbes Gelombang besar Uk. 300x105x0,5 Cm Lbr 121,300.00 133,430.00
2.2.3.15 Asbes Gelombang Kecil Uk. 150x105x0,4 Cm Lbr 49,100.00 54,010.00
2.2.3.16 Asbes Gelombang Kecil Uk. 180x105x0,4 Cm Lbr 57,200.00 62,920.00
2.2.3.17 Asbes Gelombang Kecil Uk. 300x105x0,4 Cm Lbr 94,700.00 104,170.00
2.2.3.18 Asbes Gelombang kecil 105 x 150 tbl = 4 mm Lbr 50,400.00 55,440.00
2.2.3.19 Asbes Gelombang kecil 105 x 225 tbl = 4 mm Lbr 83,600.00 91,960.00
2.2.3.20 Asbes Gelombang kecil 105 x 240 tbl = 4 mm Lbr 67,800.00 74,580.00
2.2.3.21 Asbes Gelombang kecil 105 x 240 tbl = 5 mm Lbr 72,300.00 79,530.00
2.2.3.22 Asbes Gelombang kecil 105 x 270 tbl = 4 mm Lbr 75,700.00 83,270.00
2.2.3.23 Asbes Gelombang kecil 105 x 270 tbl = 5 mm Lbr 83,600.00 91,960.00
2.2.3.24 Asbes Gelombang kecil 105 x 300 tbl = 4 mm Lbr 62,900.00 69,190.00
2.2.3.25 Asbes Gelombang kecil 105 x 300 tbl = 5 mm Lbr 86,800.00 95,480.00
2.2.3.26 Asbes Gelombang kecil 105 x 300 tbl = 6 mm Lbr 93,000.00 102,300.00
2.2.3.27 Asbes Gelombang kecil 105 x 305 tbl = 4 mm Lbr 88,300.00 97,130.00
2.2.3.28 Asbes Gelombang kecil 92 x 180 tbl = 3 mm Lbr 55,600.00 61,160.00
2.2.3.29 Asbes Gelombang kecil 92 x 180 tbl = 4 mm Lbr 80,500.00 88,550.00
2.2.3.30 Asbes Gelombang kecil 92 x 200 tbl = 4 mm Lbr 67,800.00 74,580.00
2.2.3.31 Asbes Gelombang kecil 92 x 200 tbl = 5 mm Lbr 111,000.00 122,100.00

4
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.32 Asbes Gelombang nok kecil 105 x 150 tbl = 5 mm Lbr 51,600.00 56,760.00
2.2.3.33 Asbes Gelombang nok kecil 92 x 180 tbl = 5 mm Lbr 71,200.00 78,320.00
2.2.3.34 Asbes Gelombang nok kecil 92 x 200 tbl = 5 mm Lbr 84,500.00 92,950.00
2.2.3.35 Asbes Gelombang nok kecil 92 x 225 tbl = 5 mm Lbr 101,300.00 111,430.00
2.2.3.36 Asbes Nok 105 Lbr 38,700.00 42,570.00
2.2.3.37 Asbes Nok 92 Lbr 32,200.00 35,420.00
2.2.3.38 Asbes Nok Gelombang besar Lbr 69,300.00 76,230.00
2.2.3.39 Asbes Nok Gelombang kecil Lbr 37,500.00 41,250.00
2.2.3.40 Asbes Plat 90 x 180 tbl = 3 mm Lbr 20,600.00 22,660.00
2.2.3.41 Asbes Sirap 20 x 40 tbl = 3 mm Lbr 25,700.00 28,270.00
2.2.3.42 Atap galvalum ( Hollow 4cm ) M2 / psg 440,000.00 484,000.00
2.2.3.43 Atap galvalum tebal 0,25 M2 50,800.00 55,880.00
2.2.3.44 Atap galvalum tebal 0,30 M2 59,500.00 65,450.00
2.2.3.45 Atap galvalum tebal 0,35 M2 68,200.00 75,020.00
2.2.3.46 Atap galvalum tebal 0,40 M2 76,200.00 83,820.00
2.2.3.47 Atap Policarbonat stainlees steel M2 605,000.00 665,500.00
2.2.3.48 Atap Policarbonat 3 mm (Hollow 3 cm) M2 467,500.00 514,250.00
2.2.3.49 Atap policarbonat besi M2 440,000.00 484,000.00
2.2.3.50 Atap sirap M2 220,000.00 242,000.00
2.2.3.51 Atap Skylight / fiber M2 242,000.00 266,200.00
2.2.3.52 Awning M2 / psg 346,500.00 381,150.00
2.2.3.53 Block board 122 x 244 tbl = 10 mm Lbr 231,000.00 254,100.00
2.2.3.54 Bubung asbes gel besar (Ardek 1Stel 2 Lmbr) Unit 63,600.00 69,960.00
2.2.3.55 Bubung asbes gel kecil (Ardek 1Stel 2 Lmbr) Unit 34,700.00 38,170.00
2.2.3.56 Bubungan Glasur ex. Kanmuri Bh 20,200.00 22,220.00
2.2.3.57 Bubungan Multiroof (0,5m x 1 m) Lbr 34,700.00 38,170.00
2.2.3.58 Bubungan Tembaga Motif /Tekstur 0,5 M' 825,000.00 907,500.00
2.2.3.59 Bubungan Tembaga Motif /Tekstur 0,6 M' 935,000.00 1,028,500.00
2.2.3.60 Bubungan Tembaga Motif /Tekstur 0,8 M' 1,017,500.00 1,119,250.00
2.2.3.61 Clamp penggantung lengkap Unit 33,600.00 36,960.00
2.2.3.62 Eternit kembang M2 10,500.00 11,550.00
2.2.3.63 Eternit polos (Asbes) M2 14,300.00 15,730.00
2.2.3.64 Fiber Glass ex. Kano flash L=100cm m' 52,300.00 57,530.00
2.2.3.65 Formika (120x240)cm Lbr 275,000.00 302,500.00
2.2.3.66 Genteng Bubung MKP Bh 5,800.00 6,380.00
2.2.3.67 Genteng MKP Bh 2,600.00 2,860.00
2.2.3.68 Genteng Beton Bh 5,000.00 5,500.00
2.2.3.69 Genteng bubung beton Bh 4,800.00 5,280.00
2.2.3.70 Genteng bubung beton Bh 4,800.00 5,280.00
2.2.3.71 Genteng bubung Mantili ex. Trenggalek / Tulungagung Bh 6,400.00 7,040.00
2.2.3.72 Genteng bubung Prentul ex. Trenggalek / Tulungagung Bh 5,000.00 5,500.00
2.2.3.73 Genteng bubung Press Bh 4,800.00 5,280.00
2.2.3.74 Genteng Bubung Karang Pilang Bh 6,200.00 6,820.00

5
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.75 Genteng gelombang Bh 3,100.00 3,410.00
2.2.3.76 Genteng Glasur ex. Kanmuri Bh 10,000.00 11,000.00
2.2.3.77 Genteng Kaca (model Karang Pilang) Bh 11,400.00 12,540.00
2.2.3.78 Genteng Keramik motof Mantili bh 30,800.00 33,880.00
2.2.3.79 Genteng mantili Bh 3,200.00 3,520.00
2.2.3.80 Genteng Metal Lbr 65,200.00 71,720.00
2.2.3.81 Genteng Prentul ex. T.ggalek/Tulungagung Bh 2,000.00 2,200.00
2.2.3.82 Genteng pres biasa Bh 2,300.00 2,530.00
2.2.3.83 Gypsum board tebal 12mm ( 1,2 x 2,4 m ) Lbr 78,100.00 85,910.00
2.2.3.84 Gypsum board tebal 12mm ( 1,2 x 2,4 m ) KNAF Lbr 69,900.00 76,890.00
2.2.3.85 Gypsum board tebal 9mm ( 1,2 x 2,4 m ) Lbr 76,500.00 84,150.00
2.2.3.86 Gypsum tepung / cornise kg 5,200.00 5,720.00
2.2.3.87 Harpleks 4mm ( Uk 40cm x200cm) Lbr 17,600.00 19,360.00
2.2.3.88 Harpleks 4mm ( Uk 50cm x200cm) Lbr 20,400.00 22,440.00
2.2.3.89 Harpleks 4mm ( Uk 60cm x200cm) Lbr 23,100.00 25,410.00
2.2.3.90 Kalsiplang motif kayu lebar 20 cm m' 27,500.00 30,250.00
2.2.3.91 Kalsiplang polos lebar 30 cm m' 14,900.00 16,390.00
2.2.3.92 Kalsirata 1000×1000 tebal 3 mm lbr 15,000.00 16,500.00
2.2.3.93 Kalsirata 500×1000 tebal 3 mm lbr 7,800.00 8,580.00
2.2.3.94 Kalsirata 600×2000 tebal 3 mm lbr 18,100.00 19,910.00
2.2.3.95 Kalsirata 500×2000 tebal 3 mm lbr 15,500.00 17,050.00
2.2.3.96 Kalsirata 400×2000 tebal 3 mm lbr 12,400.00 13,640.00
2.2.3.97 Kalsiplank 200×2400 tebal 8mm lbr 27,900.00 30,690.00
2.2.3.98 Kalsiplank 200×3000 tebal 8mm lbr 35,100.00 38,610.00
2.2.3.99 Kalsiplank 300×2400 tebal 8mm lbr 41,800.00 45,980.00
2.2.3.100 Kalsiplank 300×3000 tebal 8mm lbr 52,600.00 57,860.00
2.2.3.101 Kalsiplank Jati 200×2400 tebal 8mm lbr 29,400.00 32,340.00
2.2.3.102 Kalsiplank Jati 200×3000 tebal 8mm lbr 36,900.00 40,590.00
2.2.3.103 Kalsiplank Jati 300×3000 tebal 8mm lbr 55,400.00 60,940.00
2.2.3.104 Kalsiplank 200×2400 tebal 12mm lbr 42,300.00 46,530.00
2.2.3.105 Kalsiplank 200×3000 tebal 12mm lbr 52,600.00 57,860.00
2.2.3.106 Kalsiplank 300×2400 tebal 12mm lbr 63,900.00 70,290.00
2.2.3.107 Wood Plank Elephant 4050×100 tebal 8mm lbr 51,500.00 56,650.00
2.2.3.108 Wood Plank Elephant 4050×200 tebal 8mm lbr 67,000.00 73,700.00
2.2.3.109 Wood Plank Elephant 4050×300 tebal 8mm lbr 82,400.00 90,640.00
2.2.3.110 Big Flat Elephant 122×244 tebal 4mm lbr 46,400.00 51,040.00
2.2.3.111 Big Flat Elephant 122×244 tebal 6mm lbr 74,200.00 81,620.00
2.2.3.112 Big Flat Elephant 122×244 tebal 8mm lbr 101,000.00 111,100.00
2.2.3.113 Kalsiboard 1,2 x 2,4 m tebal 4 mm lbr 62,000.00 68,200.00
2.2.3.114 Kalsiplank polos 20 cm 20 cm x 3 m tebal 8 mm lbr 40,000.00 44,000.00
2.2.3.115 Kalsiplank polos 30 cm 30 cm x 3 m tgebal 8 mm lbr 60,000.00 66,000.00
2.2.3.116 Kalsiplank Jati 20 cm 20 cm x 3 m tebal 8 mm lbr 44,000.00 48,400.00
2.2.3.117 kalsiplank jati 30 cm 30 cm x 3 m tebal 8 mm lbr 64,000.00 70,400.00

6
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.118 Superplank 10 cm 10 cm x 2.44 m tebal 9 mm lbr 28,000.00 30,800.00
2.2.3.119 Superplank 20 cm 20 cm x 2.44 m tebal 9 mm lbr 45,000.00 49,500.00
2.2.3.120 Superplank 30 cm 30 cm x 2.44 tebal 9 mm lbr 65,000.00 71,500.00
2.2.3.121 Kalsirata 1,00 x 1,00 tebal 3 mm lbr 13,996.00 15,395.60
2.2.3.122 Kalsirata 0,50 x 1,00 tebal 3 mm lbr 8,000.00 8,800.00
2.2.3.123 Kalsirata 1,00 x 2,00 tebal 3 mm lbr 34,550.00 38,005.00
2.2.3.124 Kalsirata 0,50 x 2,00 tebal 3 mm lbr 15,850.00 17,435.00
2.2.3.125 Kalsirata 1,22 x 2,44 tebal 3,5 mm lbr 62,800.00 69,080.00
2.2.3.126 Kalsirata 1,20 x 2,40 tebal 3,5 mm lbr 60,400.00 66,440.00
2.2.3.127 Kalsiling 1,22 x 2,44 tebal 4,5 mm lbr 86,550.00 95,205.00
2.2.3.128 Kalsiling 1,20 x 2,40 tebal 4,5 mm lbr 83,350.00 91,685.00
2.2.3.129 Kalsiling 1,20 x 2,44 tebal 6 mm lbr 122,350.00 134,585.00
2.2.3.130 Kalsiling 1,20 x 2,40 tebal 6 mm lbr 117,750.00 129,525.00
2.2.3.131 Kalsiling 1,20 x 2,70 tebal 6 mm lbr 132,450.00 145,695.00
2.2.3.132 Kalsiling 1,20 x 3,00 tebal 6 mm lbr 148,600.00 163,460.00
2.2.3.133 Kalsiling 1,22 x 2,44 tebal 6 mm R2 lbr 125,550.00 138,105.00
2.2.3.134 Kalsiling 1,20 x 2,40 tebal 6 mm R2 lbr 120,800.00 132,880.00
2.2.3.135 Kalsiling 1,20 x 2,70 tebal 6 mm R2 lbr 135,900.00 149,490.00
2.2.3.136 Kalsiling 1,20 x 3,00 tebal 6 mm R2 lbr 149,650.00 164,615.00
2.2.3.137 Kalsiling 1,22 x 2,44 tebal 6 mm R4 lbr 126,850.00 139,535.00
2.2.3.138 Kalsiling 1,20 x 2,40 tebal 6 mm R4 lbr 122,050.00 134,255.00
2.2.3.139 Kalsiling 1,20 x 2,70 tebal 6 mm R4 lbr 137,200.00 150,920.00
2.2.3.140 Kalsiling 1,20 x 3,00 tebal 6 mm R4 lbr 152,500.00 167,750.00
2.2.3.141 Kalsipart 1,22 x 2,44 tebal 8 mm lbr 164,850.00 181,335.00
2.2.3.142 Kalsipart 1,20 x 2,40 tebal 8 mm lbr 158,600.00 174,460.00
2.2.3.143 Kalsipart 1,20 x 2,70 tebal 8 mm lbr 178,400.00 196,240.00
2.2.3.144 Kalsipart 1,20 x 3,00 tebal 8 mm lbr 198,150.00 217,965.00
2.2.3.145 Kalsipart 1,22 x 2,44 tebal 8 mm R2 lbr 169,000.00 185,900.00
2.2.3.146 Kalsipart 1,20 x 2,40 tebal 8 mm R2 lbr 162,650.00 178,915.00
2.2.3.147 Kalsipart 1,20 x 2,70 tebal 8 mm R2 lbr 183,000.00 201,300.00
2.2.3.148 Kalsipart 1,20 x 3,00 tebal 8 mm R2 lbr 202,100.00 222,310.00
2.2.3.149 Kalsipart 1,22 x 2,44 tebal 8 mm R4 lbr 170,650.00 187,715.00
2.2.3.150 Kalsipart 1,20 x 2,40 tebal 8 mm R4 lbr 164,250.00 180,675.00
2.2.3.151 Kalsipart 1,20 x 2,70 tebal 8 mm R4 lbr 184,700.00 203,170.00
2.2.3.152 Kalsipart 1,20 x 3,00 tebal 8 mm R4 lbr 204,100.00 224,510.00
2.2.3.153 Kalsiclad 1,22 x 2,44 tebal 10 mm lbr 208,000.00 228,800.00
2.2.3.154 Kalsiclad 1,20 x 2,40 tebal 10 mm lbr 200,100.00 220,110.00
2.2.3.155 Kalsiclad 1,20 x 2,70 tebal 10 mm lbr 225,100.00 247,610.00
2.2.3.156 Kalsiclad 1,20 x 2,70 tebal 10 mm lbr 225,100.00 247,610.00
2.2.3.157 Kalsiclad 1,22 x 2,44 tebal 12 mm lbr 251,850.00 277,035.00
2.2.3.158 Kalsiclad 1,20 x 2,40 tebal 12 mm lbr 242,450.00 266,695.00
2.2.3.159 Kalsiclad 1,20 x 2,70 tebal 12 mm lbr 272,650.00 299,915.00
2.2.3.160 Kalsiclad 1,20 x 3,00 tebal 12 mm lbr 303,150.00 333,465.00

7
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.161 Kalsiplang 0,2 x 2,40 tebal 8 mm lbr 31,500.00 34,650.00
2.2.3.162 Kalsiplang 0,2 x 3,00 tebal 8 mm lbr 39,350.00 43,285.00
2.2.3.163 Kalsiplang 0,2 x 2,40 tebal 8 mm lbr 31,500.00 34,650.00
2.2.3.164 Kalsiplang 0,2 x 3,00 tebal 8 mm lbr 39,350.00 43,285.00
2.2.3.165 Kalsiplang jati 0,20 x 2,40 tebal 8 mm lbr 33,000.00 36,300.00
2.2.3.166 Kalsiplang jati 0,20 x 3,00 tebal 8 mm lbr 41,350.00 45,485.00
2.2.3.167 Kalsiplang jati 0,30 x 3,00 tebal 8 mm lbr 62,000.00 68,200.00
2.2.3.168 Kalsiplang 0,20 x 2,40 tebal 12 mm lbr 46,450.00 51,095.00
2.2.3.169 Kalsiplang 0,20 x 3,00 tebal 12 mm lbr 57,900.00 63,690.00
2.2.3.170 Kalsiplang 0,30 x 2,40 tebal 12 mm lbr 69,350.00 76,285.00
2.2.3.171 Kalsiplang 0,30 x 3,00 tebal 12 mm lbr 86,700.00 95,370.00
2.2.3.172 Kalsifloor 1,20 x 2,40 tebal 20 mm lbr 553,000.00 608,300.00
2.2.3.173 Wood plank Elephant 4050 x 100 tebal 8 mm lbr 50,000.00 55,000.00
2.2.3.174 Wood plank Elephant 4050 x 200 tebal 8 mm lbr 65,000.00 71,500.00
2.2.3.175 Wood plank Elephant 4050 x 300 tebal 8 mm lbr 80,000.00 88,000.00
2.2.3.176 Big Flat Elephant 122 x 244 tebal 4 mm lbr 45,000.00 49,500.00
2.2.3.177 Big Flat Elephant 122 x 244 tebal 6 mm lbr 72,000.00 79,200.00
2.2.3.178 Big Flat Elephant 122 x 244 tebal 8 mm lbr 98,000.00 107,800.00
2.2.3.179 Kalsirata 1000 x 1000 tebal 3 mm lbr 14,500.00 15,950.00
2.2.3.180 Kalsirata 500 x 1000 tebal 3 mm lbr 7,500.00 8,250.00
2.2.3.181 Kalsirata 600 x 2000 tebal 3 mm lbr 17,500.00 19,250.00
2.2.3.182 Kalsirata 500 x 2000 tebal 3 mm lbr 15,000.00 16,500.00
2.2.3.183 Kalsirata 400 x 2000 tebal 3 mm lbr 12,000.00 13,200.00
2.2.3.184 Kalsiplank 200 x 2400 tebal 8 mm lbr 27,000.00 29,700.00
2.2.3.185 Kalsiplank 200 x 3000 tebal 8 mm lbr 34,000.00 37,400.00
2.2.3.186 Kalsiplank 300 x 2400 tebal 8 mm lbr 40,500.00 44,550.00
2.2.3.187 Kalsiplank 300 x 3000 tebal 8 mm lbr 51,000.00 56,100.00
2.2.3.188 Kalsiplank Jati 200 x 2400 tebal 8 mm lbr 28,500.00 31,350.00
2.2.3.189 Kalsiplank Jati 200 x 3000 tebal 8 mm lbr 35,750.00 39,325.00
2.2.3.190 Kalsiplank Jati 300 x 3000 tebal 8 mm lbr 53,750.00 59,125.00
2.2.3.191 Kalsiplank 200 x 2400 tebal 12 mm lbr 41,000.00 45,100.00
2.2.3.192 Kalsiplank 200 x 3000 tebal 12 mm lbr 51,000.00 56,100.00
2.2.3.193 Kalsiplank 300 x 2400 tebal 12 mm lbr 62,000.00 68,200.00
2.2.3.194 Kalsiplank 300 x 3000 tebal 12 mm lbr 73,500.00 80,850.00
2.2.3.195 Langit-langit Akustik ex. Jayaboard (30x30)cm Lbr 41,800.00 45,980.00
2.2.3.196 Langit-langit Akustik ex. Jayaboard (30x60)cm Lbr 47,300.00 52,030.00
2.2.3.197 Langit-langit Akustik ex. Jayaboard (60x120)cm Lbr 52,800.00 58,080.00
2.2.3.198 List Eternit ( kayu ) M' 3,000.00 3,300.00
2.2.3.199 List Profil besar ( gypsum ) M' 23,100.00 25,410.00
2.2.3.200 List Profil kecil ( gypsum ) M' 17,400.00 19,140.00
2.2.3.201 Multiplek 6 mm, uk 1,20 x 2,40 m Lbr 94,600.00 104,060.00
2.2.3.202 Multiplek 9 mm, uk. 1,20 x 2,40 m Lbr 140,800.00 154,880.00
2.2.3.203 Multiroof (0,6m x 1,00 m) Lbr 44,600.00 49,060.00

8
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.204 Nok atap genteng metal Lbr 36,900.00 40,590.00
2.2.3.205 Nok genteng keramik bh 53,900.00 59,290.00
2.2.3.206 Nok Stel Asbes Gelombang besar 108 Lbr 60,500.00 66,550.00
2.2.3.207 Nok Stel Asbes Gelombang kecil 105 Lbr 39,700.00 43,670.00
2.2.3.208 Partikel board t = 18 mm (1.22 m x 2.42 m ) Lbr 209,100.00 230,010.00
2.2.3.209 Plywood ( 110 x 210 ) cm, tbl. 4 mm Lbr 85,300.00 93,830.00
2.2.3.210 Plywood ( 110 x 240 ) cm, tbl. 3 mm Lbr 63,800.00 70,180.00
2.2.3.211 Plywood ( 120 x 240 ) cm, tbl. 2 mm Lbr 72,100.00 79,310.00
2.2.3.212 Plywood ( 120 x 240 ) cm, tbl. 4 mm Lbr 99,000.00 108,900.00
2.2.3.213 Plywood ( 120 x 240 ) cm, tbl. 6 mm Lbr 76,500.00 84,150.00
2.2.3.214 Plywood ( 90 x 220 ) cm, tbl. 4 mm Lbr 62,200.00 68,420.00
2.2.3.215 Plywood 122 x 244 tbl = 3 mm Lbr 94,600.00 104,060.00
2.2.3.216 Rangka plafond metal furing M' 13,200.00 14,520.00
2.2.3.217 Seng gelombang BJLS 0,02 cm 80 x 180 Lbr 56,100.00 61,710.00
2.2.3.218 Seng gelombang BJLS 0,03 cm 80 x 300 Lbr 91,300.00 100,430.00
2.2.3.219 Seng Gelombang Bjls 20 uk. 180x90x0,02 cm Lbr 55,600.00 61,160.00
2.2.3.220 Seng gelombang Bjls 20 uk. 305x90x0,02 cm Lbr 89,100.00 98,010.00
2.2.3.221 Seng Gelombang Bjls 30 uk 180x90x0,03 cm Lbr 74,300.00 81,730.00
2.2.3.222 Seng Gelombang Bjls 30 uk 305x90x0,02 cm Lbr 89,100.00 98,010.00
2.2.3.223 Seng gelombang Bjls 30 uk. 305x90x0,03 cm Lbr 123,800.00 136,180.00
2.2.3.224 Seng Plat BJLS 20 lebar 0,90 m M' 75,400.00 82,940.00
2.2.3.225 Seng Plat BJLS 27 lebar 0,60 m M' 22,600.00 24,860.00
2.2.3.226 Seng Plat BJLS 27 lebar 0,90 m M' 39,100.00 43,010.00
2.2.3.227 Seng Plat BJLS 30 lebar 0,45 m M' 24,200.00 26,620.00
2.2.3.228 Seng Plat BJLS 30 lebar 0,60 m M' 31,400.00 34,540.00
2.2.3.229 Seng Plat BJLS 30 lebar 0,90 m M' 42,400.00 46,640.00
2.2.3.230 Talang Karet L=55cm m' 21,500.00 23,650.00
2.2.3.231 Talang Karet L=90cm m' 34,700.00 38,170.00
2.2.3.232 Talang PVC U 4" M' 41,800.00 45,980.00
2.2.3.233 Teakwood 122 x 244 tbl = 3 mm Lbr 74,300.00 81,730.00
2.2.3.234 Teakwood tebal 3mm (90 x 210) Cm Lbr 80,300.00 88,330.00
2.2.3.235 Teakwood tebal 4mm (110 x 240) Cm Lbr 90,200.00 99,220.00
2.2.3.236 Teakwood tebal 4mm (120 x 240) Cm Lbr 83,700.00 92,070.00
2.2.3.237 Tekwood dilapis aluminium Lbr 98,200.00 108,020.00
2.2.3.238 Tripleks 122 x 244 tbl = 12 mm Lbr 179,100.00 197,010.00
2.2.3.239 Tripleks 122 x 244 tbl = 15 mm Lbr 225,300.00 247,830.00
2.2.3.240 Tripleks 122 x 244 tbl = 16 mm Lbr 231,000.00 254,100.00
2.2.3.241 Tripleks 122 x 244 tbl = 2 mm Lbr 37,400.00 41,140.00
2.2.3.242 Tripleks 122 x 244 tbl = 3 mm Lbr 51,200.00 56,320.00
2.2.3.243 Tripleks 122 x 244 tbl = 4 mm Lbr 79,800.00 87,780.00
2.2.3.244 Tripleks 122 x 244 tbl = 6 mm Lbr 83,100.00 91,410.00
2.2.3.245 Tripleks 122 x 244 tbl = 9 mm Lbr 133,100.00 146,410.00
2.2.3.246 Tripleks tebal 4 mm ( 1.20 x 2.40 ) m Lbr 77,000.00 84,700.00

9
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.3.247 Tripleks tebal 3 mm ( 0.90 x 2.40 ) m Lbr 53,400.00 58,740.00
2.2.3.248 Tripleks tebal 4 mm ( 0.90 x 2.00 ) m Lbr 58,300.00 64,130.00
2.2.3.249 Tripleks tebal 4 mm ( 1.10 x 2.10 ) m Lbr 71,500.00 78,650.00
2.2.3.250 Tripleks tebal 4 mm ( 1.22 x 2.44 ) m Lbr 75,900.00 83,490.00
2.2.3.251 Twekblock 122 x 244 tbl = 18 mm Lbr 247,500.00 272,250.00
- -
2.2.4 BAHAN BESI / LOGAM : - -
2.2.4.1 Aluminium strip ( l = 5 - 10 cm) M' 16,500.00 18,150.00
2.2.4.2 Alumunium Composite Panel Ex. Alucopan M2 660,000.00 726,000.00
2.2.4.3 Alumunium foil M2 11,000.00 12,100.00
2.2.4.4 Baja Galvanis Kg 22,000.00 24,200.00
2.2.4.5 Baja Galvanis 6m ljr 44,000.00 48,400.00
2.2.4.6 Baja Profil Kg 15,400.00 16,940.00
2.2.4.7 Baja siku L 30.30.3 Kg 19,300.00 21,230.00
2.2.4.8 Besi Angker dia 25 mm P 50 cm Bh 73,400.00 80,740.00
2.2.4.9 Besi Beton / tulangan beton Kg 10,500.00 11,550.00
2.2.4.10 Besi Beugel/Baut Kg 18,700.00 20,570.00
2.2.4.11 Besi lis kaca (1 x 1) cm M' 17,600.00 19,360.00
2.2.4.12 Besi pengaman pipa dia 12 mm Unit 200,500.00 220,550.00
2.2.4.13 Besi plat Kg 17,900.00 19,690.00
2.2.4.14 Besi plat strip / Strip plate Kg 17,900.00 19,690.00
2.2.4.15 Besi siku Kg 11,000.00 12,100.00
2.2.4.16 Besi Square tube M' 6,400.00 7,040.00
2.2.4.17 Besi strip + Mur Baut Kg 18,700.00 20,570.00
2.2.4.18 Daun jendela kaca aluminium 4" M2 462,000.00 508,200.00
2.2.4.19 Daun Jendela kaca aluminium YKK M3 937,300.00 1,031,030.00
2.2.4.20 Daun pintu Kaca pegas lengkap (kunci,engsel dan handle) M' 5,093,600.00 5,602,960.00
2.2.4.21 Grill besi M2 351,700.00 386,870.00
2.2.4.22 Huruf logo nama stainlees uk. 20-30 cm Kg 73,400.00 80,740.00
2.2.4.23 Huruf logo nama stainlees uk. 30-40 cm M2 87,800.00 96,580.00
2.2.4.24 Huruf logo nama stainlees uk. 40-50 cm M2 102,200.00 112,420.00
2.2.4.25 Jaring kawat baja dilas (wiremesh) Kg 28,900.00 31,790.00
2.2.4.26 Kawat Ayakan Pasir (untuk pasang) Kg 18,200.00 20,020.00
2.2.4.27 Kawat Ayakan Pasir (untuk plesteran) Kg 19,400.00 21,340.00
2.2.4.28 Kawat ayaman bronjong galvanis Ø 3mm M' 22,600.00 24,860.00
2.2.4.29 Kawat ayaman bronjong galvanis Ø 4mm M2 24,400.00 26,840.00
2.2.4.30 Kawat Beton / bendraat Bh 17,600.00 19,360.00
2.2.4.31 Kawat duri Kg 11,600.00 12,760.00
2.2.4.32 Kawat Harmonika Kg 31,400.00 34,540.00
2.2.4.33 Kawat Las karbit Kg 13,800.00 15,180.00
2.2.4.34 kawat las listrik biasa M2 75,000.00 82,500.00
2.2.4.35 Kawat Nyamuk aluminium M2 25,300.00 27,830.00
2.2.4.36 Kawat Nyamuk kasa plastik M2 18,700.00 20,570.00

10
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.4.37 Kisi - kisi almunium M' 485,100.00 533,610.00
2.2.4.38 Kawat Nyamuk aluminium M' 25,300.00 27,830.00
2.2.4.39 Kawat Nyamuk kasa plastik Unit 18,700.00 20,570.00
2.2.4.40 Kisi - kisi almunium Bh 485,100.00 533,610.00
2.2.4.41 Kisi - kisi almunium 4" Bh 77,400.00 85,140.00
2.2.4.42 Kisi - kisi aluminium 3" M2 66,400.00 73,040.00
2.2.4.43 Manhole (tutup plat besi 0.5 x 0.5) Unit 346,500.00 381,150.00
2.2.4.44 Tutup Besi Baja Manhole Diameter 50 cm tebal= 0,5cm Bh 1,045,000.00 1,149,500.00
2.2.4.45 Mur, Baut baja dia 3/4" panjang 10 cm Bh 13,900.00 15,290.00
2.2.4.46 Mur, Baut biasa dia 3/4" panjang 10 cm M2/Psg 11,600.00 12,760.00
2.2.4.47 Pagar Besi BRC Pabrikasi ( Besi Ø6" - Ø8" Uk. 90 x 240 )cm Bh/Psg 263,300.00 289,630.00
2.2.4.48 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.120 x 240 )cm Bh/Psg 255,300.00 280,830.00
2.2.4.49 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.150 x 240 )cm Bh/Psg 241,500.00 265,650.00
2.2.4.50 Pagar Besi Tuang Ø14" M2/Psg 404,300.00 444,730.00
2.2.4.51 Pagar Besi Tuang Ø16" M2/Psg 467,800.00 514,580.00
2.2.4.52 Pagar pipa besi holo (20.20.1)mm,Rangka besi holo (50.50.2)mm dicat M2/Psg 444,700.00 489,170.00
2.2.4.53 Pagar pipa besi holo (20.20.2)mm,Rangka besi holo (50.50.2)mm dicat M2/Psg 526,700.00 579,370.00
2.2.4.54 Pintu aluminium coklat / hitam 4" ( 2 sisi ) cm / Psg 702,800.00 773,080.00
2.2.4.55 Las besi / baja M2 2,300.00 2,530.00
2.2.4.56 Pintu besi lipat ( Bukan Harmonika) M2 447,000.00 491,700.00
2.2.4.57 Pintu besi lipat ( harmonika) M2 1,067,200.00 1,173,920.00
2.2.4.58 Pintu dorong BRC/PMG (120x300)cm M2 1,374,500.00 1,511,950.00
2.2.4.59 Pintu kaca sliding unit 5,512,900.00 6,064,190.00
2.2.4.60 Pintu Pagar besi holo (20.20.2)mm, Rangka besi holo (50.50.2)mm dicat mo Bh 523,300.00 575,630.00
2.2.4.61 Pintu Pagar Besi Tuang Ø14" (komplit) M2/Psg 365,500.00 402,050.00
2.2.4.62 Pintu Pagar Besi Tuang Ø16" (komplit) M2/Psg 487,400.00 536,140.00
2.2.4.63 Pintu Pagar pipa besi holo (20.20.1)mm, Rangka besi holo (50.50.2)mm dic M2 460,900.00 506,990.00
2.2.4.64 Pintu Plat Harmonika Unit 1,297,100.00 1,426,810.00
2.2.4.65 Pintu PVC Lipat (70x210)cm Unit 499,000.00 548,900.00
2.2.4.66 Pintu PVC Polos (70x210)cm M2 219,500.00 241,450.00
2.2.4.67 Pintu Roling Door aluminium M2 378,800.00 416,680.00
2.2.4.68 Pintu Roling Door besi unit 548,700.00 603,570.00
2.2.4.69 Pintu Swing Ganda BRC (121x300)cm M' 1,365,200.00 1,501,720.00
2.2.4.70 Pipa Besi  2/4 Tebal= 1.2 mm M' 12,000.00 13,200.00
2.2.4.71 Pipa Besi  2/4 Tebal= 1.4 mm M' 13,600.00 14,960.00
2.2.4.72 Pipa Besi  4/4 Tebal= 1.2 mm M' 14,700.00 16,170.00
2.2.4.73 Pipa Besi  4/4 Tebal= 1.4 mm Btg 17,400.00 19,140.00
2.2.4.74 Pipa galvanis spindo SNI 1 - 1/2" x 2,8 - 3 M' 67,900.00 74,690.00
2.2.4.75 Pipa galvanis spindo SNI 1 - 1/4" x 2,8 - 3 M' 59,200.00 65,120.00
2.2.4.76 Pipa galvanis spindo SNI 1" x 2,8 - 3 M' 44,800.00 49,280.00
2.2.4.77 Pipa galvanis spindo SNI 1/2" x 2,3 - 2,5 M' 23,100.00 25,410.00
2.2.4.78 Pipa galvanis spindo SNI 2 - 1/2" x 3,2 - 3,5 M' 118,400.00 130,240.00
2.2.4.79 Pipa galvanis spindo SNI 2" x 3,2 - 3,3 M' 92,400.00 101,640.00

11
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.4.80 Pipa galvanis spindo SNI 3" x 3,5 - 5 M' 150,200.00 165,220.00
2.2.4.81 Pipa galvanis spindo SNI 3/4" x 2,3 - 2,5 M' 28,900.00 31,790.00
2.2.4.82 Pipa galvanis spindo SNI 4" x 4 - 4,4 M' 215,400.00 236,940.00
2.2.4.83 Pipa galvanis spindo SNI 5" x 4,1 - 4,6 M' 288,800.00 317,680.00
2.2.4.84 Pipa galvanis spindo SNI 6" x 4,1 - 4,8 M' 346,500.00 381,150.00
2.2.4.85 Pipa Gas ( selang ) M' 92,400.00 101,640.00
2.2.4.86 Pipa hitam spindo SNI 1 - 1/2" M' 47,600.00 52,360.00
2.2.4.87 Pipa hitam spindo SNI 1 - 1/4" M' 40,500.00 44,550.00
2.2.4.88 Pipa hitam spindo SNI 1" M' 31,800.00 34,980.00
2.2.4.89 Pipa hitam spindo SNI 1/2" M' 15,800.00 17,380.00
2.2.4.90 Pipa hitam spindo SNI 2 - 1/2" M' 80,900.00 88,990.00
2.2.4.91 Pipa hitam spindo SNI 2" M' 65,000.00 71,500.00
2.2.4.92 Pipa hitam spindo SNI 3" M' 104,000.00 114,400.00
2.2.4.93 Pipa hitam spindo SNI 3/4" M' 21,700.00 23,870.00
2.2.4.94 Pipa hitam spindo SNI 4" M' 151,600.00 166,760.00
2.2.4.95 Pipa hitam spindo SNI 5" M' 202,200.00 222,420.00
2.2.4.96 Pipa hitam spindo SNI 6" M' 241,100.00 265,210.00
2.2.4.97 Profil aluminium T (Metal Furring) Bh 37,700.00 41,470.00
2.2.4.98 Profil daun pintu almunium coklat / hitam M' 89,300.00 98,230.00
2.2.4.99 Profil kusen almunium coklat / hitam 4" M' 101,900.00 112,090.00
2.2.4.100 Profil kusen aluminium 4" M2 90,300.00 99,330.00
2.2.4.101 Profil kusen aluminium 4"ykk M2 / Psg 176,300.00 193,930.00
2.2.4.102 Ralling tangga / grill stainlees Dia 2" M2 / Psg 924,000.00 1,016,400.00
2.2.4.103 Ralling tangga / pagar besi Unit 548,700.00 603,570.00
2.2.4.104 Rel pintu dorong unit 270,800.00 297,880.00
2.2.4.105 Rel pintu dorong l. 90 Unit 156,000.00 171,600.00
2.2.4.106 Rol baja dia 19 mm lengkap M2 133,400.00 146,740.00
2.2.4.107 Sun Screen Aluminium Unit 630,100.00 693,110.00
2.2.4.108 Tangga Pipa GI Ǿ 1" M2 571,800.00 628,980.00
2.2.4.109 Teralis Besi btg 283,600.00 311,960.00
2.2.4.110 Teralis stainlees M2 473,600.00 520,960.00
2.2.4.111 Tiang Pagar BRC ( Ø 2", t=120) Unit 78,800.00 86,680.00
2.2.4.112 Tutup Besi Baja Manhole Diameter 50 cm tebal= 0,5 cm 880,000.00 968,000.00
- -
2.2.5 BAHAN PENUTUP LANTAI & DINDING : - -
2.2.5.1 Bata berongga expose Bh 8,500.00 9,350.00
2.2.5.2 Bata ringan 60 x 25 x 10 cm Bh 11,000.00 12,100.00
2.2.5.3 Batacote Kg 5,200.00 5,720.00
2.2.5.4 Batako (30x25x10)cm Bh 3,900.00 4,290.00
2.2.5.5 Batu granit Kg 4,200.00 4,620.00
2.2.5.6 Batu teraso Kg 2,300.00 2,530.00
2.2.5.7 Dinding partisi ex.Calsy bord (uk. 122x244x0.3 cm) Lbr 62,400.00 68,640.00
2.2.5.8 Glasswoll panjang 5,00 lebar 0,60 M2 715,000.00 786,500.00

12
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.9 Granit (ex Granito) tekstur Uk. 40x40 cm M2 161,700.00 177,870.00
2.2.5.10 Granit (ex Granito) tekstur Uk. 60x60 cm M2 207,900.00 228,690.00
2.2.5.11 Granit (ex Granito) polos Uk. 40x40 cm M2 203,300.00 223,630.00
2.2.5.12 Granit (ex Granito) polos Uk. 60x60 cm M2 311,900.00 343,090.00
2.2.5.13 Granit (ex Granito) warna gelap Uk. 40x40 cm M2 225,300.00 247,830.00
2.2.5.14 Granit (ex Granito) warna gelap Uk. 60x60 cm M2 323,400.00 355,740.00
2.2.5.15 Granit (ex Granito) warna terang Uk. 40x40 cm M2 146,700.00 161,370.00
2.2.5.16 Granit (ex Granito) warna terang Uk. 60x60 cm M2 207,900.00 228,690.00
2.2.5.17 Keramik Granit 60 x 60 220 - Ivory dan 280 Joyc M2 175,000.00 192,500.00
2.2.5.18 Keramik Granit 60 x 60 242 - Sara M2 200,000.00 220,000.00
2.2.5.19 Keramik Granit 60 x 60 240 - White M2 200,000.00 220,000.00
2.2.5.20 Keramik Granit 60 x 60 989 - Granit Black M2 240,000.00 264,000.00
2.2.5.21 Karpet m2 27,300.00 30,030.00
2.2.5.22 Keramik Arstistik Uk. 10 x 20 cm M' 93,000.00 102,300.00
2.2.5.23 Keramik cutting Uk. 30cm x 50 cm M2 79,100.00 87,010.00
2.2.5.24 Keramik cutting Uk. 31cm x 63 cm M2 116,700.00 128,370.00
2.2.5.25 Keramik dinding motif Uk. 20cm x 25 cm M2 64,700.00 71,170.00
2.2.5.26 Keramik dinding putih ukuran 20/25 Cm M2 50,300.00 55,330.00
2.2.5.27 Keramik dinding Uk. 20cm x 33 cm M2 54,300.00 59,730.00
2.2.5.28 Keramik dinding Uk. 20cm x 50 cm M2 80,900.00 88,990.00
2.2.5.29 Keramik dinding 20 X 40 cm M2 103,400.00 113,740.00
2.2.5.30 Keramik dinding 20 X 45 cm M2 106,200.00 116,820.00
2.2.5.31 Keramik dinding 20 X 50 cm INA motif M2 99,000.00 108,900.00
2.2.5.32 Keramik dinding 20 X 50 cm Platinum motif M2 61,600.00 67,760.00
2.2.5.33 Keramik dinding 20 X 50 cm M2 94,600.00 104,060.00
2.2.5.34 Keramik dinding 30 X 60 cm M2 172,700.00 189,970.00
2.2.5.35 Keramik Dinding Roman 20 x 20 Golongan A M2 84,000.00 92,400.00
2.2.5.36 Keramik Dinding Roman 20 x 20 Golongan B M2 90,000.00 99,000.00
2.2.5.37 Keramik Dinding Roman 20 x 25 Golongan A M2 84,000.00 92,400.00
2.2.5.38 Keramik Dinding Roman 20 x 25 Golongan B M2 90,000.00 99,000.00
2.2.5.39 Keramik Dinding Roman 20 x 25 Golongan C M2 93,500.00 102,850.00
2.2.5.40 Keramik Dinding Roman 25 x 25 Golongan A M2 85,000.00 93,500.00
2.2.5.41 Keramik Dinding Roman 25 x 25 Golongan B M2 91,500.00 100,650.00
2.2.5.42 Keramik Dinding Roman 25 x 25 Golongan C M2 103,000.00 113,300.00
2.2.5.43 Keramik Dinding Roman 30 x 30 Golongan B (match 20 x 60) M2 118,000.00 129,800.00
2.2.5.44 Keramik Dinding Roman 30 x 30 Golongan C (match 20 x 60) M2 128,000.00 140,800.00
2.2.5.45 Keramik Dinding Roman 30 x 30 Golongan D (match 20 x 60) M2 143,000.00 157,300.00
2.2.5.46 Keramik Dinding Roman 30 x 30 Golongan A (match 30 x 60) M2 113,000.00 124,300.00
2.2.5.47 Keramik Dinding Roman 30 x 30 Golongan B (match 30 x 60) M2 118,000.00 129,800.00
2.2.5.48 Keramik Dinding Roman 30 x 30 Golongan C (match 30 x 60) M2 128,000.00 140,800.00
2.2.5.49 Keramik Dinding Roman 30 x 30 Golongan D (match 30 x 60) M2 143,000.00 157,300.00
2.2.5.50 Keramik Dinding Roman 25 x 33.3 Golongan A M2 84,000.00 92,400.00
2.2.5.51 Keramik Dinding Roman 25 x 33.3 Golongan B M2 90,000.00 99,000.00

13
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.52 Keramik Dinding Roman 25 x 33.3 Golongan C M2 93,500.00 102,850.00
2.2.5.53 Keramik Dinding Roman 20 x 40 Golongan A M2 84,000.00 92,400.00
2.2.5.54 Keramik Dinding Roman 20 x 40 Golongan B M2 90,000.00 99,000.00
2.2.5.55 Keramik Dinding Roman 25 x 45 Golongan A M2 92,500.00 101,750.00
2.2.5.56 Keramik Dinding Roman 25 x 45 Golongan B M2 103,500.00 113,850.00
2.2.5.57 Keramik Dinding Roman 25 x 45 Golongan D M2 122,500.00 134,750.00
2.2.5.58 Keramik Dinding Roman 32.5 x 32.5 Golongan A match 32.5 x 65,6 M2 126,000.00 138,600.00
2.2.5.59 Keramik Dinding Roman 32.5 x 32.5 Golongan B match 32.5 x 65,6 M2 131,000.00 144,100.00
2.2.5.60 Keramik Dinding Roman 32.5 x 32.5 Golongan A match 32.5 x 97,5 M2 126,000.00 138,600.00
2.2.5.61 Keramik Dinding Roman 20 x 60 Golongan A M2 128,500.00 141,350.00
2.2.5.62 Keramik Dinding Roman 20 x 60 Golongan B M2 140,000.00 154,000.00
2.2.5.63 Keramik Dinding Roman 20 x 60 Golongan C M2 155,000.00 170,500.00
2.2.5.64 Keramik Dinding Roman 20 x 60 Golongan D M2 175,000.00 192,500.00
2.2.5.65 Keramik Dinding Roman 30 x 60 Golongan A M2 128,500.00 141,350.00
2.2.5.66 Keramik Dinding Roman 30 x 60 Golongan B M2 140,000.00 154,000.00
2.2.5.67 Keramik Dinding Roman 30 x 60 Golongan C M2 155,000.00 170,500.00
2.2.5.68 Keramik Dinding Roman 30 x 60 Golongan D M2 175,000.00 192,500.00
2.2.5.69 Keramik Dinding Roman 30 x 60 Golongan E M2 185,000.00 203,500.00
2.2.5.70 Keramik Dinding Roman 32.5 x 65.6 Golongan A Rectified M2 191,500.00 210,650.00
2.2.5.71 Keramik Dinding Roman 32.5 x 65.6 Golongan B Rectified M2 207,000.00 227,700.00
2.2.5.72 Keramik Dinding Roman 32.5 x 65.6 Golongan C Rectified M2 226,000.00 248,600.00
2.2.5.73 Keramik Dinding Roman 32.5 x 97.5 Golongan A Rectified M2 283,000.00 311,300.00
2.2.5.74 Keramik Dinding Roman 32.5 x 97.5 Golongan B Rectified M2 323,000.00 355,300.00
2.2.5.75 Galaxy black, brown, cream, grey, white KW- A M2 39,500.00 43,450.00
2.2.5.76 Petra cream, terracota KW- A M2 39,500.00 43,450.00
2.2.5.77 Roxy black, blue, brown, green, grey, red KW-A M2 39,500.00 43,450.00
2.2.5.78 Alpha blue, green KW- A M2 42,000.00 46,200.00
2.2.5.79 Track brown, grey KW- A M2 44,500.00 48,950.00
2.2.5.80 Jungle red, green, grey, red KW- A M2 36,500.00 40,150.00
2.2.5.81 Capri brown, grey KW- A M2 37,000.00 40,700.00
2.2.5.82 Marble brown KW- A M2 38,000.00 41,800.00
2.2.5.83 Newton brown, green, grey KW- A M2 38,000.00 41,800.00
2.2.5.84 Mahoni brown, cream KW- A M2 39,000.00 42,900.00
2.2.5.85 Cargo, brown, grey, dark brown, dark grey KW-A M2 46,000.00 50,600.00
2.2.5.86 Clarin, bone, brown, grey KW- A M2 46,000.00 50,600.00
2.2.5.87 Cordon, bone, brown, cream KW- A M2 46,000.00 50,600.00
2.2.5.88 2Bintan, bone, brown, cream KW- A M2 47,500.00 52,250.00
2.2.5.89 Ecco grey, brown KW- A M2 70,000.00 77,000.00
2.2.5.90 Gobi cream, grey KW- A M2 700,000.00 770,000.00
2.2.5.91 Cavalli, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.92 Fredo, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.93 Fresno, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.94 Salsa, cream, grey KW- A M2 82,300.00 90,530.00

14
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.95 Sicillia, grey KW- A M2 82,300.00 90,530.00
2.2.5.96 Sonata, brown KW- A M2 82,300.00 90,530.00
2.2.5.97 Strata, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.98 Tequila, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.99 Tosca, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.100 Tudor, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.101 Teakwood, beige, brown, latte KW- A M2 82,300.00 90,530.00
2.2.5.102 Warna Tua 20 x 20 M2 37,500.00 41,250.00
2.2.5.103 Warna Muda 20 x 20 M2 35,000.00 38,500.00
2.2.5.104 Warna Putih 30 x 30 M2 31,500.00 34,650.00
2.2.5.105 Warna Marble 30 x 30 M2 36,000.00 39,600.00
2.2.5.106 Warna Fancy 30 x 30 M2 40,500.00 44,550.00
2.2.5.107 Warna Putih 40 x 40 M2 37,500.00 41,250.00
2.2.5.108 Warna Marble 40 x 40 M2 42,500.00 46,750.00
2.2.5.109 Warna Tua 20 x 20 M2 37,500.00 41,250.00
2.2.5.110 Warna Muda 20 x 20 M2 35,000.00 38,500.00
2.2.5.111 Warna Putih 30 x 30 M2 31,500.00 34,650.00
2.2.5.112 Warna Marble 30 x 30 M2 36,000.00 39,600.00
2.2.5.113 Warna Impresso 30 x 30 M2 40,000.00 44,000.00
2.2.5.114 Pure Color 50 x 50 M2 94,500.00 103,950.00
2.2.5.115 Classy Color 50 x 50 M2 103,000.00 113,300.00
2.2.5.116 Fancy Color 50 x 50 M2 113,500.00 124,850.00
2.2.5.117 Accent Color 50 x 50 M2 186,000.00 204,600.00
2.2.5.118 Pure Color 25 x 50 M2 79,500.00 87,450.00
2.2.5.119 Classy Color 25 x 50 M2 86,000.00 94,600.00
2.2.5.120 Fancy Color 25 x 50 M2 97,500.00 107,250.00
2.2.5.121 Accent Color 25 x 50 M2 171,000.00 188,100.00
2.2.5.122 Pure Color 25 x 25 M2 73,000.00 80,300.00
2.2.5.123 Classy Color 25 x 25 M2 79,000.00 86,900.00
2.2.5.124 Fancy Color 25 x 25 M2 91,000.00 100,100.00
2.2.5.125 Accent Color 25 x 25 M2 163,500.00 179,850.00
2.2.5.126 Putih 40 x 40 M2 50,500.00 55,550.00
2.2.5.127 Median 40 x 40 M2 52,000.00 57,200.00
2.2.5.128 Gelap 40 x 40 M2 54,500.00 59,950.00
2.2.5.129 Rustic 33 x 33 M2 45,000.00 49,500.00
2.2.5.130 Rustic 40 x 40 M2 46,250.00 50,875.00
2.2.5.131 Supermilan 25 x 33 - Golongan A M2 56,500.00 62,150.00
2.2.5.132 Supermilan 25 x 33 - Golongan B M2 58,000.00 63,800.00
2.2.5.133 Supermilan 40 x 40 - Putih M2 50,500.00 55,550.00
2.2.5.134 Supermilan 40 x 40 - Median M2 54,000.00 59,400.00
2.2.5.135 Supermilan 40 x 40 - Gelap M2 55,000.00 60,500.00
2.2.5.136 Supermilan 50 x 50 - Putih M2 73,500.00 80,850.00
2.2.5.137 Keramik Dinding Hercules - Gelap 40 x 40 M2 48,750.00 53,625.00

15
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.138 Keramik Dinding Hercules - Motif Khusus 40 x 40 M2 43,150.00 47,465.00
2.2.5.139 Keramik Dinding Hercules - Putih 40 x 40 M2 39,850.00 43,835.00
2.2.5.140 Keramik Dinding Hercules - Motif Dasar Putih 40 x 40 M2 45,500.00 50,050.00
2.2.5.141 Keramik Dinding Hercules - Motif Dasar Gelap 40 x 40 M2 46,500.00 51,150.00
2.2.5.142 Keramik Dinding Galaxy black, brown, cream, grey, white KW- A M2 39,500.00 43,450.00
2.2.5.143 Keramik Dinding Petra cream, terracota KW- A M2 39,500.00 43,450.00
2.2.5.144 Keramik Dinding Roxy black, blue, brown, green, grey, red KW- A M2 39,500.00 43,450.00
2.2.5.145 Keramik Dinding Alpha blue, green KW- A M2 42,000.00 46,200.00
2.2.5.146 Keramik Dinding Track brown, grey KW- A M2 44,500.00 48,950.00
2.2.5.147 Keramik Lantai platinum 30 x 30 Jungle red, green, grey, red KW- A M2 36,500.00 40,150.00
2.2.5.148 Keramik Lantai platinum 30 x 30 Capri brown, grey KW- A M2 37,000.00 40,700.00
2.2.5.149 Keramik Lantai platinum 30 x 30 Marble brown KW- A M2 38,000.00 41,800.00
2.2.5.150 Keramik Lantai platinum 30 x 30 Newton brown, green, grey KW- A M2 38,000.00 41,800.00
2.2.5.151 Keramik Lantai platinum 30 x 30 Mahoni brown, cream KW- A M2 39,000.00 42,900.00
2.2.5.152 Keramik Lantai platinum 30 x 30 Cargo, brown, grey, dark brown, dark gr M2 46,000.00 50,600.00
2.2.5.153 Keramik Lantai platinum 30 x 30 Clarin, bone, brown, grey KW- A M2 46,000.00 50,600.00
2.2.5.154 Keramik Lantai platinum 30 x 30 Cordon, bone, brown, cream KW- A M2 46,000.00 50,600.00
2.2.5.155 Keramik Lantai platinum 30 x 30 Bintan, bone, brown, cream KW- A M2 47,500.00 52,250.00
2.2.5.156 Keramik Lantai platinum 50 x 50 Ecco grey, brown KW- A M2 70,000.00 77,000.00
2.2.5.157 Keramik Lantai platinum 50 x 50 Gobi cream, grey KW- A M2 70,000.00 77,000.00
2.2.5.158 Keramik Lantai platinum 60 x 60 Cavalli, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.159 Keramik Lantai platinum 60 x 60 Fredo, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.160 Keramik Lantai platinum 60 x 60 Fresno, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.161 Keramik Lantai platinum 60 x 60 Salsa, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.162 Keramik Lantai platinum 60 x 60 Sicillia, grey KW- A M2 82,300.00 90,530.00
2.2.5.163 Keramik Lantai platinum 60 x 60 Sonata, brown KW- A M2 82,300.00 90,530.00
2.2.5.164 Keramik Lantai platinum 60 x 60 Strata, cream, grey KW- A M2 82,300.00 90,530.00
2.2.5.165 Keramik Lantai platinum 60 x 60 Tequila, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.166 Keramik Lantai platinum 60 x 60 Tosca, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.167 Keramik Lantai platinum 60 x 60 Tudor, cream, white KW- A M2 82,300.00 90,530.00
2.2.5.168 Keramik Lantai platinum 60 x 60 Teakwood, beige, brown, latte KW- A M2 82,300.00 90,530.00
2.2.5.169 Keramik Lantai Arwana Warna Tua 20 x 20 M2 37,500.00 41,250.00
2.2.5.170 Keramik Lantai Arwana Warna Muda 20 x 20 M2 35,000.00 38,500.00
2.2.5.171 Keramik Lantai Arwana Warna Putih 30 x 30 M2 31,500.00 34,650.00
2.2.5.172 Keramik Lantai Arwana Warna Marble 30 x 30 M2 36,000.00 39,600.00
2.2.5.173 Keramik Lantai Arwana Warna Fancy 30 x 30 M2 40,500.00 44,550.00
2.2.5.174 Keramik Lantai Arwana Warna Putih 40 x 40 M2 37,500.00 41,250.00
2.2.5.175 Keramik Lantai Arwana Warna Marble 40 x 40 M2 42,500.00 46,750.00
2.2.5.176 Keramik Lantai Mulia Warna Tua 20 x 20 M2 38,500.00 42,350.00
2.2.5.177 Keramik Lantai Mulia Warna Muda 20 x 20 M2 36,000.00 39,600.00
2.2.5.178 Keramik Lantai Mulia Warna Putih 30 x 30 M2 32,500.00 35,750.00
2.2.5.179 Keramik Lantai Mulia Warna Marble 30 x 30 M2 37,000.00 40,700.00
2.2.5.180 Keramik Lantai Mulia Warna Impresso 30 x 30 M2 40,000.00 44,000.00

16
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.181 Keramik Lantai Milan Pure Color 50 x 50 M2 94,500.00 103,950.00
2.2.5.182 Keramik Lantai Milan Classy Color 50 x 50 M2 103,000.00 113,300.00
2.2.5.183 Keramik Lantai Milan Fancy Color 50 x 50 M2 113,500.00 124,850.00
2.2.5.184 Keramik Lantai Milan Accent Color 50 x 50 M2 186,000.00 204,600.00
2.2.5.185 Keramik Lantai Milan Pure Color 25 x 50 M2 79,500.00 87,450.00
2.2.5.186 Keramik Lantai Milan Classy Color 25 x 50 M2 86,000.00 94,600.00
2.2.5.187 Keramik Lantai Milan Fancy Color 25 x 50 M2 97,500.00 107,250.00
2.2.5.188 Keramik Lantai Milan Accent Color 25 x 50 M2 171,000.00 188,100.00
2.2.5.189 Keramik Lantai Milan Pure Color 25 x 25 M2 73,000.00 80,300.00
2.2.5.190 Keramik Lantai Milan Classy Color 25 x 25 M2 79,000.00 86,900.00
2.2.5.191 Keramik Lantai Milan Fancy Color 25 x 25 M2 91,000.00 100,100.00
2.2.5.192 Keramik Lantai Milan Accent Color 25 x 25 M2 163,500.00 179,850.00
2.2.5.193 Keramik Lantai Milan Putih 40 x 40 M2 50,500.00 55,550.00
2.2.5.194 Keramik Lantai Milan Median 40 x 40 M2 52,000.00 57,200.00
2.2.5.195 Keramik Lantai Milan Gelap 40 x 40 M2 54,500.00 59,950.00
2.2.5.196 Keramik Lantai Milan Rustic 33 x 33 M2 45,000.00 49,500.00
2.2.5.197 Keramik Lantai Milan Rustic 40 x 40 M2 46,250.00 50,875.00
2.2.5.198 Keramik Lantai Milan Supermilan 25 x 33 - Golongan A M2 56,500.00 62,150.00
2.2.5.199 Keramik Lantai Milan Supermilan 25 x 33 - Golongan B M2 58,000.00 63,800.00
2.2.5.200 Keramik Lantai Milan Supermilan 40 x 40 - Putih M2 50,500.00 55,550.00
2.2.5.201 Keramik Lantai Milan Supermilan 40 x 40 - Median M2 54,000.00 59,400.00
2.2.5.202 Keramik Lantai Milan Supermilan 40 x 40 - Gelap M2 55,000.00 60,500.00
2.2.5.203 Keramik Lantai Milan Supermilan 50 x 50 - Putih M2 73,500.00 80,850.00
2.2.5.204 Keramik Lantai Hercules - Gelap 40 x 40 M2 48,750.00 53,625.00
2.2.5.205 Keramik Lantai Hercules - Motif Khusus 40 x 40 M2 43,150.00 47,465.00
2.2.5.206 Keramik Lantai Hercules - Putih 40 x 40 M2 39,850.00 43,835.00
2.2.5.207 Keramik Lantai Hercules - Motif Dasar Putih 40 x 40 M2 45,500.00 50,050.00
2.2.5.208 Keramik Lantai Hercules - Motif Dasar Gelap 40 x 40 M2 46,500.00 51,150.00
2.2.5.209 Keramik Lantai Roman 20 x 20 Golongan A M2 87,000.00 95,700.00
2.2.5.210 Keramik Lantai Roman 20 x 20 Golongan B M2 90,000.00 99,000.00
2.2.5.211 Keramik Lantai Roman 20 x 20 Golongan D M2 100,000.00 110,000.00
2.2.5.212 Keramik Lantai Roman 30 x 30 Golongan B M2 87,000.00 95,700.00
2.2.5.213 Keramik Lantai Roman 30 x 30 Golongan C M2 91,000.00 100,100.00
2.2.5.214 Keramik Lantai Roman 33.3 x 33.3 Golongan A M2 97,000.00 106,700.00
2.2.5.215 Keramik Lantai Roman 33.3 x 33.3 Golongan C M2 137,500.00 151,250.00
2.2.5.216 Keramik Lantai Roman 40 x 40 Golongan A M2 97,000.00 106,700.00
2.2.5.217 Keramik Lantai Roman 40 x 40 Golongan B M2 105,000.00 115,500.00
2.2.5.218 Keramik Lantai Roman 40 x 40 Golongan C M2 107,000.00 117,700.00
2.2.5.219 Keramik Lantai Roman 40 x 40 Golongan D M2 112,000.00 123,200.00
2.2.5.220 Keramik Lantai Roman 45 x 45 Golongan A M2 107,000.00 117,700.00
2.2.5.221 Keramik Lantai Roman 45 x 45 Golongan B M2 113,000.00 124,300.00
2.2.5.222 Keramik Lantai Roman 45 x 45 Golongan E M2 150,000.00 165,000.00
2.2.5.223 Keramik Lantai Roman 50 x 50 Golongan A M2 123,500.00 135,850.00

17
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.224 Keramik Lantai Roman 50 x 50 Golongan B M2 132,500.00 145,750.00
2.2.5.225 Keramik Lantai Roman 50 x 50 Golongan C M2 150,500.00 165,550.00
2.2.5.226 Keramik Lantai Roman 60 x 60 Golongan A M2 155,000.00 170,500.00
2.2.5.227 Keramik Lantai Roman 60 x 60 Golongan B M2 175,000.00 192,500.00
2.2.5.228 Keramik Lantai Roman 60 x 60 Golongan C M2 200,000.00 220,000.00
2.2.5.229 Keramik Lantai Roman 16.5 x 66.6 Golongan A M2 192,000.00 211,200.00
2.2.5.230 Keramik Lantai Roman 33.3 x 66.6 Golongan A M2 172,000.00 189,200.00
2.2.5.231 Keramik Lantai Roman 33.3 x 66.6 Golongan B M2 193,000.00 212,300.00
2.2.5.232 Keramik Lantai Roman 33.3 x 66.6 Golongan C M2 212,500.00 233,750.00
2.2.5.233 Keramik Lantai Roman 8 x 30 Hospital Skirting M2 474,000.00 521,400.00
2.2.5.234 Keramik Lantai Roman 10 x 20 Step Nosing M2 515,000.00 566,500.00
2.2.5.235 Keramik Lantai Asia 20 x 20 Zeus grey, white, brown M2 48,000.00 52,800.00
2.2.5.236 Keramik Lantai Asia 20 x 20 Zion grey, white M2 48,000.00 52,800.00
2.2.5.237 Keramik Lantai Asia 20 x 20 Alpha blue, black, cream, green M2 50,000.00 55,000.00
2.2.5.238 Keramik Lantai Asia 20 x 20 Galaxy black, brown, cream M2 50,000.00 55,000.00
2.2.5.239 Keramik Lantai Asia 20 x 20 Oscar black, cream, wite M2 50,000.00 55,000.00
2.2.5.240 Keramik motif Uk. 30 cm x 30 cm M2 52,600.00 57,860.00
2.2.5.241 Keramik motif Uk. 40 cm x 40 cm M2 57,200.00 62,920.00
2.2.5.242 Keramik motif Uk. 50 cm x 50 cm M2 63,600.00 69,960.00
2.2.5.243 Keramik putih Uk. 30 cm x 30 cm M2 47,400.00 52,140.00
2.2.5.244 Keramik putih Uk. 40cm x 40 cm M2 54,300.00 59,730.00
2.2.5.245 Keramik Roman Uk. 20 X 20 cm M2 96,300.00 105,930.00
2.2.5.246 Keramik Roman Uk. 30 X 30 cm M2 99,000.00 108,900.00
2.2.5.247 Keramik Roman Uk. 40 X 40 cm M2 117,700.00 129,470.00
2.2.5.248 Keramik Roman Uk. 50 X 50 cm M2 165,600.00 182,160.00
2.2.5.249 Keramik Roman Uk. 60 X 60 cm M2 170,500.00 187,550.00
2.2.5.250 Keramik tekstur cutting Uk. 31cm x 63 cm M2 123,600.00 135,960.00
2.2.5.251 Keramik tekstur Uk. 20cm x 20 cm M2 50,800.00 55,880.00
2.2.5.252 Keramik tekstur Uk. 30cm x 30 cm M2 50,300.00 55,330.00
2.2.5.253 Keramik Uk. 20Cm x 20Cm M2 50,800.00 55,880.00
2.2.5.254 Keramik warna muda Uk. 20 X 20 cm M2 52,800.00 58,080.00
2.2.5.255 Keramik warna tua Uk. 20 X 20 cm M2 54,500.00 59,950.00
2.2.5.256 Laminate Florring Ex. Belgium + Foam sheet M2 213,100.00 234,410.00
2.2.5.257 Laminate Florring Ex. China + Foam sheet M2 156,000.00 171,600.00
2.2.5.258 Laminate Florring Ex. Germany + Foam sheet M2 630,100.00 693,110.00
2.2.5.259 Laminate Florring Lokal + Foam sheet M2 236,200.00 259,820.00
2.2.5.260 List Keramik (10x20)cm Bh 17,400.00 19,140.00
2.2.5.261 Marmer bakar M2 109,100.00 120,010.00
2.2.5.262 Marmer Hitam M2 112,600.00 123,860.00
2.2.5.263 Marmer Putih M2 189,400.00 208,340.00
2.2.5.264 Marmer Slab lebar (1.80 x 2.40) m M2 352,300.00 387,530.00
2.2.5.265 Ornamen 30 x 30 cm Bh 73,900.00 81,290.00
2.2.5.266 Papan Peredam Suara 120 x 60 x 5 cm Bh 121,000.00 133,100.00

18
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.5.267 Paving Stone (12x12) 5 warna tebal 6 cm M2 77,000.00 84,700.00
2.2.5.268 Paving Stone abu - abu t= 8 cm, K225 M2 80,300.00 88,330.00
2.2.5.269 Paving Stone abu - abu t= 6 cm, K225 M2 67,100.00 73,810.00
2.2.5.270 Paving Stone abu - abu t= 6 cm, K300 M2 77,000.00 84,700.00
2.2.5.271 Paving Stone abu - abu t= 6 cm, K400 M2 72,600.00 79,860.00
2.2.5.272 Paving Stone abu - abu t= 8 cm, K300 M2 93,500.00 102,850.00
2.2.5.273 Paving Stone abu - abu t= 8 cm, K350 M2 99,000.00 108,900.00
2.2.5.274 Paving Stone abu - abu t= 8 cm, K400 M2 110,000.00 121,000.00
2.2.5.275 Paving Stone abu - abu t= 6 cm M2 60,500.00 66,550.00
2.2.5.276 Paving Stone abu - abu t= 8 cm M2 73,700.00 81,070.00
2.2.5.277 Paving Stone segi 6 abu - abu t= 6 cm M2 55,000.00 60,500.00
2.2.5.278 Paving Stone segi 6 abu - abu t= 8 cm M2 60,500.00 66,550.00
2.2.5.279 Paving Stone segi 6 merah t= 6 cm M2 57,200.00 62,920.00
2.2.5.280 Paving Stone segi 6 merah t= 8 cm M2 71,500.00 78,650.00
2.2.5.281 Paving Stone warna t= 6 cm, K225 bh 71,500.00 78,650.00
2.2.5.282 Paving Stone warna t= 8 cm, K225 Bh 88,000.00 96,800.00
2.2.5.283 Plint Keramik / kuku macan Bh 1,100.00 1,210.00
2.2.5.284 Rooster Batu Alam Uk. 20 x 20 cm Bh 57,200.00 62,920.00
2.2.5.285 Rooster Batu Alam Uk. 30 x 30 cm Bh 71,100.00 78,210.00
2.2.5.286 Rooster Beton Uk. 10 x 30 cm Bh 22,000.00 24,200.00
2.2.5.287 Rooster Beton Uk. 20 x 20 cm M2 22,000.00 24,200.00
2.2.5.288 Rooster Lokal Bata Merah Uk. 20 x 20 cm M2 19,700.00 21,670.00
2.2.5.289 Ubin Abu-abu Uk. 20Cm x 20Cm M2 30,600.00 33,660.00
2.2.5.290 Ubin Teraso Uk 30 Cm x 30 Cm M2 52,600.00 57,860.00
2.2.5.291 Ubin Wafel Uk 20Cm x 20Cm Bh 44,400.00 48,840.00
2.2.5.292 Wallpaper Classic m2 16,300.00 17,930.00
2.2.5.293 Wallpaper Minimalis m2 22,005.00 24,205.50
2.2.5.294 Wallpaper Korea m2 60,200.00 66,220.00
2.2.5.295 Wallpaper ( standart ) m2 7,500.00 8,250.00
2.2.5.296 Wallpaper Sticker m2 90,000.00 99,000.00
2.2.5.297 Wallpaper Smart Wall ukuran 0.53m x 10.00m m2 70,000.00 77,000.00
2.2.5.298 Wallpaper Grand City ukuran 0.53m x 10.00m m2 261,750.00 287,925.00
2.2.5.299 Wallpaper Dream World ukuran 1.06m x 15.60m roll 673,500.00 740,850.00
2.2.5.300 Wallpaper Jade 3d Image ukuran 0.53m x 10.00m roll 216,000.00 237,600.00
2.2.5.301 Wallpaper Clear Spirit ukuran 0.53m x 10.00m roll 328,500.00 361,350.00
2.2.5.302 Wallpaper Modern Wallcoverings ukuran 0.53m x 10.00m roll 216,000.00 237,600.00
2.2.5.303 Wallpaper Jack & Ros ukuran 0.53m x 10.00m roll 268,500.00 295,350.00
2.2.5.304 Wallpaper Daon Vol 3 ukuran 1.06m x 15.60m roll 591,000.00 650,100.00
2.2.5.305 Wallpaper Silk House ukuran 1.06m x 15.60m roll 637,500.00 701,250.00
2.2.5.306 Wallpaper Polaris Vol 3 ukuran 1.06m x 15.60m roll 600,500.00 660,550.00
2.2.5.307 Wallpaper Zinnia ukuran 1.06m x 15.60m roll 735,000.00 808,500.00
2.2.5.308 Wallpaper Kahn Design ukuran 1.06m x 15.60m roll 426,000.00 468,600.00
- -

19
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.6 BAHAN PENGECATAN & BAHAN CAIR LAINNYA : - -
2.2.6.1 Air bersih Lt 100.00 110.00
2.2.6.2 Aquaproof Kg 69,300.00 76,230.00
2.2.6.3 Cat besi Kg 59,500.00 65,450.00
2.2.6.4 Cat genteng Kg 52,000.00 57,200.00
2.2.6.5 Cat termoplastik Kg 89,000.00 97,900.00
2.2.6.6 Cat Dasar Kayu Kg 30,600.00 33,660.00
2.2.6.7 Cat Dasar wheathershield Kg 61,800.00 67,980.00
2.2.6.8 Cat Kayu Kg 64,100.00 70,510.00
2.2.6.9 Cat Marka Kg 89,000.00 97,900.00
2.2.6.10 Cat Meny besi Kg 30,000.00 33,000.00
2.2.6.11 Cat Meny kayu Kg 27,200.00 29,920.00
2.2.6.12 Cat Tembok Kg 24,300.00 26,730.00
2.2.6.13 Cat Tembok exterior wheathershield Kg 121,300.00 133,430.00
2.2.6.14 Cat Tembok interior premium Kg 54,900.00 60,390.00
2.2.6.15 Cat Untuk Pekerjaan Baja Jembatan Kg 57,800.00 63,580.00
2.2.6.16 Clear melamin impra dof / gloos Kg 63,600.00 69,960.00
2.2.6.17 Coatting Ltr 75,100.00 82,610.00
2.2.6.18 Dempul Kayu Kg 32,300.00 35,530.00
2.2.6.19 HCL / air keras Ltr 12,100.00 13,310.00
2.2.6.20 Kalsium Kg 1,800.00 1,980.00
2.2.6.21 Kertas gosok ( rempelas ) Lbr 3,500.00 3,850.00
2.2.6.22 Kuas 3 " Bj 15,100.00 16,610.00
2.2.6.23 Kuas 4 " Bj 20,200.00 22,220.00
2.2.6.24 Lem ( Kayu + Tembok ) Bh 13,900.00 15,290.00
2.2.6.25 Lem PVC Tube 8,100.00 8,910.00
2.2.6.26 Meni besi Kg 34,700.00 38,170.00
2.2.6.27 Minyak bekisting Ltr 5,800.00 6,380.00
2.2.6.28 Minyak Cat / Thiner A Ltr 30,000.00 33,000.00
2.2.6.29 Minyak Cat / Thiner B Ltr 16,200.00 17,820.00
2.2.6.30 Minyak Pelumas Ltr 37,500.00 41,250.00
2.2.6.31 Minyak Tanah Ltr 12,700.00 13,970.00
2.2.6.32 Oli Gardan Ltr 40,500.00 44,550.00
2.2.6.33 Oli rem Ltr 75,100.00 82,610.00
2.2.6.34 Oli Hidrolis Ltr 30,000.00 33,000.00
2.2.6.35 Oli Presneleng Ltr 40,500.00 44,550.00
2.2.6.36 Paint Stone Zak 427,400.00 470,140.00
2.2.6.37 Plamur kayu Kg 27,200.00 29,920.00
2.2.6.38 Plamur Tembok Kg 15,600.00 17,160.00
2.2.6.39 Politur jadi Ltr 55,400.00 60,940.00
2.2.6.40 Residu ( Ter ) Ltr 5,800.00 6,380.00
2.2.6.41 Rol kuas Bh 17,400.00 19,140.00
2.2.6.42 Sabun Kg 11,600.00 12,760.00

20
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.6.43 Sending impra ( melamine) Kg 67,000.00 73,700.00
2.2.6.44 Soda api Kg 17,400.00 19,140.00
2.2.6.45 Spiritus Ltr 16,200.00 17,820.00
2.2.6.46 Stempet / Gemuk Kg 34,700.00 38,170.00
2.2.6.47 Teak oil Ltr 8,100.00 8,910.00
2.2.6.48 Vernis Ltr 40,500.00 44,550.00
2.2.6.49 Vet Pkt 57,800.00 63,580.00
2.2.6.50 Water prooffing Kg 75,100.00 82,610.00
2.2.6.51 Wood filler impra ( dempul jati ) Kg 37,000.00 40,700.00
2.2.6.52 Wood stain impra ( Pewarna melamine) Kg 69,300.00 76,230.00
- -
2.2.7 BAHAN PENGGANTUNG DAN PENGUNCI : - -
2.2.7.1 Door Closer ex. Beluci Bh 216,600.00 238,260.00
2.2.7.2 Door Stoper Stainless Bh 50,300.00 55,330.00
2.2.7.3 Engsel pintu kupu - kupu Bh 41,000.00 45,100.00
2.2.7.4 Engsel Jendela ( H ) Bh 16,700.00 18,370.00
2.2.7.5 Engsel Jendela (Arch ) Bh 17,400.00 19,140.00
2.2.7.6 Engsel jendela (kupu-kupu) 3" Bh 20,200.00 22,220.00
2.2.7.7 Engsel jendela ex. Union 3" Bh 35,900.00 39,490.00
2.2.7.8 Engsel kuningan Arc Asli ex. Elitech 4" Set 79,100.00 87,010.00
2.2.7.9 Engsel Pintu ( H ) Bh 14,400.00 15,840.00
2.2.7.10 Engsel Pintu (Arch ) nylon Bh 9,800.00 10,780.00
2.2.7.11 Engsel pintu ex. Union 4" Bh 47,400.00 52,140.00
2.2.7.12 Engsel sendok Bh 12,100.00 13,310.00
2.2.7.13 Engsel Stainlesstel Dekson 3" (GOMPO ) Bh 16,700.00 18,370.00
2.2.7.14 Engsel Stainlesstel Dekson 4" (GOMPO ) Bh 20,200.00 22,220.00
2.2.7.15 Engsel Stainlesstel Dekson 5" (GOMPO ) Bh 26,000.00 28,600.00
2.2.7.16 Grendel biasa (Besar) 8" (GOMPO ) Bh 17,400.00 19,140.00
2.2.7.17 Grendel biasa (Kecil) 3" Bh 6,900.00 7,590.00
2.2.7.18 Engsel Stainlesstel Dekson 3" 304 Bh 68,200.00 75,020.00
2.2.7.19 Engsel Stainlesstel Dekson 3" Bh 53,100.00 58,410.00
2.2.7.20 Engsel Stainlesstel Dekson 4" Bh 124,700.00 137,170.00
2.2.7.21 Engsel Stainlesstel Dekson 5" Bh 142,700.00 156,970.00
2.2.7.22 Grendel biasa (Besar) 8" Bh 14,400.00 15,840.00
2.2.7.23 Grendel biasa (Kecil) 3" Bh 6,900.00 7,590.00
2.2.7.24 Grendel ex. AEG Bh 32,300.00 35,530.00
2.2.7.25 Grendel jendela merk SES Bh 23,700.00 26,070.00
2.2.7.26 Grendel Pintu Panjang ( sespen ) Bh 52,000.00 57,200.00
2.2.7.27 Grendel pintu ganda Dekson 40 cm komplit Bh 184,800.00 203,280.00
2.2.7.28 Grendel Tanam Kuningan Besar ex. Cavel 60mm Set 268,000.00 294,800.00
2.2.7.29 Grendel Tanam Kuningan Besar ex. Cavel 10mm Set 80,900.00 88,990.00
2.2.7.30 Grendel Tanam Kuningan Kecil ex. Beluci 4" Bh 156,000.00 171,600.00
2.2.7.31 Grendel tanam merk SES Set 41,000.00 45,100.00

21
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.7.32 Hak Angin Set 17,400.00 19,140.00
2.2.7.33 Hak angin (Sikutan) biasa Set 21,300.00 23,430.00
2.2.7.34 Hak angin 4mm Lurus/plat 4x150mm Bh 18,500.00 20,350.00
2.2.7.35 Hak angin lurus Bh 36,400.00 40,040.00
2.2.7.36 Hak angin Merk SES Set 33,600.00 36,960.00
2.2.7.37 Handle Bh 84,400.00 92,840.00
2.2.7.38 Handle pintu ganda Dekson 30 cm komplit Set 114,400.00 125,840.00
2.2.7.39 Handle pintu ganda Dekson 40 cm komplit Set 270,300.00 297,330.00
2.2.7.40 Handle pintu stanless steel besar Psg 510,500.00 561,550.00
2.2.7.41 Handle pintu stanless steel kecil Bh 201,000.00 221,100.00
2.2.7.42 Kunci gembok besar stainless 40mm Bh 32,900.00 36,190.00
2.2.7.43 Kunci gembok sedang stainless 30mm Bh 35,200.00 38,720.00
2.2.7.44 Kunci laci (088) Bh 15,100.00 16,610.00
2.2.7.45 Kunci lemari Bh 14,400.00 15,840.00
2.2.7.46 Kunci Slot 2 Putaran ex.CAVEL (dengan handle) Bh 209,700.00 230,670.00
2.2.7.47 Kunci Slot 2 Putaran ex.Kodai Bh 107,500.00 118,250.00
2.2.7.48 Kunci Slot 2 Putaran ex.YALE (dengan handle) Bh 123,600.00 135,960.00
2.2.7.49 Kunci Slot Tanam Kamar Mandi ex.Miller Bh 72,800.00 80,080.00
2.2.7.50 Kunci tanam merk SES ( pelor ) Bh 217,100.00 238,810.00
2.2.7.51 Kunci Tanam Pintu Antik ex. Miler Bh 236,800.00 260,480.00
2.2.7.52 Kunci tanam Slot ex.Kuda (2x Putaran) Bh 70,500.00 77,550.00
2.2.7.53 Pegangan pintu handle Marmer Bh 113,200.00 124,520.00
2.2.7.54 Pegangan pintu handle Marmer Bh 113,200.00 124,520.00
2.2.7.55 Pegangan pintu P=20 Bh 69,900.00 76,890.00
2.2.7.56 Selot ( kunci pintu ) merk SES Bh 283,000.00 311,300.00
2.2.7.57 Selot Rossete Dekson Bh 314,700.00 346,170.00
2.2.7.58 Slot ( Kunci-kunci pintu ) lokal Bh 95,900.00 105,490.00
2.2.7.59 Slot Tanam Kamar Mandi Bh 138,600.00 152,460.00
- -
2.2.8 BAHAN SANITAIR : - -
2.2.8.1 Avor plastik / floor drain Bh 11,200.00 12,320.00
2.2.8.2 Avor staninlees steel Bh 47,400.00 52,140.00
2.2.8.3 Bak cuci traso M2 205,000.00 225,500.00
2.2.8.4 Bak Cuci Stainlesstel (Royal) Bh 253,000.00 278,300.00
2.2.8.5 Bak Kip Bh 1,991,200.00 2,190,320.00
2.2.8.6 Bak Mandi Fiber glass, 0.3 m3 Bh 186,600.00 205,260.00
2.2.8.7 Bak Mandi Fiber glass, 1.00 m x 1.00 m Bh 300,900.00 330,990.00
2.2.8.8 Bak Mandi teraso Bh 110,300.00 121,330.00
2.2.8.9 Bak mandi teraso volume 0.3 m3 Bh 182,500.00 200,750.00
2.2.8.10 Double Kran Dupon Bh 206,800.00 227,480.00
2.2.8.11 Kloset Duduk Keramik Bh 601,800.00 661,980.00
2.2.8.12 Kloset Duduk Keramik Komplit ex.AMSTAD Bh 2,086,500.00 2,295,150.00
2.2.8.13 Kloset Duduk Keramik Komplit ex.INA Bh 1,376,800.00 1,514,480.00

22
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.8.14 Kloset Duduk Keramik Komplit ex.TOTO Bh 2,673,200.00 2,940,520.00
2.2.8.15 Kloset Jongkok Keramik ex.AMSTAD Bh 237,900.00 261,690.00
2.2.8.16 Kloset Jongkok Keramik ex.INA Bh 142,700.00 156,970.00
2.2.8.17 Kloset Jongkok teraso Bh 140,900.00 154,990.00
2.2.8.18 Kloset Monoblok Lokal Bh 974,300.00 1,071,730.00
2.2.8.19 Knee drat dalam PVC AW Ø 0,5" Bh 2,300.00 2,530.00
2.2.8.20 Knee drat dalam PVC AW Ø 0,75" Bh 3,500.00 3,850.00
2.2.8.21 Knee PVC AW Ø 0,5" Bh 1,800.00 1,980.00
2.2.8.22 Knee PVC AW Ø 0,75" Bh 2,900.00 3,190.00
2.2.8.23 Knee PVC AW Ø 1" Bh 4,100.00 4,510.00
2.2.8.24 Knee PVC AW Ø 1,5" Bh 6,900.00 7,590.00
2.2.8.25 Knee PVC AW Ø 2" Bh 9,800.00 10,780.00
2.2.8.26 Knee PVC AW Ø 2,5" Bh 13,900.00 15,290.00
2.2.8.27 Knee PVC AW Ø 3" Bh 20,800.00 22,880.00
2.2.8.28 Knee PVC AW Ø 4" Bh 43,900.00 48,290.00
2.2.8.29 Kran cucian dia 3/4" Bh 75,700.00 83,270.00
2.2.8.30 Kran Dia 1/2 " Bh 27,700.00 30,470.00
2.2.8.31 Kran Dia 3/4 " Bh 32,900.00 36,190.00
2.2.8.32 Kran Dupon Bh 159,900.00 175,890.00
2.2.8.33 Kran Toto 1/2" Bh 306,700.00 337,370.00
2.2.8.34 Pipa kurasan plastik Bh 8,700.00 9,570.00
2.2.8.35 Pipa PVC Class B Ø 1,25" Mof (limbah) M' / bhn 18,000.00 19,800.00
2.2.8.36 Pipa PVC Class B Ø 1,5" Mof (limbah) M' / bhn 22,700.00 24,970.00
2.2.8.37 Pipa PVC Class B Ø 2" Mof (limbah) M' / bhn 29,500.00 32,450.00
2.2.8.38 Pipa PVC Class B Ø 2,5" Mof (limbah) M' / bhn 34,700.00 38,170.00
2.2.8.39 Pipa PVC Class B Ø 3" Mof (limbah) M' / bhn 44,600.00 49,060.00
2.2.8.40 Pipa PVC Class B Ø 4" Mof (limbah) M' / bhn 55,100.00 60,610.00
2.2.8.41 Pipa PVC Class B Ø 6" Mof (limbah) M' / bhn 95,500.00 105,050.00
2.2.8.42 Pipa PVC Class B Ø 8" Mof (limbah) M' / bhn 164,700.00 181,170.00
2.2.8.43 PVC AW Dia 0.5 " ( putih ) M' / bhn 3,100.00 3,410.00
2.2.8.44 PVC AW Dia 0.75 " ( putih ) M' / bhn 4,100.00 4,510.00
2.2.8.45 PVC AW Dia 1 " ( putih ) M' / bhn 5,800.00 6,380.00
2.2.8.46 PVC AW Dia 1,25 " ( putih ) M' / bhn 8,100.00 8,910.00
2.2.8.47 PVC AW Dia 1,5 " ( putih ) M' / bhn 9,800.00 10,780.00
2.2.8.48 PVC AW Dia 2 " ( putih ) M' / bhn 12,800.00 14,080.00
2.2.8.49 PVC AW Dia 2 ,5" ( putih ) M' / bhn 21,300.00 23,430.00
2.2.8.50 PVC AW Dia 3 " ( putih ) M' / bhn 25,400.00 27,940.00
2.2.8.51 PVC AW Dia 4 " ( putih ) M' / bhn 42,100.00 46,310.00
2.2.8.52 PVC AW Dia 5 " ( putih ) M' / bhn 67,000.00 73,700.00
2.2.8.53 PVC AW Dia 6 " ( putih ) M' / bhn 93,600.00 102,960.00
2.2.8.54 PVC AW Dia 8 " ( putih ) M' / bhn 145,500.00 160,050.00
2.2.8.55 PVC AW Dia 10 " ( putih ) M' / bhn 230,500.00 253,550.00
2.2.8.56 PVC AW Dia 12 " ( putih ) M' / bhn 329,200.00 362,120.00

23
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.8.57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 2,900.00 3,190.00
2.2.8.58 PVC AW Dia 0.75 " ( abu - abu ) M' / bhn 8,700.00 9,570.00
2.2.8.59 PVC AW Dia 1 " ( abu - abu ) M' / bhn 11,000.00 12,100.00
2.2.8.60 PVC AW Dia 1,25 " ( abu - abu ) M' / bhn 14,400.00 15,840.00
2.2.8.61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 17,400.00 19,140.00
2.2.8.62 PVC AW Dia 2 " ( abu - abu ) M' / bhn 20,200.00 22,220.00
2.2.8.63 PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn 28,900.00 31,790.00
2.2.8.64 PVC AW Dia 3 " ( abu - abu ) M' / bhn 34,700.00 38,170.00
2.2.8.65 PVC AW Dia 4 " ( abu - abu ) M' / bhn 52,000.00 57,200.00
2.2.8.66 PVC AW Dia 5 " ( abu - abu ) M' / bhn 84,400.00 92,840.00
2.2.8.67 PVC AW Dia 6 " ( abu - abu ) M' / bhn 114,400.00 125,840.00
2.2.8.68 PVC AW Dia 8 " ( abu - abu ) M' / bhn 184,800.00 203,280.00
2.2.8.69 PVC AW Dia 10 " ( abu - abu ) M' / bhn 285,900.00 314,490.00
2.2.8.70 PVC AW Dia 12 " ( abu - abu ) M' / bhn 351,700.00 386,870.00
2.2.8.71 PVC AW Dia 14 " ( abu - abu ) M' / bhn 512,300.00 563,530.00
2.2.8.72 PVC AW Dia 16 " ( abu - abu ) M' / bhn 618,500.00 680,350.00
2.2.8.73 PVC (Class C) Dia 1.5 " M' / bhn 11,100.00 12,210.00
2.2.8.74 PVC (Class C) Dia 2 " M' / bhn 13,200.00 14,520.00
2.2.8.75 PVC (Class C) Dia 2.5 " M' / bhn 17,600.00 19,360.00
2.2.8.76 PVC (Class C) Dia 3 " M' / bhn 23,000.00 25,300.00
2.2.8.77 PVC (Class C) Dia 4 " M' / bhn 32,100.00 35,310.00
2.2.8.78 PVC (Class D) Dia 1.25 " ( putih ) M' / bhn 5,200.00 5,720.00
2.2.8.79 PVC (Class D) Dia 1.5 " ( putih ) M' / bhn 6,400.00 7,040.00
2.2.8.80 PVC (Class D) Dia 2 " ( putih ) M' / bhn 17,400.00 19,140.00
2.2.8.81 PVC (Class D) Dia 2.5 " ( putih ) M' / bhn 20,200.00 22,220.00
2.2.8.82 PVC (Class D) Dia 3 " ( putih ) M' / bhn 28,900.00 31,790.00
2.2.8.83 PVC (Class D) Dia 4 " ( putih ) M' / bhn 40,500.00 44,550.00
2.2.8.84 PVC (Class D) Dia 5 " ( putih ) M' / bhn 43,300.00 47,630.00
2.2.8.85 PVC (Class D) Dia 6 " ( putih ) M' / bhn 59,000.00 64,900.00
2.2.8.86 PVC (Class D) Dia 8 " ( putih ) M' / bhn 83,200.00 91,520.00
2.2.8.87 PVC (Class D) Dia 10 " ( putih ) M' / bhn 132,200.00 145,420.00
2.2.8.88 PVC (Class D) Dia 12 " ( putih ) M' / bhn 192,900.00 212,190.00
2.2.8.89 PVC (Class D) Dia 1.25 " ( abu - abu ) M' / bhn 6,900.00 7,590.00
2.2.8.90 PVC (Class D) Dia 1.5 " ( abu - abu ) M' / bhn 7,500.00 8,250.00
2.2.8.91 PVC (Class D) Dia 2 " ( abu - abu ) M' / bhn 14,700.00 16,170.00
2.2.8.92 PVC (Class D) Dia 2.5 " ( abu - abu ) M' / bhn 21,000.00 23,100.00
2.2.8.93 PVC (Class D) Dia 3 " ( abu - abu ) M' / bhn 31,500.00 34,650.00
2.2.8.94 PVC (Class D) Dia 4 " ( abu - abu ) M' / bhn 42,500.00 46,750.00
2.2.8.95 PVC (Class D) Dia 5 " ( abu - abu ) M' / bhn 69,300.00 76,230.00
2.2.8.96 PVC (Class D) Dia 6 " ( abu - abu ) M' / bhn 91,000.00 100,100.00
2.2.8.97 PVC (Class D) Dia 8 " ( abu - abu ) M' / bhn 147,300.00 162,030.00
2.2.8.98 PVC (Class D) Dia 10 " ( abu - abu ) M' / bhn 175,000.00 192,500.00
2.2.8.99 PVC (Class D) Dia 12 " ( abu - abu ) M' / bhn 241,500.00 265,650.00

24
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.8.100 PVC (Class D) Dia 14 " ( abu - abu ) M' / bhn 315,900.00 347,490.00
2.2.8.101 PVC (Class D) Dia 16 " ( abu - abu ) M' / bhn 408,900.00 449,790.00
2.2.8.102 PVC (Class D) Dia 20 " ( abu - abu ) M' / bhn 705,800.00 776,380.00
2.2.8.103 Shock drat dalam PVC AW Ø 0,5" Bh 2,300.00 2,530.00
2.2.8.104 Shock drat dalam PVC AW Ø 0,75" Bh 3,500.00 3,850.00
2.2.8.105 Shock PVC AW Ø 0,5" Bh 1,200.00 1,320.00
2.2.8.106 Shock PVC AW Ø 0,75" Bh 2,300.00 2,530.00
2.2.8.107 Shock PVC AW Ø 1" Bh 3,500.00 3,850.00
2.2.8.108 Shock PVC AW Ø 1,5" Bh 4,600.00 5,060.00
2.2.8.109 Shock PVC AW Ø 2" Bh 6,900.00 7,590.00
2.2.8.110 Shock PVC AW Ø 2,5" Bh 9,800.00 10,780.00
2.2.8.111 Shock PVC AW Ø 3" Bh 16,200.00 17,820.00
2.2.8.112 Shock PVC AW Ø 4" Bh 28,900.00 31,790.00
2.2.8.113 Shower Dupon Set 209,000.00 229,900.00
2.2.8.114 Slang Spiral Saluran Pembuangan Bak Cuci Bh 25,400.00 27,940.00
2.2.8.115 Seal Tape Bh 23,100.00 25,410.00
2.2.8.116 Stop Kran Dia 1 " Bh 23,700.00 26,070.00
2.2.8.117 Stop Kran Dia 1/2 " Bh 31,200.00 34,320.00
2.2.8.118 Stop Kran Dia 3/4 " Bh 20,200.00 22,220.00
2.2.8.119 Stop kran dia 1" kuningan Bh 80,900.00 88,990.00
2.2.8.120 Stop kran dia 1" plastik Bh 20,800.00 22,880.00
2.2.8.121 Stop kran dia 1/2" kuningan Bh 76,800.00 84,480.00
2.2.8.122 Stop kran dia 3/4" kuningan Bh 59,500.00 65,450.00
2.2.8.123 Stop Kran Ǿ 1/2" Bh 26,000.00 28,600.00
2.2.8.124 Tandon Air fiberglass ex.Grand Kap.1.100 Ltr (Profil Tank) Bh 1,430,000.00 1,573,000.00
2.2.8.125 Tandon Air Fiberglass ex.Grand Kap.800 Ltr (Profil Tank) Bh 1,155,000.00 1,270,500.00
2.2.8.126 Tandon air stainlees steel kap. 1.000 ltr Bh 3,135,000.00 3,448,500.00
2.2.8.127 Tandon air stainlees steel kap. 550 ltr Bh 1,815,000.00 1,996,500.00
2.2.8.128 Tee PVC AW Ø 0,5" Bh 2,300.00 2,530.00
2.2.8.129 Tee PVC AW Ø 0,75" Bh 3,500.00 3,850.00
2.2.8.130 Tee PVC AW Ø 1" Bh 5,800.00 6,380.00
2.2.8.131 Tee PVC AW Ø 1,5" Bh 8,100.00 8,910.00
2.2.8.132 Tee PVC AW Ø 2" Bh 9,200.00 10,120.00
2.2.8.133 Tee PVC AW Ø 2,5" Bh 16,200.00 17,820.00
2.2.8.134 Tee PVC AW Ø 3" Bh 23,100.00 25,410.00
2.2.8.135 Tee PVC AW Ø 4" Bh 46,200.00 50,820.00
2.2.8.136 Tempat Sabun Keramik ex.INA Bh 31,200.00 34,320.00
2.2.8.137 Urinoir Bh 1,148,100.00 1,262,910.00
2.2.8.138 Wastafel Besar Warna Muda ex.INA Bh 269,500.00 296,450.00
2.2.8.139 Wastafel Besar Warna Tua ex.INA Kg 298,700.00 328,570.00
2.2.8.140 Wiremesh M7 Uk. (2,1x5.4) m - 12,800.00 14,080.00
- -
2.2.9 BAHAN JENIS KACA : - -

25
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.9.1 Cutting Stiker M2 157,600.00 173,360.00
2.2.9.2 Glass bird Kg 49,700.00 54,670.00
2.2.9.3 Glass Block Bening (20x20)cm Bh 22,600.00 24,860.00
2.2.9.4 Glass Block Buram (20x20)cm Bh 23,700.00 26,070.00
2.2.9.5 Kaca air 5 Cm M2 94,700.00 104,170.00
2.2.9.6 Kaca bluegreen t=8mm M2 752,000.00 827,200.00
2.2.9.7 Kaca patry M2 2,505,800.00 2,756,380.00
2.2.9.8 Kaca Bening t= 3 mm M2 62,900.00 69,190.00
2.2.9.9 Kaca Bening t= 5 mm M2 106,300.00 116,930.00
2.2.9.10 Kaca Bening t= 7 mm M2 150,700.00 165,770.00
2.2.9.11 Kaca Bening t= 10 mm M2 231,000.00 254,100.00
2.2.9.12 Kaca Buram t=3mm M2 112,600.00 123,860.00
2.2.9.13 Kaca Cermin t=3mm M2 126,000.00 138,600.00
2.2.9.14 Kaca Cermin t=5mm M2 144,400.00 158,840.00
2.2.9.15 Kaca Es t=3mm M2 115,500.00 127,050.00
2.2.9.16 Kaca profil (Bevel / moulding) M' 7,500.00 8,250.00
2.2.9.17 Kaca Ray-band t= 5 mm M2 113,200.00 124,520.00
2.2.9.18 Kaca Ray-band t= 7 mm M2 176,100.00 193,710.00
2.2.9.19 Kaca Ray-band t= 10 mm M2 369,600.00 406,560.00
2.2.9.20 Kaca Stained Glass M2 1,253,200.00 1,378,520.00
2.2.9.21 Kaca clear tempered t = 5 mm M2 231,000.00 254,100.00
2.2.9.22 Kaca clear tempered t = 6 mm M2 288,800.00 317,680.00
2.2.9.23 Kaca clear tempered t = 8 mm M2 433,200.00 476,520.00
2.2.9.24 Kaca clear tempered t = 10 mm M2 462,000.00 508,200.00
2.2.9.25 Kaca clear tempered t = 12 mm M2 519,800.00 571,780.00
2.2.9.26 Kaca clear tempered t = 15 mm M2 2,252,300.00 2,477,530.00
2.2.9.27 Kaca clear tempered t = 19 mm M2 2,829,800.00 3,112,780.00
2.2.9.28 Kaca Warna t - 5 mm M2 109,800.00 120,780.00
2.2.9.29 Naco (Kerangka dan Daun ) M2 264,600.00 291,060.00
2.2.9.30 Sealant Tube 19,000.00 20,900.00
- -
2.2.10 BAHAN BETON CETAKAN : - -
2.2.10.1 Box culvert BC. 80.80.120.11 cm (gandar 10T) unit 3,476,000.00 3,823,600.00
2.2.10.2 Box culvert BC. 80.80.120.11 cm (gandar 20T) unit 3,624,500.00 3,986,950.00
2.2.10.3 Box culvert BC. 100.100.120.12,5 cm (gandar 10T) unit 3,911,600.00 4,302,760.00
2.2.10.4 Box culvert BC. 100.100.120.12,5 cm (gandar 20T) unit 4,614,500.00 5,075,950.00
2.2.10.5 Box culvert BC. 150.150.120.20 cm (gandar 10T) unit 6,505,400.00 7,155,940.00
2.2.10.6 Box culvert BC. 150.150.120.20 cm (gandar 20T) unit 8,572,300.00 9,429,530.00
2.2.10.7 Box culvert BC. 200.2000.120.20 cm (gandar 10T) unit 9,606,300.00 10,566,930.00
2.2.10.8 Box culvert BC. 200.2000.120.20 cm (gandar 20T) unit 10,759,100.00 11,835,010.00
2.2.10.9 Tiang pancang 20.20 (k.500) m' 132,000.00 145,200.00
2.2.10.10 Tiang pancang 25.25 (k.500) m' 165,000.00 181,500.00
2.2.10.11 Buis Beton 1/2 ø 20 Cm M' 40,500.00 44,550.00

26
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.10.12 Buis Beton 1/2 ø 30 Cm M' 60,100.00 66,110.00
2.2.10.13 Buis Beton 1/2 ø 40 Cm M' 63,600.00 69,960.00
2.2.10.14 Buis Beton ø 100 Cm M' 404,300.00 444,730.00
2.2.10.15 Buis Beton ø 20 Cm M' 63,600.00 69,960.00
2.2.10.16 Buis Beton ø 30 Cm M' 86,700.00 95,370.00
2.2.10.17 Buis Beton ø 40 Cm M' 115,500.00 127,050.00
2.2.10.18 Buis Beton ø 50 Cm M' 173,300.00 190,630.00
2.2.10.19 Buis Beton ø 60 Cm M' 184,800.00 203,280.00
2.2.10.20 Buis Beton ø 80 Cm M' 231,000.00 254,100.00
2.2.10.21 Concrete Block 20 Bh 57,200.00 62,920.00
2.2.10.22 Concrete Block 15 Bh 46,800.00 51,480.00
2.2.10.23 Concrete Block 10 Bh 35,200.00 38,720.00
2.2.10.24 CU - ditch 30.8.120 cm G. 10T Unit 257,000.00 282,700.00
2.2.10.25 CU - ditch 40.12.120 cm G. 10T Unit 381,200.00 419,320.00
2.2.10.26 CU - ditch 60.12.120 cm G. 10T Unit 531,300.00 584,430.00
2.2.10.27 CU - ditch 30.40.120.5 cm G. 10T Unit 467,800.00 514,580.00
2.2.10.28 CU - ditch 40.50.120.6 cm G. 10T Unit 652,600.00 717,860.00
2.2.10.29 CU - ditch 60.70.120.8 cm G. 10T Unit 1,155,000.00 1,270,500.00
2.2.10.30 Hollow Block 20 Bh 79,100.00 87,010.00
2.2.10.31 Hollow Block 15 Bh 56,700.00 62,370.00
2.2.10.32 Hollow Block 10 Bh 35,200.00 38,720.00
2.2.10.33 Kanstin (K225) uk. 40x20x10 cm Bh 34,700.00 38,170.00
2.2.10.34 Kanstin (K225) uk. 40x20x15 cm Bh 41,600.00 45,760.00
2.2.10.35 Pasang tiang listrik cor beton Titik 8,250,000.00 9,075,000.00
2.2.10.36 U-DITCH (300X300X1200)mm, berat = 160 Kg unit 442,900.00 487,190.00
2.2.10.37 U-DITCH (300X400X1200)mm, berat = 190 Kg unit 515,500.00 567,050.00
2.2.10.38 U-DITCH (300X500X1200)mm, berat = 220 Kg unit 589,500.00 648,450.00
2.2.10.39 U-DITCH (400X400X1200)mm, berat = 250 Kg unit 646,100.00 710,710.00
2.2.10.40 U-DITCH (400X500X1200)mm, berat = 270 Kg unit 736,200.00 809,820.00
2.2.10.41 U-DITCH (400X600X1200)mm, berat = 320 Kg unit 804,400.00 884,840.00
2.2.10.42 U-DITCH (500X500X1200)mm, berat = 380 Kg unit 872,700.00 959,970.00
2.2.10.43 U-DITCH (500X600X1200)mm, berat = 420 Kg unit 962,700.00 1,058,970.00
2.2.10.44 U-DITCH (600X600X1200)mm, berat = 480 Kg unit 1,030,900.00 1,133,990.00
2.2.10.45 U-DITCH (600X700X1200)mm, berat = 500 Kg unit 1,122,400.00 1,234,640.00
2.2.10.46 U-DITCH (600X800X1200)mm, berat = 550 Kg unit 1,224,000.00 1,346,400.00
2.2.10.47 U-DITCH (800X800X1200)mm, berat = 730 Kg unit 1,264,700.00 1,391,170.00
2.2.10.48 U-DITCH (800X900X1200)mm, berat = 890 Kg unit 1,332,900.00 1,466,190.00
2.2.10.49 U-DITCH (800X1000X1200)mm, berat = 950 Kg unit 1,710,500.00 1,881,550.00
2.2.10.50 U-DITCH (800X1200X1200)mm, berat = 1100 Kg unit 1,937,000.00 2,130,700.00
2.2.10.51 U-DITCH (1000X1000X1200)mm, berat = 1250 Kg unit 2,831,400.00 3,114,540.00
2.2.10.52 U-DITCH (1000X1200X1200)mm, berat = 1450 Kg unit 3,092,800.00 3,402,080.00
2.2.10.53 U-DITCH (1200X1200X1200)mm, berat = 1650 Kg unit 3,454,300.00 3,799,730.00
2.2.10.54 U-DITCH (1200X1400X1200)mm, berat = 1800 Kg unit 3,704,100.00 4,074,510.00

27
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.10.55 U-DITCH (1500X1500X1200)mm, berat = 2950 Kg unit 5,810,900.00 6,391,990.00
2.2.10.56 U-DITCH (1500X1600X1200)mm, berat = 3050 Kg unit 6,014,200.00 6,615,620.00
2.2.10.57 U-DITCH (1500X1700X1200)mm, berat = 3150 Kg unit 6,285,700.00 6,914,270.00
2.2.10.58 U-DITCH (1800X1800X1200)mm, berat = 3500 Kg unit 6,920,200.00 7,612,220.00
2.2.10.59 U-DITCH (1800X1900X1200)mm, berat = 3600 Kg unit 7,170,000.00 7,887,000.00
2.2.10.60 U-DITCH (1800X2000X1200)mm, berat = 3700 Kg unit 7,418,300.00 8,160,130.00
2.2.10.61 U-DITCH (2000X2000X1200)mm, berat = 3900 Kg unit 7,713,000.00 8,484,300.00
2.2.10.62 U-DITCH (2000X2100X1200)mm, berat = 4000 Kg unit 7,984,500.00 8,782,950.00
2.2.10.63 U-DITCH (2000X2200X1200)mm, berat = 4100 Kg unit 8,234,300.00 9,057,730.00
2.2.10.64 Tutup U-DITCH 300-60/1200 mm, Berat = 75Kg Gandar = 5 ton/m' unit 273,000.00 300,300.00
2.2.10.65 Tutup U-DITCH 400-80/1200 mm, Berat = 120Kg Gandar = 5 ton/m' unit 339,800.00 373,780.00
2.2.10.66 Tutup U-DITCH 500-80/1200 mm, Berat = 130Kg Gandar = 5 ton/m' unit 431,200.00 474,320.00
2.2.10.67 Tutup U-DITCH 600-100/1200 mm, Berat = 250Kg Gandar = 5 ton/m' unit 509,700.00 560,670.00
2.2.10.68 Tutup U-DITCH 800-100/1200 mm, Berat = 290Kg Gandar = 5 ton/m' unit 714,400.00 785,840.00
2.2.10.69 Tutup U-DITCH 1000-120/1200 mm, Berat = 470Kg Gandar = 5 ton/m' unit 906,000.00 996,600.00
2.2.10.70 Tutup U-DITCH 1200-120/1200 mm, Berat = 520Kg Gandar = 5 ton/m' unit 1,292,300.00 1,421,530.00
2.2.10.71 Tutup U-DITCH 1500-150/1200 mm, Berat = 820Kg Gandar = 5 ton/m' unit 2,016,800.00 2,218,480.00
2.2.10.72 Tutup U-DITCH 1800-150/1200 mm, Berat = 950Kg Gandar = 5 ton/m' unit 2,604,900.00 2,865,390.00
2.2.10.73 Tutup U-DITCH 2000-150/1200 mm, Berat = 1050Kg Gandar = 5 ton/m' unit 2,831,400.00 3,114,540.00
2.2.10.74 Tutup U-DITCH 300-100/1200 mm, Berat = 120Kg Gandar = 10 ton/m' unit 381,900.00 420,090.00
2.2.10.75 Tutup U-DITCH 400-110/1200 mm, Berat = 170Kg Gandar = 10 ton/m' unit 577,900.00 635,690.00
2.2.10.76 Tutup U-DITCH 500-110/1200 mm, Berat = 210Kg Gandar = 10 ton/m' unit 679,500.00 747,450.00
2.2.10.77 Tutup U-DITCH 600-150/1200 mm, Berat = 330Kg Gandar = 10 ton/m' unit 884,300.00 972,730.00
2.2.10.78 Tutup U-DITCH 800-150/1200 mm, Berat = 420Kg Gandar = 10 ton/m' unit 1,065,800.00 1,172,380.00
2.2.10.79 Tutup U-DITCH 1000-150/1200 mm, Berat = 600Kg Gandar = 10 ton/m' unit 1,529,000.00 1,681,900.00
2.2.10.80 Tutup U-DITCH 1200-150/1200 mm, Berat = 630Kg Gandar = 10 ton/m' unit 1,982,000.00 2,180,200.00
2.2.10.81 Tutup U-DITCH 1500-200/1200 mm, Berat = 1100Kg Gandar = 10 ton/m' unit 2,718,100.00 2,989,910.00
2.2.10.82 Tutup U-DITCH 1800-200/1200 mm, Berat = 1300Kg Gandar = 10 ton/m' unit 3,126,200.00 3,438,820.00
2.2.10.83 Tutup U-DITCH 2000-200/1200 mm, Berat = 1400Kg Gandar = 10 ton/m' unit 3,397,700.00 3,737,470.00
2.2.10.84 BC 80.80.120.11 cm Gandar = 10 ton unit 2,851,200.00 3,136,320.00
2.2.10.85 BC 100.100.120.12,5 cm Gandar = 10 ton unit 3,373,900.00 3,711,290.00
2.2.10.86 BC 150.150.120.20 cm Gandar = 10 ton unit 7,806,500.00 8,587,150.00
2.2.10.87 BC 200.200.120.20 cm Gandar = 10 ton unit 10,207,600.00 11,228,360.00
2.2.10.88 BC 80.80.120.11 cm Gandar = 20 ton unit 3,029,400.00 3,332,340.00
2.2.10.89 BC 100.100.120.12,5 cm Gandar = 20 ton unit 4,217,400.00 4,639,140.00
2.2.10.90 BC 150.150.120.20 cm Gandar = 20 ton unit 8,966,800.00 9,863,480.00
2.2.10.91 BC 200.200.120.20 cm Gandar = 20 ton unit 11,590,900.00 12,749,990.00
- -
2.2.11 BAHAN PIPA - -
2.2.11.1 POMPA AIR MINUM - -
2.11.1.1.1 Pompa GRUNDFOS, Type CM 10-3 Unit 13,503,600.00 14,853,960.00
2.11.1.1.2 Panel 2,2 KW/3x380Volt/Single WLC Unit 8,385,300.00 9,223,830.00
2.11.1.1.3 Pompa GRUNDFOS, Type CM 10-2 Unit 9,111,300.00 10,022,430.00

28
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.11.1.1.4 Panel 2,2 KW/3x380Volt/Single WLC Unit 8,385,300.00 9,223,830.00
2.11.1.1.5 Pompa GRUNDFOS, Type CR 20-17, 18,5 KW Unit 123,662,000.00 136,028,200.00
2.11.1.1.6 Panel 18,5 KW/3x380Volt/Single WLC Unit 11,313,500.00 12,444,850.00
2.11.1.1.7 Pompa GRUNDFOS, Type CR 15-14, 11 KW Unit 84,733,000.00 93,206,300.00
2.11.1.1.8 Panel 11 KW/3x380Volt/Single WLC Unit 11,313,500.00 12,444,850.00
2.11.1.1.9 Pompa GRUNDFOS, Type CR 10-22, 7,5 KW Unit 58,140,500.00 63,954,550.00
2.11.1.1.10 Panel 7,5 KW/3x380Volt/Single WLC Unit 9,982,500.00 10,980,750.00
2.11.1.1.11 Pompa GRUNDFOS, Type CR 5-20, 3 KW Unit 29,306,200.00 32,236,820.00
2.11.1.1.12 Panel 3 KW/3x380Volt/Single WLC Unit 8,385,300.00 9,223,830.00
2.11.1.1.13 Pompa GRUNDFOS, Type CR 10-9, 3 KW Unit 31,060,700.00 34,166,770.00
2.11.1.1.14 Panel 3 KW/3x380Volt/Single WLC Unit 8,385,300.00 9,223,830.00
2.11.1.1.15 Pompa GRUNDFOS, Type SP 17-37, 22 KW Unit 185,735,000.00 204,308,500.00
2.11.1.1.16 Panel 22 KW/3x380Volt/Single WLC Unit 12,644,500.00 13,908,950.00
2.11.1.1.17 Pompa GRUNDFOS, Type SP 8A-37, 5,5 KW Unit 70,990,700.00 78,089,770.00
2.11.1.1.18 Panel 5,5 KW/3x380Volt/Single WLC Unit 8,651,500.00 9,516,650.00
2.11.1.1.19 Pompa GRUNDFOS, Type SP 5A-33, 3 KW Unit 33,121,000.00 36,433,100.00
2.11.1.1.20 Panel 3 KW/3x380Volt/Single WLC Unit 8,385,300.00 9,223,830.00
2.11.1.1.21 Pompa JD Basic 5 Unit 7,235,800.00 7,959,380.00
2.11.1.1.22 Pompa GRUNDFOS, Type CR 10-16, 5,5 KW Unit 50,927,300.00 56,020,030.00
2.11.1.1.23 Panel Pompa > 10 KW Unit 9,847,200.00 10,831,920.00
2.11.1.1.24 Panel Pompa < 10 KW Unit 10,551,200.00 11,606,320.00
2.11.1.1.25 Pompa GRUNDFOS, Type CR 15-17, 15 KW Unit 88,400,000.00 88,400,000.00
2.11.1.1.26 Panel 15 KW start Delta Unit 13,000,000.00 13,000,000.00
2.11.1.1.27 Pompa GRUNDFOS, Type CR 45-12, 15 KW Unit 240,400,000.00 240,400,000.00
2.11.1.1.28 Panel 45 KW start Delta Unit 14,000,000.00 14,000,000.00
- -
2.2.11.2 PIPA AIR MINUM - -
2.2.11.2.1 Pipa GI Med. Ø 0,5" (SNI 0039:2013) M' 22,900.00 25,190.00
2.2.11.2.2 Pipa GI Med. Ø 0,75" (SNI 0039:2013) M' 29,400.00 32,340.00
2.2.11.2.3 Pipa GI Med. Ø 1" (SNI 0039:2013) M' 45,000.00 49,500.00
2.2.11.2.4 Pipa GI Med. Ø 1,5" (SNI 0039:2013) M' 68,200.00 75,020.00
2.2.11.2.5 Pipa GI Med. Ø 2" (SNI 0039:2013) M' 93,100.00 102,410.00
2.2.11.2.6 Pipa GI Med. Ø 2,5" (SNI 0039:2013) M' 118,800.00 130,680.00
2.2.11.2.7 Pipa GI Med. Ø 3" (SNI 0039:2013) M' 153,500.00 168,850.00
2.2.11.2.8 Pipa GI Med. Ø 4" (SNI 0039:2013) M' 222,100.00 244,310.00
2.2.11.2.9 Pipa PN-10 Diameter 1" (Pipa PE) M' 12,000.00 13,200.00
2.2.11.2.10 Pipa PN-10 Diameter 1,5" (Pipa PE) M' 25,000.00 27,500.00
2.2.11.2.11 Pipa PN-10 Diameter 2" (Pipa PE) M' 39,900.00 43,890.00
2.2.11.2.12 Pipa PN-10 Diameter 2,5" (Pipa PE) M' 54,900.00 60,390.00
2.2.11.2.13 Pipa PN-10 Diameter 3" (Pipa PE) M' 79,000.00 86,900.00
2.2.11.2.14 Pipa PN-10 Diameter 4" (Pipa PE) M' 118,000.00 129,800.00
2.2.11.2.15 Pipa PN-10 Diameter 6" (Pipa PE) M' 247,200.00 271,920.00
2.2.11.2.16 PVC. Diameter 0,5" (S 12,5) (MOF) M' 2,600.00 2,860.00

29
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.2.17 PVC. Diameter 0,75" (S 12,5) (MOF) M' 4,100.00 4,510.00
2.2.11.2.18 PVC. Diameter 1" (S 12,5) (MOF) M' 6,400.00 7,040.00
2.2.11.2.19 PVC. Diameter 1,25" (S 12,5) (MOF) M' 9,800.00 10,780.00
2.2.11.2.20 PVC. Diameter 1,5" (S 12,5) (MOF) M' 15,000.00 16,500.00
2.2.11.2.21 PVC. Diameter 2" (S 12,5) (RR) M' 24,400.00 26,840.00
2.2.11.2.22 PVC. Diameter 2,5" (S 12,5) (RR) M' 34,500.00 37,950.00
2.2.11.2.23 PVC. Diameter 3" (S 12,5) (RR) M' 48,300.00 53,130.00
2.2.11.2.24 PVC. Diameter 4" (S 12,5) (RR) M' 70,700.00 77,770.00
2.2.11.2.25 PVC. Diameter 6" (S 12,5) (RR) M' 148,200.00 163,020.00
2.2.11.2.26 PVC. Diameter 8" (S 12,5) (RR) M' 239,400.00 263,340.00
2.2.11.2.27 Pipa HDPE s-12,5 diameter 2" (pipa PE) M' 19,400.00 21,340.00
2.2.11.2.28 Pipa HDPE s-12,5 diameter 2,5" (pipa PE) M' 27,500.00 30,250.00
2.2.11.2.29 Pipa HDPE s-12,5 diameter 3" (pipa PE) M' 39,800.00 43,780.00
- -
2.2.11.3 ACEESORIES PIPA AIR MINUM - -
2.2.11.3.1 Ball Valve Ǿ 2" Bh 71,800.00 78,980.00
2.2.11.3.2 Bend All Flange 22.5 GI Ǿ 2" Bh 339,200.00 373,120.00
2.2.11.3.3 Bend All Flange 22.5 GI Ǿ 2,5" Bh 498,800.00 548,680.00
2.2.11.3.4 Bend All Flange 22.5 GI Ǿ 3" Bh 428,100.00 470,910.00
2.2.11.3.5 Bend All Flange 22.5 GI Ǿ 4" Bh 504,000.00 554,400.00
2.2.11.3.6 Bend All Flange 45 Ǿ 2" Bh 362,300.00 398,530.00
2.2.11.3.7 Bend All Flange 45 Ǿ 2,5" Bh 395,200.00 434,720.00
2.2.11.3.8 Bend All Flange 45 Ǿ 3" Bh 428,100.00 470,910.00
2.2.11.3.9 Bend All Flange 45 Ǿ 4" Bh 553,400.00 608,740.00
2.2.11.3.10 Bend All Flange 90 Ǿ 2" Bh 345,800.00 380,380.00
2.2.11.3.11 Bend All Flange 90 Ǿ 2,5" Bh 444,600.00 489,060.00
2.2.11.3.12 Bend All Flange 90 Ǿ 3" Bh 543,400.00 597,740.00
2.2.11.3.13 Bend All Flange 90 Ǿ 4" Bh 625,900.00 688,490.00
2.2.11.3.14 Bend GI. Ǿ 2" Bh 38,600.00 42,460.00
2.2.11.3.15 Bend GI. Ǿ 2,5" Bh 72,200.00 79,420.00
2.2.11.3.16 Bend GI. Ǿ 3" Bh 109,400.00 120,340.00
2.2.11.3.17 Bend GI. Ǿ 4" Bh 195,900.00 215,490.00
2.2.11.3.18 Bend PVC All Socket 45 Ǿ 2" Bh 115,900.00 127,490.00
2.2.11.3.19 Bend PVC All Socket 45 Ǿ 2,5" Bh 143,600.00 157,960.00
2.2.11.3.20 Bend PVC All Socket 45 Ǿ 3" Bh 173,300.00 190,630.00
2.2.11.3.21 Bend PVC All Socket 45 Ǿ 4" Bh 252,600.00 277,860.00
2.2.11.3.22 Bend PVC All Socket 90 Ǿ 1,5" Bh 72,800.00 75,000.00
2.2.11.3.23 Bend PVC All Socket 90 Ǿ 2" Bh 128,600.00 141,460.00
2.2.11.3.24 Bend PVC All Socket 90 Ǿ 2,5" Bh 157,300.00 173,030.00
2.2.11.3.25 Bend PVC All Socket 90 Ǿ 3" Bh 202,100.00 222,310.00
2.2.11.3.26 Bend PVC All Socket 90 Ǿ 4" Bh 281,300.00 309,430.00
2.2.11.3.27 Bend PVC 45 Ǿ 1,5" Bh 62,200.00 68,420.00
2.2.11.3.28 Bend PVC 90 Ǿ 2" Bh 83,700.00 92,070.00

30
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.3.29 Chek Valve Ǿ 2" Bh 643,500.00 707,850.00
2.2.11.3.30 Chek Valve Ǿ 2,5" Bh 1,260,200.00 1,386,220.00
2.2.11.3.31 Chek Valve Ǿ 3" Bh 1,876,900.00 2,064,590.00
2.2.11.3.32 Chek Valve Ǿ 4" Bh 2,681,300.00 2,949,430.00
2.2.11.3.33 Clam Sadle Ǿ 1 1/2" x 1/2" Bh 42,200.00 46,420.00
2.2.11.3.34 Clam Sadle Ǿ 1 1/2" x 3/4" Bh 48,300.00 53,130.00
2.2.11.3.35 Clam Sadle Ǿ 2" x 1/2" Bh 50,600.00 55,660.00
2.2.11.3.36 Clam Sadle Ǿ 2" x 3/4" Bh 62,000.00 68,200.00
2.2.11.3.37 Clam Sadle Ǿ 3" x 1/2" Bh 65,200.00 71,720.00
2.2.11.3.38 Clam Sadle Ǿ 3" x 3/4" Bh 93,200.00 102,520.00
2.2.11.3.39 Clam Sadle Ǿ 4" x 1/2" Bh 98,100.00 107,910.00
2.2.11.3.40 Clam Sadle Ǿ 4" x 3/4" Bh 142,800.00 157,080.00
2.2.11.3.41 Coupler / Join Ǿ 2,5" Bh 311,200.00 342,320.00
2.2.11.3.42 Coupler / Join Ǿ 3" Bh 395,600.00 435,160.00
2.2.11.3.43 Dobel Neple GI Ǿ 1/2" Bh 5,700.00 6,270.00
2.2.11.3.44 Dobel Neple Ǿ 1" Bh 10,300.00 11,330.00
2.2.11.3.45 Dobel Neple Ǿ 1,25" Bh 14,300.00 15,730.00
2.2.11.3.46 Dobel Neple Ǿ 1,5" Bh 21,000.00 23,100.00
2.2.11.3.47 Dobel Neple Ǿ 2" Bh 29,000.00 31,900.00
2.2.11.3.48 Dobel Neple Ǿ 2,5" Bh 48,300.00 53,130.00
2.2.11.3.49 Doble Neple Ǿ 3" Bh 82,000.00 90,200.00
2.2.11.3.50 Dobel Neple Ǿ 4" Bh 130,400.00 143,440.00
2.2.11.3.51 Dop GI dia 1" Bh 8,800.00 9,680.00
2.2.11.3.52 Dop GI dia 1.5" Bh 17,200.00 18,920.00
2.2.11.3.53 Dop GI dia 2" Bh 236,500.00 260,150.00
2.2.11.3.54 Dop GI dia 2.5" Bh 48,300.00 53,130.00
2.2.11.3.55 Dop GI dia 3" Bh 67,000.00 73,700.00
2.2.11.3.56 Dop GI dia 4" Bh 111,800.00 122,980.00
2.2.11.3.57 Dop PVC Ø 1,5'' Bh 28,700.00 31,570.00
2.2.11.3.58 Dop PVC dia 2" RRJ Bh 29,700.00 32,670.00
2.2.11.3.59 Dop PVC dia 2.5" RRJ Bh 40,500.00 44,550.00
2.2.11.3.60 Dop PVC dia 3" RRJ Bh 47,500.00 52,250.00
2.2.11.3.61 Dop PVC dia 4" RRJ Bh 79,400.00 87,340.00
2.2.11.3.62 Dop PVC dia 1" Moof Bh 6,600.00 7,260.00
2.2.11.3.63 Dop PVC dia 1,5" Moof Bh 18,200.00 20,020.00
2.2.11.3.64 Dop PVC dia 2" Moof Bh 29,700.00 32,670.00
2.2.11.3.65 Dop PVC dia 2,5" Moof Bh 40,500.00 44,550.00
2.2.11.3.66 Dop PVC dia 3" Moof Bh 36,500.00 40,150.00
2.2.11.3.67 Dop PVC dia 4" Moof Bh 79,400.00 87,340.00
2.2.11.3.68 Equal Elbow Coupling Ø 2,5'' Bh 368,200.00 405,020.00
2.2.11.3.69 Equal Elbow Coupling Ø Ø 3'' Bh 471,400.00 518,540.00
2.2.11.3.70 Flange Drat GI Dia 2" Bh 22,900.00 25,190.00
2.2.11.3.71 Flange Drat GI Dia 2,5" Bh 80,100.00 88,110.00

31
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.3.72 Flange Drat GI Dia 3" Bh 98,700.00 108,570.00
2.2.11.3.73 Flange Drat GI Dia 4" Bh 120,100.00 132,110.00
2.2.11.3.74 Flange Las Dia 2" Bh 55,600.00 61,160.00
2.2.11.3.75 Flange Las Dia 2,5" Bh 91,500.00 100,650.00
2.2.11.3.76 Flange Las Dia 3" Bh 83,200.00 91,520.00
2.2.11.3.77 Flange Las Dia 4" Bh 94,800.00 104,280.00
2.2.11.3.78 Flange Socket Ǿ 2" Bh 217,600.00 239,360.00
2.2.11.3.79 Flange Socket Ǿ 2,5" Bh 268,600.00 295,460.00
2.2.11.3.80 Flange Socket Ǿ 3" Bh 319,600.00 351,560.00
2.2.11.3.81 Flange Socket Ǿ 4" Bh 388,100.00 426,910.00
2.2.11.3.82 Gate Valve GI Ǿ 2" Bh 760,100.00 836,110.00
2.2.11.3.83 Gate Valve GI Ǿ 2,5" Bh 1,031,600.00 1,134,760.00
2.2.11.3.84 Gate Valve GI Ǿ 3" Bh 1,303,500.00 1,433,850.00
2.2.11.3.85 Gate Valve GI Ǿ 4" Bh 1,520,200.00 1,672,220.00
2.2.11.3.86 Gibol Joint Ǿ 2" Bh 175,000.00 180,000.00
2.2.11.3.87 Gibol Joint Ǿ 3" Bh 215,300.00 236,830.00
2.2.11.3.88 Gibol Joint Ǿ 4" Bh 225,000.00 410,000.00
2.2.11.3.89 Gibol Joint Ǿ 6" Bh 400,000.00 566,000.00
2.2.11.3.90 Gibol Joint Ǿ 8" Bh 550,000.00 400,000.00
2.2.11.3.91 Karet packing Ǿ 1,5" Bh 5,800.00 6,380.00
2.2.11.3.92 Karet packing Ǿ 2" Bh 6,900.00 7,590.00
2.2.11.3.93 Karet packing Ǿ 2,5" Bh 7,700.00 8,470.00
2.2.11.3.94 Karet packing Ǿ 3" Bh 8,600.00 9,460.00
2.2.11.3.95 Karet packing Ǿ 4" Bh 11,200.00 12,320.00
2.2.11.3.96 Knee drat GI Ǿ 1" Bh 13,000.00 14,300.00
2.2.11.3.97 Knee drat GI Ǿ 1,5" Bh 26,000.00 28,600.00
2.2.11.3.98 Knee drat GI Ǿ 2" Bh 40,800.00 44,880.00
2.2.11.3.99 Knee drat GI Ǿ 2,5" Bh 78,000.00 85,800.00
2.2.11.3.100 Knee drat GI Ǿ 3" Bh 119,100.00 131,010.00
2.2.11.3.101 Knee drat GI Ǿ 4" Bh 216,000.00 237,600.00
2.2.11.3.102 Knee PVC AW Ǿ 0,5" Bh 1,900.00 2,090.00
2.2.11.3.103 Knee drat dalam PVC AW Ǿ 0,5" Bh 2,400.00 2,640.00
2.2.11.3.104 Knee PVC Ǿ 1" Bh 6,500.00 7,150.00
2.2.11.3.105 Knee PVC Ǿ 1,5" Bh 14,300.00 15,730.00
2.2.11.3.106 Knee PVC Ǿ 2" Bh 22,600.00 24,860.00
2.2.11.3.107 Knee PVC Ǿ 2,5" Bh 37,300.00 41,030.00
2.2.11.3.108 Knee PVC Ǿ 3" Unit 59,300.00 65,230.00
2.2.11.3.109 Knee PVC Ǿ 4" Unit 141,100.00 155,210.00
2.2.11.3.110 Reducer GI Ǿ 1 - Ǿ 3/4 Unit 11,500.00 12,650.00
2.2.11.3.111 Reducer GI Ǿ 1,5 - Ǿ 1,25 Unit 19,700.00 21,670.00
2.2.11.3.112 Reducer GI Ǿ 1 1/4 - Ǿ 2 Unit 27,800.00 30,580.00
2.2.11.3.113 Reducer GI Ǿ 2 - Ǿ 1 Unit 26,500.00 29,150.00
2.2.11.3.114 Reducer GI Ǿ 2 - Ǿ 1,5 Bh 30,600.00 33,660.00

32
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.3.115 Reducer GI Ǿ 3 - Ǿ 2 Unit 79,900.00 87,890.00
2.2.11.3.116 Reducer GI Ǿ 4 - Ǿ 2 Bh 150,200.00 165,220.00
2.2.11.3.117 Reducer GI Ǿ 4 - Ǿ 3 Bh 156,900.00 172,590.00
2.2.11.3.118 Reducer PVC Ǿ 1,5" - 1" Bh 23,800.00 26,180.00
2.2.11.3.119 Reducer PVC Ǿ 2 x 1,5" Bh 34,600.00 38,060.00
2.2.11.3.120 Reducer PVC Ǿ 2,5 - 2" Bh 93,100.00 102,410.00
2.2.11.3.121 Reducer PVC Ǿ 3" - 2" Bh 183,600.00 201,960.00
2.2.11.3.122 Reducer PVC Ǿ 3" - 2,5" Bh 252,900.00 278,190.00
2.2.11.3.123 Reducer PVC Ǿ 4" - 3" Bh 306,000.00 336,600.00
2.2.11.3.124 Screen Ǿ 2" Bh 230,200.00 253,220.00
2.2.11.3.125 Screen Ǿ 3" Bh 684,200.00 752,620.00
2.2.11.3.126 Screen Ǿ 4" Bh 945,200.00 1,039,720.00
2.2.11.3.127 Single Air Valve Dia 1" Bh 312,800.00 344,080.00
2.2.11.3.128 Single Air Valve Dia 1,5" Bh 732,900.00 806,190.00
2.2.11.3.129 Single Air Valve Dia 2" Bh 1,152,800.00 1,268,080.00
2.2.11.3.130 Single Air Valve Dia 2,5" Bh 1,276,000.00 1,403,600.00
2.2.11.3.131 Single Air Valve Dia 3" Bh 1,399,800.00 1,539,780.00
2.2.11.3.132 Single Air Valve Dia 4" Bh 1,564,200.00 1,720,620.00
2.2.11.3.133 Sock Drat GI 1" Bh 11,000.00 12,100.00
2.2.11.3.134 Sock Drat GI 1,5 " Bh 19,400.00 21,340.00
2.2.11.3.135 Sock Drat GI 2 " Bh 29,700.00 32,670.00
2.2.11.3.136 Sock Drat GI 2,5 " Bh 55,900.00 61,490.00
2.2.11.3.137 Sock Drat GI 3" Bh 82,000.00 90,200.00
2.2.11.3.138 Sock Drat GI 4 " Bh 134,000.00 147,400.00
2.2.11.3.139 Scok Drat dalam PVC Ǿ 1,5 " Bh 4,800.00 5,280.00
2.2.11.3.140 Scok Drat luar Ǿ 1/2" Bh 4,800.00 5,280.00
2.2.11.3.141 Scok Drat luar PVC Ǿ 2" Bh 38,700.00 42,570.00
2.2.11.3.142 Stop Kran Ǿ 1" Bh 148,100.00 162,910.00
2.2.11.3.143 Stop Kran Ǿ 1,5 " Bh 345,700.00 380,270.00
2.2.11.3.144 Stop Kran Ǿ 2 " Bh 510,500.00 561,550.00
2.2.11.3.145 Stop Kran Ǿ 2,5 " Bh 942,900.00 1,037,190.00
2.2.11.3.146 Stop Kran Ǿ 3" Bh 1,375,600.00 1,513,160.00
2.2.11.3.147 Stop Kran Ǿ 4 " Bh 1,737,500.00 1,911,250.00
2.2.11.3.148 Stop Kran PVC Ǿ 3" Bh 215,300.00 236,830.00
2.2.11.3.149 Tee All Socket PVC RR Ǿ 2" x 2" Bh 242,000.00 266,200.00
2.2.11.3.150 Tee All Socket PVC RR Ǿ 3" x 2" Bh 350,400.00 385,440.00
2.2.11.3.151 Tee All Socket PVC RR Ǿ 3" x 3" Bh 398,800.00 438,680.00
2.2.11.3.152 Tee All Socket PVC RR Ǿ 4" x 2" Bh 538,700.00 592,570.00
2.2.11.3.153 Tee All Socket PVC RR Ǿ 4" x 3" Bh 601,000.00 661,100.00
2.2.11.3.154 Tee All Socket PVC RR Ǿ 4" x 4" Bh 660,800.00 726,880.00
2.2.11.3.155 Tee All Socket PVC Ǿ 8" x 3" Bh 1,178,800.00 1,213,650.00
2.2.11.3.156 Tee Drat GI Ǿ 1" Bh 24,600.00 27,060.00
2.2.11.3.157 Tee Drat GI Ǿ 1,5" Bh 47,200.00 51,920.00

33
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.3.158 Tee Drat GI Ǿ 2" Bh 70,600.00 77,660.00
2.2.11.3.159 Tee Drat GI Ǿ 2,5" Bh 161,200.00 177,320.00
2.2.11.3.160 Tee Drat GI Ǿ 3" Bh 211,800.00 232,980.00
2.2.11.3.161 Tee Drat GI Ǿ 4" Bh 383,200.00 421,520.00
2.2.11.3.162 Tee All Socket PVC Moof Ǿ 1,5" x Ǿ 1,5" Bh 32,300.00 35,530.00
2.2.11.3.163 Tee All Socket PVC Moof Ǿ 2" x Ǿ 1,5" Bh 53,600.00 58,960.00
2.2.11.3.164 Tee All Socket PVC Moof Ǿ 2" x Ǿ 2" Bh 181,000.00 199,100.00
2.2.11.3.165 Tee All Socket PVC Moof Ǿ 3" x Ǿ 2" Bh 188,500.00 207,350.00
2.2.11.3.166 Tee All Socket PVC Moof Ǿ 3" x Ǿ 3" Bh 224,700.00 247,170.00
2.2.11.3.167 Tee All Socket PVC Moof Ǿ 4" x Ǿ 2" Bh 298,900.00 328,790.00
2.2.11.3.168 Tee All Socket PVC Moof Ǿ 4" x Ǿ 3" Bh 350,000.00 385,000.00
2.2.11.3.169 Tee All Socket PVC Moof Ǿ 4" x Ǿ 4" Bh 370,600.00 407,660.00
2.2.11.3.170 Tee Y All Flange Ǿ 2" x 2" Bh 181,000.00 199,100.00
2.2.11.3.171 Tee Y All Flange Ǿ 3" x 2" Bh 188,500.00 207,350.00
2.2.11.3.172 Tee Y All Flange Ǿ 3" x 3" Bh 224,700.00 247,170.00
2.2.11.3.173 Tee Y All Flange Ǿ 4" x 2" Bh 298,900.00 328,790.00
2.2.11.3.174 Tee Y All Flange Ǿ 4" x 3" Bh 350,000.00 385,000.00
2.2.11.3.175 Tee Y All Flange Ǿ 4" x 4" Bh 370,600.00 407,660.00
2.2.11.3.176 Tee PVC Ǿ 1,5" x Ǿ 1,5" Bh 52,600.00 57,860.00
2.2.11.3.177 Tee PVC Ǿ 2" x Ǿ 1" Bh 57,400.00 63,140.00
2.2.11.3.178 Tee PVC Ǿ 2" x Ǿ 1,5" Bh 62,200.00 68,420.00
2.2.11.3.179 Tee PVC Ǿ 3" x Ǿ 1,5" Bh 71,800.00 78,980.00
2.2.11.3.180 Tee PVC Ǿ 3" x Ǿ 2" Bh 76,500.00 84,150.00
2.2.11.3.181 Tee PVC Ǿ 2" x Ǿ 2" Bh 72,800.00 75,000.00
2.2.11.3.182 Tee GI Ǿ 2" x Ǿ 0,5" Bh 287,100.00 315,810.00
2.2.11.3.183 Tusen Klap GI Ǿ 1,5" Bh 191,400.00 210,540.00
2.2.11.3.184 Tusen Klap GI Ǿ 2" Bh 248,800.00 273,680.00
2.2.11.3.185 Tusen Klap GI Ǿ 3" Bh 680,000.00 700,000.00
2.2.11.3.186 Tusen Klap GI Ǿ 4" Bh 1,020,000.00 1,050,000.00
2.2.11.3.187 Vent GI Ǿ 2" Bh 697,100.00 766,810.00
2.2.11.3.188 Vent GI Ǿ 3" Bh 1,018,600.00 1,120,460.00
2.2.11.3.189 Vent GI Ǿ 4" Bh 1,340,600.00 1,474,660.00
2.2.11.3.190 Wall Pipe Seal Bh 145,900.00 160,490.00
2.2.11.3.191 Water Meter Ǿ 0,5" m 241,300.00 265,430.00
2.2.11.3.192 Water Meter Ǿ 1" m 858,000.00 943,800.00
2.2.11.3.193 Water Meter Ǿ 1,5" m 1,501,500.00 1,651,650.00
2.2.11.3.194 Water Meter Ǿ 2" m 2,145,000.00 2,359,500.00
2.2.11.3.195 Water Meter Ǿ 2,5" m 2,600,400.00 2,860,440.00
2.2.11.3.196 Water Meter Ǿ 3" m 3,055,800.00 3,361,380.00
2.2.11.3.197 Water Mur GI Ǿ 1" m 33,500.00 36,850.00
2.2.11.3.198 Water Mur GI Ǿ 1,5" m 47,900.00 52,690.00
2.2.11.3.199 Water Mur GI Ǿ 2" m 239,300.00 263,230.00
2.2.11.3.200 Waterstop (Lebar 150mm) m 47,900.00 52,690.00

34
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.11.3.201 Waterstop (Lebar 200mm) m 64,500.00 70,950.00
2.2.11.3.202 Waterstop (Lebar 250mm) m 90,600.00 99,660.00
- -
2.2.12 BAHAN JENIS PAKU : - -
2.2.12.1 Paku biasa Kg 16,200.00 17,820.00
2.2.12.2 Paku Eternit / Triplek Kg 19,700.00 21,670.00
2.2.12.3 Paku Gypsum Kg 24,300.00 26,730.00
2.2.12.4 Paku Kalsiboard Kg 27,700.00 30,470.00
2.2.12.5 Paku Kayu Uk.2,5"-5" Kg 15,100.00 16,610.00
2.2.12.6 Paku Reng Kayu 2" Kg 15,600.00 17,160.00
2.2.12.7 Paku Usuk 3" Kg 15,600.00 17,160.00
2.2.12.8 Paku Asbes Kg 27,200.00 29,920.00
2.2.12.9 Paku beton 5cm Bh 600.00 660.00
2.2.12.10 Paku Kait ( pancing ) Bh 1,200.00 1,320.00
2.2.12.11 Paku Ramset / dinabolt Bh 2,900.00 3,190.00
2.2.12.12 Paku Sekrup Bh 600.00 660.00
2.2.12.13 Paku Seng ( Paku payung ) Kg 26,000.00 28,600.00
2.2.12.14 Paku Sumbat Bh 1,800.00 1,980.00
2.2.12.15 Skrup Fixer Bh 800.00 880.00
- -
2.2.13 BAHAN FABRIKASI, ELEKTRIK, POMPA : - -
2.2.13.1 Alat - alat kerja Set 137,500.00 151,250.00
2.2.13.2 Arde Bh 210,100.00 231,110.00
2.2.13.3 Beton 1 : 1 1/2 : 2 1/2 m3 605,000.00 665,500.00
2.2.13.4 Beton Pracetak (Kolom) (5x50x200) Btg 104,500.00 114,950.00
2.2.13.5 Beton Pracetak (Panel) (5x50x200) Lbr 192,500.00 211,750.00
2.2.13.6 Biaya Penyambungan dan Uji PLN Titik 48,315,300.00 53,146,830.00
2.2.13.7 Boull Valve Bh 31,200.00 34,320.00
2.2.13.8 Box Meter Bh 44,300.00 48,730.00
2.2.13.9 BPU VA 704,600.00 775,060.00
2.2.13.10 Cassing Pompa PVC dia 10" S 10 Bh 3,143,800.00 3,458,180.00
2.2.13.11 Elektroda Kg 156,200.00 171,820.00
2.2.13.12 Exhaust dinding 20 x 20 cm Unit 368,000.00 404,800.00
2.2.13.13 Exhaust dinding 30 x 30 cm Unit 495,000.00 544,500.00
2.2.13.14 Exhaust dinding 40 x 40 cm Unit 605,000.00 665,500.00
2.2.13.15 Exhaust langit-langit 20/20 cm M' 262,900.00 289,190.00
2.2.13.16 Exhaust langit-langit 25/25 cm Unit 420,200.00 462,220.00
2.2.13.17 Kabel cocial Bh 15,400.00 16,940.00
2.2.13.18 Kipas Angin langit-langit Bh 459,800.00 505,780.00
2.2.13.19 Kompor Gas 1 tungku ( untuk biogas ) Bh 192,500.00 211,750.00
2.2.13.20 Kompor Gas 2 tungku ( untuk biogas ) Bh 302,500.00 332,750.00
2.2.13.21 Large angle Bh 166,400.00 183,040.00
2.2.13.22 Manometer Bh 599,000.00 658,900.00

35
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.2.13.23 Manometer Kecil Bh 250,000.00 275,000.00
2.2.13.24 Mesin Diesel 5 HP / 2200 RPM Unit 9,355,500.00 10,291,050.00
2.2.13.25 Pompa Tangan Unit 275,000.00 302,500.00
2.2.13.26 Pompa diesel (ex. honda wb 30 xh) Unit 3,850,000.00 4,235,000.00
2.2.13.27 Storox-100 Unit 40,200.00 44,220.00
2.2.13.28 Venetion Blinds And Vertical Blinds (Tirai) Unit 109,500.00 120,450.00
2.2.13.29 Pompa air listrik 40 lt/menit 125 watt Unit 550,000.00 605,000.00
2.2.13.30 Panel kontrol 2WLC DOL 7,5 kw 3x380 V 50 Hz Unit 6,501,000.00 7,151,100.00
2.2.13.31 Pelampung/water level kontrol Bh 508,000.00 558,800.00
2.2.13.32 Perbaikan Pintu Ulir Unit 4,950,000.00 5,445,000.00
2.2.13.33 Pintu air Type A Unit 110,125,400.00 121,137,940.00
2.2.13.34 Pintu air Type A* Unit 70,789,400.00 77,868,340.00
2.2.13.35 Pintu air Type B Unit 53,606,300.00 58,966,930.00
2.2.13.36 Pintu air Type B* Unit 35,171,400.00 38,688,540.00
2.2.13.37 Pintu air Type C2 Unit 20,722,900.00 22,795,190.00
2.2.13.38 Pintu air Type C3 Unit 11,905,300.00 13,095,830.00
2.2.13.39 Pintu air Type C5 Unit 2,358,400.00 2,594,240.00
2.2.13.40 Pintu air WIN WERK Unit 50,175,400.00 55,192,940.00
2.2.13.41 Pintu Scot Balk Balau M3 12,664,600.00 13,931,060.00
2.2.13.42 Pompa air Alcon Dia 3" (setara Honda WB 30 XT) Unit 4,070,000.00 4,477,000.00
2.2.13.43 Pompa air listrik 40 lt/menit 125 watt Bh 550,000.00 605,000.00
2.2.13.44 Pompa Sub Mersible Sp. 17.37 Unit 165,000,000.00 181,500,000.00
2.2.13.45 Pompa Tangan Bh 275,000.00 302,500.00
2.2.13.46 Rambu lalu lintas Bh 330,000.00 363,000.00
2.2.13.47 Storox-100 Kg 40,200.00 44,220.00
2.2.13.48 TC (Twisted Cable) : 3 x 70 + 1 x 50 Bh 79,900.00 87,890.00
2.2.13.49 Travo Unit 5,989,500.00 6,588,450.00
2.2.13.50 Trek Schok Bh 99,800.00 109,780.00
2.2.13.51 Treker dia 12 mm Unit 66,600.00 73,260.00
2.2.13.52 Venetion Blinds And Vertical Blinds (Tirai) M2 109,500.00 120,450.00
2.2.13.53 Water Meter Dia 0.5" Bh 308,000.00 338,800.00
2.2.13.54 Water Meter Dia 1" Bh 364,400.00 400,840.00
2.2.13.55 Water Meter Dia 1.25" Bh 401,700.00 441,870.00
2.2.13.56 Water Meter Dia 1.5" Bh 613,100.00 674,410.00
2.2.13.57 Water Meter Dia 2" Bh 1,444,300.00 1,588,730.00
2.2.13.58 Water Meter Dia 2.5" Bh 1,568,700.00 1,725,570.00
2.2.13.59 Water Meter Dia 3" Bh 1,673,900.00 1,841,290.00
2.2.13.60 Water Meter Dia 4" Bh 2,008,700.00 2,209,570.00
2.2.13.61 Waterstop (Lbr 150mm) m 62,200.00 68,420.00
2.2.13.62 Waterstop (Lbr 200mm) m 75,600.00 83,160.00
2.2.13.63 Waterstop (Lbr 230-320mm) m 79,400.00 87,340.00
- -
2.3.7 BIAYA TES KEGIATAN DI LABORATORIUM - -

36
HARGA 2018

No JENIS BAHAN SAT. DAERAH


DAERAH DATAR
PEGUNUNGAN
(Rp)
(Rp)

1 2 3 4 5
2.3.7.1 Tes Beton paket 385,000.00 423,500.00
2.3.7.2 Tes daya dukung tanah/CBR (DCP) ttk/km 1,375,000.00 1,512,500.00
2.3.7.3 Tes kedalaman tanah keras/sondir ttk/km 3,300,000.00 3,630,000.00
2.3.7.4 Tes Lapen ttk 192,500.00 211,750.00
2.3.7.5 Tes Telford ttk 66,000.00 72,600.00
2.3.7.6 Test abrasi /uji 165,000.00 181,500.00
2.3.7.7 Test kepadatan /uji 165,000.00 181,500.00
2.3.7.8 Hammer Test /uji 165,000.00 181,500.00
- -
2.4.13 BIAYA KEGIATAN LAIN-LAIN - -
2.4.13.1 Papan nama kegiatan unit 550,000.00 605,000.00
2.4.13.2 Prasasti batu marmer (uk. 50x80) cm unit 550,000.00 605,000.00
2.4.13.3 Pembersihan telford lama m2 2,200.00 2,420.00
2.4.13.4 Pengeboran sumur bor ( manual ) m1 33,000.00 36,300.00
2.4.13.5 Sewa alat ukur water pass per - hari 220,000.00 242,000.00
2.4.13.6 Sewa alat ukur theodolit per - hari 385,000.00 423,500.00
2.4.13.7 Sewa alat ukur GPS per - hari 55,000.00 60,500.00
2.4.13.8 Sewa kamera digital per - hari 55,000.00 60,500.00
2.4.13.9 Sewa direksi keet per-bulan 165,000.00 181,500.00
2.4.13.10 Sewa kantor konsultan per-bulan 825,000.00 907,500.00
2.4.13.11 Penebangan pohon : Ø < 50 cm ttk 330,000.00 363,000.00
2.4.13.12 Penebangan pohon : Ø ≥ 50 cm ttk 825,000.00 907,500.00
2.4.13.13 Pengukuran ( uitzet ) jalan > 500 m per - km 1,100,000.00 1,210,000.00

37
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH
Overhead dan profit = 0.0800

HARGA JUMLAH HARGA


NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )

A.4.1.1 PEKERJAAN BETON

A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir


Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.0700 72,000.00 5,040.00
Tukang besi 1.2.7.17 oh 0.0700 88,000.00 6,160.00
Kepala Tukang 1.2.7.3 oh 0.0070 98,000.00 686.00
Mandor 1.2.7.5 oh 0.0040 99,000.00 396.00
Bahan
Besi Beton / tulangan beton 2.2.4.9 kg 10.5000 -
Kawat Beton / bendraat 2.2.4.30 kg 0.1500 -
12,282.00 - - 12,282.00
Overhead dan profit 0.0800 982.56 - - 982.56
13,264.56 - - 13,264.56

A.4.2.1 PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 1 kg Pemasangan besi profil


Tenaga
Tukang las 1.2.7.21 oh 0.0600 94,000.00 5,640.00
Tukang las 1.2.7.21 oh 0.0600 94,000.00 5,640.00
Kepala Tukang 1.2.7.3 oh 0.0060 98,000.00 588.00
Mandor 1.2.7.5 oh 0.0030 99,000.00 297.00
Bahan
Baja Profil 2.2.4.6 kg 1.1500 - -
#N/A 12,165.00 - - 12,165.00
Overhead dan profit 0.0800 973.20 - - 973.20
13,138.20 - - 13,138.20

A.4.2.1.2 1 kg Pemasangan rangka kuda-kuda baja IWF


Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.0600 72,000.00 4,320.00
Tukang las 1.2.7.21 oh 0.0600 94,000.00 5,640.00
Kepala Tukang 1.2.7.3 oh 0.0060 98,000.00 588.00
Mandor 1.2.7.5 oh 0.0030 99,000.00 297.00
Bahan
Baja Profil 2.2.4.6 kg 1.1500 - -
10,845.00 - - 10,845.00
Overhead dan profit 0.0800 867.60 - - 867.60
11,712.60 - - 11,712.60

A.4.2.1.3 100 kg Pengerjaan Pekerjaan perakitan


Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.1000 72,000.00 7,200.00
Tukang las 1.2.7.21 oh 0.1000 94,000.00 9,400.00
Kepala Tukang 1.2.7.3 oh 0.0010 98,000.00 98.00
Mandor 1.2.7.5 oh 0.0050 99,000.00 495.00
Bahan
Solar 2.2.1.66 liter 1.0000 -
Minyak pelumas 2.2.6.30 liter 0.1000 -
Peralatan
1. Sewa alat jam 0.8000 18,000.00 14,400.00
17,193.00 - 14,400.00 31,593.00
Overhead dan profit 0.0800 1,375.44 - 1,152.00 2,527.44
18,568.44 - 15,552.00 34,120.44

A.4.2.1.5 10 cm Pengerjaan pengelasan dengan las listrik


Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.0400 72,000.00 2,880.00
Tukang las 1.2.7.21 oh 0.0200 94,000.00 1,880.00
Kepala Tukang 1.2.7.3 oh 0.0020 98,000.00 196.00
Mandor 1.2.7.5 oh 0.0020 99,000.00 198.00
Bahan

1
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
kawat las listrik biasa 2.2.4.34 kg 0.4000 -
Solar 2.2.1.66 liter 0.3000 -
Minyak pelumas 2.2.6.30 liter 0.0400 -
Peralatan
Mesin Las jam 0.1700 -
5,154.00 - - 5,154.00
Overhead dan profit 0.0800 412.32 - - 412.32
5,566.32 - - 5,566.32

2
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.2.1.19 1m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.1500 72,000.00 10,800.00
Tukang las 1.2.7.21 oh 0.3000 94,000.00 28,200.00
Kepala Tukang 1.2.7.3 oh 0.0300 98,000.00 2,940.00
Mandor 1.2.7.5 oh 0.0080 99,000.00 792.00
Bahan
Seng Plat BJLS 30 lebar 0,90 m 2.2.3.229 m 1.0500 - -
Paku biasa 2.2.12.1 kg 0.0100 - -
Besi strip + Mur Baut 2.2.4.17 kg 0.5000 - -
42,732.00 - - 42,732.00
Overhead dan profit 0.0800 3,418.56 - - 3,418.56
46,150.56 - - 46,150.56

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4"


Tenaga
Pekerja / Buruh tak terlatih 1.2.7.10 oh 0.0810 72,000.00 5,832.00
Tukang batu 1.2.7.16 oh 0.1350 83,000.00 11,205.00
Kepala Tukang 1.2.7.3 oh 0.0135 98,000.00 1,323.00
Mandor 1.2.7.5 oh 0.0040 99,000.00 396.00
Bahan
PVC AW Dia 4 " ( abu - abu ) 2.2.8.65 M 1.2000 - -
Perlengkapan % 0.3500 - -
18,756.00 - - 18,756.00
Overhead dan profit 0.0800 1,500.48 - - 1,500.48
20,256.48 - - 20,256.48

………… 1 m2 Pemasangan Penutup Atap Zincalum


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1200 72,000.00 8,640.00
Tukang kayu L.03 oh 0.0600 94,000.00 5,640.00
Kepala Tukang L.11 oh 0.0060 98,000.00 588.00
Mandor L.15 oh 0.0060 99,000.00 594.00
Bahan
Zincalum m2 1.1340 -
15,462.00 - - 15,462.00
Overhead dan profit 0.0800 1,236.96 - - 1,236.96
16,698.96 - - 16,698.96

3
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH DAN ATAS OVERHEAD DAN PROFIT

HARGA SATUAN KONTRAK BA


NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4

A.2.2.1 PEKERJAAN PERSIAPAN

A.2.2.1.1 1 m2 Pembuatan Pagar sementara dari kayu tinggi 2 meter 55,663.20 -


A.2.2.1.2 1 m2 Pembuatan Pagar Sementara dari seng gelombang tinggi 2m 60,415.20 -
A.2.2.1.3 1 m2 Pembuatan Pagar sementara dari kawat duri tinggi 1.8 M 50,263.20 -
A.2.2.1.4 1 m' Pengukuran dan pemasangan Bowplank 19,521.00 -
A.2.2.1.5 1 m2 Pembuatan kantor sementara lantai plesteran 485,298.00 -
A.2.2.1.6 1 m2 Pembuatan Rumah Jaga ( Kontrusi Kayu ) 251,262.00 -
A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan 288,262.80 -
A.2.2.1.8 1 m2 Pembuatan Bedeng Pekerja 288,262.80 -
A.2.2.1.9 1 m2 Pembersihan Lapangan dan perataan 13,122.00 -
A.2.2.1.10 1 m2 Pembuatan Steger/Perancah dari bambu 288,262.80 -
A.2.2.1.11 1 bh Pembuatan Kotak adukan ukuran 40 cm x 50 cm x25 cm 33,631.20 -
A.2.2.1.12 1 m2 Pembuatan Jalan Sementara 78,294.60 -
A.2.2.1.13 1 m3 Pembongkaran Beton bertulang 1,108,060.56 -
A.2.2.1.14 1 m3 Pembongkaran Dinding Tembok bata 554,030.28 -
A.2.2.1.15 1 m2 Pemasangan pagar kawat jaring galvanis panjang 240 Cm 8,374.32 -
A.2.2.1.16 1 m2 Pemasangan panel Beton pracetak 5 x 50 x 213 Cm 55,097.28 -
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar 88,452.00 -
A.2.2.1.17a 10 m2 Menghapus plesteran yang lama 41,553.00 -
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi) 26,244.00 -
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi) 26,244.00 -
A.2.2.1.17d 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi) 134,946.00 -
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi) 83,106.00 -
A.2.2.1.17f 1 m3 Membongkar kuda-kuda jika dipakai lagi 1,005,048.00 -
A.2.2.1.17g 1 m3 Membongkar kuda-kuda jika tidak dipakai lagi 672,624.00 -

A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 1 m3 Penggalian Tanah biasa sedalam 1 m 60,993.00 -


A.2.3.1.2 1 m3 Penggalian Tanah biasa sedalam 2 m 74,795.40 -
A.2.3.1.3 1 m3 Penggalian Tanah biasa sedalam 3 m 88,811.64 -
A.2.3.1.4 1 m3 Penggalian Tanah keras sedalam 1 m 81,181.44 -
A.2.3.1.5 1 m3 Penggalian Tanah cadas sedalam 1 m 123,055.20 -
A.2.3.1.6 1 m3 Penggalian Tanah lumpur sedalam 1 m 98,123.40 -
A.2.3.1.7 1 m2 Pengerjaan stripping tanah tebing setinngi 1 meter 4,422.60 -
A.2.3.1.8 1 m3 Pembuangan tanah sejauh 30 meter 26,730.00 -
A.2.3.1.9 1 m3 Pengurugan kembali galian tanah 44,226.00 -
A.2.3.1.10 1 m3 Pemadatan tanah ( per 20 cm ) 44,226.00 -
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 24,397.20 -
A.2.3.1.12 1 m3 Pemasangan lapisan pudel campuran 1 kp : 3 pp : 7 tl 110,851.20 -
A.2.3.1.13 1 m2 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 13,267.80 -
A.2.3.1.14 1 m3 Pengurugan sirtu padat 22,113.00 -
A.2.3.1.14a 1 m3 Pengurugan tanah 22,113.00 -

A.3.2.1 PEKERJAAN PONDASI

A.3.2.1.1 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 pp 199,827.00 -


A.3.2.1.2 1 m3 Pasangan pondasi batu belah campuran 1 sp : 4 pp 199,827.00 -
A.3.2.1.3 1 m3 Pasangan pondasi batu belah campuran 1 sp : 5 pp 199,827.00 -

1
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.3.2.1.4 1 m3 Pasangan pondasi batu belah campuran 1 sp : 6 pp 199,827.00 -
A.3.2.1.5 1 m3 Pasangan pondasi batu belah campuran 1 sp : 8 pp 199,827.00 -
A.3.2.1.6 1 m3 Pasangan pondasi batu belah campuran 1 sp : 1 kp : 2 pp 199,827.00 -
A.3.2.1.7 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 kp : 10 pp 199,827.00 -
A.3.2.1.8 1 m3 Pasangan pondasi batu belah campuran 1/4 sp : 1 kp : 4 pp 199,827.00 -
A.3.2.1.9 1 m3 Pasangan pondasi batu kosong ( anstamping ) 103,910.04 -
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah 368,178.48 #N/A
A.3.2.1.11 1 m3 Pasangan pondasi sumuran diameter 100 cm 279,526.68 -
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 150,256.08 #N/A
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 116,596.80 #N/A

A.4.1.1 PEKERJAAN BETON

A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87 - -
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78 - -
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72 - -
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87 - -
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66 - -
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61 - -
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58 - -
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56 - -
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53 - -
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52 - -
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49 - -
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48 - -
A.4.1.1.13 1 m3 Membuat Beton kedap air dengan strorox - 100 - -
A.4.1.1.14 1 m' Pasang PVC waterstop lebar 150 mm - -
A.4.1.1.15 1 m' Pasang PVC waterstop lebar 200 mm - -
A.4.1.1.16 1 m' Pasang PVC waterstop lebar 230 - 320 mm - -
A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir 13,264.56 -
A.4.1.1.18 10 kg Pemasangan kabel presstressed polos / strands 9,219.96 -
A.4.1.1.19 10 kg Pemasangan jaring kawat baja ( wiremesh ) 6,937.92 -
A.4.1.1.20 1 m2 Pemasangan bekisting untuk pondasi 72,362.16 -
A.4.1.1.21 1 m2 Pemasangan bekisting untuk sloof 72,362.16 -
A.4.1.1.22 1 m2 Pemasangan bekisting untuk kolom 91,844.28 -
A.4.1.1.23 1 m2 Pemasangan bekisting untuk balok 91,844.28 -
A.4.1.1.24 1 m2 Pemasangan bekisting untuk lantai 91,844.28 -
A.4.1.1.25 1 m2 Pemasangan bekisting untuk dinding 91,844.28 -
A.4.1.1.26 1 m2 Pemasangan bekisting untuk tangga 91,844.28 -
A.4.1.1.27 1 m2 Pemasangan jembatan untuk pengecoran beton 18,124.56 -
A.4.1.1.28 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting ) 724,610.88 -
A.4.1.1.29 1 m3 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) 819,866.88 -
A.4.1.1.30 1 m3 Membuat kolom beton bertulang ( 300 kg besi + bekisting ) 1,020,347.28 -
A.4.1.1.31 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting ) 888,236.28 -
A.4.1.1.32 1 m3 Membuat kolom beton bertulang (150 kg besi + bekisting ) 724,928.40 -
A.4.1.1.33 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting ) 724,610.88 -
A.4.1.1.34 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting ) 819,866.88 -
A.4.1.1.35 1 m' Membuat kolom praktis beton bertulang (11 x 11 ) cm 21,318.12 -
A.4.1.1.36 1 m' Membuat ring balok beton bertulang (10 x 15 ) cm 35,201.52 -
A.4.1.1.37 1 m3 Membongkar bekisting dan perawatan beton 311,040.00 -

A.4.1.2 PEKERJAAN BETON PRACETAK

A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 13,196.52 -
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 16,513.20 -
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 19,741.32 -
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 24,773.04 -
A.4.1.2.5 1 m2 Pembuatan bekisting untuk plat pracetak ( 5 kali pakai ) 8,310.60 #N/A
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai ) 4,247.64 -

2
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai ) 4,247.64 -
A.4.1.2.8 1 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 5,948.64 -
A.4.1.2.9 1 bh Pemasangan dan membuka bekisting komponen balok beton pracetak 10,500.84 -
A.4.1.2.10 1 bh Pemasangan dan membuka bekisting komponen kolom beton pracetak 8,492.04 -
A.4.1.2.11 1 bh Penuangan/menebar beton untuk komponen plat beton pracetak 51,938.28 -
A.4.1.2.12 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 53,534.52 -
A.4.1.2.13 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 48,178.80 -
A.4.1.2.22 1 titik Upah melakukan grouting pada join pracetak 44,686.08 -
A.4.1.2.23 1 titik Pemasangan bekisting join pracetak 28,476.36 -
A.4.1.2.24 1 titik Upah join dengan sling 63,902.52 -

A.4.2.1 PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 1 kg Pemasangan besi profil 13,138.20 -


A.4.2.1.2 1 kg Pemasangan rangka kuda-kuda baja IWF 11,712.60 -
A.4.2.1.3 100 kg Pengerjaan Pekerjaan perakitan 18,568.44 -
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku 204,917.04 -
A.4.2.1.5 10 cm Pengerjaan pengelasan dengan las listrik 5,566.32 -
A.4.2.1.6 1 m2 Pemasangan rangka jendela besi scuare tube ( 25 x 5 ) cm 126,833.04 -
A.4.2.1.7 1 m2 Pemasangan pintu rolling door besi 228,478.32 -
A.4.2.1.8 1 m2 Pemasangan pintu lipat ( Folding door ) bahan plastik/PVC 85,892.40 -
A.4.2.1.9 1 m2 Pemasangan sunscreen aluminium 96,331.68 -
A.4.2.1.10 1 m2 Pemasangan rolling door aluminium 195,210.00 -
A.4.2.1.11 1 m Pemasangan kusen pintu aluminium 8,388.68 -
A.4.2.1.12 1 m2 Pemasangan pintu aluminium strip lebar 8 cm 16,587.50 -
A.4.2.1.13 1 m2 Pemasangan pintu kaca alumunium 16,725.96 -
A.4.2.1.14 1 m2 Pemasangan venetions blinds dan vertical blinds 68,376.96 -
A.4.2.1.15 1 m2 Pemasangan terali besi strip ( 2x3 ) mm 325,947.24 -
A.4.2.1.16 1 m2 Pemasangan kawat nyamuk 19,521.00 -
A.4.2.1.16a 1 m2 Pemasangan kawat harmonika 19,521.00 -
A.4.2.1.16b 1 m2 Pemasangan kawat kassa 19,521.00 -
A.4.2.1.16c 1 m2 Pemasangan kawat burung 19,521.00 -
A.4.2.1.17 1 m2 Pemasangan jendela nako dan tralis 38,079.72 -
A.4.2.1.18 1 m' Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm 38,079.72 -
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 46,150.56 -
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi - -
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon - -

A.4.4.1 PEKERJAAN PASANGAN DINDING

A.4.4.1.1 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 2 pp - -


A.4.4.1.2 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 pp - -
A.4.4.1.3 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 4 pp - -
A.4.4.1.4 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 5 pp - -
A.4.4.1.5 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 6 pp - -
A.4.4.1.6 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 kp : 10 pp - -
A.4.4.1.7 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 2 pp - -
A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp - -
A.4.4.1.9 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 4 pp - -
A.4.4.1.10 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 5 pp - -
A.4.4.1.11 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 6 pp - -
A.4.4.1.12 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 8 pp - -
A.4.4.1.13 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 kp : 8 pp - -
A.4.4.1.14 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 1 pp - -
A.4.4.1.15 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 2 pp - -
A.4.4.1.16 1 m3 Pemasangan dinding HB20 campuran 1 sp : 3 pp - -
A.4.4.1.16a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 3 pp - -
A.4.4.1.17 1 m3 Pemasangan dinding HB20 campuran 1 sp : 4 pp - -
A.4.4.1.17a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 4 pp - -

3
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.1.18 1 m3 Pemasangan dinding HB15 campuran 1 sp : 3 pp - -
A.4.4.1.18a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 3 pp - -
A.4.4.1.19 1 m3 Pemasangan dinding HB15 campuran 1 sp : 4 pp - -
A.4.4.1.19a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 4 pp - -
A.4.4.1.20 1 m3 Pemasangan dinding HB10 campuran 1 sp : 3 pp - -
A.4.4.1.20a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 3 pp - -
A.4.4.1.21 1 m3 Pemasangan dinding HB10 campuran 1 sp : 4 pp - -
A.4.4.1.21a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 4 pp - -
A.4.4.1.22 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 3 pp - -
A.4.4.1.23 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 4 pp - -
A.4.4.1.24 1 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 sp : 3 pp - -
A.4.4.1.24a 1 m2 Pasangan bataco 1 Pc : 3 Psr - -

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.1 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 15 mm - -


A.4.4.2.2 1 m2 Pemasangan plesteran 1 sp : 2 pp tebal 15 mm - -
A.4.4.2.3 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 15 mm - -
A.4.4.2.4 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 15 mm - -
A.4.4.2.5 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 15 mm - -
A.4.4.2.6 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 15 mm - -
A.4.4.2.7 1 m2 Pemasangan plesteran 1 sp : 7 pp tebal 15 mm - -
A.4.4.2.8 1 m2 Pemasangan plesteran 1 sp : 8 pp tebal 15 mm - -
A.4.4.2.9 1 m2 Pemasangan plesteran 1 sp : 1/2 kp : 3 pp tebal 15 mm - -
A.4.4.2.10 1 m2 Pemasangan plesteran 1 sp : 2 kp : 8 pp tebal 15 mm - -
A.4.4.2.11 1 m2 Pemasangan plesteran 1 sm : 1 kp : 1 pp tebal 15 mm - -
A.4.4.2.12 1 m2 Pemasangan plesteran 1 sm : 1 kp : 2 pp tebal 15 mm - -
A.4.4.2.13 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 20 mm - -
A.4.4.2.14 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 20 mm - -
A.4.4.2.15 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 20 mm - -
A.4.4.2.16 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 20 mm - -
A.4.4.2.17 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 20 mm - -
A.4.4.2.18 1 m2 Pemasangan plesteran 1 sp : 1 kp : 2 pp tebal 20 mm - -
A.4.4.2.19 1 m2 Pemasangan berapen 1 sp : 5 pp tebal 15 mm - -
A.4.4.2.20 1 m2 Pemasangan plesteran sconing 1 sp : 3 pp lebar 10 mm - -
A.4.4.2.21 1 m2 Pemasangan plesteran granit 1 sp : 2 granit tebal 1 cm - -
A.4.4.2.22 1 m2 Pemasangan plesteran traso 1 sp : 2 traso tebal 1 cm - -
A.4.4.2.23 1 m2 Pemasangan plesteran ciprat 1 sp : 2 pp - -
A.4.4.2.24 1 m2 Pemasangan finishing siar bata merah - -
A.4.4.2.25 1 m2 Pemasangan finishing siar pasangan conblock ekspose - -
A.4.4.2.26 1 m2 Pemasangan finishing siar pasangan batu kali, campuran 1 sp : 2 pp - -
A.4.4.2.27 1 m2 Pemasangan acian - -
A.4.4.2.28 1 m' Benangan / Tali Air / Sudut Kol Kolan - -

A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.3 1 m2 Pemasangan lantai ubin PC abu - abu ukuran 20 x 20 Cm - -


A.4.4.3.8 1 m2 Pemasangan lantai ubin teraso ukuran 30 x 30 Cm - -
A.4.4.3.9 1 m2 Pemasangan lantai ubin Granit ukuran 40 x 40 Cm - -
A.4.4.3.32 1 m2 Pemasangan lantai keramik artistik 10 x 20 Cm - -
A.4.4.3.35 1 m2 Pemasangan lantai keramik polos ukuran 30 x 30 cm - -
A.4.4.3.35a 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm - -
A.4.4.3.35b 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 40 x 40 cm - -
A.4.4.3.35c 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 60 x 60 cm - -
A.4.4.3.35d 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 40 x 40 cm - -
A.4.4.3.35e 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 60 x 60 cm - -
A.4.4.3.35f 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 40 x 40 cm - -
A.4.4.3.35g 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 60 x 60 cm - -
A.4.4.3.35h 1 m2 Pemasangan lantai keramik cutting ukuran 30 x 50 cm - -

4
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.3.35i 1 m2 Pemasangan lantai keramik cutting ukuran 31 x 63 cm - -
A.4.4.3.35j 1 m2 Pemasangan lantai keramik motif ukuran 40 x 40 cm - -
A.4.4.3.35k 1 m2 Pemasangan lantai keramik polos ukuran 40 x 40 cm - -
A.4.4.3.35l 1 m2 Pemasangan lantai keramik tekstur cuttingukuran 31 x 63 cm - -
A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm - -
A.4.4.3.35n 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm - -
A.4.4.3.35o 1 m2 Pemasangan lantai keramik tekstur ukuran 30 x 30 cm - -
A.4.4.3.35p 1 m2 Pemasangan lantai keramik motif ukuran 50 x 50 cm - -
A.4.4.3.36 1 m2 Pemasangan lantai keramik ukuran 20 x 20 Cm - -
A.4.4.3.39 1 m1 Pemasangan plint keramik artistik ukuran 10 x 20 Cm - -
A.4.4.3.40 1 m1 Pemasangan plint keramik ukuran 10 x 20 Cm - -
A.4.4.3.43 1 m2 Pemasangan lantai marmer bakar ukuran 100 x 100 Cm - -
A.4.4.3.43a 1 m2 Pemasangan lantai marmer hitam ukuran 100 x 100 Cm - -
A.4.4.3.43b 1 m2 Pemasangan lantai marmer putih ukuran 100 x 100 Cm - -
A.4.4.3.43c 1 m2 Pemasangan lantai batu andesit - -
A.4.4.3.43d 1 m2 Pemasangan lantai batu andesit hijau - -
A.4.4.3.43e 1 m2 Pemasangan lantai batu candi - -
A.4.4.3.43f 1 m2 Pemasangan lantai batu candi hitam - -
A.4.4.3.43g 1 m2 Pemasangan lantai batu granit black gold - -
A.4.4.3.43h 1 m2 Pemasangan lantai batu granit motif - -
A.4.4.3.43i 1 m2 Pemasangan lantai batu lempeng - -
A.4.4.3.43j 1 m2 Pemasangan lantai batu lempeng hijau - -
A.4.4.3.43k 1 m2 Pemasangan lantai batu lempeng coklat - -
A.4.4.3.44 1 m2 Lantai karpet - -
A.4.4.3.49 1 m2 Pemasangan dinding keramik 10 cm x 20 cm - -
A.4.4.3.50 1 m2 Pemasangan dinding keramik tekture 20 cm x 20 cm - -
A.4.4.3.51 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm - -
A.4.4.3.53 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm - -
A.4.4.3.54 1 m2 Pemasangan dinding keramik 20 x 20 cm - -
A.4.4.3.54a 1 m2 Pemasangan dinding keramik motif 20 x 25 cm - -
A.4.4.3.54b 1 m2 Pemasangan dinding keramik putih 20 x 25 cm - -
A.4.4.3.54c 1 m2 Pemasangan dinding keramik 20 x 33 cm - -
A.4.4.3.54d 1 m2 Pemasangan dinding keramik 40 x 40 cm - -
A.4.4.3.54e 1 m2 Pemasangan dinding keramik tekstur cutting 31 x 63 cm - -
A.4.4.3.54f 1 m2 Pemasangan dinding keramik tekstur 20 x 20 cm - -
A.4.4.3.54g 1 m2 Pemasangan dinding keramik tekstur 30 x 30 cm - -
A.4.4.3.54h 1 m2 Pemasangan dinding batu marmo warna - -
A.4.4.3.54i 1 m2 Pemasangan dinding batu andesit - -
A.4.4.3.54j 1 m2 Pemasangan dinding batu andesit alur - -
A.4.4.3.54k 1 m2 Pemasangan dinding batu andesit alur hitam - -
A.4.4.3.54l 1 m2 Pemasangan dinding batu andesit hitam bakar - -
A.4.4.3.54m 1 m2 Pemasangan dinding batu andesit hitam - -
A.4.4.3.54n 1 m2 Pemasangan dinding batu andesit hijau - -
A.4.4.3.54o 1 m2 Pemasangan dinding batu bali green - -
A.4.4.3.54p 1 m2 Pemasangan dinding batu bobos - -
A.4.4.3.54q 1 m2 Pemasangan dinding batu candi - -
A.4.4.3.54r 1 m2 Pemasangan dinding batu candi hitam - -
A.4.4.3.54s 1 m2 Pemasangan dinding batu granit black gold - -
A.4.4.3.54t 1 m2 Pemasangan dinding batu granit motif - -
A.4.4.3.54u 1 m2 Pemasangan dinding batu lempeng - -
A.4.4.3.54v 1 m2 Pemasangan dinding batu marmo biasa - -
A.4.4.3.54w 1 m2 Pemasangan dinding batu paras putih - -
A.4.4.3.54x 1 m2 Pemasangan dinding batu paras grobongan - -
A.4.4.3.54y 1 m2 Pemasangan dinding batu susun sirih - -
A.4.4.3.54z 1 m2 Pemasangan dinding batu warna ( hias ) - -
A.4.4.3.54aa 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 20 cm - -
A.4.4.3.54ab 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 30 cm - -
A.4.4.3.54ac 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 40 cm - -
A.4.4.3.55 1 m2 Pemasangan dinding marmer bakar 100 x 100 cm - -

5
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.3.55a 1 m2 Pemasangan dinding marmer hitam 100 x 100 cm - -
A.4.4.3.55b 1 m2 Pemasangan dinding marmer putih 100 x 100 cm - -
A.4.4.3.57 1 m2 Pemasangan dinding batu paras putih - -
A.4.4.3.57a 1 m2 Pemasangan dinding batu paras grobogan - -
A.4.4.3.58 1 m2 Pemasangan dinding batu tempel hitam - -
A.4.4.3.60 1 m2 Pemasangan wallpaper lebar 50 cm - -
A.4.4.3.63 1 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm - -
A.4.4.3.63a 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr - -
A.4.4.3.63b 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K225 - -
A.4.4.3.63c 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K225 - -
A.4.4.3.63d 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K300 - -
A.4.4.3.63e 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K300 - -
A.4.4.3.63f 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K400 - -
A.4.4.3.63g 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K400 - -
A.4.4.3.63h 1 m2 Pasang Paving Stone Warna Tebal 8 Cm K225 - -
A.4.4.3.63i 1 m2 Pasang Paving Stone Warna Tebal 6 Cm K225 - -
A.4.4.3.63j 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 8 Cm K225 - -
A.4.4.3.63k 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 6 Cm K225 - -
A.4.4.3.63l 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm - -
A.4.4.3.63m 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm - -
A.4.4.3.63n 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 8 cm - -
A.4.4.3.63o 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 6 cm - -
A.4.4.3.63p 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 8 Cm - -
A.4.4.3.63q 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 6 Cm - -
A.4.4.3.63r 1 m2 Pasang Paving Stone (12 x 12) 5 warna Tebal 6 Cm - -

A.4.5.1 PEKERJAAN LANGIT - LANGIT ( PLAFOND )

A.4.5.1.1 1 m2 Pemasangan langit - langit Eternit Polos ( Asbes ) - -


A.4.5.1.1a 1 m2 Pemasangan langit - langit Eternit Kembang ( Asbes ) - -
A.4.5.1.2 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 30 ) cm - -
A.4.5.1.3 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 60 ) cm - -
A.4.5.1.4 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 120 ) cm - -
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm - -
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm - -
A.4.5.1.6a 1 m2 Pemasangan langit - langit lambrisering kayu jati lokal, tebal 9 mm - -
A.4.5.1.6b 1 m2 Pemasangan langit - langit lambrisering kayu kamfer, tebal 9 mm - -
A.4.5.1.6c 1 m2 Pemasangan langit - langit lambrisering kayu balau, tebal 9 mm - -
A.4.5.1.6d 1 m2 Pemasangan langit - langit lambrisering kayu kempas, tebal 9 mm - -
A.4.5.1.6e 1 m2 Pemasangan langit - langit lambrisering kayu kruing, tebal 9 mm - -
A.4.5.1.6f 1 m2 Pemasangan langit - langit lambrisering kayu meranti, tebal 9 mm - -
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm - -
A.4.5.1.7 1 m2 Pemasangan langit - langit gypsum board ukuran ( 120 x 240 x 9 ) 9 mm - -
A.4.5.1.8 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 240 ) Cm rangka Alluminium - -
A.4.5.1.9 1 m' Pemasangan list langit - langit kayu profil - -
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon - -
A.4.5.1.10a 1 m' List Plafond Gypsum Kecil - -
A.4.5.1.10b 1 m' List Plafond Gypsum Besar - -

A.4.5.2 HARGA SATUAN PENUTUP ATAP

A.4.5.2.1 1 m2 Pemasangan atap genteng MKP lokal - -


A.4.5.2.1a 1 m2 Pemasangan atap genteng Mantili - -
A.4.5.2.1b 1 m2 Pemasangan atap genteng Press biasa - -
A.4.5.2.1c 1 m2 Pemasangan atap genteng Prentul eks Trenggalek / Tulungagung - -
A.4.5.2.1d 1 m2 Pemasangan atap genteng Kaca ( model karangpilang) - -
A.4.5.2.2 1 m2 Pemasangan atap genteng glazuur eks Kanmuri - -
A.4.5.2.4 1 m2 Pemasangan bubung genteng MKP lokal - -
A.4.5.2.5 1 m2 Pemasangan bubung genteng glazuur eks Kanmuri - -

6
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.5.2.6a 1 m2 Pemasangan bubung genteng bubung mantili - -
A.4.5.2.6b 1 m2 Pemasangan bubung genteng bubung Prentul eks Trenggalek / Tulungagung - -
A.4.5.2.6c 1 m2 Pemasangan bubung genteng bubung Press - -
A.4.5.2.7 1 m2 Pemasangan roof light fibreglass 90 x 180 - -
A.4.5.2.8 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,50 m x 5 mm - -
A.4.5.2.9 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,25 m x 5 mm - -
A.4.5.2.10 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,00 m x 5 mm - -
A.4.5.2.11 1 m2 Pemasangan atap asbes gelombang 0,92 m x 1,80 m x 5 mm - -
A.4.5.2.12 1 m2 Pemasangan atap asbes gelombang 1,05 m x 3,00 m x 4 mm - -
A.4.5.2.13 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,70 m x 4 mm - -
A.4.5.2.14 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,50 m x 4 mm - -
A.4.5.2.15 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,25 m x 4 mm - -
A.4.5.2.16 1 m2 Pemasangan atap asbes gelombang 1,05 m x 1,50 m x 4 mm - -
A.4.5.2.17 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 3,00 m x 5 mm - -
A.4.5.2.18 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,50 m x 5 mm - -
A.4.5.2.19 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,25 m x 5 mm - -
A.4.5.2.20 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,00 m x 5 mm - -
A.4.5.2.21 1 m2 Pemasangan atap asbes gelombang besar 0,92 x 2,50 m x 5 mm - -
A.4.5.2.22 1 m1 Pemasangan bumbungan stel gelombang 0,92 m - -
A.4.5.2.23 1 m1 Pemasangan bumbungan stel gelombang 1,05 m - -
A.4.5.2.24 1 m1 Pemasangan bumbungan stel gelombang 1,08 m - -
A.4.5.2.25 1 m1 Pemasangan nok paten 0,92 m - -
A.4.5.2.26 1 m1 Pemasangan nok paten 1,05 m - -
A.4.5.2.28 1 m1 Pemasangan nok stel rata 0,92 m - -
A.4.5.2.29 1 m1 Pemasangan nok stel rata 1,05 m - -
A.4.5.2.30 1 m2 Pemasangan genteng beton - -
A.4.5.2.32 1 m2 Pemasangan genteng metal - -
A.4.5.2.33 1 m2 Pemasangan atap sirap kayu - -
A.4.5.2.34 1 m1 Pemasangan nok genteng beton - -
A.4.5.2.36 1 m1 Pemasangan nok genteng metal - -
A.4.5.2.37 1 m1 Pemasangan nok sirap - -
A.4.5.2.38 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 180 x 90 x 0,03 cm - -
A.4.5.2.38a 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 180 x 90 x 0,02 cm - -
A.4.5.2.38b 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 305 x 90 x 0,03 cm - -
A.4.5.2.38c 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 305 x 90 x 0,02 cm - -
A.4.5.2.39 1 m2 Pemasangan atap seng BJLS 20 - -
A.4.5.2.39a 1 m2 Pemasangan atap seng BJLS 27 - -
A.4.5.2.39b 1 m2 Pemasangan atap seng BJLS 30 - -
A.4.5.2.40 1 m2 Pemasangan atap alumunium tebal 0,25 mm - -
A.4.5.2.40a 1 m2 Pemasangan atap alumunium tebal 0,30 mm - -
A.4.5.2.40b 1 m2 Pemasangan atap alumunium tebal 0,35 mm - -
A.4.5.2.40c 1 m2 Pemasangan atap alumunium tebal 0,40 mm - -
A.4.5.2.41 1 m2 Pemasangan nok alumunium - -
A.4.5.2.42 1 m2 Pemasangan alumunium foil / sisalation - -

A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro - -
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal - -
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer - -
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau - -
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas - -
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing - -
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti - -
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia ) - -
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro - -
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal - -
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer - -
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau - -

7
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas - -
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing - -
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti - -
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia ) - -
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro - -
A.4.6.1.3a 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati - -
A.4.6.1.3b 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kamfer - -
A.4.6.1.3c 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu balau - -
A.4.6.1.3d 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kempas - -
A.4.6.1.3e 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kruing - -
A.4.6.1.3f 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu meranti - -
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia ) - -
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro - -
A.4.6.1.4a 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati - -
A.4.6.1.4b 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kamfer - -
A.4.6.1.4c 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu balau - -
A.4.6.1.4d 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kempas - -
A.4.6.1.4e 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kruing - -
A.4.6.1.4f 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu meranti - -
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia ) - -
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro - -
A.4.6.1.5a 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati lokal - -
A.4.6.1.5b 1 m2 Pembuatan dan pemasangan pintu panel, kayu kamfer - -
A.4.6.1.5c 1 m2 Pembuatan dan pemasangan pintu panel, kayu balau - -
A.4.6.1.5d 1 m2 Pembuatan dan pemasangan pintu panel, kayu kempas - -
A.4.6.1.5e 1 m2 Pembuatan dan pemasangan pintu panel, kayu kruing - -
A.4.6.1.5f 1 m2 Pembuatan dan pemasangan pintu panel, kayu meranti - -
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia ) - -
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro - -
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal - -
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer - -
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau - -
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas - -
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing - -
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti - -
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia) - -
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro - -
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal - -
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer - -
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau - -
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas - -
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing - -
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti - -
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia ) - -
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm - -
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm - -
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm - -
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm - -
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm - -
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm - -
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm - -
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm - -
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro - -
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal - -
A.4.6.1.9b 1 m2 Pembuatan daun pintu plywood rangka expose kayu kamfer - -
A.4.6.1.9c 1 m2 Pembuatan daun pintu plywood rangka expose kayu balau - -
A.4.6.1.9d 1 m2 Pembuatan daun pintu plywood rangka expose kayu kempas - -
A.4.6.1.9e 1 m2 Pembuatan daun pintu plywood rangka expose kayu kruing - -
A.4.6.1.9f 1 m2 Pembuatan daun pintu plywood rangka expose kayu meranti - -

8
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia ) - -
A.4.6.1.10 1 m2 Pemasangan jalusi kusen, kayu Jati eks Bojonegoro - -
A.4.6.1.10a 1 m2 Pemasangan jalusi kusen, kayu Jati lokal - -
A.4.6.1.10b 1 m2 Pemasangan jalusi kusen, kayu kamfer - -
A.4.6.1.10c 1 m2 Pemasangan jalusi kusen, kayu balau - -
A.4.6.1.10d 1 m2 Pemasangan jalusi kusen, kayu kempas - -
A.4.6.1.10e 1 m2 Pemasangan jalusi kusen, kayu kruing - -
A.4.6.1.10f 1 m2 Pemasangan jalusi kusen, kayu meranti - -
A.4.6.1.10g 1 m2 Pemasangan jalusi kusen, kayu tahun ( mauni / akasia ) - -
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro - -
A.4.6.1.11a 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati lokal - -
A.4.6.1.11b 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Kamfer - -
A.4.6.1.11c 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Balau - -
A.4.6.1.11d 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kempas - -
A.4.6.1.11e 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kruing - -
A.4.6.1.11f 1 m2 Pemasangan teakwood rangkap, rangka expose kayu meranti - -
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia ) - -
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro - -
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal - -
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer - -
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau - -
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas - -
A.4.6.1.12e 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing - -
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti - -
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia ) - -
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter - -
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter - -
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter - -
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter - -
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter - -
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter - -
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter - -
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter - -
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro - -
A.4.6.1.14a 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati lokal - -
A.4.6.1.14b 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kamfer - -
A.4.6.1.14c 1 m3 Pemasangan konstruksi kuda kuda expose kayu Balau - -
A.4.6.1.14d 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kempas - -
A.4.6.1.14e 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kruing - -
A.4.6.1.14f 1 m3 Pemasangan konstruksi kuda kuda expose kayu Meranti - -
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia ) - -
A.4.6.1.15 1 m3 Pemasangan konstruksi gordeng, kayu Jati eks Bojonegoro - -
A.4.6.1.15a 1 m3 Pemasangan konstruksi gordeng, kayu Jati lokal - -
A.4.6.1.15b 1 m3 Pemasangan konstruksi gordeng, kayu kamfer - -
A.4.6.1.15c 1 m3 Pemasangan konstruksi gordeng, kayu Balau - -
A.4.6.1.15d 1 m3 Pemasangan konstruksi gordeng, kayu Kempas - -
A.4.6.1.15e 1 m3 Pemasangan konstruksi gordeng, kayu Kruing - -
A.4.6.1.15f 1 m3 Pemasangan konstruksi gordeng, kayu Meranti - -
A.4.6.1.15g 1 m3 Pemasangan konstruksi gordeng, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro - -
A.4.6.1.16a 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati lokal - -
A.4.6.1.16b 1 m2 Pemasangan rangka atap genteng keramik, kayu Kamfer - -
A.4.6.1.16c 1 m2 Pemasangan rangka atap genteng keramik, kayu Balau - -
A.4.6.1.16d 1 m2 Pemasangan rangka atap genteng keramik, kayu Kempas - -
A.4.6.1.16e 1 m2 Pemasangan rangka atap genteng keramik, kayu Kruing - -
A.4.6.1.16f 1 m2 Pemasangan rangka atap genteng keramik, kayu Meranti - -
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro - -
A.4.6.1.17a 1 m2 Pemasangan rangka atap genteng beton, kayu Jati lokal - -

9
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.17b 1 m2 Pemasangan rangka atap genteng beton, kayu Kamper - -
A.4.6.1.17c 1 m2 Pemasangan rangka atap genteng beton, kayu Balau - -
A.4.6.1.17d 1 m2 Pemasangan rangka atap genteng beton, kayu Kempas - -
A.4.6.1.17e 1 m2 Pemasangan rangka atap genteng beton, kayu Kruing - -
A.4.6.1.17f 1 m2 Pemasangan rangka atap genteng beton, kayu Meranti - -
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.18 1 m2 Pemasangan rangka atap sirap, kayu Jati eks Bojonegoro - -
A.4.6.1.18a 1 m2 Pemasangan rangka atap sirap, kayu Jati lokal - -
A.4.6.1.18b 1 m2 Pemasangan rangka atap sirap, kayu Kamfer - -
A.4.6.1.18c 1 m2 Pemasangan rangka atap sirap, kayu Balau - -
A.4.6.1.18d 1 m2 Pemasangan rangka atap sirap, kayu Kempas - -
A.4.6.1.18e 1 m2 Pemasangan rangka atap sirap, kayu Kruing - -
A.4.6.1.18f 1 m2 Pemasangan rangka atap sirap, kayu Meranti - -
A.4.6.1.18g 1 m2 Pemasangan rangka atap sirap, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro - -
A.4.6.1.19a 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati lokal - -
A.4.6.1.19b 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kamfer - -
A.4.6.1.19c 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Balau - -
A.4.6.1.19d 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kempas - -
A.4.6.1.19e 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kruing - -
A.4.6.1.19f 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Meranti - -
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia ) - -
A.4.6.1.20 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati eks Bojonegoro - -
A.4.6.1.20a 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati lokal - -
A.4.6.1.20b 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kamfer - -
A.4.6.1.20c 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Balau - -
A.4.6.1.20d 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kempas - -
A.4.6.1.20e 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kruing - -
A.4.6.1.20f 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Meranti - -
A.4.6.1.20g 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Tahun 9 mauni / akasia ) - -
A.4.6.1.21 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati eks Bojonegoro - -
A.4.6.1.21a 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati lokal - -
A.4.6.1.21b 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kamfer - -
A.4.6.1.21c 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Balau - -
A.4.6.1.21d 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati Kempas - -
A.4.6.1.21e 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kruing - -
A.4.6.1.21f 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Meranti - -
A.4.6.1.21g 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.22 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati eks Bojonegoro - -
A.4.6.1.22a 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati lokal - -
A.4.6.1.22b 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kamfer - -
A.4.6.1.22c 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Balau - -
A.4.6.1.22d 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kempas - -
A.4.6.1.22e 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kruing - -
A.4.6.1.22f 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Meranti - -
A.4.6.1.22g 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro - -
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal - -
A.4.6.1.23b 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kamfer - -
A.4.6.1.23c 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Balau - -
A.4.6.1.23d 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kempas - -
A.4.6.1.23e 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kruing - -
A.4.6.1.23f 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Meranti - -
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia ) - -
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro - -
A.4.6.1.24a 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati lokal - -
A.4.6.1.24b 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kamfer - -
A.4.6.1.24c 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Balau - -
A.4.6.1.24d 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kempas - -

10
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.24e 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kruing - -
A.4.6.1.24f 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Meranti - -
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia ) - -
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro - -
A.4.6.1.25a 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati lokal - -
A.4.6.1.25b 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kamfer - -
A.4.6.1.25c 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Balau - -
A.4.6.1.25d 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kempas - -
A.4.6.1.25e 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kruing - -
A.4.6.1.25f 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Meranti - -
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia ) - -
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro - -
A.4.6.1.26a 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati lokal - -
A.4.6.1.26b 1 m2 Pemasangan dinding lambrisering dari papan kayu Kamfer - -
A.4.6.1.26c 1 m2 Pemasangan dinding lambrisering dari papan kayu Balau - -
A.4.6.1.26d 1 m2 Pemasangan dinding lambrisering dari papan kayu Kempas - -
A.4.6.1.26e 1 m2 Pemasangan dinding lambrisering dari papan kayu Kruing - -
A.4.6.1.26f 1 m2 Pemasangan dinding lambrisering dari papan kayu Meranti - -
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia ) - -
A.4.6.1.27 1 m2 Pemasangan dinding lambrisering dari plywood ukuran 120 x 240 cm - -
A.4.6.1.28 1 m2 Pemasangan dinding bilik, rangka kayu Jati eks Bojonegoro - -
A.4.6.1.28a 1 m2 Pemasangan dinding bilik, rangka kayu Jati lokal - -
A.4.6.1.28b 1 m2 Pemasangan dinding bilik, rangka kayu Kamfer - -
A.4.6.1.28c 1 m2 Pemasangan dinding bilik, rangka kayu Balau - -
A.4.6.1.28d 1 m2 Pemasangan dinding bilik, rangka kayu Kempas - -
A.4.6.1.28e 1 m2 Pemasangan dinding bilik, rangka kayu Kruing - -
A.4.6.1.28f 1 m2 Pemasangan dinding bilik, rangka kayu Meranti - -
A.4.6.1.28g 1 m2 Pemasangan dinding bilik, rangka kayu Tahun ( mauni / akasia ) - -

A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 1 bh Pemasangan kunci tanam antik eks Miler - -


A.4.6.2.1a 1 bh Pemasangan kunci tanam ( SES ) - -
A.4.6.2.2 1 bh Pemasangan kunci tanam biasa - -
A.4.6.2.2a 1 bh Pemasangan kunci tanam slot tanam eks Kuda 2x putaran - -
A.4.6.2.3 1 bh Pemasangan kunci Slot tanam kamar mandi eks Miler - -
A.4.6.2.3a 1 bh Pemasangan kunci Slot tanam kamar mandi - -
A.4.6.2.5 1 bh Pemasangan engsel pintu kupu - kupu - -
A.4.6.2.5a 1 bh Pemasangan engsel kuningan Arc Asli eks Elitech 4" - -
A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H ) - -
A.4.6.2.5c 1 bh Pemasangan engsel pintu ( Arc ) nylon - -
A.4.6.2.5d 1 bh Pemasangan engsel pintu eks Union 4" - -
A.4.6.2.5e 1 bh Pemasangan engsel Stainlesstel Dekson 3" - -
A.4.6.2.5f 1 bh Pemasangan engsel Stainlesstel Dekson 4" - -
A.4.6.2.5g 1 bh Pemasangan engsel Stainlesstel Dekson 5" - -
A.4.6.2.5h 1 bh Pemasangan engsel Sendok - -
A.4.6.2.6 1 bh Pemasangan engsel jendela kupu kupu - -
A.4.6.2.6a 1 bh Pemasangan engsel jendela eks Union 3" - -
A.4.6.2.6b 1 bh Pemasangan engsel jendela ( H ) - -
A.4.6.2.6c 1 bh Pemasangan engsel jendela ( Arch ) - -
A.4.6.2.6d 1 bh Pemasangan grendel biasa ( besar ) 8" - -
A.4.6.2.6e 1 bh Pemasangan grendel biasa ( kecil ) 3" - -
A.4.6.2.6f 1 bh Pemasangan grendel eks AEG - -
A.4.6.2.6g 1 bh Pemasangan grendel jendela merk SES - -
A.4.6.2.6h 1 bh Pemasangan grendel pintu panjang ( sespen ) - -
A.4.6.2.6i 1 bh Pemasangan grendel pintu ganda Dekson 40 cm komplit - -
A.4.6.2.6j 1 bh Pemasangan grendel tanam kuningan besar eks Cavel 60 mm - -
A.4.6.2.6k 1 bh Pemasangan grendel tanam kuningan kecil eks beluci 4" - -
A.4.6.2.6l 1 bh Pemasangan grendel tanam merk SES - -

11
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.2.7 1 bh Pemasangan hak angin - -
A.4.6.2.7a 1 bh Pemasangan hak angin ( Sikutan ) biasa - -
A.4.6.2.7b 1 bh Pemasangan hak angin 4 mm lurus / plat 4 x 150 mm - -
A.4.6.2.7c 1 bh Pemasangan hak angin lurus - -
A.4.6.2.7d 1 bh Pemasangan hak angin merk SES - -
A.4.6.2.9 1 bh Pemasangan kait angin - -
A.4.6.2.10 1 bh Pemasangan door closer - -
A.4.6.2.11 1 bh Pemasangan kunci sloot 2 putaran eks CAVEL ( dengan handle ) - -
A.4.6.2.11a 1 bh Pemasangan kunci sloot 2 putaran eks kodai - -
A.4.6.2.11b 1 bh Pemasangan kunci sloot 2 putaran eks YALE ( dengan handle ) - -
A.4.6.2.11c 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES - -
A.4.6.2.11d 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES - -
A.4.6.2.11e 1 bh Pemasangan kunci sloot Rossete Dekson - -
A.4.6.2.11f 1 bh Pemasangan kunci sloot ( kunci pintu ) lokal - -
A.4.6.2.12a 1 bh Pemasangan Handle - -
A.4.6.2.12b 1 bh Pemasangan Handle pintu ganda Dekson 30 cm komplit - -
A.4.6.2.12c 1 bh Pemasangan Handle pintu ganda Dekson 40 cm komplit - -
A.4.6.2.12d 1 bh Pemasangan Handle ointu stainless steel besar - -
A.4.6.2.12e 1 bh Pemasangan Handle ointu stainless steel kecil - -
A.4.6.2.12h 1 bh Pemasangan Pegangan pintu P=20 - -
A.4.6.2.13 1 bh Pemasangan Door stoper Stainlees - -
A.4.6.2.14 1 bh Pemasangan Rel pintu dorong - -
A.4.6.2.15 1 bh Pemasangan Kunci lemari - -
A.4.6.2.15a 1 bh Pemasangan Kunci laci ( 808 ) - -
A.4.6.2.15b 1 bh Pemasangan Kunci gembok besar stainless 40 mm - -
A.4.6.2.15c 1 bh Pemasangan Kunci gembok besar stainless 30 mm - -
A.4.6.2.16 1 m2 Pemasangan kaca bening tebal 3 mm - -
A.4.6.2.16a 1 m2 Pemasangan kaca buram tebal 3 mm - -
A.4.6.2.16b 1 m2 Pemasangan kaca Es tebal 3 mm - -
A.4.6.2.17 1 bh Pemasangan kaca bening tebal 5 mm - -
A.4.6.2.17a 1 bh Pemasangan kaca Ray band tebal 5 mm - -
A.4.6.2.18 1 m2 Pemasangan kaca bening tebal 7 mm - -
A.4.6.2.18a 1 m2 Pemasangan kaca Ray band tebal 7 mm - -
A.4.6.2.19 1 m2 Pemasangan kaca tebal 10 mm - -
A.4.6.2.20 1 m2 Pemasangan kaca cermin tebal 5 mm - -
A.4.6.2.21 1 m2 Pemasangan kaca cermin tebal 3 mm - -
A.4.6.2.22 1 m2 Pemasangan kaca Stained glass tebal 5 mm - -
A.4.6.2.22a 1 m2 Pemasangan kaca air tebal 5 mm - -
A.4.6.2.22b 1 m2 Pemasangan kaca bluegreen tebal 8 mm - -
A.4.6.2.22c 1 m2 Pemasangan kaca profil ( bevel / moulding ) - -
A.4.6.2.23 1 m2 Pemasangan kaca patri - -

A.4.7.1 PEKERJAAN PENGECATAN

A.4.7.1.1 1 m2 Pengikisan / pengerokan permukaan cat lama - -


A.4.7.1.2 1 m2 Pencucian Bidang permukaan tembok yang pernah dicat - -
A.4.7.1.3 1 m2 Pengerokan karat pada permukaan baja cara manual - -
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup) - -
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup) - -
A.4.7.1.6 1 m2 Pelaburan bidang kayu dengan teak oil - -
A.4.7.1.7 1 m2 Pelaburan bidang kayu dengan pelitur - -
A.4.7.1.8 1 m2 Pelaburan bidang kayu dengan cat residu dan ter - -
A.4.7.1.9 1 m2 Pelaburan bidang kayu dengan vernis - -
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup) - -
A.4.7.1.10a 1 m2 Pengecatan tembok Eksterior - -
A.4.7.1.10b 1 m2 Pengecatan tembok Interior - -
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup) - -
A.4.7.1.13 1 m2 Pelaburan tembok dengan kapur sirih - -
A.4.7.1.14 1 m2 Pelaburan tembok lama dengan kapur sirih - -

12
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.7.1.15 1 m2 Pemasangan wallpaper - -
A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi - -
A.4.7.1.17 1 m2 Pengecatan permukaan baja dengan menie besi dengan perancah - -
A.4.7.1.18 1 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis - -
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir - -
A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis - -
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir - -
A.4.7.1.21a 1 m2 Pengecatan langit-langit (plafond) - -
A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam ) - -
A.4.7.1.21c 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) - -
A.4.7.1.21d 1 m2 Sending impra ( melamine) 42,123.00 71,392.50

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 1 Bh Pemasangan closet duduk keramik 373,377.60 -


A.5.1.1.1a 1 Bh Pemasangan closet duduk keramik komplit eks AMSTAD 373,377.60 -
A.5.1.1.1b 1 Bh Pemasangan closet duduk keramik komplit eks INA 373,377.60 -
A.5.1.1.1c 1 Bh Pemasangan closet duduk keramik komplit eks TOTO 373,377.60 -
A.5.1.1.1d 1 Bh Pemasangan closet monoblock lokal 373,377.60 -
A.5.1.1.2 1 Bh Pemasangan closet jongkok keramik eks AMSTAD 245,203.20 -
A.5.1.1.2a 1 Bh Pemasangan closet jongkok keramik eks INA 245,203.20 -
A.5.1.1.3 1 Bh Pemasangan closet duduk jongkok teraso 233,442.00 -
A.5.1.1.4 1 Bh Pemasangan urinoir 183,330.00 -
A.5.1.1.5 1 Bh Pemasangan wastafel besar warna muda eks INA 245,581.20 -
A.5.1.1.5a 1 Bh Pemasangan wastafel besar warna tua eks INA 245,581.20 -
A.5.1.1.6 1 Bh Pemasangan bathcuip porselen 81,320.76 -
A.5.1.1.7 1 Bh Pemasangan bak fiberglass vol 1 m3 738,180.00 -
A.5.1.1.8 1 Bh Pemasangan bak mandi batu vol 0,30 m3 770,439.60 -
A.5.1.1.9 1 Bh Pemasangan bak mandi teraso vol 0,30 m3 738,180.00 -
A.5.1.1.10 1 Bh Pemasangan bak mandi fiberglass vol 1 m3 70,032.60 -
A.5.1.1.11 1 Bh Pemasangan bak mandi beton vol 1 m3 682,756.56 -
A.5.1.1.12 1 Bh Pemasangan bak cuci piring stainlessteel 34,003.80 -
A.5.1.1.13 1 Bh Pemasangan bak cuci piring teraso 56,673.00 -
A.5.1.1.14 1 Bh Pemasangan floor drain plastik 11,334.60 -
A.5.1.1.14a 1 Bh Pemasangan floor drain staninlees steel 11,334.60 -
A.5.1.1.15 1 Bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35cm 240,240.49 -
A.5.1.1.16 1 Bh Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm 354,792.96 -
A.5.1.1.17 1 Bh Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm 354,792.96 -
A.5.1.1.18 1 m' Pemasangan pipa galvanis diameter 1/2" 16,106.04 -
A.5.1.1.19 1 m' Pemasangan kran diameter 1/2" 41,401.80 -
A.5.1.1.19a 1 m' Pemasangan kran diameter 3/4" 41,401.80 -
A.5.1.1.19b 1 m' Pemasangan kran dupon 41,401.80 -
A.5.1.1.19c 1 m' Pemasangan kran Toto 1/2" 41,401.80 -
A.5.1.1.19d 1 m' Pemasangan stop kran diameter 1" 41,401.80 -
A.5.1.1.19e 1 m' Pemasangan stop kran diameter 1/2" 41,401.80 -
A.5.1.1.19f 1 m' Pemasangan stop kran diameter 3/4" 41,401.80 -
A.5.1.1.19g 1 m' Pemasangan stop kran diameter 1" kuningan 41,401.80 -
A.5.1.1.19h 1 m' Pemasangan stop kran diameter 1/2" kuningan 41,401.80 -
A.5.1.1.19i 1 m' Pemasangan stop kran diameter 3/4" kuningan 41,401.80 -
A.5.1.1.19j 1 m' Pemasangan stop kran diameter 1" plastik 41,401.80 -
A.5.1.1.19k 1 m' Pemasangan stop kran diameter 1/2" 41,401.80 -
A.5.1.1.20 1 m' Pemasangan pipa galvanis diameter 3/4" 16,106.04 -
A.5.1.1.21 1 m' Pemasangan pipa galvanis diameter 1" 16,106.04 -
A.5.1.1.22 1 m' Pemasangan pipa galvanis diameter 1 1/2" 26,973.00 -
A.5.1.1.22a 1 m' Pemasangan pipa galvanis diameter 2" 26,973.00 0.13
A.5.1.1.22b 1 m' Pemasangan pipa galvanis diameter 2 1/2" 26,973.00 -
A.5.1.1.23 1 m' Pemasangan pipa galvanis diameter 3" 33,849.36 -
A.5.1.1.24 1 m' Pemasangan pipa galvanis diameter 4" 33,849.36 -
A.5.1.1.25 1 m' Pemasangan pipa PVC tipe AW diameter 1/2" 9,026.64 -

13
HARGA SATUAN KONTRAK BA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.5.1.1.26 1 m' Pemasangan pipa PVC tipe AW diameter 3/4" 9,026.64 -
A.5.1.1.27 1 m' Pemasangan pipa PVC tipe AW diameter 1" 9,026.64 -
A.5.1.1.28 1 m' Pemasangan pipa PVC tipe AW diameter 11/2" 13,539.96 -
A.5.1.1.29 1 m' Pemasangan pipa PVC tipe AW diameter 2" 13,539.96 -
A.5.1.1.30 1 m' Pemasangan pipa PVC tipe AW diameter 21/2" 20,256.48 -
A.5.1.1.31 1 m' Pemasangan pipa PVC tipe AW diameter 3" 20,256.48 -
A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4" 20,256.48 -
A.5.1.1.33 #N/A #N/A - -
A.5.1.1.35 #N/A #N/A - -
A.5.1.1.36 #N/A #N/A - -
A.5.1.1.36a #N/A #N/A - -
A.5.1.1.36b #N/A #N/A - -
A.5.1.1.36c #N/A #N/A - -
A.5.1.1.36d #N/A #N/A - -
A.5.1.1.36e #N/A #N/A - -

ANALISA TAMBAHAN

1 1 m2 Pemasangan lantai batu ampyang 136,212.62 126,973.20


2 1 m2 Pemasangan HPL 215,019.50 215,986.91
3 1 m2 Pengecatan Flexy 41,151.44 91,792.80
4 1 m2 Pemasangan Alumunium Composite Panel Ex. Alucopan 331,208.76 597,046.50

14
REKAPITULASI
HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM

14%

HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS


PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10

- 55,663.20 55,928.40 736,418.00 - 792,346.40


- 60,415.20 60,716.40 882,778.61 - 943,495.01
- 50,263.20 50,513.40 590,646.77 - 641,160.17
- 19,521.00 19,616.55 791,147.35 - 810,763.90
- 485,298.00 487,663.50 1,773,734.55 7,448.76 2,268,846.81
- 251,262.00 252,510.00 2,413,059.66 - 2,665,569.66
- 288,262.80 289,668.30 1,905,528.81 - 2,195,197.11
- 288,262.80 289,668.30 1,827,266.67 - 2,116,934.97
- 13,122.00 13,195.50 - - 13,195.50
- 288,262.80 289,668.30 20,762.73 - 310,431.03
- 33,631.20 33,806.70 280,953.68 - 314,760.38
- 78,294.60 78,628.65 87,870.06 - 166,498.71
- 1,108,060.56 1,113,000.24 - - 1,113,000.24
- 554,030.28 556,500.12 - - 556,500.12
- 8,374.32 8,425.74 5,196.91 - 13,622.65
- 55,097.28 55,378.92 354,766.92 - 410,145.84
- 88,452.00 88,863.00 - - 88,863.00
- 41,553.00 41,738.25 - - 41,738.25
- 26,244.00 26,391.00 - - 26,391.00
- 26,244.00 26,391.00 - - 26,391.00
- 134,946.00 135,631.50 - - 135,631.50
- 83,106.00 83,476.50 - - 83,476.50
- 1,005,048.00 1,010,040.00 - - 1,010,040.00
- 672,624.00 676,134.00 - - 676,134.00

- 60,993.00 61,260.75 - - 61,260.75


- 74,795.40 75,128.85 - - 75,128.85
- 88,811.64 89,212.41 - - 89,212.41
- 81,181.44 81,537.36 - - 81,537.36
- 123,055.20 123,598.80 - - 123,598.80
- 98,123.40 98,555.85 - - 98,555.85
- 4,422.60 4,443.15 - - 4,443.15
- 26,730.00 26,847.00 - - 26,847.00
- 44,226.00 44,431.50 - - 44,431.50
- 44,226.00 44,431.50 - - 44,431.50
- 24,397.20 24,504.30 260,781.84 - 285,286.14
- 110,851.20 111,378.00 406,350.55 - 517,728.55
- 13,267.80 13,329.45 57,934.80 - 71,264.25
- 22,113.00 22,215.75 281,397.60 - 303,613.35
- 22,113.00 22,215.75 124,146.00 - 146,361.75

- 199,827.00 200,754.00 929,013.36 - 1,129,767.36


- 199,827.00 200,754.00 872,131.92 - 1,072,885.92
- 199,827.00 200,754.00 832,676.06 - 1,033,430.06

15
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 199,827.00 200,754.00 804,947.62 - 1,005,701.62
- 199,827.00 200,754.00 766,916.30 - 967,670.30
- 199,827.00 200,754.00 797,522.68 - 998,276.68
- 199,827.00 200,754.00 917,992.58 - 1,118,746.58
- 199,827.00 200,754.00 867,652.01 - 1,068,406.01
- 103,910.04 104,392.08 556,836.19 - 661,228.27
- #N/A 369,862.17 2,478,898.99 - 2,848,761.16
- 279,526.68 280,811.07 769,784.77 - 1,050,595.84
- #N/A 150,958.23 1,235,464.71 - 1,386,422.94
- #N/A 117,140.70 755,619.57 - 872,760.27

- - 165,541.11 936,032.66 - 1,101,573.77


- - 165,541.11 980,747.20 - 1,146,288.31
- - 165,541.11 1,015,622.90 - 1,181,164.01
- - 120,315.60 917,551.98 - 1,037,867.58
- - 165,541.11 1,057,067.46 - 1,222,608.57
- - 165,541.11 1,096,374.30 - 1,261,915.41
- - 165,541.11 1,126,292.00 - 1,291,833.11
- - 165,541.11 1,145,502.46 - 1,311,043.57
- - 165,541.11 1,178,726.96 - 1,344,268.07
- - 165,541.11 1,188,947.68 - 1,354,488.79
- - 210,552.30 1,227,961.76 - 1,438,514.06
- - 244,128.15 1,241,392.24 - 1,485,520.39
- - 210,552.30 1,213,479.84 - 1,424,032.14
- - 8,030.16 63,069.93 - 71,100.09
- - 9,798.87 84,927.15 - 94,726.02
- - 10,706.88 119,293.02 - 129,999.90
- 13,264.56 13,346.55 141,564.06 - 154,910.61
- 9,219.96 9,263.64 140,460.54 - 149,724.18
- 6,937.92 6,976.23 370,757.64 - 377,733.87
- 72,362.16 72,706.92 180,626.16 - 253,333.08
- 72,362.16 72,706.92 202,351.71 - 275,058.63
- 91,844.28 92,281.86 340,705.53 - 432,987.39
- 91,844.28 92,281.86 353,740.86 - 446,022.72
- 91,844.28 92,281.86 401,399.13 - 493,680.99
- 91,844.28 92,281.86 293,185.20 - 385,467.06
- 91,844.28 92,281.86 296,890.77 - 389,172.63
- 18,124.56 18,209.79 134,486.48 - 152,696.27
- 724,610.88 728,305.53 4,090,004.22 - 4,818,309.75
- 819,866.88 824,121.96 5,113,594.26 - 5,937,716.22
- 1,020,347.28 1,025,730.96 8,718,116.94 - 9,743,847.90
- 888,236.28 892,804.11 6,707,967.48 - 7,600,771.59
- 724,928.40 728,625.30 6,156,019.38 - 6,884,644.68
- 724,610.88 728,305.53 5,860,827.78 - 6,589,133.31
- 819,866.88 824,121.96 6,161,442.93 - 6,985,564.89
- 21,318.12 21,422.31 79,345.82 - 100,768.13
- 35,201.52 35,373.63 88,781.49 - 124,155.12
- 311,040.00 312,360.00 - - 312,360.00

- 13,196.52 13,256.49 84,563.56 - 97,820.05


- 16,513.20 16,588.14 105,702.76 - 122,290.90
- 19,741.32 19,830.87 114,556.14 - 134,387.01
- 24,773.04 24,885.63 158,537.59 - 183,423.22
- #N/A 8,351.64 343,267.51 - 351,619.15
- 4,247.64 4,268.73 35,357.78 - 39,626.51

16
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 4,247.64 4,268.73 33,070.11 - 37,338.84
- 5,948.64 5,975.31 - - 5,975.31
- 10,500.84 10,549.56 - - 10,549.56
- 8,492.04 8,531.76 - - 8,531.76
- 51,938.28 52,250.19 - - 52,250.19
- 53,534.52 53,857.59 - - 53,857.59
- 48,178.80 53,857.59 - - 53,857.59
- 44,686.08 44,925.69 - - 44,925.69
- 28,476.36 28,615.14 74,884.87 - 103,500.01
- 63,902.52 64,261.23 - - 64,261.23

- 13,138.20 13,206.33 22,208.34 - 35,414.67


- 11,712.60 11,769.93 22,208.34 - 33,978.27
15,552.00 34,120.44 18,657.24 12,477.30 16,416.00 47,550.54
- 204,917.04 205,919.91 1,103,983.98 - 1,309,903.89
- 5,566.32 5,592.84 41,833.44 3,876.00 51,302.28
- 126,833.04 127,453.71 195,688.20 - 323,141.91
- 228,478.32 229,581.18 688,069.80 - 917,650.98
- 85,892.40 86,312.82 560,538.00 - 646,850.82
- 96,331.68 96,829.32 790,145.40 - 886,974.72
- 195,210.00 196,165.50 475,015.20 - 671,180.70
- 8,388.68 8,429.73 127,995.78 - 136,425.51
- 16,587.50 16,668.68 800,327.88 - 816,996.56
- 16,725.96 16,808.16 1,104,523.20 - 1,121,331.36
- 68,376.96 68,711.79 137,313.00 - 206,024.79
- 325,947.24 327,542.52 222,953.55 - 550,496.07
- 19,521.00 19,616.55 107,182.14 - 126,798.69
- 19,521.00 19,616.55 115,596.48 - 135,213.03
- 19,521.00 19,616.55 98,078.10 - 117,694.65
- 19,521.00 19,616.55 97,388.40 - 117,004.95
- 38,079.72 38,263.53 536,661.84 - 574,925.37
- 38,079.72 38,263.53 200,280.10 - 238,543.63
- 46,150.56 46,382.04 67,756.13 - 114,138.17
- - 47,527.74 98,188.20 - 145,715.94
- - 66,517.29 109,098.00 - 175,615.29

- - 70,229.70 260,857.08 - 331,086.78


- - 70,229.70 245,977.12 - 316,206.82
- - 70,229.70 235,403.39 - 305,633.09
- - 70,229.70 230,746.03 - 300,975.73
- - 70,229.70 230,871.43 - 301,101.13
- - 70,229.70 251,400.36 - 321,630.06
- - 35,114.85 124,850.75 - 159,965.60
- - 35,114.85 117,472.21 - 152,587.06
- - 35,114.85 113,426.81 - 148,541.66
- - 35,114.85 110,893.73 - 146,008.58
- - 35,114.85 109,830.34 - 144,945.19
- - 35,114.85 106,966.20 - 142,081.05
- - 35,114.85 127,353.11 - 162,467.96
- - 35,114.85 113,670.33 - 148,785.18
- - 35,114.85 110,601.04 - 145,715.89
- - 44,378.49 1,540,697.00 - 1,585,075.49
- - 44,378.49 1,197,414.50 - 1,241,792.99
- - 44,378.49 1,544,624.53 - 1,589,003.02
- - 44,378.49 1,201,342.03 - 1,245,720.52

17
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 54,311.88 1,117,341.59 - 1,171,653.47
- - 54,311.88 962,159.09 - 1,016,470.97
- - 54,311.88 1,119,964.96 - 1,174,276.84
- - 54,311.88 964,782.46 - 1,019,094.34
- - 35,114.85 705,445.22 - 740,560.07
- - 35,114.85 705,445.22 - 740,560.07
- - 35,114.85 708,071.10 - 743,185.95
- - 35,114.85 708,071.10 - 743,185.95
- - 35,114.85 772,012.56 - 807,127.41
- - 35,114.85 350,668.56 - 385,783.41
- - 40,150.80 781,302.19 - 821,452.99
- - 34,845.53 103,808.63 - 138,654.16

- - 40,150.80 32,515.72 - 72,666.52


- - 40,150.80 24,570.37 - 64,721.17
- - 40,150.80 21,265.83 - 61,416.63
- - 40,150.80 18,900.29 - 59,051.09
- - 40,150.80 17,708.49 - 57,859.29
- - 40,150.80 16,691.24 - 56,842.04
- - 40,150.80 16,179.61 - 56,330.41
- - 40,150.80 15,667.98 - 55,818.78
- - 42,137.82 19,195.61 - 61,333.43
- - 42,137.82 19,853.96 - 61,991.78
- - 42,137.82 19,013.52 - 61,151.34
- - 42,137.82 17,436.74 - 59,574.56
- - 53,749.86 32,870.85 - 86,620.71
- - 41,847.69 28,464.80 - 70,312.49
- - 53,749.86 25,200.38 - 78,950.24
- - 53,749.86 23,721.67 - 77,471.53
- - 53,749.86 22,254.99 - 76,004.85
- - 58,887.84 21,993.03 - 80,880.87
- - 20,182.56 17,708.49 - 37,891.05
- - 46,965.72 5,181.53 - 52,147.25
- - 60,333.36 96,558.00 - 156,891.36
- - 60,333.36 60,819.00 - 121,152.36
- - 35,114.85 9,570.53 - 44,685.38
- - 20,182.56 5,456.40 - 25,638.96
- - 9,475.68 2,808.96 - 12,284.64
- - 40,150.80 15,103.18 - 55,253.98
- - 26,767.20 5,705.70 - 32,472.90
- - 5,674.35 16,515.18 - 22,189.53

- - 36,242.88 73,830.50 - 110,073.38


- - 34,797.36 108,562.02 - 143,359.38
- - 33,566.16 252,093.33 - 285,659.49
- - 93,685.20 163,240.70 - 256,925.90
- - 93,685.20 101,595.84 - 195,281.04
- - 93,685.20 108,562.02 - 202,247.22
- - 93,685.20 254,717.63 - 348,402.83
- - 93,685.20 316,609.38 - 410,294.58
- - 93,685.20 339,919.26 - 433,604.46
- - 93,685.20 471,338.75 - 565,023.95
- - 93,685.20 234,622.91 - 328,308.11
- - 93,685.20 316,609.38 - 410,294.58
- - 93,685.20 144,062.69 - 237,747.89

18
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 93,685.20 194,433.46 - 288,118.66
- - 93,685.20 114,186.44 - 207,871.64
- - 93,685.20 110,328.72 - 204,013.92
- - 93,685.20 203,677.04 - 297,362.24
- - 93,685.20 106,150.64 - 199,835.84
- - 93,685.20 108,562.02 - 202,247.22
- - 93,685.20 105,480.83 - 199,166.03
- - 93,685.20 123,298.15 - 216,983.35
- - 93,685.20 106,775.59 - 200,460.79
- - 21,321.42 126,707.92 - 148,029.34
- - 19,402.80 26,311.43 - 45,714.23
- - 93,685.20 176,741.27 - 270,426.47
- - 93,685.20 181,393.61 - 275,078.81
- - 93,685.20 283,479.24 - 377,164.44
- - 93,685.20 249,317.77 - 343,002.97
- - 93,685.20 292,783.92 - 386,469.12
- - 93,685.20 219,675.72 - 313,360.92
- - 93,685.20 219,675.72 - 313,360.92
- - 93,685.20 3,102,265.58 - 3,195,950.78
- - 93,685.20 324,286.91 - 417,972.11
- - 93,685.20 179,266.82 - 272,952.02
- - 93,685.20 177,671.74 - 271,356.94
- - 93,685.20 131,547.11 - 225,232.31
- - 33,402.00 39,501.00 - 72,903.00
- - 120,452.40 55,760.36 - 176,212.76
- - 120,452.40 95,835.70 - 216,288.10
- - 120,452.40 156,250.91 - 276,703.31
- - 120,452.40 156,250.91 - 276,703.31
- - 120,452.40 97,109.76 - 217,562.16
- - 120,452.40 115,586.20 - 236,038.60
- - 120,452.40 96,445.14 - 216,897.54
- - 120,452.40 101,762.10 - 222,214.50
- - 120,452.40 101,762.10 - 222,214.50
- - 120,452.40 193,878.43 - 314,330.83
- - 120,452.40 97,109.76 - 217,562.16
- - 120,452.40 96,445.14 - 216,897.54
- - 120,452.40 186,168.84 - 306,621.24
- - 120,452.40 247,180.96 - 367,633.36
- - 120,452.40 386,618.23 - 507,070.63
- - 120,452.40 394,593.67 - 515,046.07
- - 120,452.40 380,636.65 - 501,089.05
- - 120,452.40 312,712.49 - 433,164.89
- - 120,452.40 290,647.10 - 411,099.50
- - 120,452.40 201,853.87 - 322,306.27
- - 120,452.40 223,786.33 - 344,238.73
- - 120,452.40 217,538.90 - 337,991.30
- - 120,452.40 217,538.90 - 337,991.30
- - 120,452.40 3,100,128.77 - 3,220,581.17
- - 120,452.40 322,150.09 - 442,602.49
- - 120,452.40 177,130.01 - 297,582.41
- - 120,452.40 153,735.38 - 274,187.78
- - 120,452.40 198,530.77 - 318,983.17
- - 120,452.40 175,933.69 - 296,386.09
- - 120,452.40 629,071.61 - 749,524.01
- - 120,452.40 153,336.61 - 273,789.01
- - 120,452.40 270,841.43 - 391,293.83
- - 120,452.40 270,841.43 - 391,293.83
- - 120,452.40 270,841.43 - 391,293.83
- - 173,986.80 393,445.01 - 567,431.81

19
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 173,986.80 398,097.35 - 572,084.15
- - 173,986.80 500,182.98 - 674,169.78
- - 120,452.40 198,530.77 - 318,983.17
- - 93,685.20 184,087.20 - 277,772.40
- - 93,685.20 185,328.66 - 279,013.86
- - 45,119.49 25,048.65 - 70,168.14
- - 22,103.46 84,870.72 - 106,974.18
- - 22,073.25 67,154.71 - 89,227.96
- - 21,021.60 122,352.78 - 143,374.38
- - 21,021.60 104,144.70 - 125,166.30
- - 21,021.60 140,560.86 - 161,582.46
- - 21,021.60 117,800.76 - 138,822.36
- - 21,021.60 163,320.96 - 184,342.56
- - 21,021.60 111,731.40 - 132,753.00
- - 21,021.60 132,974.16 - 153,995.76
- - 21,021.60 110,214.06 - 131,235.66
- - 21,021.60 132,974.16 - 153,995.76
- - 21,021.60 110,214.06 - 131,235.66
- - 21,021.60 113,248.74 - 134,270.34
- - 21,021.60 95,040.66 - 116,062.26
- - 21,021.60 95,040.66 - 116,062.26
- - 21,021.60 87,453.96 - 108,475.56
- - 21,021.60 110,214.06 - 131,235.66
- - 21,021.60 90,488.64 - 111,510.24
- - 21,021.60 117,800.76 - 138,822.36

- - 10,661.85 20,066.51 - 30,728.36


- - 10,661.85 14,824.79 - 25,486.64
- - 23,539.86 630,711.84 - 654,251.70
- - 23,539.86 345,727.80 - 369,267.66
- - 199,736.55 101,022.24 - 300,758.79
- - 199,736.55 37,232.51 - 236,969.06
- - 156,932.40 693,489.59 - 850,421.99
- - 156,932.40 424,506.59 - 581,438.99
- - 156,932.40 217,596.59 - 374,528.99
- - 156,932.40 222,769.34 - 379,701.74
- - 156,932.40 160,696.34 - 317,628.74
- - 156,932.40 150,350.84 - 307,283.24
- - 156,932.40 114,141.59 - 271,073.99
- - 156,932.40 98,623.34 - 255,555.74
- - 13,982.10 38,670.85 - 52,652.95
- - 98,082.75 514,096.11 - 612,178.86
- - 9,862.14 4,291.19 - 14,153.33
- - 66,517.29 109,098.00 - 175,615.29
- - 4,103.43 26,823.06 - 30,926.49
- - 4,103.43 34,328.25 - 38,431.68

- - 21,027.02 81,510.00 - 102,537.02


- - 21,027.02 100,320.00 - 121,347.02
- - 21,027.02 72,105.00 - 93,132.02
- - 21,027.02 156,750.00 - 177,777.02
- - 21,027.02 357,390.00 - 378,417.02
- - 21,080.31 313,500.00 - 334,580.31
- - 53,989.26 61,004.59 - 114,993.85
- - 53,989.26 151,292.59 - 205,281.85

20
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 51,595.26 56,740.99 - 108,336.25
- - 53,989.26 49,718.59 - 103,707.85
- - 53,989.26 48,715.39 - 102,704.65
- - 19,268.85 183,096.54 - 202,365.39
- - 20,299.41 72,599.08 - 92,898.49
- - 20,299.41 76,398.70 - 96,698.11
- - 19,574.94 83,696.98 - 103,271.92
- - 19,574.94 67,144.18 - 86,719.12
- - 19,574.94 27,787.39 - 47,362.33
- - 19,574.94 40,050.25 - 59,625.19
- - 19,574.94 37,589.90 - 57,164.84
- - 19,574.94 53,646.12 - 73,221.06
- - 19,574.94 50,741.86 - 70,316.80
- - 19,574.94 50,986.39 - 70,561.33
- - 19,574.94 55,218.64 - 74,793.58
- - 19,574.94 60,864.14 - 80,439.08
- - 19,574.94 61,196.45 - 80,771.39
- - 19,574.94 82,737.67 - 102,312.61
- - 21,129.90 108,947.52 - 130,077.42
- - 21,129.90 109,060.38 - 130,190.28
- - 21,129.90 160,041.75 - 181,171.65
- - 21,129.90 52,968.96 - 74,098.86
- - 21,129.90 62,750.16 - 83,880.06
- - 24,930.09 56,241.90 - 81,171.99
- - 21,129.90 100,106.82 - 121,236.72
- - 27,964.20 68,992.57 - 96,956.77
- - 26,994.63 87,458.98 - 114,453.61
- - 41,997.03 279,942.96 - 321,939.99
- - 55,928.40 55,399.21 - 111,327.61
- - 37,826.34 51,915.60 - 89,741.94
- - 38,579.88 23,299.32 - 61,879.20
- - 16,778.52 65,626.84 - 82,405.36
- - 16,778.52 49,211.98 - 65,990.50
- - 16,778.52 62,504.38 - 79,282.90
- - 16,778.52 45,098.86 - 61,877.38
- - 20,248.11 29,669.64 - 49,917.75
- - 20,248.11 16,013.58 - 36,261.69
- - 20,248.11 17,255.04 - 37,503.15
- - 97,409.58 67,540.44 - 164,950.02
- - 97,409.58 78,995.73 - 176,405.31
- - 97,409.58 90,451.02 - 187,860.60
- - 97,409.58 100,984.62 - 198,394.20
- - 34,057.50 26,133.36 - 60,190.86
- - 18,209.79 14,483.70 - 32,693.49

- - 2,950,804.50 42,528,344.10 - 45,479,148.60


- - 2,950,804.50 28,872,284.10 - 31,823,088.60
- - 2,950,804.50 14,457,554.10 - 17,408,358.60
- - 2,950,804.50 14,836,889.10 - 17,787,693.60
- - 2,950,804.50 10,284,869.10 - 13,235,673.60
- - 2,950,804.50 9,526,199.10 - 12,477,003.60
- - 2,950,804.50 7,629,524.10 - 10,580,328.60
- - 2,950,804.50 6,870,854.10 - 9,821,658.60
- - 2,529,261.00 46,390,664.10 - 48,919,925.10
- - 2,529,261.00 31,493,144.10 - 34,022,405.10
- - 2,529,261.00 15,767,984.10 - 18,297,245.10
- - 2,529,261.00 16,181,804.10 - 18,711,065.10

21
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 2,529,261.00 11,215,964.10 - 13,745,225.10
- - 2,529,261.00 10,388,324.10 - 12,917,585.10
- - 2,529,261.00 8,319,224.10 - 10,848,485.10
- - 2,529,261.00 7,491,584.10 - 10,020,845.10
- - 147,594.09 1,849,411.74 - 1,997,005.83
- - 147,594.09 1,132,123.74 - 1,279,717.83
- - 147,594.09 580,363.74 - 727,957.83
- - 147,594.09 594,157.74 - 741,751.83
- - 147,594.09 428,629.74 - 576,223.83
- - 147,594.09 401,041.74 - 548,635.83
- - 147,594.09 304,483.74 - 452,077.83
- - 147,594.09 263,101.74 - 410,695.83
- - 147,594.09 1,849,411.74 - 1,997,005.83
- - 147,594.09 1,132,123.74 - 1,279,717.83
- - 147,594.09 580,363.74 - 727,957.83
- - 147,594.09 594,157.74 - 741,751.83
- - 147,594.09 428,629.74 - 576,223.83
- - 147,594.09 401,041.74 - 548,635.83
- - 147,594.09 304,483.74 - 452,077.83
- - 147,594.09 263,101.74 - 410,695.83
- - 421,543.50 1,849,267.53 - 2,270,811.03
- - 421,543.50 1,131,979.53 - 1,553,523.03
- - 421,543.50 580,219.53 - 1,001,763.03
- - 421,543.50 594,013.53 - 1,015,557.03
- - 421,543.50 428,485.53 - 850,029.03
- - 421,543.50 400,897.53 - 822,441.03
- - 421,543.50 304,339.53 - 725,883.03
- - 421,543.50 262,957.53 - 684,501.03
- - 337,234.80 1,114,266.78 - 1,451,501.58
- - 337,234.80 683,893.98 - 1,021,128.78
- - 337,234.80 352,837.98 - 690,072.78
- - 337,234.80 361,114.38 - 698,349.18
- - 337,234.80 261,797.58 - 599,032.38
- - 337,234.80 245,244.78 - 582,479.58
- - 337,234.80 187,309.98 - 524,544.78
- - 337,234.80 162,480.78 - 499,715.58
- - 421,543.50 2,966,148.90 - 3,387,692.40
- - 421,543.50 1,818,488.10 - 2,240,031.60
- - 421,543.50 935,672.10 - 1,357,215.60
- - 421,543.50 957,742.50 - 1,379,286.00
- - 421,543.50 692,897.70 - 1,114,441.20
- - 421,543.50 648,756.90 - 1,070,300.40
- - 421,543.50 494,264.10 - 915,807.60
- - 421,543.50 428,052.90 - 849,596.40
- - 295,080.45 1,242,571.04 - 1,537,651.49
- - 295,080.45 794,266.04 - 1,089,346.49
- - 295,080.45 449,416.04 - 744,496.49
- - 295,080.45 458,037.29 - 753,117.74
- - 295,080.45 354,582.29 - 649,662.74
- - 295,080.45 337,339.79 - 632,420.24
- - 295,080.45 276,991.04 - 572,071.49
- - 295,080.45 251,127.29 - 546,207.74
- - 337,234.80 2,675,077.94 - 3,012,312.74
- - 337,234.80 1,670,874.74 - 2,008,109.54
- - 337,234.80 898,410.74 - 1,235,645.54
- - 337,234.80 917,722.34 - 1,254,957.14
- - 337,234.80 685,983.14 - 1,023,217.94
- - 337,234.80 647,359.94 - 984,594.74
- - 337,234.80 512,178.74 - 849,413.54

22
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 337,234.80 454,243.94 - 791,478.74
- - 313,787.85 2,775,641.22 - 3,089,429.07
- - 313,787.85 1,699,709.22 - 2,013,497.07
- - 313,787.85 872,069.22 - 1,185,857.07
- - 313,787.85 892,760.22 - 1,206,548.07
- - 313,787.85 644,468.22 - 958,256.07
- - 313,787.85 603,086.22 - 916,874.07
- - 313,787.85 458,249.22 - 772,037.07
- - 313,787.85 396,176.22 - 709,964.07
- - 337,234.80 1,261,782.32 - 1,599,017.12
- - 337,234.80 813,477.32 - 1,150,712.12
- - 337,234.80 468,627.32 - 805,862.12
- - 337,234.80 477,248.57 - 814,483.37
- - 337,234.80 373,793.57 - 711,028.37
- - 337,234.80 356,551.07 - 693,785.87
- - 337,234.80 296,202.32 - 633,437.12
- - 337,234.80 270,338.57 - 607,573.37
- - 358,365.84 1,442,922.62 - 1,801,288.46
- - 358,365.84 994,617.62 - 1,352,983.46
- - 358,365.84 649,767.62 - 1,008,133.46
- - 358,365.84 658,388.87 - 1,016,754.71
- - 358,365.84 554,933.87 - 913,299.71
- - 358,365.84 537,691.37 - 896,057.21
- - 358,365.84 477,342.62 - 835,708.46
- - 358,365.84 451,478.87 - 809,844.71
- - 1,686,174.00 42,951,029.88 - 44,637,203.88
- - 1,686,174.00 29,294,969.88 - 30,981,143.88
- - 1,686,174.00 16,397,579.88 - 18,083,753.88
- - 1,686,174.00 15,259,574.88 - 16,945,748.88
- - 1,686,174.00 10,707,554.88 - 12,393,728.88
- - 1,686,174.00 9,948,884.88 - 11,635,058.88
- - 1,686,174.00 8,052,209.88 - 9,738,383.88
- - 1,686,174.00 7,293,539.88 - 8,979,713.88
- - 2,824,341.45 46,813,349.88 - 49,637,691.33
- - 2,824,341.45 31,915,829.88 - 34,740,171.33
- - 2,824,341.45 16,190,669.88 - 19,015,011.33
- - 2,824,341.45 16,604,489.88 - 19,428,831.33
- - 2,824,341.45 11,638,649.88 - 14,462,991.33
- - 2,824,341.45 10,811,009.88 - 13,635,351.33
- - 2,824,341.45 8,741,909.88 - 11,566,251.33
- - 2,824,341.45 7,914,269.88 - 10,738,611.33
- - 2,824,341.45 42,898,211.40 - 45,722,552.85
- - 2,824,341.45 29,242,151.40 - 32,066,492.85
- - 2,824,341.45 14,827,421.40 - 17,651,762.85
- - 2,824,341.45 15,206,756.40 - 18,031,097.85
- - 2,824,341.45 10,654,736.40 - 13,479,077.85
- - 2,824,341.45 9,896,066.40 - 12,720,407.85
- - 2,824,341.45 7,999,391.40 - 10,823,732.85
- - 2,824,341.45 7,240,721.40 - 10,065,062.85
- - 19,616.55 684,847.02 - 704,463.57
- - 19,616.55 466,350.06 - 485,966.61
- - 19,616.55 235,714.38 - 255,330.93
- - 19,616.55 241,783.74 - 261,400.29
- - 19,616.55 168,951.42 - 188,567.97
- - 19,616.55 156,812.70 - 176,429.25
- - 19,616.55 126,465.90 - 146,082.45
- - 19,616.55 114,327.18 - 133,943.73
- - 19,616.55 765,955.74 - 785,572.29
- - 19,616.55 521,388.12 - 541,004.67

23
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 19,616.55 263,233.41 - 282,849.96
- - 19,616.55 270,026.96 - 289,643.51
- - 19,616.55 188,504.42 - 208,120.97
- - 19,616.55 174,917.33 - 194,533.88
- - 19,616.55 140,949.60 - 160,566.15
- - 19,616.55 140,949.60 - 160,566.15
- - 19,616.55 541,882.74 - 565,422.60
- - 23,539.86 368,078.34 - 391,618.20
- - 23,539.86 184,618.14 - 208,158.00
- - 23,539.86 189,446.04 - 212,985.90
- - 23,539.86 131,511.24 - 155,051.10
- - 23,539.86 121,855.44 - 145,395.30
- - 23,539.86 97,715.94 - 121,255.80
- - 23,539.86 88,060.14 - 111,600.00
- - 53,599.95 598,860.24 - 652,460.19
- - 53,599.95 407,675.40 - 461,275.35
- - 53,599.95 205,869.18 - 259,469.13
- - 53,599.95 211,179.87 - 264,779.82
- - 53,599.95 147,451.59 - 201,051.54
- - 53,599.95 136,830.21 - 190,430.16
- - 53,599.95 110,276.76 - 163,876.71
- - 53,599.95 99,655.38 - 153,255.33
- - 50,502.00 634,636.86 - 685,138.86
- - 50,502.00 432,278.88 - 482,780.88
- - 50,502.00 218,678.79 - 269,180.79
- - 50,502.00 224,299.85 - 274,801.85
- - 50,502.00 156,847.19 - 207,349.19
- - 50,502.00 145,605.08 - 196,107.08
- - 50,502.00 117,499.80 - 168,001.80
- - 50,502.00 106,257.69 - 156,759.69
- - 30,885.45 501,098.40 - 531,983.85
- - 30,885.45 307,430.64 - 338,316.09
- - 30,885.45 158,455.44 - 189,340.89
- - 30,885.45 162,179.82 - 193,065.27
- - 30,885.45 117,487.26 - 148,372.71
- - 30,885.45 110,038.50 - 140,923.95
- - 30,885.45 83,967.84 - 114,853.29
- - 30,885.45 72,794.70 - 103,680.15
- - 30,885.45 509,324.64 - 540,210.09
- - 30,885.45 312,070.44 - 342,955.89
- - 30,885.45 160,336.44 - 191,221.89
- - 30,885.45 164,129.79 - 195,015.24
- - 30,885.45 118,609.59 - 149,495.04
- - 30,885.45 111,022.89 - 141,908.34
- - 30,885.45 84,469.44 - 115,354.89
- - 30,885.45 73,089.39 - 103,974.84
- - 63,285.39 1,296,924.42 - 1,360,209.81
- - 63,285.39 794,822.82 - 858,108.21
- - 63,285.39 408,590.82 - 471,876.21
- - 63,285.39 418,246.62 - 481,532.01
- - 63,285.39 302,377.02 - 365,662.41
- - 63,285.39 283,065.42 - 346,350.81
- - 63,285.39 215,474.82 - 278,760.21
- - 63,285.39 186,507.42 - 249,792.81
- - 63,285.39 1,184,523.38 - 1,247,808.77
- - 63,285.39 836,914.58 - 900,199.97
- - 63,285.39 469,994.18 - 533,279.57
- - 63,285.39 479,649.98 - 542,935.37
- - 63,285.39 363,780.38 - 427,065.77

24
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 63,285.39 344,468.78 - 407,754.17
- - 63,285.39 296,189.78 - 359,475.17
- - 63,285.39 276,878.18 - 340,163.57
- - 94,004.40 1,201,023.52 - 1,295,027.92
- - 94,004.40 853,414.72 - 947,419.12
- - 94,004.40 486,494.32 - 580,498.72
- - 94,004.40 496,150.12 - 590,154.52
- - 94,004.40 380,280.52 - 474,284.92
- - 94,004.40 360,968.92 - 454,973.32
- - 94,004.40 312,689.92 - 406,694.32
- - 94,004.40 293,378.32 - 387,382.72
- - 252,926.10 325,613.64 - 578,539.74
- - 252,926.10 200,088.24 - 453,014.34
- - 252,926.10 103,530.24 - 356,456.34
- - 252,926.10 105,944.19 - 358,870.29
- - 252,926.10 76,976.79 - 329,902.89
- - 252,926.10 72,148.89 - 325,074.99
- - 252,926.10 55,251.24 - 308,177.34
- - 252,926.10 48,009.39 - 300,935.49
- - 10,564.95 50,674.14 - 61,239.09
- - 13,982.10 713,268.18 - 727,250.28
- - 13,982.10 502,219.98 - 516,202.08
- - 13,982.10 279,446.88 - 293,428.98
- - 13,982.10 285,309.33 - 299,291.43
- - 13,982.10 214,959.93 - 228,942.03
- - 13,982.10 203,235.03 - 217,217.13
- - 13,982.10 173,922.78 - 187,904.88
- - 13,982.10 162,197.88 - 176,179.98

- - 72,621.99 296,947.20 - 369,569.19


- - 72,621.99 272,243.40 - 344,865.39
- - 57,664.05 88,407.00 - 146,071.05
- - 57,664.05 88,407.00 - 146,071.05
- - 57,058.14 91,291.20 - 148,349.34
- - 57,058.14 173,804.40 - 230,862.54
- - 18,160.88 51,414.00 - 69,574.88
- - 18,160.88 99,191.40 - 117,352.28
- - 18,160.88 18,057.60 - 36,218.48
- - 18,160.88 12,289.20 - 30,450.08
- - 18,160.88 59,439.60 - 77,600.48
- - 18,160.88 66,587.40 - 84,748.28
- - 18,160.88 156,373.80 - 174,534.68
- - 18,160.88 178,945.80 - 197,106.68
- - 18,160.88 15,173.40 - 33,334.28
- - 12,103.67 25,330.80 - 37,434.47
- - 12,103.67 45,018.60 - 57,122.27
- - 12,103.67 20,941.80 - 33,045.47
- - 12,103.67 21,819.60 - 33,923.27
- - 12,103.67 18,057.60 - 30,161.27
- - 12,103.67 8,652.60 - 20,756.27
- - 12,103.67 40,504.20 - 52,607.87
- - 12,103.67 29,719.80 - 41,823.47
- - 12,103.67 65,208.00 - 77,311.67
- - 12,103.67 231,739.20 - 243,842.87
- - 12,103.67 336,072.00 - 348,175.67
- - 12,103.67 195,624.00 - 207,727.67
- - 12,103.67 51,414.00 - 63,517.67

25
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 30,400.67 21,819.60 - 52,220.27
- - 30,400.67 26,710.20 - 57,110.87
- - 30,400.67 23,199.00 - 53,599.67
- - 30,400.67 45,645.60 - 76,046.27
- - 30,400.67 42,134.40 - 72,535.07
- - 18,936.54 21,819.60 - 40,756.14
- - 60,572.19 271,616.40 - 332,188.59
- - 24,207.33 262,963.80 - 287,171.13
- - 24,207.33 134,805.00 - 159,012.33
- - 24,207.33 154,994.40 - 179,201.73
- - 24,207.33 354,882.00 - 379,089.33
- - 24,207.33 354,882.00 - 379,089.33
- - 24,207.33 394,633.80 - 418,841.13
- - 24,207.33 120,258.60 - 144,465.93
- - 60,572.19 105,837.60 - 166,409.79
- - 60,572.19 143,457.60 - 204,029.79
- - 60,572.19 338,956.20 - 399,528.39
- - 60,572.19 640,167.00 - 700,739.19
- - 60,572.19 252,054.00 - 312,626.19
- - 60,572.19 87,654.60 - 148,226.79
- - 12,588.45 63,076.20 - 75,664.65
- - 72,621.99 339,583.20 - 412,205.19
- - 30,264.55 18,057.60 - 48,322.15
- - 30,264.55 18,935.40 - 49,199.95
- - 30,264.55 41,256.60 - 71,521.15
- - 30,264.55 44,140.80 - 74,405.35
- - 18,160.88 87,955.56 - 106,116.44
- - 18,160.88 156,511.74 - 174,672.62
- - 18,160.88 160,512.00 - 178,672.88
- - 18,160.88 147,821.52 - 165,982.40
- - 18,160.88 157,339.38 - 175,500.26
- - 20,581.62 209,543.40 - 230,125.02
- - 20,581.62 244,580.16 - 265,161.78
- - 30,264.55 320,309.22 - 350,573.77
- - 18,936.54 199,185.36 - 218,121.90
- - 21,454.23 173,804.40 - 195,258.63
- - 18,936.54 1,728,664.08 - 1,747,600.62
- - 18,936.54 130,629.18 - 149,565.72
- - 18,936.54 1,037,308.80 - 1,056,245.34
- - 18,936.54 10,345.50 - 29,282.04
- - 23,191.02 3,457,691.82 - 3,480,882.84

- - 12,036.69 1,090.98 - 13,127.67


- - 12,036.69 727.32 - 12,764.01
- - 12,575.34 727.32 - 13,302.66
- - 7,239.57 41,037.15 - 48,276.72
- - 15,672.15 48,271.48 - 63,943.63
- - 15,835.74 3,656.66 - 19,492.40
- - 10,555.83 45,042.18 - 55,598.01
- - 8,455.38 2,545.62 - 11,001.00
- - 3,871.44 10,082.16 - 13,953.60
- - 8,230.29 12,926.23 - 21,156.52
- - 8,230.29 56,715.91 - 64,946.20
- - 8,230.29 26,740.30 - 34,970.59
- - 6,739.91 9,141.66 - 15,881.57
- - 12,083.54 5,511.33 - 17,594.87
- - 3,896.52 6,288.81 - 10,185.33

26
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- - 21,974.93 14,772.12 - 36,747.05
- - 21,974.93 4,525.69 - 26,500.62
- - 42,992.25 17,158.48 - 60,150.73
- - 44,842.30 12,155.02 - 56,997.32
- - 11,691.27 22,776.40 - 34,467.67
- - 113,965.80 27,253.18 - 141,218.98
- - 103,893.90 22,760.10 - 126,654.00
- - 8,230.29 10,969.99 - 19,200.28
- - 11,834.91 35,389.13 - 47,224.04
- - 6,686.04 19,562.40 - 26,248.44
399.00 113,914.50 42,123.00 71,392.50 399.00 113,914.50

- 373,377.60 375,065.70 799,936.63 - 1,175,002.33


- 373,377.60 375,065.70 2,773,459.26 - 3,148,524.96
- 373,377.60 375,065.70 1,830,097.63 - 2,205,163.33
- 373,377.60 375,065.70 3,553,324.37 - 3,928,390.07
- 373,377.60 375,065.70 1,295,078.53 - 1,670,144.23
- 245,203.20 246,405.30 341,965.80 - 588,371.10
- 245,203.20 246,405.30 222,585.00 - 468,990.30
- 233,442.00 234,555.00 198,432.96 - 432,987.96
- 183,330.00 184,195.50 1,885,476.78 - 2,069,672.28
- 245,581.20 246,747.30 459,942.12 - 706,689.42
- 245,581.20 246,747.30 508,276.30 - 755,023.60
- 81,320.76 81,719.19 2,996,357.76 - 3,078,076.95
- 738,180.00 741,826.50 422,608.03 - 1,164,434.53
- 770,439.60 773,928.90 760,769.70 - 1,534,698.60
- 738,180.00 741,826.50 154,914.14 - 896,740.64
- 70,032.60 70,366.50 422,608.03 - 492,974.53
- 682,756.56 685,853.64 4,299,886.95 - 4,985,740.59
- 34,003.80 34,174.35 412,189.80 - 446,364.15
- 56,673.00 56,957.25 403,662.60 - 460,619.85
- 11,334.60 11,391.45 14,044.80 - 25,436.25
- 11,334.60 11,391.45 59,439.60 - 70,831.05
- 240,240.49 241,310.58 212,030.88 - 453,341.46
- 354,792.96 356,353.17 328,545.72 - 684,898.89
- 354,792.96 356,353.17 515,495.57 - 871,848.74
- 16,106.04 16,190.28 44,510.73 - 60,701.01
- 41,401.80 41,607.15 34,808.22 - 76,415.37
- 41,401.80 41,607.15 41,329.02 - 82,936.17
- 41,401.80 41,607.15 200,587.02 - 242,194.17
- 41,401.80 41,607.15 384,674.22 - 426,281.37
- 41,401.80 41,607.15 29,792.22 - 71,399.37
- 41,401.80 41,607.15 39,197.22 - 80,804.37
- 41,401.80 41,607.15 25,403.22 - 67,010.37
- 41,401.80 41,607.15 101,521.02 - 143,128.17
- 41,401.80 41,607.15 96,379.62 - 137,986.77
- 41,401.80 41,607.15 74,685.42 - 116,292.57
- 41,401.80 41,607.15 26,155.62 - 67,762.77
- 41,401.80 41,607.15 32,676.42 - 74,283.57
- 16,106.04 16,190.28 57,144.78 - 73,335.06
- 16,106.04 16,190.28 87,466.50 - 103,656.78
- 26,973.00 27,101.79 132,560.34 - 159,662.13
- 26,973.13 27,101.79 180,958.47 - 208,060.26
- 26,973.00 27,101.79 230,911.56 - 258,013.35
- 33,849.36 34,011.33 298,357.95 - 332,369.28
- 33,849.36 34,011.33 431,695.77 - 465,707.10
- 9,026.64 9,069.84 5,636.73 - 14,706.57

27
HARGA SATUAN KONTRAK BAWAH HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 9,026.64 9,069.84 16,910.19 - 25,980.03
- 9,026.64 9,069.84 21,380.70 - 30,450.54
- 13,539.96 13,604.76 33,820.38 - 47,425.14
- 13,539.96 13,604.76 39,262.74 - 52,867.50
- 20,256.48 20,353.28 56,172.93 - 76,526.21
- 20,256.48 20,353.28 67,446.39 - 87,799.67
- 20,256.48 20,353.28 101,072.40 - 121,425.68
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A
- - #N/A #N/A #N/A #N/A

- 263,185.82 136,212.62 139,670.52 - 275,883.14


- 431,006.41 215,019.50 237,585.60 - 452,605.10
4,389.00 137,333.24 41,151.44 91,792.80 4,389.00 137,333.24
- 928,255.26 331,208.76 656,751.15 - 987,959.91

28
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH OVERHEAD DAN PROFIT

HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3

A.2.2.1 PEKERJAAN PERSIAPAN

A.2.2.1.1 1 m2 Pembuatan Pagar sementara dari kayu tinggi 2 meter 55,663.20


A.2.2.1.2 1 m2 Pembuatan Pagar Sementara dari seng gelombang tinggi 2m 60,415.20
A.2.2.1.3 1 m2 Pembuatan Pagar sementara dari kawat duri tinggi 1.8 M 50,263.20
A.2.2.1.4 1 m' Pengukuran dan pemasangan Bowplank 19,521.00
A.2.2.1.5 1 m2 Pembuatan kantor sementara lantai plesteran 485,298.00
A.2.2.1.6 1 m2 Pembuatan Rumah Jaga ( Kontrusi Kayu ) 251,262.00
A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan 288,262.80
A.2.2.1.8 1 m2 Pembuatan Bedeng Pekerja 288,262.80
A.2.2.1.9 1 m2 Pembersihan Lapangan dan perataan 13,122.00
A.2.2.1.10 1 m2 Pembuatan Steger/Perancah dari bambu 288,262.80
A.2.2.1.11 1 bh Pembuatan Kotak adukan ukuran 40 cm x 50 cm x25 cm 33,631.20
A.2.2.1.12 1 m2 Pembuatan Jalan Sementara 78,294.60
A.2.2.1.13 1 m3 Pembongkaran Beton bertulang 1,108,060.56
A.2.2.1.14 1 m3 Pembongkaran Dinding Tembok bata 554,030.28
A.2.2.1.15 1 m2 Pemasangan pagar kawat jaring galvanis panjang 240 Cm 8,374.32
A.2.2.1.16 1 m2 Pemasangan panel Beton pracetak 5 x 50 x 213 Cm 55,097.28
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar 88,452.00
A.2.2.1.17a 10 m2 Menghapus plesteran yang lama 41,553.00
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi) 26,244.00
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi) 26,244.00
A.2.2.1.17d 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi) 134,946.00
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi) 83,106.00
A.2.2.1.17f 1 m3 Membongkar kuda-kuda jika dipakai lagi 1,005,048.00

1
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.2.2.1.17g 1 m3 Membongkar kuda-kuda jika tidak dipakai lagi 672,624.00

A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 1 m3 Penggalian Tanah biasa sedalam 1 m 60,993.00


A.2.3.1.2 1 m3 Penggalian Tanah biasa sedalam 2 m 74,795.40
A.2.3.1.3 1 m3 Penggalian Tanah biasa sedalam 3 m 88,811.64
A.2.3.1.4 1 m3 Penggalian Tanah keras sedalam 1 m 81,181.44
A.2.3.1.5 1 m3 Penggalian Tanah cadas sedalam 1 m 123,055.20
A.2.3.1.6 1 m3 Penggalian Tanah lumpur sedalam 1 m 98,123.40
A.2.3.1.7 1 m2 Pengerjaan stripping tanah tebing setinngi 1 meter 4,422.60
A.2.3.1.8 1 m3 Pembuangan tanah sejauh 30 meter 26,730.00
A.2.3.1.9 1 m3 Pengurugan kembali galian tanah 44,226.00
A.2.3.1.10 1 m3 Pemadatan tanah ( per 20 cm ) 44,226.00
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 24,397.20
A.2.3.1.12 1 m3 Pemasangan lapisan pudel campuran 1 kp : 3 pp : 7 tl 110,851.20
A.2.3.1.13 1 m2 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 13,267.80
A.2.3.1.14 1 m3 Pengurugan sirtu padat 22,113.00
A.2.3.1.14a 1 m3 Pengurugan tanah 22,113.00

A.3.2.1 PEKERJAAN PONDASI

A.3.2.1.1 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 pp 199,827.00


A.3.2.1.2 1 m3 Pasangan pondasi batu belah campuran 1 sp : 4 pp 199,827.00
A.3.2.1.3 1 m3 Pasangan pondasi batu belah campuran 1 sp : 5 pp 199,827.00
A.3.2.1.4 1 m3 Pasangan pondasi batu belah campuran 1 sp : 6 pp 199,827.00
A.3.2.1.5 1 m3 Pasangan pondasi batu belah campuran 1 sp : 8 pp 199,827.00
A.3.2.1.6 1 m3 Pasangan pondasi batu belah campuran 1 sp : 1 kp : 2 pp 199,827.00
A.3.2.1.7 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 kp : 10 pp 199,827.00
A.3.2.1.8 1 m3 Pasangan pondasi batu belah campuran 1/4 sp : 1 kp : 4 pp 199,827.00
A.3.2.1.9 1 m3 Pasangan pondasi batu kosong ( anstamping ) 103,910.04
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah 368,178.48
A.3.2.1.11 1 m3 Pasangan pondasi sumuran diameter 100 cm 279,526.68
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 150,256.08
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 116,596.80

2
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3

A.4.1.1 PEKERJAAN BETON

A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87 -
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78 -
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72 -
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87 -
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66 -
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61 -
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58 -
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56 -
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53 -
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52 -
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49 -
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48 -
A.4.1.1.13 1 m3 Membuat Beton kedap air dengan strorox - 100 -
A.4.1.1.14 1 m' Pasang PVC waterstop lebar 150 mm -
A.4.1.1.15 1 m' Pasang PVC waterstop lebar 200 mm -
A.4.1.1.16 1 m' Pasang PVC waterstop lebar 230 - 320 mm -
A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir 13,264.56
A.4.1.1.18 10 kg Pemasangan kabel presstressed polos / strands 9,219.96
A.4.1.1.19 10 kg Pemasangan jaring kawat baja ( wiremesh ) 6,937.92
A.4.1.1.20 1 m2 Pemasangan bekisting untuk pondasi 72,362.16
A.4.1.1.21 1 m2 Pemasangan bekisting untuk sloof 72,362.16
A.4.1.1.22 1 m2 Pemasangan bekisting untuk kolom 91,844.28
A.4.1.1.23 1 m2 Pemasangan bekisting untuk balok 91,844.28
A.4.1.1.24 1 m2 Pemasangan bekisting untuk lantai 91,844.28
A.4.1.1.25 1 m2 Pemasangan bekisting untuk dinding 91,844.28
A.4.1.1.26 1 m2 Pemasangan bekisting untuk tangga 91,844.28
A.4.1.1.27 1 m2 Pemasangan jembatan untuk pengecoran beton 18,124.56
A.4.1.1.28 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting ) 724,610.88
A.4.1.1.29 1 m3 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) 819,866.88
A.4.1.1.30 1 m3 Membuat kolom beton bertulang ( 300 kg besi + bekisting ) 1,020,347.28
A.4.1.1.31 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting ) 888,236.28
A.4.1.1.32 1 m3 Membuat kolom beton bertulang (150 kg besi + bekisting ) 724,928.40
A.4.1.1.33 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting ) 724,610.88
A.4.1.1.34 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting ) 819,866.88
A.4.1.1.35 1 m' Membuat kolom praktis beton bertulang (11 x 11 ) cm 21,318.12
A.4.1.1.36 1 m' Membuat ring balok beton bertulang (10 x 15 ) cm 35,201.52
A.4.1.1.37 1 m3 Membongkar bekisting dan perawatan beton 311,040.00

A.4.1.2 PEKERJAAN BETON PRACETAK

A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 13,196.52
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 16,513.20
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 19,741.32
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 24,773.04
A.4.1.2.5 1 m2 Pembuatan bekisting untuk plat pracetak ( 5 kali pakai ) 8,310.60

3
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai ) 4,247.64
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai ) 4,247.64
A.4.1.2.8 1 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 5,948.64
A.4.1.2.9 1 bh Pemasangan dan membuka bekisting komponen balok beton pracetak 10,500.84
A.4.1.2.10 1 bh Pemasangan dan membuka bekisting komponen kolom beton pracetak 8,492.04
A.4.1.2.11 1 bh Penuangan/menebar beton untuk komponen plat beton pracetak 51,938.28
A.4.1.2.12 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 53,534.52
A.4.1.2.13 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 48,178.80
A.4.1.2.22 1 titik Upah melakukan grouting pada join pracetak 44,686.08
A.4.1.2.23 1 titik Pemasangan bekisting join pracetak 28,476.36
A.4.1.2.24 1 titik Upah join dengan sling 63,902.52

A.4.2.1 PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 1 kg Pemasangan besi profil 13,138.20


A.4.2.1.2 1 kg Pemasangan rangka kuda-kuda baja IWF 11,712.60
A.4.2.1.3 100 kg Pengerjaan Pekerjaan perakitan 18,568.44
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku 204,917.04
A.4.2.1.5 10 cm Pengerjaan pengelasan dengan las listrik 5,566.32
A.4.2.1.6 1 m2 Pemasangan rangka jendela besi scuare tube ( 25 x 5 ) cm 126,833.04
A.4.2.1.7 1 m2 Pemasangan pintu rolling door besi 228,478.32
A.4.2.1.8 1 m2 Pemasangan pintu lipat ( Folding door ) bahan plastik/PVC 85,892.40
A.4.2.1.9 1 m2 Pemasangan sunscreen aluminium 96,331.68
A.4.2.1.10 1 m2 Pemasangan rolling door aluminium 195,210.00
A.4.2.1.11 1 m Pemasangan kusen pintu aluminium 8,388.68
A.4.2.1.12 1 m2 Pemasangan pintu aluminium strip lebar 8 cm 16,587.50
A.4.2.1.13 1 m2 Pemasangan pintu kaca alumunium 16,725.96
A.4.2.1.14 1 m2 Pemasangan venetions blinds dan vertical blinds 68,376.96
A.4.2.1.15 1 m2 Pemasangan terali besi strip ( 2x3 ) mm 325,947.24
A.4.2.1.16 1 m2 Pemasangan kawat nyamuk 19,521.00
A.4.2.1.16a 1 m2 Pemasangan kawat harmonika 19,521.00
A.4.2.1.16b 1 m2 Pemasangan kawat kassa 19,521.00
A.4.2.1.16c 1 m2 Pemasangan kawat burung 19,521.00
A.4.2.1.17 1 m2 Pemasangan jendela nako dan tralis 38,079.72
A.4.2.1.18 1 m' Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm 38,079.72
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 46,150.56
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi -
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon -

A.4.4.1 PEKERJAAN PASANGAN DINDING

A.4.4.1.1 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 2 pp -


A.4.4.1.2 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 pp -
A.4.4.1.3 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 4 pp -
A.4.4.1.4 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 5 pp -
A.4.4.1.5 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 6 pp -
A.4.4.1.6 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 kp : 10 pp -
A.4.4.1.7 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 2 pp -

4
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp -
A.4.4.1.9 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 4 pp -
A.4.4.1.10 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 5 pp -
A.4.4.1.11 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 6 pp -
A.4.4.1.12 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 8 pp -
A.4.4.1.13 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 kp : 8 pp -
A.4.4.1.14 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 1 pp -
A.4.4.1.15 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 2 pp -
A.4.4.1.16 1 m3 Pemasangan dinding HB20 campuran 1 sp : 3 pp -
A.4.4.1.16a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 3 pp -
A.4.4.1.17 1 m3 Pemasangan dinding HB20 campuran 1 sp : 4 pp -
A.4.4.1.17a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 4 pp -
A.4.4.1.18 1 m3 Pemasangan dinding HB15 campuran 1 sp : 3 pp -
A.4.4.1.18a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 3 pp -
A.4.4.1.19 1 m3 Pemasangan dinding HB15 campuran 1 sp : 4 pp -
A.4.4.1.19a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 4 pp -
A.4.4.1.20 1 m3 Pemasangan dinding HB10 campuran 1 sp : 3 pp -
A.4.4.1.20a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 3 pp -
A.4.4.1.21 1 m3 Pemasangan dinding HB10 campuran 1 sp : 4 pp -
A.4.4.1.21a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 4 pp -
A.4.4.1.22 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 3 pp -
A.4.4.1.23 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 4 pp -
A.4.4.1.24 1 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 sp : 3 pp -
A.4.4.1.24a 1 m2 Pasangan bataco 1 Pc : 3 Psr -

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.1 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 15 mm -


A.4.4.2.2 1 m2 Pemasangan plesteran 1 sp : 2 pp tebal 15 mm -
A.4.4.2.3 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 15 mm -
A.4.4.2.4 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 15 mm -
A.4.4.2.5 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 15 mm -
A.4.4.2.6 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 15 mm -
A.4.4.2.7 1 m2 Pemasangan plesteran 1 sp : 7 pp tebal 15 mm -
A.4.4.2.8 1 m2 Pemasangan plesteran 1 sp : 8 pp tebal 15 mm -
A.4.4.2.9 1 m2 Pemasangan plesteran 1 sp : 1/2 kp : 3 pp tebal 15 mm -
A.4.4.2.10 1 m2 Pemasangan plesteran 1 sp : 2 kp : 8 pp tebal 15 mm -
A.4.4.2.11 1 m2 Pemasangan plesteran 1 sm : 1 kp : 1 pp tebal 15 mm -
A.4.4.2.12 1 m2 Pemasangan plesteran 1 sm : 1 kp : 2 pp tebal 15 mm -
A.4.4.2.13 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 20 mm -
A.4.4.2.14 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 20 mm -
A.4.4.2.15 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 20 mm -
A.4.4.2.16 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 20 mm -
A.4.4.2.17 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 20 mm -
A.4.4.2.18 1 m2 Pemasangan plesteran 1 sp : 1 kp : 2 pp tebal 20 mm -
A.4.4.2.19 1 m2 Pemasangan berapen 1 sp : 5 pp tebal 15 mm -
A.4.4.2.20 1 m2 Pemasangan plesteran sconing 1 sp : 3 pp lebar 10 mm -
A.4.4.2.21 1 m2 Pemasangan plesteran granit 1 sp : 2 granit tebal 1 cm -

5
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.2.22 1 m2 Pemasangan plesteran traso 1 sp : 2 traso tebal 1 cm -
A.4.4.2.23 1 m2 Pemasangan plesteran ciprat 1 sp : 2 pp -
A.4.4.2.24 1 m2 Pemasangan finishing siar bata merah -
A.4.4.2.25 1 m2 Pemasangan finishing siar pasangan conblock ekspose -
A.4.4.2.26 1 m2 Pemasangan finishing siar pasangan batu kali, campuran 1 sp : 2 pp -
A.4.4.2.27 1 m2 Pemasangan acian -
A.4.4.2.28 1 m' Benangan / Tali Air / Sudut Kol Kolan -

A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.3 1 m2 Pemasangan lantai ubin PC abu - abu ukuran 20 x 20 Cm -


A.4.4.3.8 1 m2 Pemasangan lantai ubin teraso ukuran 30 x 30 Cm -
A.4.4.3.9 1 m2 Pemasangan lantai ubin Granit ukuran 40 x 40 Cm -
A.4.4.3.32 1 m2 Pemasangan lantai keramik artistik 10 x 20 Cm -
A.4.4.3.35 1 m2 Pemasangan lantai keramik polos ukuran 30 x 30 cm -
A.4.4.3.35a 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm -
A.4.4.3.35b 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 40 x 40 cm -
A.4.4.3.35c 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 60 x 60 cm -
A.4.4.3.35d 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 40 x 40 cm -
A.4.4.3.35e 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 60 x 60 cm -
A.4.4.3.35f 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 40 x 40 cm -
A.4.4.3.35g 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 60 x 60 cm -
A.4.4.3.35h 1 m2 Pemasangan lantai keramik cutting ukuran 30 x 50 cm -
A.4.4.3.35i 1 m2 Pemasangan lantai keramik cutting ukuran 31 x 63 cm -
A.4.4.3.35j 1 m2 Pemasangan lantai keramik motif ukuran 40 x 40 cm -
A.4.4.3.35k 1 m2 Pemasangan lantai keramik polos ukuran 40 x 40 cm -
A.4.4.3.35l 1 m2 Pemasangan lantai keramik tekstur cuttingukuran 31 x 63 cm -
A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm -
A.4.4.3.35n 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm -
A.4.4.3.35o 1 m2 Pemasangan lantai keramik tekstur ukuran 30 x 30 cm -
A.4.4.3.35p 1 m2 Pemasangan lantai keramik motif ukuran 50 x 50 cm -
A.4.4.3.36 1 m2 Pemasangan lantai keramik ukuran 20 x 20 Cm -
A.4.4.3.39 1 m1 Pemasangan plint keramik artistik ukuran 10 x 20 Cm -
A.4.4.3.40 1 m1 Pemasangan plint keramik ukuran 10 x 20 Cm -
A.4.4.3.43 1 m2 Pemasangan lantai marmer bakar ukuran 100 x 100 Cm -
A.4.4.3.43a 1 m2 Pemasangan lantai marmer hitam ukuran 100 x 100 Cm -
A.4.4.3.43b 1 m2 Pemasangan lantai marmer putih ukuran 100 x 100 Cm -
A.4.4.3.43c 1 m2 Pemasangan lantai batu andesit -
A.4.4.3.43d 1 m2 Pemasangan lantai batu andesit hijau -
A.4.4.3.43e 1 m2 Pemasangan lantai batu candi -
A.4.4.3.43f 1 m2 Pemasangan lantai batu candi hitam -
A.4.4.3.43g 1 m2 Pemasangan lantai batu granit black gold -
A.4.4.3.43h 1 m2 Pemasangan lantai batu granit motif -
A.4.4.3.43i 1 m2 Pemasangan lantai batu lempeng -
A.4.4.3.43j 1 m2 Pemasangan lantai batu lempeng hijau -
A.4.4.3.43k 1 m2 Pemasangan lantai batu lempeng coklat -
A.4.4.3.44 1 m2 Lantai karpet -
A.4.4.3.49 1 m2 Pemasangan dinding keramik 10 cm x 20 cm -

6
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.3.50 1 m2 Pemasangan dinding keramik tekture 20 cm x 20 cm -
A.4.4.3.51 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm -
A.4.4.3.53 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm -
A.4.4.3.54 1 m2 Pemasangan dinding keramik 20 x 20 cm -
A.4.4.3.54a 1 m2 Pemasangan dinding keramik motif 20 x 25 cm -
A.4.4.3.54b 1 m2 Pemasangan dinding keramik putih 20 x 25 cm -
A.4.4.3.54c 1 m2 Pemasangan dinding keramik 20 x 33 cm -
A.4.4.3.54d 1 m2 Pemasangan dinding keramik 40 x 40 cm -
A.4.4.3.54e 1 m2 Pemasangan dinding keramik tekstur cutting 31 x 63 cm -
A.4.4.3.54f 1 m2 Pemasangan dinding keramik tekstur 20 x 20 cm -
A.4.4.3.54g 1 m2 Pemasangan dinding keramik tekstur 30 x 30 cm -
A.4.4.3.54h 1 m2 Pemasangan dinding batu marmo warna -
A.4.4.3.54i 1 m2 Pemasangan dinding batu andesit -
A.4.4.3.54j 1 m2 Pemasangan dinding batu andesit alur -
A.4.4.3.54k 1 m2 Pemasangan dinding batu andesit alur hitam -
A.4.4.3.54l 1 m2 Pemasangan dinding batu andesit hitam bakar -
A.4.4.3.54m 1 m2 Pemasangan dinding batu andesit hitam -
A.4.4.3.54n 1 m2 Pemasangan dinding batu andesit hijau -
A.4.4.3.54o 1 m2 Pemasangan dinding batu bali green -
A.4.4.3.54p 1 m2 Pemasangan dinding batu bobos -
A.4.4.3.54q 1 m2 Pemasangan dinding batu candi -
A.4.4.3.54r 1 m2 Pemasangan dinding batu candi hitam -
A.4.4.3.54s 1 m2 Pemasangan dinding batu granit black gold -
A.4.4.3.54t 1 m2 Pemasangan dinding batu granit motif -
A.4.4.3.54u 1 m2 Pemasangan dinding batu lempeng -
A.4.4.3.54v 1 m2 Pemasangan dinding batu marmo biasa -
A.4.4.3.54w 1 m2 Pemasangan dinding batu paras putih -
A.4.4.3.54x 1 m2 Pemasangan dinding batu paras grobongan -
A.4.4.3.54y 1 m2 Pemasangan dinding batu susun sirih -
A.4.4.3.54z 1 m2 Pemasangan dinding batu warna ( hias ) -
A.4.4.3.54aa 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 20 cm -
A.4.4.3.54ab 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 30 cm -
A.4.4.3.54ac 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 40 cm -
A.4.4.3.55 1 m2 Pemasangan dinding marmer bakar 100 x 100 cm -
A.4.4.3.55a 1 m2 Pemasangan dinding marmer hitam 100 x 100 cm -
A.4.4.3.55b 1 m2 Pemasangan dinding marmer putih 100 x 100 cm -
A.4.4.3.57 1 m2 Pemasangan dinding batu paras putih -
A.4.4.3.57a 1 m2 Pemasangan dinding batu paras grobogan -
A.4.4.3.58 1 m2 Pemasangan dinding batu tempel hitam -
A.4.4.3.60 1 m2 Pemasangan wallpaper lebar 50 cm -
A.4.4.3.63 1 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm -
A.4.4.3.63a 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr -
A.4.4.3.63b 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K225 -
A.4.4.3.63c 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K225 -
A.4.4.3.63d 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K300 -
A.4.4.3.63e 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K300 -
A.4.4.3.63f 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K400 -
A.4.4.3.63g 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K400 -

7
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.3.63h 1 m2 Pasang Paving Stone Warna Tebal 8 Cm K225 -
A.4.4.3.63i 1 m2 Pasang Paving Stone Warna Tebal 6 Cm K225 -
A.4.4.3.63j 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 8 Cm K225 -
A.4.4.3.63k 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 6 Cm K225 -
A.4.4.3.63l 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm -
A.4.4.3.63m 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm -
A.4.4.3.63n 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 8 cm -
A.4.4.3.63o 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 6 cm -
A.4.4.3.63p 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 8 Cm -
A.4.4.3.63q 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 6 Cm -
A.4.4.3.63r 1 m2 Pasang Paving Stone (12 x 12) 5 warna Tebal 6 Cm -

A.4.5.1 PEKERJAAN LANGIT - LANGIT ( PLAFOND )

A.4.5.1.1 1 m2 Pemasangan langit - langit Eternit Polos ( Asbes ) -


A.4.5.1.1a 1 m2 Pemasangan langit - langit Eternit Kembang ( Asbes ) -
A.4.5.1.2 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 30 ) cm -
A.4.5.1.3 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 60 ) cm -
A.4.5.1.4 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 120 ) cm -
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm -
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm -
A.4.5.1.6a 1 m2 Pemasangan langit - langit lambrisering kayu jati lokal, tebal 9 mm -
A.4.5.1.6b 1 m2 Pemasangan langit - langit lambrisering kayu kamfer, tebal 9 mm -
A.4.5.1.6c 1 m2 Pemasangan langit - langit lambrisering kayu balau, tebal 9 mm -
A.4.5.1.6d 1 m2 Pemasangan langit - langit lambrisering kayu kempas, tebal 9 mm -
A.4.5.1.6e 1 m2 Pemasangan langit - langit lambrisering kayu kruing, tebal 9 mm -
A.4.5.1.6f 1 m2 Pemasangan langit - langit lambrisering kayu meranti, tebal 9 mm -
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm -
A.4.5.1.7 1 m2 Pemasangan langit - langit gypsum board ukuran ( 120 x 240 x 9 ) 9 mm -
A.4.5.1.8 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 240 ) Cm rangka Alluminium -
A.4.5.1.9 1 m' Pemasangan list langit - langit kayu profil -
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon -
A.4.5.1.10a 1 m' List Plafond Gypsum Kecil -
A.4.5.1.10b 1 m' List Plafond Gypsum Besar -

A.4.5.2 HARGA SATUAN PENUTUP ATAP

A.4.5.2.1 1 m2 Pemasangan atap genteng MKP lokal -


A.4.5.2.1a 1 m2 Pemasangan atap genteng Mantili -
A.4.5.2.1b 1 m2 Pemasangan atap genteng Press biasa -
A.4.5.2.1c 1 m2 Pemasangan atap genteng Prentul eks Trenggalek / Tulungagung -
A.4.5.2.1d 1 m2 Pemasangan atap genteng Kaca ( model karangpilang) -
A.4.5.2.2 1 m2 Pemasangan atap genteng glazuur eks Kanmuri -
A.4.5.2.4 1 m2 Pemasangan bubung genteng MKP lokal -
A.4.5.2.5 1 m2 Pemasangan bubung genteng glazuur eks Kanmuri -
A.4.5.2.6a 1 m2 Pemasangan bubung genteng bubung mantili -
A.4.5.2.6b 1 m2 Pemasangan bubung genteng bubung Prentul eks Trenggalek / Tulungagung -
A.4.5.2.6c 1 m2 Pemasangan bubung genteng bubung Press -

8
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.5.2.7 1 m2 Pemasangan roof light fibreglass 90 x 180 -
A.4.5.2.8 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,50 m x 5 mm -
A.4.5.2.9 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,25 m x 5 mm -
A.4.5.2.10 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,00 m x 5 mm -
A.4.5.2.11 1 m2 Pemasangan atap asbes gelombang 0,92 m x 1,80 m x 5 mm -
A.4.5.2.12 1 m2 Pemasangan atap asbes gelombang 1,05 m x 3,00 m x 4 mm -
A.4.5.2.13 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,70 m x 4 mm -
A.4.5.2.14 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,50 m x 4 mm -
A.4.5.2.15 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,25 m x 4 mm -
A.4.5.2.16 1 m2 Pemasangan atap asbes gelombang 1,05 m x 1,50 m x 4 mm -
A.4.5.2.17 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 3,00 m x 5 mm -
A.4.5.2.18 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,50 m x 5 mm -
A.4.5.2.19 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,25 m x 5 mm -
A.4.5.2.20 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,00 m x 5 mm -
A.4.5.2.21 1 m2 Pemasangan atap asbes gelombang besar 0,92 x 2,50 m x 5 mm -
A.4.5.2.22 1 m1 Pemasangan bumbungan stel gelombang 0,92 m -
A.4.5.2.23 1 m1 Pemasangan bumbungan stel gelombang 1,05 m -
A.4.5.2.24 1 m1 Pemasangan bumbungan stel gelombang 1,08 m -
A.4.5.2.25 1 m1 Pemasangan nok paten 0,92 m -
A.4.5.2.26 1 m1 Pemasangan nok paten 1,05 m -
A.4.5.2.28 1 m1 Pemasangan nok stel rata 0,92 m -
A.4.5.2.29 1 m1 Pemasangan nok stel rata 1,05 m -
A.4.5.2.30 1 m2 Pemasangan genteng beton -
A.4.5.2.32 1 m2 Pemasangan genteng metal -
A.4.5.2.33 1 m2 Pemasangan atap sirap kayu -
A.4.5.2.34 1 m1 Pemasangan nok genteng beton -
A.4.5.2.36 1 m1 Pemasangan nok genteng metal -
A.4.5.2.37 1 m1 Pemasangan nok sirap -
A.4.5.2.38 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 180 x 90 x 0,03 cm -
A.4.5.2.38a 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 180 x 90 x 0,02 cm -
A.4.5.2.38b 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 305 x 90 x 0,03 cm -
A.4.5.2.38c 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 305 x 90 x 0,02 cm -
A.4.5.2.39 1 m2 Pemasangan atap seng BJLS 20 -
A.4.5.2.39a 1 m2 Pemasangan atap seng BJLS 27 -
A.4.5.2.39b 1 m2 Pemasangan atap seng BJLS 30 -
A.4.5.2.40 1 m2 Pemasangan atap alumunium tebal 0,25 mm -
A.4.5.2.40a 1 m2 Pemasangan atap alumunium tebal 0,30 mm -
A.4.5.2.40b 1 m2 Pemasangan atap alumunium tebal 0,35 mm -
A.4.5.2.40c 1 m2 Pemasangan atap alumunium tebal 0,40 mm -
A.4.5.2.41 1 m2 Pemasangan nok alumunium -
A.4.5.2.42 1 m2 Pemasangan alumunium foil / sisalation -

A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro -
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal -
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer -
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau -

9
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas -
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing -
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti -
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia ) -
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro -
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal -
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer -
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau -
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas -
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing -
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti -
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia ) -
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro -
A.4.6.1.3a 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati -
A.4.6.1.3b 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kamfer -
A.4.6.1.3c 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu balau -
A.4.6.1.3d 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kempas -
A.4.6.1.3e 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kruing -
A.4.6.1.3f 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu meranti -
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia ) -
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro -
A.4.6.1.4a 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati -
A.4.6.1.4b 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kamfer -
A.4.6.1.4c 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu balau -
A.4.6.1.4d 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kempas -
A.4.6.1.4e 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kruing -
A.4.6.1.4f 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu meranti -
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia ) -
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro -
A.4.6.1.5a 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati lokal -
A.4.6.1.5b 1 m2 Pembuatan dan pemasangan pintu panel, kayu kamfer -
A.4.6.1.5c 1 m2 Pembuatan dan pemasangan pintu panel, kayu balau -
A.4.6.1.5d 1 m2 Pembuatan dan pemasangan pintu panel, kayu kempas -
A.4.6.1.5e 1 m2 Pembuatan dan pemasangan pintu panel, kayu kruing -
A.4.6.1.5f 1 m2 Pembuatan dan pemasangan pintu panel, kayu meranti -
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia ) -
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro -
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal -
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer -
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau -
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas -
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing -
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti -
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia) -
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro -
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal -
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer -
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau -

10
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas -
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing -
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti -
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia ) -
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm -
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm -
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm -
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm -
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm -
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm -
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm -
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm -
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro -
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal -
A.4.6.1.9b 1 m2 Pembuatan daun pintu plywood rangka expose kayu kamfer -
A.4.6.1.9c 1 m2 Pembuatan daun pintu plywood rangka expose kayu balau -
A.4.6.1.9d 1 m2 Pembuatan daun pintu plywood rangka expose kayu kempas -
A.4.6.1.9e 1 m2 Pembuatan daun pintu plywood rangka expose kayu kruing -
A.4.6.1.9f 1 m2 Pembuatan daun pintu plywood rangka expose kayu meranti -
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia ) -
A.4.6.1.10 1 m2 Pemasangan jalusi kusen, kayu Jati eks Bojonegoro -
A.4.6.1.10a 1 m2 Pemasangan jalusi kusen, kayu Jati lokal -
A.4.6.1.10b 1 m2 Pemasangan jalusi kusen, kayu kamfer -
A.4.6.1.10c 1 m2 Pemasangan jalusi kusen, kayu balau -
A.4.6.1.10d 1 m2 Pemasangan jalusi kusen, kayu kempas -
A.4.6.1.10e 1 m2 Pemasangan jalusi kusen, kayu kruing -
A.4.6.1.10f 1 m2 Pemasangan jalusi kusen, kayu meranti -
A.4.6.1.10g 1 m2 Pemasangan jalusi kusen, kayu tahun ( mauni / akasia ) -
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro -
A.4.6.1.11a 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati lokal -
A.4.6.1.11b 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Kamfer -
A.4.6.1.11c 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Balau -
A.4.6.1.11d 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kempas -
A.4.6.1.11e 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kruing -
A.4.6.1.11f 1 m2 Pemasangan teakwood rangkap, rangka expose kayu meranti -
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia ) -
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro -
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal -
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer -
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau -
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas -
A.4.6.1.12e 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing -
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti -
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia ) -
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter -
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter -
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter -
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter -

11
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter -
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter -
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter -
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter -
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro -
A.4.6.1.14a 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati lokal -
A.4.6.1.14b 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kamfer -
A.4.6.1.14c 1 m3 Pemasangan konstruksi kuda kuda expose kayu Balau -
A.4.6.1.14d 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kempas -
A.4.6.1.14e 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kruing -
A.4.6.1.14f 1 m3 Pemasangan konstruksi kuda kuda expose kayu Meranti -
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia ) -
A.4.6.1.15 1 m3 Pemasangan konstruksi gordeng, kayu Jati eks Bojonegoro -
A.4.6.1.15a 1 m3 Pemasangan konstruksi gordeng, kayu Jati lokal -
A.4.6.1.15b 1 m3 Pemasangan konstruksi gordeng, kayu kamfer -
A.4.6.1.15c 1 m3 Pemasangan konstruksi gordeng, kayu Balau -
A.4.6.1.15d 1 m3 Pemasangan konstruksi gordeng, kayu Kempas -
A.4.6.1.15e 1 m3 Pemasangan konstruksi gordeng, kayu Kruing -
A.4.6.1.15f 1 m3 Pemasangan konstruksi gordeng, kayu Meranti -
A.4.6.1.15g 1 m3 Pemasangan konstruksi gordeng, kayu Tahun ( mauni / akasia ) -
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro -
A.4.6.1.16a 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati lokal -
A.4.6.1.16b 1 m2 Pemasangan rangka atap genteng keramik, kayu Kamfer -
A.4.6.1.16c 1 m2 Pemasangan rangka atap genteng keramik, kayu Balau -
A.4.6.1.16d 1 m2 Pemasangan rangka atap genteng keramik, kayu Kempas -
A.4.6.1.16e 1 m2 Pemasangan rangka atap genteng keramik, kayu Kruing -
A.4.6.1.16f 1 m2 Pemasangan rangka atap genteng keramik, kayu Meranti -
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia ) -
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro -
A.4.6.1.17a 1 m2 Pemasangan rangka atap genteng beton, kayu Jati lokal -
A.4.6.1.17b 1 m2 Pemasangan rangka atap genteng beton, kayu Kamper -
A.4.6.1.17c 1 m2 Pemasangan rangka atap genteng beton, kayu Balau -
A.4.6.1.17d 1 m2 Pemasangan rangka atap genteng beton, kayu Kempas -
A.4.6.1.17e 1 m2 Pemasangan rangka atap genteng beton, kayu Kruing -
A.4.6.1.17f 1 m2 Pemasangan rangka atap genteng beton, kayu Meranti -
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia ) -
A.4.6.1.18 1 m2 Pemasangan rangka atap sirap, kayu Jati eks Bojonegoro -
A.4.6.1.18a 1 m2 Pemasangan rangka atap sirap, kayu Jati lokal -
A.4.6.1.18b 1 m2 Pemasangan rangka atap sirap, kayu Kamfer -
A.4.6.1.18c 1 m2 Pemasangan rangka atap sirap, kayu Balau -
A.4.6.1.18d 1 m2 Pemasangan rangka atap sirap, kayu Kempas -
A.4.6.1.18e 1 m2 Pemasangan rangka atap sirap, kayu Kruing -
A.4.6.1.18f 1 m2 Pemasangan rangka atap sirap, kayu Meranti -
A.4.6.1.18g 1 m2 Pemasangan rangka atap sirap, kayu Tahun ( mauni / akasia ) -
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro -
A.4.6.1.19a 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati lokal -
A.4.6.1.19b 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kamfer -
A.4.6.1.19c 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Balau -

12
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.19d 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kempas -
A.4.6.1.19e 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kruing -
A.4.6.1.19f 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Meranti -
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia ) -
A.4.6.1.20 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati eks Bojonegoro -
A.4.6.1.20a 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati lokal -
A.4.6.1.20b 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kamfer -
A.4.6.1.20c 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Balau -
A.4.6.1.20d 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kempas -
A.4.6.1.20e 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kruing -
A.4.6.1.20f 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Meranti -
A.4.6.1.20g 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Tahun 9 mauni / akasia ) -
A.4.6.1.21 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati eks Bojonegoro -
A.4.6.1.21a 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati lokal -
A.4.6.1.21b 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kamfer -
A.4.6.1.21c 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Balau -
A.4.6.1.21d 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati Kempas -
A.4.6.1.21e 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kruing -
A.4.6.1.21f 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Meranti -
A.4.6.1.21g 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Tahun ( mauni / akasia ) -
A.4.6.1.22 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati eks Bojonegoro -
A.4.6.1.22a 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati lokal -
A.4.6.1.22b 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kamfer -
A.4.6.1.22c 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Balau -
A.4.6.1.22d 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kempas -
A.4.6.1.22e 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kruing -
A.4.6.1.22f 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Meranti -
A.4.6.1.22g 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Tahun ( mauni / akasia ) -
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro -
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal -
A.4.6.1.23b 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kamfer -
A.4.6.1.23c 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Balau -
A.4.6.1.23d 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kempas -
A.4.6.1.23e 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kruing -
A.4.6.1.23f 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Meranti -
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia ) -
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro -
A.4.6.1.24a 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati lokal -
A.4.6.1.24b 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kamfer -
A.4.6.1.24c 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Balau -
A.4.6.1.24d 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kempas -
A.4.6.1.24e 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kruing -
A.4.6.1.24f 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Meranti -
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia ) -
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro -
A.4.6.1.25a 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati lokal -
A.4.6.1.25b 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kamfer -
A.4.6.1.25c 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Balau -

13
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.25d 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kempas -
A.4.6.1.25e 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kruing -
A.4.6.1.25f 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Meranti -
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia ) -
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro -
A.4.6.1.26a 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati lokal -
A.4.6.1.26b 1 m2 Pemasangan dinding lambrisering dari papan kayu Kamfer -
A.4.6.1.26c 1 m2 Pemasangan dinding lambrisering dari papan kayu Balau -
A.4.6.1.26d 1 m2 Pemasangan dinding lambrisering dari papan kayu Kempas -
A.4.6.1.26e 1 m2 Pemasangan dinding lambrisering dari papan kayu Kruing -
A.4.6.1.26f 1 m2 Pemasangan dinding lambrisering dari papan kayu Meranti -
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia ) -
A.4.6.1.27 1 m2 Pemasangan dinding lambrisering dari plywood ukuran 120 x 240 cm -
A.4.6.1.28 1 m2 Pemasangan dinding bilik, rangka kayu Jati eks Bojonegoro -
A.4.6.1.28a 1 m2 Pemasangan dinding bilik, rangka kayu Jati lokal -
A.4.6.1.28b 1 m2 Pemasangan dinding bilik, rangka kayu Kamfer -
A.4.6.1.28c 1 m2 Pemasangan dinding bilik, rangka kayu Balau -
A.4.6.1.28d 1 m2 Pemasangan dinding bilik, rangka kayu Kempas -
A.4.6.1.28e 1 m2 Pemasangan dinding bilik, rangka kayu Kruing -
A.4.6.1.28f 1 m2 Pemasangan dinding bilik, rangka kayu Meranti -
A.4.6.1.28g 1 m2 Pemasangan dinding bilik, rangka kayu Tahun ( mauni / akasia ) -

A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 1 bh Pemasangan kunci tanam antik eks Miler -


A.4.6.2.1a 1 bh Pemasangan kunci tanam ( SES ) -
A.4.6.2.2 1 bh Pemasangan kunci tanam biasa -
A.4.6.2.2a 1 bh Pemasangan kunci tanam slot tanam eks Kuda 2x putaran -
A.4.6.2.3 1 bh Pemasangan kunci Slot tanam kamar mandi eks Miler -
A.4.6.2.3a 1 bh Pemasangan kunci Slot tanam kamar mandi -
A.4.6.2.5 1 bh Pemasangan engsel pintu kupu - kupu -
A.4.6.2.5a 1 bh Pemasangan engsel kuningan Arc Asli eks Elitech 4" -
A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H ) -
A.4.6.2.5c 1 bh Pemasangan engsel pintu ( Arc ) nylon -
A.4.6.2.5d 1 bh Pemasangan engsel pintu eks Union 4" -
A.4.6.2.5e 1 bh Pemasangan engsel Stainlesstel Dekson 3" -
A.4.6.2.5f 1 bh Pemasangan engsel Stainlesstel Dekson 4" -
A.4.6.2.5g 1 bh Pemasangan engsel Stainlesstel Dekson 5" -
A.4.6.2.5h 1 bh Pemasangan engsel Sendok -
A.4.6.2.6 1 bh Pemasangan engsel jendela kupu kupu -
A.4.6.2.6a 1 bh Pemasangan engsel jendela eks Union 3" -
A.4.6.2.6b 1 bh Pemasangan engsel jendela ( H ) -
A.4.6.2.6c 1 bh Pemasangan engsel jendela ( Arch ) -
A.4.6.2.6d 1 bh Pemasangan grendel biasa ( besar ) 8" -
A.4.6.2.6e 1 bh Pemasangan grendel biasa ( kecil ) 3" -
A.4.6.2.6f 1 bh Pemasangan grendel eks AEG -
A.4.6.2.6g 1 bh Pemasangan grendel jendela merk SES -
A.4.6.2.6h 1 bh Pemasangan grendel pintu panjang ( sespen ) -

14
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.2.6i 1 bh Pemasangan grendel pintu ganda Dekson 40 cm komplit -
A.4.6.2.6j 1 bh Pemasangan grendel tanam kuningan besar eks Cavel 60 mm -
A.4.6.2.6k 1 bh Pemasangan grendel tanam kuningan kecil eks beluci 4" -
A.4.6.2.6l 1 bh Pemasangan grendel tanam merk SES -
A.4.6.2.7 1 bh Pemasangan hak angin -
A.4.6.2.7a 1 bh Pemasangan hak angin ( Sikutan ) biasa -
A.4.6.2.7b 1 bh Pemasangan hak angin 4 mm lurus / plat 4 x 150 mm -
A.4.6.2.7c 1 bh Pemasangan hak angin lurus -
A.4.6.2.7d 1 bh Pemasangan hak angin merk SES -
A.4.6.2.9 1 bh Pemasangan kait angin -
A.4.6.2.10 1 bh Pemasangan door closer -
A.4.6.2.11 1 bh Pemasangan kunci sloot 2 putaran eks CAVEL ( dengan handle ) -
A.4.6.2.11a 1 bh Pemasangan kunci sloot 2 putaran eks kodai -
A.4.6.2.11b 1 bh Pemasangan kunci sloot 2 putaran eks YALE ( dengan handle ) -
A.4.6.2.11c 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES -
A.4.6.2.11d 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES -
A.4.6.2.11e 1 bh Pemasangan kunci sloot Rossete Dekson -
A.4.6.2.11f 1 bh Pemasangan kunci sloot ( kunci pintu ) lokal -
A.4.6.2.12a 1 bh Pemasangan Handle -
A.4.6.2.12b 1 bh Pemasangan Handle pintu ganda Dekson 30 cm komplit -
A.4.6.2.12c 1 bh Pemasangan Handle pintu ganda Dekson 40 cm komplit -
A.4.6.2.12d 1 bh Pemasangan Handle ointu stainless steel besar -
A.4.6.2.12e 1 bh Pemasangan Handle ointu stainless steel kecil -
A.4.6.2.12h 1 bh Pemasangan Pegangan pintu P=20 -
A.4.6.2.13 1 bh Pemasangan Door stoper Stainlees -
A.4.6.2.14 1 bh Pemasangan Rel pintu dorong -
A.4.6.2.15 1 bh Pemasangan Kunci lemari -
A.4.6.2.15a 1 bh Pemasangan Kunci laci ( 808 ) -
A.4.6.2.15b 1 bh Pemasangan Kunci gembok besar stainless 40 mm -
A.4.6.2.15c 1 bh Pemasangan Kunci gembok besar stainless 30 mm -
A.4.6.2.16 1 m2 Pemasangan kaca bening tebal 3 mm -
A.4.6.2.16a 1 m2 Pemasangan kaca buram tebal 3 mm -
A.4.6.2.16b 1 m2 Pemasangan kaca Es tebal 3 mm -
A.4.6.2.17 1 bh Pemasangan kaca bening tebal 5 mm -
A.4.6.2.17a 1 bh Pemasangan kaca Ray band tebal 5 mm -
A.4.6.2.18 1 m2 Pemasangan kaca bening tebal 7 mm -
A.4.6.2.18a 1 m2 Pemasangan kaca Ray band tebal 7 mm -
A.4.6.2.19 1 m2 Pemasangan kaca tebal 10 mm -
A.4.6.2.20 1 m2 Pemasangan kaca cermin tebal 5 mm -
A.4.6.2.21 1 m2 Pemasangan kaca cermin tebal 3 mm -
A.4.6.2.22 1 m2 Pemasangan kaca Stained glass tebal 5 mm -
A.4.6.2.22a 1 m2 Pemasangan kaca air tebal 5 mm -
A.4.6.2.22b 1 m2 Pemasangan kaca bluegreen tebal 8 mm -
A.4.6.2.22c 1 m2 Pemasangan kaca profil ( bevel / moulding ) -
A.4.6.2.23 1 m2 Pemasangan kaca patri -

A.4.7.1 PEKERJAAN PENGECATAN

15
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.7.1.1 1 m2 Pengikisan / pengerokan permukaan cat lama -
A.4.7.1.2 1 m2 Pencucian Bidang permukaan tembok yang pernah dicat -
A.4.7.1.3 1 m2 Pengerokan karat pada permukaan baja cara manual -
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup) -
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup) -
A.4.7.1.6 1 m2 Pelaburan bidang kayu dengan teak oil -
A.4.7.1.7 1 m2 Pelaburan bidang kayu dengan pelitur -
A.4.7.1.8 1 m2 Pelaburan bidang kayu dengan cat residu dan ter -
A.4.7.1.9 1 m2 Pelaburan bidang kayu dengan vernis -
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup) -
A.4.7.1.10a 1 m2 Pengecatan tembok Eksterior -
A.4.7.1.10b 1 m2 Pengecatan tembok Interior -
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup) -
A.4.7.1.13 1 m2 Pelaburan tembok dengan kapur sirih -
A.4.7.1.14 1 m2 Pelaburan tembok lama dengan kapur sirih -
A.4.7.1.15 1 m2 Pemasangan wallpaper -
A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi -
A.4.7.1.17 1 m2 Pengecatan permukaan baja dengan menie besi dengan perancah -
A.4.7.1.18 1 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis -
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir -
A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis -
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir -
A.4.7.1.21a 1 m2 Pengecatan langit-langit (plafond) -
A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam ) -
A.4.7.1.21c 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) -
A.4.7.1.21d 1 m2 Sending impra ( melamine) 42,123.00

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 1 Bh Pemasangan closet duduk keramik 373,377.60


A.5.1.1.1a 1 Bh Pemasangan closet duduk keramik komplit eks AMSTAD 373,377.60
A.5.1.1.1b 1 Bh Pemasangan closet duduk keramik komplit eks INA 373,377.60
A.5.1.1.1c 1 Bh Pemasangan closet duduk keramik komplit eks TOTO 373,377.60
A.5.1.1.1d 1 Bh Pemasangan closet monoblock lokal 373,377.60
A.5.1.1.2 1 Bh Pemasangan closet jongkok keramik eks AMSTAD 245,203.20
A.5.1.1.2a 1 Bh Pemasangan closet jongkok keramik eks INA 245,203.20
A.5.1.1.3 1 Bh Pemasangan closet duduk jongkok teraso 233,442.00
A.5.1.1.4 1 Bh Pemasangan urinoir 183,330.00
A.5.1.1.5 1 Bh Pemasangan wastafel besar warna muda eks INA 245,581.20
A.5.1.1.5a 1 Bh Pemasangan wastafel besar warna tua eks INA 245,581.20
A.5.1.1.6 1 Bh Pemasangan bathcuip porselen 81,320.76
A.5.1.1.7 1 Bh Pemasangan bak fiberglass vol 1 m3 738,180.00
A.5.1.1.8 1 Bh Pemasangan bak mandi batu vol 0,30 m3 770,439.60
A.5.1.1.9 1 Bh Pemasangan bak mandi teraso vol 0,30 m3 738,180.00
A.5.1.1.10 1 Bh Pemasangan bak mandi fiberglass vol 1 m3 70,032.60
A.5.1.1.11 1 Bh Pemasangan bak mandi beton vol 1 m3 682,756.56
A.5.1.1.12 1 Bh Pemasangan bak cuci piring stainlessteel 34,003.80
A.5.1.1.13 1 Bh Pemasangan bak cuci piring teraso 56,673.00

16
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.5.1.1.14 1 Bh Pemasangan floor drain plastik 11,334.60
A.5.1.1.14a 1 Bh Pemasangan floor drain staninlees steel 11,334.60
A.5.1.1.15 1 Bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35cm 240,240.49
A.5.1.1.16 1 Bh Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm 354,792.96
A.5.1.1.17 1 Bh Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm 354,792.96
A.5.1.1.18 1 m' Pemasangan pipa galvanis diameter 1/2" 16,106.04
A.5.1.1.19 1 m' Pemasangan kran diameter 1/2" 41,401.80
A.5.1.1.19a 1 m' Pemasangan kran diameter 3/4" 41,401.80
A.5.1.1.19b 1 m' Pemasangan kran dupon 41,401.80
A.5.1.1.19c 1 m' Pemasangan kran Toto 1/2" 41,401.80
A.5.1.1.19d 1 m' Pemasangan stop kran diameter 1" 41,401.80
A.5.1.1.19e 1 m' Pemasangan stop kran diameter 1/2" 41,401.80
A.5.1.1.19f 1 m' Pemasangan stop kran diameter 3/4" 41,401.80
A.5.1.1.19g 1 m' Pemasangan stop kran diameter 1" kuningan 41,401.80
A.5.1.1.19h 1 m' Pemasangan stop kran diameter 1/2" kuningan 41,401.80
A.5.1.1.19i 1 m' Pemasangan stop kran diameter 3/4" kuningan 41,401.80
A.5.1.1.19j 1 m' Pemasangan stop kran diameter 1" plastik 41,401.80
A.5.1.1.19k 1 m' Pemasangan stop kran diameter 1/2" 41,401.80
A.5.1.1.20 1 m' Pemasangan pipa galvanis diameter 3/4" 16,106.04
A.5.1.1.21 1 m' Pemasangan pipa galvanis diameter 1" 16,106.04
A.5.1.1.22 1 m' Pemasangan pipa galvanis diameter 1 1/2" 26,973.00
A.5.1.1.22a 1 m' Pemasangan pipa galvanis diameter 2" 26,973.00
A.5.1.1.22b 1 m' Pemasangan pipa galvanis diameter 2 1/2" 26,973.00
A.5.1.1.23 1 m' Pemasangan pipa galvanis diameter 3" 33,849.36
A.5.1.1.24 1 m' Pemasangan pipa galvanis diameter 4" 33,849.36
A.5.1.1.25 1 m' Pemasangan pipa PVC tipe AW diameter 1/2" 9,026.64
A.5.1.1.26 1 m' Pemasangan pipa PVC tipe AW diameter 3/4" 9,026.64
A.5.1.1.27 1 m' Pemasangan pipa PVC tipe AW diameter 1" 9,026.64
A.5.1.1.28 1 m' Pemasangan pipa PVC tipe AW diameter 11/2" 13,539.96
A.5.1.1.29 1 m' Pemasangan pipa PVC tipe AW diameter 2" 13,539.96
A.5.1.1.30 1 m' Pemasangan pipa PVC tipe AW diameter 21/2" 20,256.48
A.5.1.1.31 1 m' Pemasangan pipa PVC tipe AW diameter 3" 20,256.48
A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4" 20,256.48
A.5.1.1.33 #N/A #N/A -
A.5.1.1.35 #N/A #N/A -
A.5.1.1.36 #N/A #N/A -
A.5.1.1.36a #N/A #N/A -
A.5.1.1.36b #N/A #N/A -
A.5.1.1.36c #N/A #N/A -
A.5.1.1.36d #N/A #N/A -
A.5.1.1.36e #N/A #N/A -

ANALISA TAMBAHAN

1 1 m2 Pemasangan lantai batu ampyang 136,212.62


2 1 m2 Pemasangan HPL 215,019.50
3 1 m2 Pengecatan Flexy 41,151.44
4 1 m2 Pemasangan Alumunium Composite Panel Ex. Alucopan 331,208.76

17
HARGA
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3

18
REKAPITULASI
GA SATUAN PEKERJAAN ( AHSP )
ANG PEKERJAAN UMUM

OVERHEAD DAN PROFIT 14%

HARGA SATUAN KONTRAK BAWAH


BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

- - 55,663.20
- - 60,415.20
- - 50,263.20
- - 19,521.00
- - 485,298.00
- - 251,262.00
- - 288,262.80
- - 288,262.80
- - 13,122.00
- - 288,262.80
- - 33,631.20
- - 78,294.60
- - 1,108,060.56
- - 554,030.28
- - 8,374.32
- - 55,097.28
- - 88,452.00
- - 41,553.00
- - 26,244.00
- - 26,244.00
- - 134,946.00
- - 83,106.00
- - 1,005,048.00

19
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - 672,624.00

- - 60,993.00
- - 74,795.40
- - 88,811.64
- - 81,181.44
- - 123,055.20
- - 98,123.40
- - 4,422.60
- - 26,730.00
- - 44,226.00
- - 44,226.00
- - 24,397.20
- - 110,851.20
- - 13,267.80
- - 22,113.00
- - 22,113.00

- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 199,827.00
- - 103,910.04
#N/A - #N/A
- - 279,526.68
#N/A - #N/A
#N/A - #N/A

20
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - 13,264.56
- - 9,219.96
- - 6,937.92
- - 72,362.16
- - 72,362.16
- - 91,844.28
- - 91,844.28
- - 91,844.28
- - 91,844.28
- - 91,844.28
- - 18,124.56
- - 724,610.88
- - 819,866.88
- - 1,020,347.28
- - 888,236.28
- - 724,928.40
- - 724,610.88
- - 819,866.88
- - 21,318.12
- - 35,201.52
- - 311,040.00

- - 13,196.52
- - 16,513.20
- - 19,741.32
- - 24,773.04
#N/A - #N/A

21
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - 4,247.64
- - 4,247.64
- - 5,948.64
- - 10,500.84
- - 8,492.04
- - 51,938.28
- - 53,534.52
- - 48,178.80
- - 44,686.08
- - 28,476.36
- - 63,902.52

- - 13,138.20
- - 11,712.60
- 15,552.00 34,120.44
- - 204,917.04
- - 5,566.32
- - 126,833.04
- - 228,478.32
- - 85,892.40
- - 96,331.68
- - 195,210.00
- - 8,388.68
- - 16,587.50
- - 16,725.96
- - 68,376.96
- - 325,947.24
- - 19,521.00
- - 19,521.00
- - 19,521.00
- - 19,521.00
- - 38,079.72
- - 38,079.72
- - 46,150.56
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -

22
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

23
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

24
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

25
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

26
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

27
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

28
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

29
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

30
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

31
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

32
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

33
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
71,392.50 399.00 113,914.50

- - 373,377.60
- - 373,377.60
- - 373,377.60
- - 373,377.60
- - 373,377.60
- - 245,203.20
- - 245,203.20
- - 233,442.00
- - 183,330.00
- - 245,581.20
- - 245,581.20
- - 81,320.76
- - 738,180.00
- - 770,439.60
- - 738,180.00
- - 70,032.60
- - 682,756.56
- - 34,003.80
- - 56,673.00

34
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - 11,334.60
- - 11,334.60
- - 240,240.49
- - 354,792.96
- - 354,792.96
- - 16,106.04
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 41,401.80
- - 16,106.04
- - 16,106.04
- - 26,973.00
0.13 - 26,973.13
- - 26,973.00
- - 33,849.36
- - 33,849.36
- - 9,026.64
- - 9,026.64
- - 9,026.64
- - 13,539.96
- - 13,539.96
- - 20,256.48
- - 20,256.48
- - 20,256.48
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

126,973.20 - 263,185.82
215,986.91 - 431,006.41
91,792.80 4,389.00 137,333.24
597,046.50 - 928,255.26

35
HARGA SATUAN KONTRAK BAWAH
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

36
HSPK 2018
No Nama Barang Vol Daerah Daerah
Datar Pegunungan
1 2 3 4 5

3.6 LAMPU PENERANGAN JALAN DAN


LAMPU TAMAN SERTA PERALATAN
LISTRIK

3.6.1 LAMPU TAMAN DAN PERALATAN LISTRIK


3.6.1.1 Arde 08 mm M' 9,000.00 9,900.00
3.6.1.2 Arde 12 mm M' 14,000.00 15,400.00
3.6.1.3 Arde 14 mm M' 26,500.00 29,150.00
3.6.1.4 Arde 16 mm M' 30,000.00 33,000.00
3.6.1.5 Arde 16 mm yang panjang M' 55,000.00 60,500.00
3.6.1.6 Arde 18 mm M' 56,000.00 61,600.00
3.6.1.7 Balok 20 Watt Double Bh 65,000.00 71,500.00
3.6.1.8 Balok 40 Watt Double Bh 115,000.00 126,500.00
3.6.1.9 BC (kabel tembaga) 06 mm M' 1,500.00 1,650.00
3.6.1.10 BC (kabel tembaga) 16 mm Bh 25,000.00 27,500.00
3.6.1.11 BC (kabel tembaga) 25 mm Bh 35,000.00 38,500.00
3.6.1.12 Box MCB 1 grup Bh 600.00 660.00
3.6.1.13 Box MCB 2 grup Bh 9,500.00 10,450.00
3.6.1.14 Box MCB 3 grup Bh 14,500.00 15,950.00
3.6.1.15 Box meter MG Bh 17,500.00 19,250.00
3.6.1.16 Box Panel KWH 60x40x20 cm / outdoor Bh 800,000.00 880,000.00
3.6.1.17 Box panel saka 20x30x12 Bh 137,000.00 150,700.00
3.6.1.18 Box presto uticon 4 grup Bh 40,000.00 44,000.00
3.6.1.19 Box presto uticon 8 grup Bh 55,000.00 60,500.00
3.6.1.20 BUSBAR (Plat Tembaga) Nol & Arde (2x20mm) M' 45,000.00 49,500.00
3.6.1.21 Contactor Bh 340,000.00 374,000.00
3.6.1.22 Fitcing tempel ( broco) Bh 10,000.00 11,000.00
3.6.1.23 Fiting Halogen Stick 1000 Watt Bh 11,000.00 12,100.00
3.6.1.24 Fiting Halogen Stick 150 Watt Bh 9,000.00 9,900.00
3.6.1.25 Fiting Halogen Stick 500/300 Watt Bh 11,000.00 12,100.00
3.6.1.26 Fiting Sambung E40-E27 Bh 11,000.00 12,100.00
3.6.1.27 Fitting besi Kj E - 40 Bh 22,500.00 24,750.00
3.6.1.28 Ft besi gantung E - 27 Bh 10,000.00 11,000.00
3.6.1.29 Ft ceramic E-40 gantung Bh 18,000.00 19,800.00
3.6.1.30 Fuse box Broco 1 grup Bh 34,000.00 37,400.00
3.6.1.31 Fuse box Broco 2 grup Bh 41,000.00 45,100.00
3.6.1.32 Fuse box Broco 3 grup Bh 60,000.00 66,000.00
3.6.1.33 Fuse box Max 1 grup Bh 30,000.00 33,000.00
3.6.1.34 Hakiki NYAF srabut engkel NYAF = 0.75 mm(100m) Rol 145,000.00 159,500.00
3.6.1.35 Hakiki NYAF serabut engkel NYAF = 1.5 mm(100m) Rol 220,000.00 242,000.00
3.6.1.36 Hakiki NYAF srabut engkel NYAF = 1.5 mm(100m) Rol 236,000.00 259,600.00
3.6.1.37 Hakiki NYAF serabut engkel NYAF = 2.5 mm(100m) Rol 370,000.00 407,000.00
3.6.1.38 Hakiki NYAF serabut engkel NYAF = 4 mm(100m) Rol 640,000.00 704,000.00
3.6.1.39 Hakiki NYAF serabut engkel NYAF = 6 mm(100m) Rol 870,000.00 957,000.00
3.6.1.40 Halogen stic 1000W Philips Bh 40,000.00 44,000.00

37
1 2 3 4 5
3.6.1.41 Halogen stic 150W philips Bh 26,000.00 28,600.00
3.6.1.42 Halogen stic 300W Philips Bh 27,500.00 30,250.00
3.6.1.43 Halogen stic 500W Philips Bh 28,000.00 30,800.00
3.6.1.44 Handel G2 15 Bh 165,000.00 181,500.00
3.6.1.45 Handel G2 32 NISO Bh 225,000.00 247,500.00
3.6.1.46 Handel G2 63 Bh 155,000.00 155,000.00
3.6.1.47 Handel 63 A NISO Bh 650,000.00 715,000.00
3.6.1.48 HPIT 250W Philips Bh 168,000.00 184,800.00
3.6.1.49 HPIT 400W Philips Bh 179,000.00 196,900.00
3.6.1.50 Ignitor untuk Lampu Philips, S1- 51 putih Bh 36,000.00 39,600.00
3.6.1.51 Ignitor untuk Lampu Philips, SN- 58 kuning Bh 40,000.00 44,000.00
3.6.1.52 Isolasi Nachi Bh 8,500.00 9,350.00
3.6.1.53 Jet power lampu selang (soket) Bh 20,000.00 22,000.00
3.6.1.54 Kabel NYA 1.5 mm 100 m Rol 171,000.00 188,100.00
3.6.1.55 Kabel NYA 1.5 mm / eterna M' 2,500.00 2,750.00
3.6.1.56 Kabel NYA 2.5 mm 100 m Rol 272,000.00 299,200.00
3.6.1.57 Kabel NYA 2.5 mm M' 4,500.00 4,950.00
3.6.1.58 Kabel NYA 4 mm M' 5,000.00 5,500.00
3.6.1.59 Kabel NYA 6 mm M' 11,000.00 12,100.00
3.6.1.60 Kabel NYA 10 mm M' 19,000.00 20,900.00
3.6.1.61 Kabel NYM 2 x 1,5 mm M' 7,000.00 7,700.00
3.6.1.62 Kabel NYM 2 x 2,5 mm M' 9,500.00 10,450.00
3.6.1.63 Kabel NYM 3 x 1,5 mm M' 9,000.00 9,900.00
3.6.1.64 Kabel NYM 3 x 2,5 mm M' 13,000.00 14,300.00
3.6.1.65 Kabel NYM 3 x 4 mm M' 18,000.00 19,800.00
3.6.1.66 Kabel NYM 4 x 2,5 mm M' 16,500.00 18,150.00
3.6.1.67 Kabel MYM Focus 4 x 4 mm hakiki 100m Rol 2,120,000.00 2,332,000.00
3.6.1.68 Kabel NYM 3 x 4 mm Rol 18,000.00 19,800.00
3.6.1.69 Kabel NYM 4 x 2,5 mm Rol 16,500.00 18,150.00
3.6.1.70 Kabel Nymhy (serabut) 2 x 0.75 mm Roll 435,000.00 478,500.00
3.6.1.71 Kabel Nymhy (serabut) 2 x 2.5 mm Roll 1,100,000.00 1,210,000.00
3.6.1.72 Kabel Nymhy (serabut) 4 x 2.5 mm Roll 2,000,000.00 2,200,000.00
3.6.1.73 Kabel NYY 2 x 1,5 mm M' 10,000.00 11,000.00
3.6.1.74 Kabel NYY 2 x 2,5 mm M' 13,000.00 14,300.00
3.6.1.75 Kabel NYY 3 x 1,5 mm M' 13,000.00 14,300.00
3.6.1.76 Kabel NYY 3 x 2,5 mm M' 17,500.00 19,250.00
3.6.1.77 Kabel NYY 3 x 4 mm M' 25,000.00 27,500.00
3.6.1.78 Kabel NYY 4 x 2,5 mm M' 20,000.00 22,000.00
3.6.1.79 Kabel NYY 4 x 4 mm M' 30,000.00 33,000.00
3.6.1.80 Kabel NYY 4 x 6 mm M' 40,000.00 44,000.00
3.6.1.81 Kabel NYY 4 x 10 mm M' 63,000.00 69,300.00
3.6.1.82 Kabel NYY 2 x 1,5 mm @ 100 m Rol 800,000.00 880,000.00
3.6.1.83 Kabel NYY 2 x 2,5 mm @ 100 m Rol 1,060,000.00 1,166,000.00
3.6.1.84 Kabel NYY 3 x 1,5 mm @ 100 m Rol 970,000.00 1,067,000.00
3.6.1.85 Kabel NYY 3 x 2,5 mm @ 100 m Rol 1,325,000.00 1,457,500.00
3.6.1.86 Kabel NYY 4 x 2,5 mm @ 100 m Rol 1,625,000.00 1,787,500.00
3.6.1.87 Kabel NYY 4 x 4 mm @ 100 m Rol 2,350,000.00 2,585,000.00
3.6.1.88 Kabel NYY 4 x 6 mm @ 100 m Rol 3,300,000.00 3,630,000.00
3.6.1.89 Kabel NYY HYO 2 x 0,75 mm @ 100 m Rol 435,000.00 478,500.00
3.6.1.90 Kabel NYY HYO 2 x 1,5 mm @ 100 m Rol 740,000.00 814,000.00

38
1 2 3 4 5
3.6.1.91 Kabel NYY HYO 2x 2,5 mm @ 100 m Rol 1,100,000.00 1,210,000.00
3.6.1.92 Kabel NYY HYO 3 x 1,5 mm @ 100 m Rol 1,020,000.00 1,122,000.00
3.6.1.93 Kabel NYY HYO 3 x 2,5 mm @ 100 m Rol 1,475,000.00 1,622,500.00
3.6.1.94 Kabel PVC 2 x 23 mm Rol 200,000.00 220,000.00
3.6.1.95 Kabel Twistied 2 x 12 mm M' 8,000.00 8,800.00
3.6.1.96 Kabel Twistied 2 x 16 mm M' 7,250.00 7,975.00
3.6.1.97 Kabel Twistied 2 x 10 Pulong M' 6,000.00 6,600.00
3.6.1.98 Kabel Twistied 3 x 35 mm2 + 1 x 25 mm2 M' 21,000.00 23,100.00
3.6.1.99 Kabel Twistied 3 x 50 mm2 + 1 x 35 mm2 M' 28,000.00 30,800.00
3.6.1.100 Kabel Twistied 4 x 25 mm2 M' 37,000.00 40,700.00
3.6.1.101 Kap Lampu Tancap PAR Bh 59,000.00 64,900.00
3.6.1.102 Kap Halogen 1000 NISO Rol 108,000.00 118,800.00
3.6.1.103 Kap Halogen 150 NISO Rol 35,000.00 38,500.00
3.6.1.104 Kap Halogen 500/300 NISO Rol 54,000.00 59,400.00
3.6.1.105 Kap HPIT 250 Watt NISO Bh 335,000.00 368,500.00
3.6.1.106 Kap HPIT 400 Watt Bh 350,000.00 385,000.00
3.6.1.107 Kap ijo E- 27 pasific Bh 10,000.00 11,000.00
3.6.1.108 Kap ijo E- 40 dexta Bh 22,500.00 24,750.00
3.6.1.109 Kap Lampu TL 20 Watt balak TKOU 1 X 20 Bh 49,000.00 53,900.00
3.6.1.110 Kap Lampu TL 40 Watt balak TKOU 1 X 40 Bh 95,000.00 104,500.00
3.6.1.111 Kap Reflektor (putih) Kap. Industri 8" E40 Bh 50,000.00 55,000.00
3.6.1.112 Kap Totok MC Bh 1,250,000.00 1,375,000.00
3.6.1.113 Kapasitor 25 µ Bh 40,000.00 44,000.00
3.6.1.114 Kapasitor 30 µ Bh 45,000.00 49,500.00
3.6.1.115 Kawat Tarik uk 14 Kg 25,000.00 27,500.00
3.6.1.116 Klem Imundex no 10 Dos 6,250.00 6,875.00
3.6.1.117 Klem Imundex no 12 Dos 8,500.00 9,350.00
3.6.1.118 Klem Imundex no 17 Dos 13,900.00 15,290.00
3.6.1.119 Klem Imundex no 9 Dos 5,750.00 6,325.00
3.6.1.120 Konektor 6-25 mm Bh 9,000.00 9,900.00
3.6.1.121 Kontaktor Telemekanik SN 32 / 50A / 220V Bh 525,000.00 577,500.00
3.6.1.122 Lampu Spot JCDR 20 Watt Bh 12,000.00 13,200.00
3.6.1.123 Lampu Spot JCDR 50 Watt Bh 12,000.00 13,200.00
3.6.1.124 Lampu dop pijar 5 W Bh 5,000.00 5,500.00
3.6.1.125 Lampu selang LED Kotak / Putih Rol 1,750,000.00 1,925,000.00
3.6.1.126 Lampu LED 14 watt Bh 40,000.00 44,000.00
3.6.1.127 Lampu Selang Shinyoku 3 j / merah Rol 3,900,000.00 4,290,000.00
3.6.1.128 Lampu Hias Meteor Uk. 40 cm Bh 113,000.00 124,300.00
3.6.1.129 Lampu Hias Meteor Uk. 60 cm Bh 136,000.00 149,600.00
3.6.1.130 Lampu Hias Meteor Uk. 80 cm Bh 155,000.00 170,500.00
3.6.1.131 Lampu LHE 13 Watt ( E 27 ) Bh 34,000.00 37,400.00
3.6.1.132 Lampu LHE 18 Watt Spiral( E 27 ) Bh 31,500.00 34,650.00
3.6.1.133 Lampu LHE 23 Watt ( E 27 ) Bh 30,000.00 33,000.00
3.6.1.134 Lampu LHE 25 Watt Spiral ( E 27 ) Bh 35,000.00 38,500.00
3.6.1.135 Lampu LHE 36 Watt ( E 27 ) Bh 93,000.00 102,300.00
3.6.1.136 Lampu LHE 36 Watt Kuning ( E 27 ) Spiral Bh 84,000.00 92,400.00
3.6.1.137 Lampu LHE 45 Watt (E27) Bh 60,000.00 66,000.00
3.6.1.138 Lampu LHE 45 Watt Kuning (E27) Spiral Bh 95,000.00 104,500.00
3.6.1.139 Lampu LHE 65 Watt Kuning ( E 27 ) Spiral Bh 170,000.00 187,000.00
3.6.1.140 Lampu LHE 68 Watt ( E 27 ) Bh 165,000.00 181,500.00

39
1 2 3 4 5
3.6.1.141 Lampu LHE 85 Watt ( E 40 ) Spiral Visalux Bh 220,000.00 242,000.00
3.6.1.142 Lampu MC 125 Watt Bh 41,000.00 45,100.00
3.6.1.143 Lampu MC 250 Watt Bh 75,000.00 82,500.00
3.6.1.144 Lampu MC 400 Watt Bh 95,000.00 104,500.00
3.6.1.145 Lampu ML 160 Watt Bh 40,000.00 44,000.00
3.6.1.146 Lampu philips ML 500 W Bh 73,000.00 80,300.00
3.6.1.147 Lampu philips ML 250 W Bh 67,000.00 73,700.00
3.6.1.148 Lampu Sorot PAR 220 V 120 W Bh 102,000.00 112,200.00
3.6.1.149 Lampu Sorot PAR 220 V 80 W Bh 92,500.00 101,750.00
3.6.1.150 Lampu spot light 150 watt eks philips ( lengkap) Bh 106,000.00 116,600.00
3.6.1.151 Lampu spot light 300 watt eks philips ( lengkap) Bh 137,500.00 151,250.00
3.6.1.152 Lampu TL 20 watt komplit Bh 92,500.00 101,750.00
3.6.1.153 Lampu TL 40 watt komplit Bh 116,000.00 127,600.00
3.6.1.154 MC HPL-N 125W Philips (Trafo) Bh 120,000.00 132,000.00
3.6.1.155 MC HPL-N 250W Philips (Trafo) Bh 200,000.00 220,000.00
3.6.1.156 MC HPL-N 400W Philips (Trafo) Bh 203,000.00 223,300.00
3.6.1.157 MCB 2 A / 1 Phase / Merlin Gerin Bh 40,000.00 44,000.00
3.6.1.158 MCB 4 A / 1 Phase Bh 37,500.00 41,250.00
3.6.1.159 MCB 6 A / 1 Phase Bh 35,000.00 38,500.00
3.6.1.160 MCB 10 A / 1 Phase Bh 40,000.00 44,000.00
3.6.1.161 MCB 16 A / 1 Phase Bh 40,000.00 44,000.00
3.6.1.162 MCB 20 A / 1 Phase Bh 40,000.00 44,000.00
3.6.1.163 MCB 25 A / 1 Phase Bh 40,000.00 44,000.00
3.6.1.164 MCB 32 A / 1 Phase Bh 49,000.00 53,900.00
3.6.1.165 MCB 35 A / 1 Phase Bh 50,000.00 55,000.00
3.6.1.166 MCB 40 A / 1 Phase Bh 52,000.00 57,200.00
3.6.1.167 MCB 50 A / 1 Phase Bh 130,000.00 143,000.00
3.6.1.168 MCB 63 A / 1 Phase Bh 160,000.00 176,000.00
3.6.1.169 Mitsubishi Magnetic SN-35/220 Bh 410,000.00 451,000.00
3.6.1.170 NFB 100A Bh 603,000.00 663,300.00
3.6.1.171 NFB 125A Bh 1,030,000.00 1,133,000.00
3.6.1.172 NFB 75A Bh 603,000.00 663,300.00
3.6.1.173 NYM 2X1.5mm hakiki Roll 550,000.00 605,000.00
3.6.1.174 NYM 2X2.5mm hakiki Roll 794,000.00 873,400.00
3.6.1.175 NYM 2X4mm hakiki Roll 1,230,000.00 1,353,000.00
3.6.1.176 NYM 3X1.5mm hakiki Roll 710,000.00 781,000.00
3.6.1.177 NYM 3X2.5mm hakiki Roll 1,013,000.00 1,114,300.00
3.6.1.178 NYM 3X4mm hakiki Roll 1,586,500.00 1,745,150.00
3.6.1.179 NYM 3X6mm hakiki Roll 2,250,000.00 2,475,000.00
3.6.1.180 NYM 4X1.5mm hakiki Roll 900,000.00 990,000.00
3.6.1.181 NYM 4X2.5mm hakiki Roll 1,350,000.00 1,485,000.00
3.6.1.182 NYM 4X4mm hakiki Roll 2,120,000.00 2,332,000.00
3.6.1.183 NYZ 2X23 (oval) hakiki Roll 240,000.00 264,000.00
3.6.1.184 Ongkos pasang titik lampu + instalasi Ttk 150,000.00 165,000.00
3.6.1.185 Ornamen pipa medium 1,5" / 2 mm / 6 m unit 1,350,000.00 1,485,000.00
3.6.1.186 Panel Box (40x60x20) Bh 365,000.00 401,500.00
3.6.1.187 Pasang KWH Meter 900 VA Psg 2,700,000.00 2,970,000.00
3.6.1.188 Philips jari essential 11 w Bh 23,000.00 25,300.00
3.6.1.189 Philips jari essential 13 w Bh 31,000.00 31,000.00
3.6.1.190 Philips jari essential 14 w Bh 23,000.00 25,300.00

40
1 2 3 4 5
3.6.1.191 Philips jari essential 18 w Bh 25,000.00 27,500.00
3.6.1.192 Philips jari essential 23 w Bh 30,000.00 33,000.00
3.6.1.193 Philips jari essential 36 w Bh 54,000.00 59,400.00
3.6.1.194 Philips jari essential 45 w Bh 110,000.00 121,000.00
3.6.1.195 Philips jari essential 5 w Bh 16,000.00 17,600.00
3.6.1.196 Philips jari essential 65 w Bh 136,500.00 150,150.00
3.6.1.197 Philips jari essential 8 w Bh 18,500.00 20,350.00
3.6.1.198 Rel barr / 3 phase Pcs 39,000.00 42,900.00
3.6.1.199 Rel barr / 1 phase Lot 19,000.00 20,900.00
3.6.1.200 Saklar Panasonic (ganda) Bh 22,100.00 24,310.00
3.6.1.201 Saklar Panasonic (tunggal) Bh 13,700.00 15,070.00
3.6.1.202 Sambungan Jet P Lampu Selang Rol 20,000.00 22,000.00
3.6.1.203 Selcon photosel 06A Bh 45,000.00 49,500.00
3.6.1.204 Sevis (penguat tarikan) Bh 6,500.00 7,150.00
3.6.1.205 Shinyoku PLC 40w E-27 Bh 93,000.00 93,000.00
3.6.1.206 Shinyoku PLC 45w E-27 Bh 99,000.00 99,000.00
3.6.1.207 SISIR MCB 3 fase Lot 155,000.00 170,500.00
3.6.1.208 SKUN Kabel 16mm Bh 1,550.00 1,705.00
3.6.1.209 SKUN Kabel 25mm Bh 2,000.00 2,200.00
3.6.1.210 SON-H 250W Philips Bh 220,000.00 242,000.00
3.6.1.211 SON-H 350W Philips Bh 275,000.00 302,500.00
3.6.1.212 SON-T 250W Philips Bh 132,000.00 145,200.00
3.6.1.213 SON-T 400W Philips Bh 139,000.00 152,900.00
3.6.1.214 Steker arde Bh 9,500.00 10,450.00
3.6.1.215 T Dos 20 mm / bulat Bh 5,000.00 5,500.00
3.6.1.216 SON-T 70 Watt Bh 83,000.00 91,300.00
3.6.1.217 SON-T 150 Watt Bh 95,000.00 104,500.00
3.6.1.218 Stater / S2 Bh 3,000.00 3,300.00
3.6.1.219 Stop Kontak IB / Tanem Bh 12,000.00 13,200.00
3.6.1.220 T. Dos Kotak Bh 10,000.00 11,000.00
3.6.1.221 Tali Ties 10 cm Pak 4,500.00 4,950.00
3.6.1.222 Tali Ties 15 cm Pak 7,000.00 7,700.00
3.6.1.223 Tali Ties 20 cm Pak 10,000.00 11,000.00
3.6.1.224 Terminal 10 mm Bh 9,250.00 10,175.00
3.6.1.225 Terminal 16 mm Bh 20,000.00 22,000.00
3.6.1.226 Terminal 25 mm Bh 26,000.00 28,600.00
3.6.1.227 Terminal 6 mm Bh 6,500.00 7,150.00
3.6.1.228 Timer theben Bh 350,000.00 385,000.00
3.6.1.229 Trafo BSN 70 Watt / 3 kaki Bh 115,000.00 126,500.00
3.6.1.230 Trafo BSN 150 Watt / 3 kaki Bh 165,000.00 181,500.00
3.6.1.231 Trafo Elektrik TL 20 Watt ex, Philips Bh 30,000.00 33,000.00
3.6.1.232 Trafo Elektrik TL 40 Watt ex. Philips Bh 30,000.00 33,000.00
3.6.1.233 Trafo 5 Am Bh 80,000.00 88,000.00
3.6.1.234 Trafo MC 250 Watt Bh 200,000.00 220,000.00
3.6.1.235 Trafo MC 400 Watt Bh 203,000.00 223,300.00
3.6.1.236 Travo 125W Philips Bh 120,000.00 132,000.00
3.6.1.237 Travo 250W Philips kaki 3 Bh 225,000.00 247,500.00
3.6.1.238 Travo 400W Philips kaki 3 Bh 385,000.00 423,500.00
3.6.1.239 Trek Schok Bh 325,000.00 357,500.00
3.6.1.240 Kabel NYM 2 x 1,5 mm Rol 7,000.00 7,700.00

41
1 2 3 4 5
3.6.1.241 Saklar Panasonic (Tunggal) Buah 13,700.00 15,070.00
3.6.1.242 Sekering Matsuka 2 A - 10 A Buah 25,000.00 27,500.00
3.6.1.243 Kabel NYM 3 x 4 mm Rol 18,000.00 19,800.00
3.6.1.244 Kabel NYM 3 x 1,5 mm Rol 710,000.00 781,000.00
3.6.1.245 Fiiting TL Buah 2,000.00 2,200.00
3.6.1.246 Fuse Box Broco 1 Group Buah 36,000.00 39,600.00
3.6.1.247 Fiiting Tempel (Broco) Buah 10,000.00 11,000.00
3.6.1.248 Stop Kontak Panasonic Buah 16,500.00 18,150.00
3.6.1.249 T. Dos Buah 1,000.00 1,100.00
3.6.1.250 Paket PJU Solar Cell 4 m 100 Wp (30 Watt) Paket 25,630,000.00 28,193,000.00
3.6.1.251 Paket PJU Solar Cell 7 m 100 Wp (60 Watt) Paket 36,630,000.00 40,293,000.00
3.6.1.252 Paket PJU Solar Cell 9 m 100 Wp (80 Watt) Paket 45,870,000.00 50,457,000.00
3.6.1.253 Solar Panel 100 WP Unit 3,600,000.00 3,960,000.00
3.6.1.254 Panel Box Automatic Switcher Solar System Unit 11,000,000.00 12,100,000.00
3.6.1.255 Inverter 48 V 4000 Watt Unit 35,000,000.00 38,500,000.00
3.6.1.256 Charger Controller 48 V 75 Ah Unit 28,000,000.00 30,800,000.00
3.6.1.257 OPzV Gel Batteray 2 V 400 Ah Unit 5,400,000.00 5,940,000.00
3.6.1.258 Smart Controller And Inverter Automatic Detection 12/24 V Output 20 Amp Unit 1,800,000.00 1,980,000.00
3.6.1.259 Battery MF 12 V 100 Ah 2,750,000.00 3,025,000.00
3.6.1.260 LED Light 80 Watt Unit 5,500,000.00 5,500,000.00
3.6.1.261 LED Light 60 Watt Unit 5,350,000.00 5,350,000.00
3.6.1.262 LED Light 30 Watt Unit 4,500,000.00 4,500,000.00
3.6.1.263 Tiang Lampu Unit 4,500,000.00 4,500,000.00
3.6.1.264 Smart Controller 12 / 24 V Output 20 Amp Unit 1,500,000.00 1,650,000.00
3.6.1.265 Inverter Automatic Detection 12 / 24 V Output 20 Amp Unit 750,000.00 825,000.00
3.6.1.266 Trafo BSN 125W / kaki 3 Bh 106,000.00 106,000.00
3.6.1.267 Trafo BSN 250 Watt / kaki 3 Bh 210,000.00 210,000.00
3.6.1.268 Trafo BSN 400 Watt / kaki 3 Bh 360,000.00 360,000.00
3.6.1.269 Multi LED 60 watt Bh 2,400,000.00 2,640,000.00
3.6.1.270 Multi LED 80 watt Bh 2,600,000.00 2,860,000.00
3.6.1.271 Multi LED 100 watt Bh 3,250,000.00 3,575,000.00
3.6.1.272 LED runbay komplit / 5m Bh 300,000.00 330,000.00
3.6.1.273 Kap lampu kaca ukuran kecil Unit 130,000.00 143,000.00
3.6.1.274 Kap lampu kaca ukuran besar Unit 180,000.00 198,000.00
3.6.1.275 Multi LED 96 watt 220-240 V Bh 3,000,000.00 3,300,000.00
3.6.1.276 LED 59/NW 55 Watt 220-240 V DM Mpi Bh 4,250,000.00 4,675,000.00
3.6.1.277 LED 97/NW 90 Watt 220-240 V DM Mpi Bh 5,000,000.00 5,500,000.00
3.6.1.278 LED 138/NW 120 Watt 220-240 V DM Mpi Bh 5,750,000.00 6,325,000.00
3.6.1.279 LED 167/NW 150 Watt 220-240 V DM Mpi Bh 7,000,000.00 7,700,000.00
3.6.1.280 Ornamen pipa medium 1,5" / 3 m unit 1,100,000.00 1,210,000.00
3.6.1.281 Ornamen pipa medium 1,5" / 9 m unit 1,650,000.00 1,815,000.00
3.6.1.282 Tiang PJU pipa medium 4", 3", 2,5", 2" / 7 m unit 3,000,000.00 3,300,000.00
3.6.1.283 Ornamen pipa medium 1,5" / 2 m Unit 1,000,000.00 1,100,000.00
3.6.1.284 Ornamen pipa medium 1,5" / 4 m Unit 1,250,000.00 1,375,000.00
3.6.1.285 Ornamen pipa medium 1,5" / 5 m Unit 1,350,000.00 1,485,000.00
3.6.1.286 Tiang PJU pipa besi 7 m Unit 2,900,000.00 3,190,000.00
3.6.1.287 Tiang PJU besi 7 m / 2 ornamen Unit 4,000,000.00 4,400,000.00
3.6.1.288 Tiang PJU besi 7 m / 3 ornamen Unit 6,500,000.00 7,150,000.00
3.6.1.289 Tiang PJU besi 8 m Unit 4,500,000.00 4,950,000.00

42
1 2 3 4 5
3.6.2 Alat – alat listrik
3.6.2.1 Avo Meter Bh 375,000.00 412,500.00
3.6.2.2 Belenja Tanda Rambu Bh 80,000.00 88,000.00
3.6.2.3 Bor Listrik Bh 2,100,000.00 2,310,000.00
3.6.2.4 Gergaji Bh 120,000.00 132,000.00
3.6.2.5 Kunci inggris Bh 140,000.00 154,000.00
3.6.2.6 Kunci set Bh 1,200,000.00 1,320,000.00
3.6.2.7 Meteran ( 5 ) m Bh 20,000.00 22,000.00
3.6.2.8 Meteran ( 50 ) m Bh 115,000.00 126,500.00
3.6.2.9 Senter Bh 110,000.00 121,000.00
3.6.2.10 Senter Kepala Bh 165,000.00 181,500.00
3.6.2.11 Solder Bh 30,000.00 33,000.00
3.6.2.12 Tanda rambu (Trafic cone) Bh 300,000.00 330,000.00
3.6.2.13 Tang Bh 40,000.00 44,000.00
3.6.2.14 Tang meter Bh 500,000.00 550,000.00
3.6.2.15 Tang Skut Bh 200,000.00 220,000.00
3.6.2.16 Tang Wentes Bh 500,000.00 550,000.00
3.6.2.17 Tangga (aluminium) 4 m Bh 2,400,000.00 2,640,000.00
3.6.2.18 Tangga (aluminium) 6 m Bh 3,100,000.00 3,410,000.00
3.6.2.19 Tangga aluminium) 3 m Bh 1,700,000.00 1,870,000.00
3.6.2.20 Tangga fiber anti petir Bh 15,500,000.00 17,050,000.00
3.6.2.21 Testpen Bh 16,000.00 17,600.00
3.6.2.22 Tang Kombinasi Bh 40,000.00 44,000.00
3.6.2.23 Gerinda / Serkel Listrik Bh 550,000.00 605,000.00
3.6.2.24 Genset 3500 watt Bh 6,600,000.00 7,260,000.00

3.6.3 PAKAIAN KERJA DAN KELENGKAPAN ANTI STRUM


3.6.3.1 Helm Bh 150,000.00 165,000.00
3.6.3.2 Jas Hujan Bh 180,000.00 198,000.00
3.6.3.3 Kaos Panjang Bh 130,000.00 143,000.00
3.6.3.4 Kaos pendek Bh 115,000.00 126,500.00
3.6.3.5 Katelpak Stell 250,000.00 275,000.00
3.6.3.6 Rompi fosfor Bh 75,000.00 82,500.00
3.6.3.7 Sabuk Pengaman Set 1,500,000.00 1,650,000.00
3.6.3.8 Sarung tangan Psg 195,000.00 214,500.00
3.6.3.9 Sepatu Psg 500,000.00 550,000.00
3.6.3.10 Sepatu harian Psg 250,000.00 275,000.00
3.6.3.11 Topi kerja Bh 40,000.00 44,000.00

43
Harga 2019
Kode Nama Barang Satuan (Non Pajak dan
Non Overhead)

1 2 3 4

UPAH TENAGA DALAM PELAKSANAAN KONSTRUKSI


Buruh semi terlatih Org/Hari 78,000.00
Buruh terlatih Org/Hari 81,000.00
Kepala Tukang Org/Hari 98,000.00
Kernet Org/Hari 75,000.00
Mandor Org/Hari 99,000.00
Mekanik terlatih Org/Hari 94,000.00
Mekanik semi terlatih Org/Hari 88,000.00
Operator semi terlatih Org/Hari 94,000.00
Operator terlatih Org/Hari 99,000.00
Pekerja / Buruh tak terlatih Org/Hari 72,000.00
Pembantu Sopir Org/Hari 72,000.00
Pembantu operator Org/Hari 72,000.00
Penganyam Org/Hari 72,000.00
Penjaga Org/Hari 72,000.00
Sopir Org/Hari 86,000.00
Tukang batu Org/Hari 83,000.00
Tukang besi Org/Hari 88,000.00
Tukang baja konstruksi Org/Hari 100,000.00
Tukang cat Org/Hari 83,000.00
Tukang kayu Org/Hari 94,000.00
Tukang Pipa Org/Hari 83,000.00
Tukang Las Org/Hari 94,000.00
Tukang aluminium Org/Hari 88,000.00
Juru Ukur Bangunan Org/Hari 105,000.00
Penyapu Jalan Org/Bln 1,000,000.00
Perawat Taman Org/Bln 1,000,000.00
Teknisi PJU Org/Bln 1,000,000.00
Operator Alat Berat Org/Bln 650,000.00
Mekanik Org/Bln 650,000.00
Petugas Laboratorium Org/Bln 650,000.00

2. 2. BAHAN MATERIAL DINAS PU BMCK


2. 2. BAHAN BANGUNAN
2. 2. 1. BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
2. 2. 1. 1 Aspal Curah Kg
2. 2. 1. 2 Aspal Kemas Kg
2. 2. 1. 3 Batu marmo warna M2
2. 2. 1. 4 Batu amyang Kg
2. 2. 1. 5 Batu andesit M2
2. 2. 1. 6 Batu andesit bakar M2
2. 2. 1. 7 Batu Andesit alur M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 44


1 2 3 4
2. 2. 1. 8 Batu Andesit Alur hitam M2
2. 2. 1. 9 Batu andesit hitam bakar M2
2. 2. 1. 10 Batu andesit hitam M2
2. 2. 1. 11 Batu Andisit Hijau M2
2. 2. 1. 12 Batu apung 3 - 5 cm M3
2. 2. 1. 13 Batu Bali Green M2
2. 2. 1. 14 Batu Bata / Merah Bj
2. 2. 1. 15 Batu Bobos M2
2. 2. 1. 16 Batu candi M2
2. 2. 1. 17 Batu candi hitam M2
2. 2. 1. 18 Batu granit black gold M2
2. 2. 1. 19 Batu granit motif M2
2. 2. 1. 20 Batu guary/batu besar ( uk. Crussher) M3
2. 2. 1. 21 Batu koral putih M2
2. 2. 1. 22 Batu koral sikat M2
2. 2. 1. 23 Batu koral warna M2
2. 2. 1. 24 Batu lempeng M2
2. 2. 1. 25 Batu lempeng hijau M2
2. 2. 1. 26 Batu lempeng coklat M2
2. 2. 1. 27 Batu marmo biasa M2
2. 2. 1. 28 Batu paras putih M2
2. 2. 1. 29 Batu paras grobongan M2
2. 2. 1. 30 Batu pecah 0,5-1 cm M3
2. 2. 1. 31 Batu pecah 1-2 cm M3
2. 2. 1. 32 Batu pecah 2-3 cm M3
2. 2. 1. 33 Batu pecah 3-5 cm M3
2. 2. 1. 34 Batu pecah 5-7 cm M3
2. 2. 1. 35 Batu pecah 8-10 cm M3
2. 2. 1. 36 Batu pecah 10-15 cm (15-20) M3
2. 2. 1. 37 Batu plontos 5/7 cm M3
2. 2. 1. 38 Batu putih / gunung M3
2. 2. 1. 39 Batu putih pecah , 5 - 7 cm M3
2. 2. 1. 40 Batu susun sirih M2
2. 2. 1. 41 Batu Volcano 10-15 cm M3
2. 2. 1. 42 Batu warna ( hias ) Zak
2. 2. 1. 43 Grasak M3
2. 2. 1. 44 Ijuk Kg
2. 2. 1. 45 Kapur Batu ( sirih ) Kg
2. 2. 1. 46 Kapur Batu Kg
2. 2. 1. 47 Kerikil halus 0.4 / 0.4 (hitam ) Kg
2. 2. 1. 48 Kerikil halus 0.4 / 0.4 (putih ) Kg
2. 2. 1. 49 Kerikil halus 0.4 x 0.4 ( hijau) Kg
2. 2. 1. 50 Pasir pasang / beton M3
2. 2. 1. 51 Pasir Urug M3
2. 2. 1. 52 PC / Portland cement Kg
2. 2. 1. 53 Semen Merah M3
2. 2. 1. 54 Semen Putih / warna Kg
2. 2. 1. 55 Sirtu royalti M3
2. 2. 1. 56 Sirtu Urug M3
2. 2. 1. 57 Susun Sirih, andisit hitam uk. 3 x 20 cm M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 45


1 2 3 4
2. 2. 1. 58 Susun Sirih, andisit hitam uk. 3 x 30 cm M2
2. 2. 1. 59 Susun Sirih, andisit hitam uk. 3 x 40 cm M2
2. 2. 1. 60 Tali ijuk Kg
2. 2. 1. 61 Tanah liat M3
2. 2. 1. 62 Tanah urug M3
2. 2. 1. 63 Urugan Taman M3
2. 2. 1. 64 Tanah subur ( humus ) rit
2. 2. 1. 65 Pasir putih halus rit
2. 2. 1. 66 Tanah Padas M3

2. 2. 2. BAHAN KAYU DAN BAMBU :


2. 2. 2. 1 Arang kayu Kg
2. 2. 2. 2 Bambu (Dia 6 - 8 cm x 600cm) Btg
2. 2. 2. 3 Bambu Ori (Dia 10-12 x 600 cm) Btg
2. 2. 2. 4 Bambu Petung (p = 6 m) Ljr
2. 2. 2. 5 Batang kelapa dia 30 cm M'
2. 2. 2. 6 Betek / sesek kasar Uk. 2m x 3m Lbr
2. 2. 2. 7 Bilik bambu Uk. 2m x 3m Lbr
2. 2. 2. 8 Dolken bambu panjang 3 m Btg
2. 2. 2. 9 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg
2. 2. 2. 10 HPL Btg
2. 2. 2. 11 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg
2. 2. 2. 12 Kayu bakar M3
2. 2. 2. 13 Kayu Balau Balok M3
2. 2. 2. 14 Kayu Balau Papan M3
2. 2. 2. 15 Kayu bekisting M3
2. 2. 2. 16 Kayu Jati Balok eks. Bojonegoro M3
2. 2. 2. 17 Kayu Jati Balok lokal M3
2. 2. 2. 18 Kayu Jati Papan eks. Bojonegoro M3
2. 2. 2. 19 Kayu jati papan lokal M3
2. 2. 2. 20 Kayu Kamper Balok M3
2. 2. 2. 21 Kayu Kamper papan M3
2. 2. 2. 22 Kayu kelapa / glugu 8/10 cm M'
2. 2. 2. 23 Kayu kelapa / glugu Ø 20 cm M'
2. 2. 2. 24 Kayu kelapa / glugu Ø 30 cm M'
2. 2. 2. 25 Kayu kelapa / glugu Ø 40 cm M'
2. 2. 2. 26 Kayu kelapa / glugu Ø 50 cm M'
2. 2. 2. 27 Kayu kelapa / glugu usuk 4/6 cm M'
2. 2. 2. 28 Kayu Kempas Balok M3
2. 2. 2. 29 Kayu Kempas Papan M3
2. 2. 2. 30 Kayu Kruing Balok M3
2. 2. 2. 31 Kayu Kruing Papan M3
2. 2. 2. 32 Kayu Meranti Balok M3
2. 2. 2. 33 Kayu Meranti Papan M3
2. 2. 2. 34 Kayu Tahun Balok ( Mauni/ Akasia ) M3
2. 2. 2. 35 Kayu Tahun papan ( Mauni/akasia) M3
2. 2. 2. 36 Kornis kayu jati lebar 10 cm + Finishing m'

2. 2. 3. BAHAN PLAFOND, KERANGKA ATAP & PENUTUP ATAP:


2. 2. 3. 1 Asbes Datar / Eternit 100 x 100 tbl = 3 mm Lbr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 46


1 2 3 4
2. 2. 3. 2 Asbes Datar / Eternit 40 x 200 tbl = 6 mm Lbr
2. 2. 3. 3 Asbes Datar / Eternit 60 x 180 tbl = 4 mm Lbr
2. 2. 3. 4 Asbes Datar / Eternit 60 x 180 tbl = 5 mm Lbr
2. 2. 3. 5 Asbes Datar / Eternit 60 x 180 tbl = 6 mm Lbr
2. 2. 3. 6 Asbes Datar / Eternit 60 x 200 tbl = 4 mm Lbr
2. 2. 3. 7 Asbes Datar / Eternit 60 x 200 tbl = 5 mm Lbr
2. 2. 3. 8 Asbes Gelombang besar 110 x 200 tbl = 5 mm Lbr
2. 2. 3. 9 Asbes Gelombang besar 110 x 225 tbl = 5 mm Lbr
2. 2. 3. 10 Asbes Gelombang besar 110 x 250 tbl = 5 mm Lbr
2. 2. 3. 11 Asbes Gelombang besar 110 x 300 tbl = 5 mm Lbr
2. 2. 3. 12 Asbes Gelombang besar 150 x 305 tbl = 5 mm Lbr
2. 2. 3. 13 Asbes Gelombang besar 92 x 250 tbl = 5 mm Lbr
2. 2. 3. 14 Asbes Gelombang Besar Uk. 300x105x0,5 Cm Lbr
2. 2. 3. 15 Asbes Gelombang Kecil Uk. 150x105x0,4 Cm Lbr
2. 2. 3. 16 Asbes Gelombang Kecil Uk. 180x105x0,4 Cm Lbr
2. 2. 3. 17 Asbes Gelombang Kecil Uk. 300x105x0,4 Cm Lbr
2. 2. 3. 18 Asbes Gelombang kecil 105 x 150 tbl = 4 mm Lbr
2. 2. 3. 19 Asbes Gelombang kecil 105 x 225 tbl = 4 mm Lbr
2. 2. 3. 20 Asbes Gelombang kecil 105 x 240 tbl = 4 mm Lbr
2. 2. 3. 21 Asbes Gelombang kecil 105 x 240 tbl = 5 mm Lbr
2. 2. 3. 22 Asbes Gelombang kecil 105 x 270 tbl = 4 mm Lbr
2. 2. 3. 23 Asbes Gelombang kecil 105 x 270 tbl = 5 mm Lbr
2. 2. 3. 24 Asbes Gelombang kecil 105 x 300 tbl = 4 mm Lbr
2. 2. 3. 25 Asbes Gelombang kecil 105 x 300 tbl = 5 mm Lbr
2. 2. 3. 26 Asbes Gelombang kecil 105 x 300 tbl = 6 mm Lbr
2. 2. 3. 27 Asbes Gelombang kecil 105 x 305 tbl = 4 mm Lbr
2. 2. 3. 28 Asbes Gelombang kecil 92 x 180 tbl = 3 mm Lbr
2. 2. 3. 29 Asbes Gelombang kecil 92 x 180 tbl = 4 mm Lbr
2. 2. 3. 30 Asbes Gelombang kecil 92 x 200 tbl = 4 mm Lbr
2. 2. 3. 31 Asbes Gelombang kecil 92 x 200 tbl = 5 mm Lbr
2. 2. 3. 32 Asbes Gelombang nok kecil 105 x 150 tbl = 5 mm Lbr
2. 2. 3. 33 Asbes Gelombang nok kecil 92 x 180 tbl = 5 mm Lbr
2. 2. 3. 34 Asbes Gelombang nok kecil 92 x 200 tbl = 5 mm Lbr
2. 2. 3. 35 Asbes Gelombang nok kecil 92 x 225 tbl = 5 mm Lbr
2. 2. 3. 36 Asbes Nok 105 Lbr
2. 2. 3. 37 Asbes Nok 92 Lbr
2. 2. 3. 38 Asbes Nok Gelombang besar Lbr
2. 2. 3. 39 Asbes Nok Gelombang kecil Lbr
2. 2. 3. 40 Asbes Plat 90 x 180 tbl = 3 mm Lbr
2. 2. 3. 41 Asbes Sirap 20 x 40 tbl = 3 mm Lbr
2. 2. 3. 42 Atap galvalum ( Hollow 4cm ) M2 / psg
2. 2. 3. 43 Atap galvalum tebal 0,25 M2
2. 2. 3. 44 Atap galvalum tebal 0,30 M2
2. 2. 3. 45 Atap galvalum tebal 0,35 M2
2. 2. 3. 46 Atap galvalum tebal 0,40 M2
2. 2. 3. 47 Atap Policarbonat stainlees steel M2
2. 2. 3. 48 Atap Policarbonat 3 mm (Hollow 3 cm) M2
2. 2. 3. 49 Atap policarbonat besi M2
2. 2. 3. 50 Atap sirap M2
2. 2. 3. 51 Atap Skylight / fiber M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 47


1 2 3 4
2. 2. 3. 52 Awning M2 / psg
2. 2. 3. 53 Block board 122 x 244 tbl = 10 mm Lbr
2. 2. 3. 54 Bubung asbes gel besar (Ardek 1Stel 2 Lmbr) Unit
2. 2. 3. 55 Bubung asbes gel kecil (Ardek 1Stel 2 Lmbr) Unit
2. 2. 3. 56 Bubungan Glasur ex. Kanmuri Bh
2. 2. 3. 57 Bubungan Multiroof (0,5m x 1 m) Lbr
2. 2. 3. 58 Bubungan Tembaga Motif /Tekstur 0,5 M'
2. 2. 3. 59 Bubungan Tembaga Motif /Tekstur 0,6 M'
2. 2. 3. 60 Bubungan Tembaga Motif /Tekstur 0,8 M'
2. 2. 3. 61 Clamp penggantung lengkap Unit
2. 2. 3. 62 Eternit kembang M2
2. 2. 3. 63 Eternit polos (Asbes) M2
2. 2. 3. 64 Fiber Glass ex. Kano flash L=100cm m'
2. 2. 3. 65 Formika (120x240)cm Lbr
2. 2. 3. 66 Genteng Bubung MKP Bh
2. 2. 3. 67 Genteng MKP Bh
2. 2. 3. 68 Genteng Beton Bh
2. 2. 3. 69 Genteng bubung beton Bh
2. 2. 3. 70 Genteng bubung beton Bh
2. 2. 3. 71 Genteng bubung Mantili ex. Trenggalek/Tulungag Bh
2. 2. 3. 72 Genteng bubung Prentul ex. Trenggalek/Tulunga Bh
2. 2. 3. 73 Genteng bubung Press Bh
2. 2. 3. 74 Genteng Bubung Karang Pilang Bh
2. 2. 3. 75 Genteng gelombang Bh
2. 2. 3. 76 Genteng Glasur ex. Kanmuri Bh
2. 2. 3. 77 Genteng Kaca (model Karang Pilang) Bh
2. 2. 3. 78 Genteng Keramik motof Mantili bh
2. 2. 3. 79 Genteng mantili Bh
2. 2. 3. 80 Genteng Metal Lbr
2. 2. 3. 81 Genteng Prentul ex. T.ggalek/Tulungagung Bh
2. 2. 3. 82 Genteng pres biasa Bh
2. 2. 3. 83 Gypsum board tebal 12mm ( 1,2 x 2,4 m ) Lbr
2. 2. 3. 84 Gypsum board tebal 12mm ( 1,2 x 2,4 m ) KNAF Lbr
2. 2. 3. 85 Gypsum board tebal 9mm ( 1,2 x 2,4 m ) Lbr
2. 2. 3. 86 Gypsum tepung / cornise kg
2. 2. 3. 87 Harpleks 4mm ( Uk 40cm x200cm) Lbr
2. 2. 3. 88 Harpleks 4mm ( Uk 50cm x200cm) Lbr
2. 2. 3. 89 Harpleks 4mm ( Uk 60cm x200cm) Lbr
2. 2. 3. 90 Kalsiplang motif kayu lebar 20 cm m'
2. 2. 3. 91 Kalsiplang polos lebar 30 cm m'
2. 2. 3. 92 Kalsirata 1000×1000 tebal 3 mm lbr
2. 2. 3. 93 Kalsirata 500×1000 tebal 3 mm lbr
2. 2. 3. 94 Kalsirata 600×2000 tebal 3 mm lbr
2. 2. 3. 95 Kalsirata 500×2000 tebal 3 mm lbr
2. 2. 3. 96 Kalsirata 400×2000 tebal 3 mm lbr
2. 2. 3. 97 Kalsiplank 200×2400 tebal 8mm lbr
2. 2. 3. 98 Kalsiplank 200×3000 tebal 8mm lbr
2. 2. 3. 99 Kalsiplank 300×2400 tebal 8mm lbr
2. 2. 3. 100 Kalsiplank 300×3000 tebal 8mm lbr
2. 2. 3. 101 Kalsiplank Jati 200×2400 tebal 8mm lbr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 48


1 2 3 4
2. 2. 3. 102 Kalsiplank Jati 200×3000 tebal 8mm lbr
2. 2. 3. 103 Kalsiplank Jati 300×3000 tebal 8mm lbr
2. 2. 3. 104 Kalsiplank 200×2400 tebal 12mm lbr
2. 2. 3. 105 Kalsiplank 200×3000 tebal 12mm lbr
2. 2. 3. 106 Kalsiplank 300×2400 tebal 12mm lbr
2. 2. 3. 107 Wood Plank Elephant 4050×100 tebal 8mm lbr
2. 2. 3. 108 Wood Plank Elephant 4050×200 tebal 8mm lbr
2. 2. 3. 109 Wood Plank Elephant 4050×300 tebal 8mm lbr
2. 2. 3. 110 Big Flat Elephant 122×244 tebal 4mm lbr
2. 2. 3. 111 Big Flat Elephant 122×244 tebal 6mm lbr
2. 2. 3. 112 Big Flat Elephant 122×244 tebal 8mm lbr
2. 2. 3. 113 Kalsiboard 1,2 x 2,4 m tebal 4 mm lbr
2. 2. 3. 114 Kalsiplank polos 20 cm 20 cm x 3 m tebal 8 mm lbr
2. 2. 3. 115 Kalsiplank polos 30 cm 30 cm x 3 m tgebal 8 mm lbr
2. 2. 3. 116 Kalsiplank Jati 20 cm 20 cm x 3 m tebal 8 mm lbr
2. 2. 3. 117 kalsiplank jati 30 cm 30 cm x 3 m tebal 8 mm lbr
2. 2. 3. 118 Superplank 10 cm 10 cm x 2.44 m tebal 9 mm lbr
2. 2. 3. 119 Superplank 20 cm 20 cm x 2.44 m tebal 9 mm lbr
2. 2. 3. 120 Superplank 30 cm 30 cm x 2.44 tebal 9 mm lbr
2. 2. 3. 121 Kalsirata 1,00 x 1,00 tebal 3 mm lbr
2. 2. 3. 122 Kalsirata 0,50 x 1,00 tebal 3 mm lbr
2. 2. 3. 123 Kalsirata 1,00 x 2,00 tebal 3 mm lbr
2. 2. 3. 124 Kalsirata 0,50 x 2,00 tebal 3 mm lbr
2. 2. 3. 125 Kalsirata 1,22 x 2,44 tebal 3,5 mm lbr
2. 2. 3. 126 Kalsirata 1,20 x 2,40 tebal 3,5 mm lbr
2. 2. 3. 127 Kalsiling 1,22 x 2,44 tebal 4,5 mm lbr
2. 2. 3. 128 Kalsiling 1,20 x 2,40 tebal 4,5 mm lbr
2. 2. 3. 129 Kalsiling 1,20 x 2,44 tebal 6 mm lbr
2. 2. 3. 130 Kalsiling 1,20 x 2,40 tebal 6 mm lbr
2. 2. 3. 131 Kalsiling 1,20 x 2,70 tebal 6 mm lbr
2. 2. 3. 132 Kalsiling 1,20 x 3,00 tebal 6 mm lbr
2. 2. 3. 133 Kalsiling 1,22 x 2,44 tebal 6 mm R2 lbr
2. 2. 3. 134 Kalsiling 1,20 x 2,40 tebal 6 mm R2 lbr
2. 2. 3. 135 Kalsiling 1,20 x 2,70 tebal 6 mm R2 lbr
2. 2. 3. 136 Kalsiling 1,20 x 3,00 tebal 6 mm R2 lbr
2. 2. 3. 137 Kalsiling 1,22 x 2,44 tebal 6 mm R4 lbr
2. 2. 3. 138 Kalsiling 1,20 x 2,40 tebal 6 mm R4 lbr
2. 2. 3. 139 Kalsiling 1,20 x 2,70 tebal 6 mm R4 lbr
2. 2. 3. 140 Kalsiling 1,20 x 3,00 tebal 6 mm R4 lbr
2. 2. 3. 141 Kalsipart 1,22 x 2,44 tebal 8 mm lbr
2. 2. 3. 142 Kalsipart 1,20 x 2,40 tebal 8 mm lbr
2. 2. 3. 143 Kalsipart 1,20 x 2,70 tebal 8 mm lbr
2. 2. 3. 144 Kalsipart 1,20 x 3,00 tebal 8 mm lbr
2. 2. 3. 145 Kalsipart 1,22 x 2,44 tebal 8 mm R2 lbr
2. 2. 3. 146 Kalsipart 1,20 x 2,40 tebal 8 mm R2 lbr
2. 2. 3. 147 Kalsipart 1,20 x 2,70 tebal 8 mm R2 lbr
2. 2. 3. 148 Kalsipart 1,20 x 3,00 tebal 8 mm R2 lbr
2. 2. 3. 149 Kalsipart 1,22 x 2,44 tebal 8 mm R4 lbr
2. 2. 3. 150 Kalsipart 1,20 x 2,40 tebal 8 mm R4 lbr
2. 2. 3. 151 Kalsipart 1,20 x 2,70 tebal 8 mm R4 lbr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 49


1 2 3 4
2. 2. 3. 152 Kalsipart 1,20 x 3,00 tebal 8 mm R4 lbr
2. 2. 3. 153 Kalsiclad 1,22 x 2,44 tebal 10 mm lbr
2. 2. 3. 154 Kalsiclad 1,20 x 2,40 tebal 10 mm lbr
2. 2. 3. 155 Kalsiclad 1,20 x 2,70 tebal 10 mm lbr
2. 2. 3. 156 Kalsiclad 1,20 x 2,70 tebal 10 mm lbr
2. 2. 3. 157 Kalsiclad 1,22 x 2,44 tebal 12 mm lbr
2. 2. 3. 158 Kalsiclad 1,20 x 2,40 tebal 12 mm lbr
2. 2. 3. 159 Kalsiclad 1,20 x 2,70 tebal 12 mm lbr
2. 2. 3. 160 Kalsiclad 1,20 x 3,00 tebal 12 mm lbr
2. 2. 3. 161 Kalsiplang 0,2 x 2,40 tebal 8 mm lbr
2. 2. 3. 162 Kalsiplang 0,2 x 3,00 tebal 8 mm lbr
2. 2. 3. 163 Kalsiplang 0,2 x 2,40 tebal 8 mm lbr
2. 2. 3. 164 Kalsiplang 0,2 x 3,00 tebal 8 mm lbr
2. 2. 3. 165 Kalsiplang jati 0,20 x 2,40 tebal 8 mm lbr
2. 2. 3. 166 Kalsiplang jati 0,20 x 3,00 tebal 8 mm lbr
2. 2. 3. 167 Kalsiplang jati 0,30 x 3,00 tebal 8 mm lbr
2. 2. 3. 168 Kalsiplang 0,20 x 2,40 tebal 12 mm lbr
2. 2. 3. 169 Kalsiplang 0,20 x 3,00 tebal 12 mm lbr
2. 2. 3. 170 Kalsiplang 0,30 x 2,40 tebal 12 mm lbr
2. 2. 3. 171 Kalsiplang 0,30 x 3,00 tebal 12 mm lbr
2. 2. 3. 172 Kalsifloor 1,20 x 2,40 tebal 20 mm lbr
2. 2. 3. 173 Wood plank Elephant 4050 x 100 tebal 8 mm lbr
2. 2. 3. 174 Wood plank Elephant 4050 x 200 tebal 8 mm lbr
2. 2. 3. 175 Wood plank Elephant 4050 x 300 tebal 8 mm lbr
2. 2. 3. 176 Big Flat Elephant 122 x 244 tebal 4 mm lbr
2. 2. 3. 177 Big Flat Elephant 122 x 244 tebal 6 mm lbr
2. 2. 3. 178 Big Flat Elephant 122 x 244 tebal 8 mm lbr
2. 2. 3. 179 Kalsirata 1000 x 1000 tebal 3 mm lbr
2. 2. 3. 180 Kalsirata 500 x 1000 tebal 3 mm lbr
2. 2. 3. 181 Kalsirata 600 x 2000 tebal 3 mm lbr
2. 2. 3. 182 Kalsirata 500 x 2000 tebal 3 mm lbr
2. 2. 3. 183 Kalsirata 400 x 2000 tebal 3 mm lbr
2. 2. 3. 184 Kalsiplank 200 x 2400 tebal 8 mm lbr
2. 2. 3. 185 Kalsiplank 200 x 3000 tebal 8 mm lbr
2. 2. 3. 186 Kalsiplank 300 x 2400 tebal 8 mm lbr
2. 2. 3. 187 Kalsiplank 300 x 3000 tebal 8 mm lbr
2. 2. 3. 188 Kalsiplank Jati 200 x 2400 tebal 8 mm lbr
2. 2. 3. 189 Kalsiplank Jati 200 x 3000 tebal 8 mm lbr
2. 2. 3. 190 Kalsiplank Jati 300 x 3000 tebal 8 mm lbr
2. 2. 3. 191 Kalsiplank 200 x 2400 tebal 12 mm lbr
2. 2. 3. 192 Kalsiplank 200 x 3000 tebal 12 mm lbr
2. 2. 3. 193 Kalsiplank 300 x 2400 tebal 12 mm lbr
2. 2. 3. 194 Kalsiplank 300 x 3000 tebal 12 mm lbr
2. 2. 3. 195 Langit-langit Akustik ex. Jayaboard (30x30)cm Lbr
2. 2. 3. 196 Langit-langit Akustik ex. Jayaboard (30x60)cm Lbr
2. 2. 3. 197 Langit-langit Akustik ex. Jayaboard (60x120)cm Lbr
2. 2. 3. 198 List Eternit ( kayu ) M'
2. 2. 3. 199 List Profil besar ( gypsum ) M'
2. 2. 3. 200 List Profil kecil ( gypsum ) M'
2. 2. 3. 201 Multiplek 6 mm, uk 1,20 x 2,40 m Lbr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 50


1 2 3 4
2. 2. 3. 202 Multiplek 9 mm, uk. 1,20 x 2,40 m Lbr
2. 2. 3. 203 Multiroof (0,6m x 1,00 m) Lbr
2. 2. 3. 204 Nok atap genteng metal Lbr
2. 2. 3. 205 Nok genteng keramik bh
2. 2. 3. 206 Nok Stel Asbes Gelombang besar 108 Lbr
2. 2. 3. 207 Nok Stel Asbes Gelombang kecil 105 Lbr
2. 2. 3. 208 Partikel board t = 18 mm (1.22 m x 2.42 m ) Lbr
2. 2. 3. 209 Plywood ( 110 x 210 ) cm, tbl. 4 mm Lbr
2. 2. 3. 210 Plywood ( 110 x 240 ) cm, tbl. 3 mm Lbr
2. 2. 3. 211 Plywood ( 120 x 240 ) cm, tbl. 2 mm Lbr
2. 2. 3. 212 Plywood ( 120 x 240 ) cm, tbl. 4 mm Lbr
2. 2. 3. 213 Plywood ( 120 x 240 ) cm, tbl. 6 mm Lbr
2. 2. 3. 214 Plywood ( 90 x 220 ) cm, tbl. 4 mm Lbr
2. 2. 3. 215 Plywood 122 x 244 tbl = 3 mm Lbr
2. 2. 3. 216 Rangka plafond metal furing M'
2. 2. 3. 217 Seng gelombang Bjls 0,02cm 80 x 180 Lbr
2. 2. 3. 218 Seng gelombang BJLS 0,03 CM 80X300 Lbr
2. 2. 3. 219 Seng Gelombang Bjls 20 uk. 180x90x0,02 cm Lbr
2. 2. 3. 220 Seng gelombang Bjls 20 uk. 305x90x0,02 cm Lbr
2. 2. 3. 221 Seng Gelombang Bjls 30 uk 180x90x0,03 cm Lbr
2. 2. 3. 222 Seng Gelombang Bjls 30 uk 305x90x0,02 cm Lbr
2. 2. 3. 223 Seng gelombang Bjls 30 uk. 305x90x0,03 cm Lbr
2. 2. 3. 224 Seng Plat BJLS 20 lebar 0,90 m M'
2. 2. 3. 225 Seng Plat BJLS 27 lebar 0,60 m M'
2. 2. 3. 226 Seng Plat BJLS 27 lebar 0,90 m M'
2. 2. 3. 227 Seng Plat BJLS 30 lebar 0,45 m M'
2. 2. 3. 228 Seng Plat BJLS 30 lebar 0,60 m M'
2. 2. 3. 229 Seng Plat BJLS 30 lebar 0,90 m M'
2. 2. 3. 230 Talang Karet L=55cm m'
2. 2. 3. 231 Talang Karet L=90cm m'
2. 2. 3. 232 Talang PVC U 4" M'
2. 2. 3. 233 Teakwood 122 x 244 tbl = 3 mm Lbr
2. 2. 3. 234 Teakwood tebal 3mm (90 x 210) Cm Lbr
2. 2. 3. 235 Teakwood tebal 4mm (110 x 240) Cm Lbr
2. 2. 3. 236 Teakwood tebal 4mm (120 x 240) Cm Lbr
2. 2. 3. 237 Tekwood dilapis aluminium Lbr
2. 2. 3. 238 Tripleks 122 x 244 tbl = 12 mm Lbr
2. 2. 3. 239 Tripleks 122 x 244 tbl = 15 mm Lbr
2. 2. 3. 240 Tripleks 122 x 244 tbl = 16 mm Lbr
2. 2. 3. 241 Tripleks 122 x 244 tbl = 2 mm Lbr
2. 2. 3. 242 Tripleks 122 x 244 tbl = 3 mm Lbr
2. 2. 3. 243 Tripleks 122 x 244 tbl = 4 mm Lbr
2. 2. 3. 244 Tripleks 122 x 244 tbl = 6 mm Lbr
2. 2. 3. 245 Tripleks 122 x 244 tbl = 9 mm Lbr
2. 2. 3. 246 Tripleks tebal 4 mm ( 1.20 x 2.40 ) m Lbr
2. 2. 3. 247 Tripleks tebal 3 mm ( 0.90 x 2.40 ) m Lbr
2. 2. 3. 248 Tripleks tebal 4 mm ( 0.90 x 2.00 ) m Lbr
2. 2. 3. 249 Tripleks tebal 4 mm ( 1.10 x 2.10 ) m Lbr
2. 2. 3. 250 Tripleks tebal 4 mm ( 1.22 x 2.44 ) m Lbr
2. 2. 3. 251 Twekblock 122 x 244 tbl = 18 mm Lbr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 51


1 2 3 4

2. 2. 4. BAHAN BESI / LOGAM :


2. 2. 4. 1 Aluminium strip ( l = 5 - 10 cm) M'
2. 2. 4. 2 Alumunium Composite Panel Ex. Alucopan M2
2. 2. 4. 3 Alumunium foil M2
2. 2. 4. 4 Baja Galvanis Kg
2. 2. 4. 5 Baja Galvanis 6m ljr
2. 2. 4. 6 Baja Profil Kg
2. 2. 4. 7 Baja siku L 30.30.3 Kg
2. 2. 4. 8 Besi Angker dia 25 mm P 50 cm Bh
2. 2. 4. 9 Besi Beton / tulangan beton polos Kg
2. 2. 4. 10 Besi Beton / tulangan beton ulir Kg
2. 2. 4. 11 Besi Beugel/Baut Kg
2. 2. 4. 12 Besi lis kaca (1 x 1) cm M'
2. 2. 4. 13 Besi pengaman pipa dia 12 mm Unit
2. 2. 4. 14 Besi plat Kg
2. 2. 4. 15 Besi plat strip / Strip plate Kg
2. 2. 4. 16 Besi siku Kg
2. 2. 4. 17 Besi Square tube M'
2. 2. 4. 18 Besi strip + Mur Baut Kg
2. 2. 4. 19 Daun jendela kaca aluminium 4" M2
2. 2. 4. 20 Daun Jendela kaca aluminium YKK M3
2. 2. 4. 21 Daun pintu kaca pegas lengkap (kunci,engsel & handle) M'
2. 2. 4. 22 Grill besi M2
2. 2. 4. 23 Huruf logo nama stainlees uk. 20-30 cm Kg
2. 2. 4. 24 Huruf logo nama stainlees uk. 30-40 cm M2
2. 2. 4. 25 Huruf logo nama stainlees uk. 40-50 cm M2
2. 2. 4. 26 Jaring kawat baja dilas (wiremesh) Kg
2. 2. 4. 27 Kawat Ayakan Pasir (untuk pasang) Kg
2. 2. 4. 28 Kawat Ayakan Pasir (untuk plesteran) Kg
2. 2. 4. 29 Kawat ayaman bronjong galvanis Ø 3mm M'
2. 2. 4. 30 Kawat ayaman bronjong galvanis Ø 4mm M2
2. 2. 4. 31 Kawat Beton / bendraat Bh
2. 2. 4. 32 Kawat duri Kg
2. 2. 4. 33 Kawat Harmonika Kg
2. 2. 4. 34 Kawat Las karbit Kg
2. 2. 4. 35 kawat las listrik biasa pak
2. 2. 4. 36 Kawat Nyamuk aluminium M2
2. 2. 4. 37 Kawat Nyamuk kasa plastik M2
2. 2. 4. 38 Kisi - kisi almunium M2
2. 2. 4. 39 Kawat Nyamuk aluminium M'
2. 2. 4. 40 Kawat Nyamuk kasa plastik M'
2. 2. 4. 41 Kisi - kisi almunium Unit
2. 2. 4. 42 Kisi - kisi almunium 4" Bh
2. 2. 4. 43 Kisi - kisi aluminium 3" Bh
2. 2. 4. 44 Manhole (tutup plat besi 0.5 x 0.5) M2
2. 2. 4. 45 Tutup Besi Baja Manhole Dia. 50 cm tebal = 0,5cm Unit
2. 2. 4. 46 Mur, Baut baja dia 3/4" panjang 10 cm Bh
2. 2. 4. 47 Mur, Baut biasa dia 3/4" panjang 10 cm Bh

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 52


1 2 3 4
2. 2. 4. 48 Pagar Besi BRC Pabrikasi ( Besi Ø6" - Ø8" Uk. 90 M2/Psg
x 240 ) cm
2. 2. 4. 49 Pagar Besi BRC Pabrikasi (Besi Ø6"- Ø8" Uk.120 x 240 Bh/Psg
2. 2. 4. 50 Pagar Besi BRC Pabrikasi (Besi Ø6"- Ø8" Uk.150 x 240 Bh/Psg
2. 2. 4. 51 Pagar Besi Tuang Ø14" Bh/Psg
2. 2. 4. 52 Pagar Besi Tuang Ø16" M2/Psg
2. 2. 4. 53 Pagar pipa besi holo (20.20.1)mm,Rangka besi
holo (50.50.2)mm dicat M2/Psg
2. 2. 4. 54 Pagar pipa besi holo (20.20.2)mm,Rangka besi
holo (50.50.2)mm dicat M2/Psg
2. 2. 4. 55 Pintu aluminium coklat / hitam 4" ( 2 sisi ) M2/Psg
2. 2. 4. 56 Las besi / baja cm / Psg
2. 2. 4. 57 Pintu besi lipat ( Bukan Harmonika) M2
2. 2. 4. 58 Pintu besi lipat ( harmonika) M2
2. 2. 4. 59 Pintu dorong BRC/PMG (120x300)cm M2
2. 2. 4. 60 Pintu kaca sliding M2
2. 2. 4. 61 Pintu Pagar besi holo (20.20.2)mm, Rangka besi ho unit
2. 2. 4. 62 Pintu Pagar Besi Tuang Ø14" (komplit) Bh
2. 2. 4. 63 Pintu Pagar Besi Tuang Ø16" (komplit) M2/Psg
2. 2. 4. 64 Pintu Pagar pipa besi holo (20.20.1)mm, Rangka M2/Psg
besi holo (50.50.2)mm dicat motif
2. 2. 4. 65 Pintu Plat Harmonika M2
2. 2. 4. 66 Pintu PVC Lipat (70x210)cm Unit
2. 2. 4. 67 Pintu PVC Polos (70x210)cm Unit
2. 2. 4. 68 Pintu Roling Door aluminium M2
2. 2. 4. 69 Pintu Roling Door besi M2
2. 2. 4. 70 Pintu Swing Ganda BRC (121x300)cm unit
2. 2. 4. 71 Pipa Besi  2/4 Tebal= 1.2 mm M'
2. 2. 4. 72 Pipa Besi  2/4 Tebal= 1.4 mm M'
2. 2. 4. 73 Pipa Besi  4/4 Tebal= 1.2 mm M'
2. 2. 4. 74 Pipa Besi  4/4 Tebal= 1.4 mm M'
2. 2. 4. 75 Pipa galvanis spindo SNI 1 - 1/2" x 2,8 - 3 Btg
2. 2. 4. 76 Pipa galvanis spindo SNI 1 - 1/4" x 2,8 - 3 M'
2. 2. 4. 77 Pipa galvanis spindo SNI 1" x 2,8 - 3 M'
2. 2. 4. 78 Pipa galvanis spindo SNI 1/2" x 2,3 - 2,5 M'
2. 2. 4. 79 Pipa galvanis spindo SNI 2 - 1/2" x 3,2 - 3,5 M'
2. 2. 4. 80 Pipa galvanis spindo SNI 2" x 3,2 - 3,3 M'
2. 2. 4. 81 Pipa galvanis spindo SNI 3" x 3,5 - 5 M'
2. 2. 4. 82 Pipa galvanis spindo SNI 3/4" x 2,3 - 2,5 M'
2. 2. 4. 83 Pipa galvanis spindo SNI 4" x 4 - 4,4 M'
2. 2. 4. 84 Pipa galvanis spindo SNI 5" x 4,1 - 4,6 M'
2. 2. 4. 85 Pipa galvanis spindo SNI 6" x 4,1 - 4,8 M'
2. 2. 4. 86 Pipa Gas ( selang ) M'
2. 2. 4. 87 Pipa hitam spindo SNI 1 - 1/2" M'
2. 2. 4. 88 Pipa hitam spindo SNI 1 - 1/4" M'
2. 2. 4. 89 Pipa hitam spindo SNI 1" M'
2. 2. 4. 90 Pipa hitam spindo SNI 1/2" M'
2. 2. 4. 91 Pipa hitam spindo SNI 2 - 1/2" M'
2. 2. 4. 92 Pipa hitam spindo SNI 2" M'
2. 2. 4. 93 Pipa hitam spindo SNI 3" M'

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 53


1 2 3 4
2. 2. 4. 94 Pipa hitam spindo SNI 3/4" M'
2. 2. 4. 95 Pipa hitam spindo SNI 4" M'
2. 2. 4. 96 Pipa hitam spindo SNI 5" M'
2. 2. 4. 97 Pipa hitam spindo SNI 6" M'
2. 2. 4. 98 Profil aluminium T (Metal Furring) M'
2. 2. 4. 99 Profil daun pintu almunium coklat / hitam Bh
2. 2. 4. 100 Profil kusen almunium coklat / hitam 4" M'
2. 2. 4. 101 Profil kusen aluminium 4" M'
2. 2. 4. 102 Profil kusen aluminium 4"ykk M2
2. 2. 4. 103 Ralling tangga / grill stainlees Dia 2" M2 / Psg
2. 2. 4. 104 Ralling tangga / pagar besi M2 / Psg
2. 2. 4. 105 Rel pintu dorong Unit
2. 2. 4. 106 Rel pintu dorong l. 90 unit
2. 2. 4. 107 Rol baja dia 19 mm lengkap Unit
2. 2. 4. 108 Sun Screen Aluminium M2
2. 2. 4. 109 Tangga Pipa GI Ǿ 1" Unit
2. 2. 4. 110 Teralis Besi M2
2. 2. 4. 111 Teralis stainlees btg
2. 2. 4. 112 Tiang Pagar BRC ( Ø 2", t=120) M2
2. 2. 4. 113 Tutup Besi Baja Manhole Diameter 50 cm tebal= Unit
0,5 cm
2. 2. 5. BAHAN PENUTUP LANTAI & DINDING :
2. 2. 5. 1 Bata berongga expose Bh
2. 2. 5. 2 Bata ringan 60 x 25 x 10 cm Bh
2. 2. 5. 3 Bata ringan 60 x 20 x 10 cm Bh
2. 2. 5. 4 Batacote (lem bata ringan) Kg
2. 2. 5. 5 Batako biasa Bh
2. 2. 5. 6 Batu granit Kg
2. 2. 5. 7 Batu teraso Kg
2. 2. 5. 8 Dinding partisi ex.Calsy bord (uk. 122x244x0.3 cm) Lbr
2. 2. 5. 9 Glasswoll panjang 5,00 lebar 0,60 M2
2. 2. 5. 10 Granit (ex Granito) tekstur Uk. 40x40 cm M2
2. 2. 5. 11 Granit (ex Granito) tekstur Uk. 60x60 cm M2
2. 2. 5. 12 Granit (ex Granito) polos Uk. 40x40 cm M2
2. 2. 5. 13 Granit (ex Granito) polos Uk. 60x60 cm M2
2. 2. 5. 14 Granit (ex Granito) warna gelap Uk. 40x40 cm M2
2. 2. 5. 15 Granit (ex Granito) warna gelap Uk. 60x60 cm M2
2. 2. 5. 16 Granit (ex Granito) warna terang Uk. 40x40 cm M2
2. 2. 5. 17 Granit (ex Granito) warna terang Uk. 60x60 cm M2
2. 2. 5. 18 Keramik Granit 60 x 60 220 - Ivory dan 280 Joyc M2
2. 2. 5. 19 Keramik Granit 60 x 60 242 - Sara M2
2. 2. 5. 20 Keramik Granit 60 x 60 240 - White M2
2. 2. 5. 21 Keramik Granit 60 x 60 989 - Granit Black M2
2. 2. 5. 22 Karpet m2
2. 2. 5. 23 Keramik Arstistik Uk. 10 x 20 cm M'
2. 2. 5. 24 Keramik cutting Uk. 30cm x 50 cm M2
2. 2. 5. 25 Keramik cutting Uk. 31cm x 63 cm M2
2. 2. 5. 26 Keramik dinding motif Uk. 20cm x 25 cm M2
2. 2. 5. 27 Keramik dinding putih ukuran 20/25 Cm M2
2. 2. 5. 28 Keramik dinding Uk. 20cm x 33 cm M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 54


1 2 3 4
2. 2. 5. 29 Keramik dinding Uk. 20cm x 50 cm M2
2. 2. 5. 30 Keramik dinding 20 X 40 cm M2
2. 2. 5. 31 Keramik dinding 20 X 45 cm M2
2. 2. 5. 32 Keramik dinding 20 X 50 cm INA motif M2
2. 2. 5. 33 Keramik dinding 20 X 50 cm Platinum motif M2
2. 2. 5. 34 Keramik dinding 20 X 50 cm M2
2. 2. 5. 35 Keramik dinding 30 X 60 cm M2
2. 2. 5. 36 Keramik Dinding Roman 20 x 20 Golongan A M2
2. 2. 5. 37 Keramik Dinding Roman 20 x 20 Golongan B M2
2. 2. 5. 38 Keramik Dinding Roman 20 x 25 Golongan A M2
2. 2. 5. 39 Keramik Dinding Roman 20 x 25 Golongan B M2
2. 2. 5. 40 Keramik Dinding Roman 20 x 25 Golongan C M2
2. 2. 5. 41 Keramik Dinding Roman 25 x 25 Golongan A M2
2. 2. 5. 42 Keramik Dinding Roman 25 x 25 Golongan B M2
2. 2. 5. 43 Keramik Dinding Roman 25 x 25 Golongan C M2
2. 2. 5. 44 Keramik Dinding Roman 30 x 30 Golongan B
(match 20 x 60) M2
2. 2. 5. 45 Keramik Dinding Roman 30 x 30 Golongan C
(match 20 x 60) M2
2. 2. 5. 46 Keramik Dinding Roman 30 x 30 Golongan D
(match 20 x 60) M2
2. 2. 5. 47 Keramik Dinding Roman 30 x 30 Golongan A
(match 30 x 60) M2
2. 2. 5. 48 Keramik Dinding Roman 30 x 30 Golongan B
(match 30 x 60) M2
2. 2. 5. 49 Keramik Dinding Roman 30 x 30 Golongan C
(match 30 x 60) M2
2. 2. 5. 50 Keramik Dinding Roman 30 x 30 Golongan D
(match 30 x 60) M2
2. 2. 5. 51 Keramik Dinding Roman 25 x 33.3 Golongan A M2
2. 2. 5. 52 Keramik Dinding Roman 25 x 33.3 Golongan B M2
2. 2. 5. 53 Keramik Dinding Roman 25 x 33.3 Golongan C M2
2. 2. 5. 54 Keramik Dinding Roman 20 x 40 Golongan A M2
2. 2. 5. 55 Keramik Dinding Roman 20 x 40 Golongan B M2
2. 2. 5. 56 Keramik Dinding Roman 25 x 45 Golongan A M2
2. 2. 5. 57 Keramik Dinding Roman 25 x 45 Golongan B M2
2. 2. 5. 58 Keramik Dinding Roman 25 x 45 Golongan D M2
2. 2. 5. 59 Keramik Dinding Roman 32.5 x 32.5 Golongan A
match 32.5 x 65,6 M2
2. 2. 5. 60 Keramik Dinding Roman 32.5 x 32.5 Golongan B
match 32.5 x 65,6 M2
2. 2. 5. 61 Keramik Dinding Roman 32.5 x 32.5 Golongan A
match 32.5 x 97,5 M2
2. 2. 5. 62 Keramik Dinding Roman 20 x 60 Golongan A M2
2. 2. 5. 63 Keramik Dinding Roman 20 x 60 Golongan B M2
2. 2. 5. 64 Keramik Dinding Roman 20 x 60 Golongan C M2
2. 2. 5. 65 Keramik Dinding Roman 20 x 60 Golongan D M2
2. 2. 5. 66 Keramik Dinding Roman 30 x 60 Golongan A M2
2. 2. 5. 67 Keramik Dinding Roman 30 x 60 Golongan B M2
2. 2. 5. 68 Keramik Dinding Roman 30 x 60 Golongan C M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 55


1 2 3 4
2. 2. 5. 69 Keramik Dinding Roman 30 x 60 Golongan D M2
2. 2. 5. 70 Keramik Dinding Roman 30 x 60 Golongan E M2
2. 2. 5. 71 Keramik Dinding Roman 32.5 x 65.6 Golongan A
Rectified M2
2. 2. 5. 72 Keramik Dinding Roman 32.5 x 65.6 Golongan B
Rectified M2
2. 2. 5. 73 Keramik Dinding Roman 32.5 x 65.6 Golongan C
Rectified M2
2. 2. 5. 74 Keramik Dinding Roman 32.5 x 97.5 Golongan A
Rectified M2
2. 2. 5. 75 Keramik Dinding Roman 32.5 x 97.5 Golongan B
Rectified M2
2. 2. 5. 76 Galaxy black, brown, cream, grey, white KW- A M2
2. 2. 5. 77 Petra cream, terracota KW- A M2
2. 2. 5. 78 Roxy black, blue, brown, green, grey, red KW-A M2
2. 2. 5. 79 Alpha blue, green KW- A M2
2. 2. 5. 80 Track brown, grey KW- A M2
2. 2. 5. 81 Jungle red, green, grey, red KW- A M2
2. 2. 5. 82 Capri brown, grey KW- A M2
2. 2. 5. 83 Marble brown KW- A M2
2. 2. 5. 84 Newton brown, green, grey KW- A M2
2. 2. 5. 85 Mahoni brown, cream KW- A M2
2. 2. 5. 86 Cargo, brown, grey, dark brown, dark grey KW-A M2
2. 2. 5. 87 Clarin, bone, brown, grey KW- A M2
2. 2. 5. 88 Cordon, bone, brown, cream KW- A M2
2. 2. 5. 89 Bintan, bone, brown, cream KW- A M2
2. 2. 5. 90 Ecco grey, brown KW- A M2
2. 2. 5. 91 Gobi cream, grey KW- A M2
2. 2. 5. 92 Cavalli, cream, white KW- A M2
2. 2. 5. 93 Fredo, cream, grey KW- A M2
2. 2. 5. 94 Fresno, cream, grey KW- A M2
2. 2. 5. 95 Salsa, cream, grey KW- A M2
2. 2. 5. 96 Sicillia, grey KW- A M2
2. 2. 5. 97 Sonata, brown KW- A M2
2. 2. 5. 98 Strata, cream, grey KW- A M2
2. 2. 5. 99 Tequila, cream, white KW- A M2
2. 2. 5. 100 Tosca, cream, white KW- A M2
2. 2. 5. 101 Tudor, cream, white KW- A M2
2. 2. 5. 102 Teakwood, beige, brown, latte KW- A M2
2. 2. 5. 103 Warna Tua 20 x 20 M2
2. 2. 5. 104 Warna Muda 20 x 20 M2
2. 2. 5. 105 Warna Putih 30 x 30 M2
2. 2. 5. 106 Warna Marble 30 x 30 M2
2. 2. 5. 107 Warna Fancy 30 x 30 M2
2. 2. 5. 108 Warna Putih 40 x 40 M2
2. 2. 5. 109 Warna Marble 40 x 40 M2
2. 2. 5. 110 Warna Tua 20 x 20 M2
2. 2. 5. 111 Warna Muda 20 x 20 M2
2. 2. 5. 112 Warna Putih 30 x 30 M2
2. 2. 5. 113 Warna Marble 30 x 30 M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 56


1 2 3 4
2. 2. 5. 114 Warna Impresso 30 x 30 M2
2. 2. 5. 115 Pure Color 50 x 50 M2
2. 2. 5. 116 Classy Color 50 x 50 M2
2. 2. 5. 117 Fancy Color 50 x 50 M2
2. 2. 5. 118 Accent Color 50 x 50 M2
2. 2. 5. 119 Pure Color 25 x 50 M2
2. 2. 5. 120 Classy Color 25 x 50 M2
2. 2. 5. 121 Fancy Color 25 x 50 M2
2. 2. 5. 122 Accent Color 25 x 50 M2
2. 2. 5. 123 Pure Color 25 x 25 M2
2. 2. 5. 124 Classy Color 25 x 25 M2
2. 2. 5. 125 Fancy Color 25 x 25 M2
2. 2. 5. 126 Accent Color 25 x 25 M2
2. 2. 5. 127 Putih 40 x 40 M2
2. 2. 5. 128 Median 40 x 40 M2
2. 2. 5. 129 Gelap 40 x 40 M2
2. 2. 5. 130 Rustic 33 x 33 M2
2. 2. 5. 131 Rustic 40 x 40 M2
2. 2. 5. 132 Supermilan 25 x 33 - Golongan A M2
2. 2. 5. 133 Supermilan 25 x 33 - Golongan B M2
2. 2. 5. 134 Supermilan 40 x 40 - Putih M2
2. 2. 5. 135 Supermilan 40 x 40 - Median M2
2. 2. 5. 136 Supermilan 40 x 40 - Gelap M2
2. 2. 5. 137 Supermilan 50 x 50 - Putih M2
2. 2. 5. 138 Keramik Dinding Hercules - Gelap 40 x 40 M2
2. 2. 5. 139 Keramik Dinding Hercules - Motif Khusus 40 x 40 M2
2. 2. 5. 140 Keramik Dinding Hercules - Putih 40 x 40 M2
2. 2. 5. 141 Keramik Dinding Hercules - Motif Dasar Putih 40 x 40 M2
2. 2. 5. 142 Keramik Dinding Hercules - Motif Dasar Gelap 40 x 40 M2
2. 2. 5. 143 Keramik Dinding Galaxy black, brown, cream,
grey, white KW- A M2
2. 2. 5. 144 Keramik Dinding Petra cream, terracota KW- A M2
2. 2. 5. 145 Keramik Dinding Roxy black, blue, brown, green,
grey, red KW- A M2
2. 2. 5. 146 Keramik Dinding Alpha blue, green KW- A M2
2. 2. 5. 147 Keramik Dinding Track brown, grey KW- A M2
2. 2. 5. 148 Keramik Lantai platinum 30 x 30 Jungle red,
green, grey, red KW- A M2
2. 2. 5. 149 Keramik Lantai platinum 30 x 30 Capri brown,
grey KW- A M2
2. 2. 5. 150 Keramik Lantai platinum 30 x 30 Marblebrown KW- M2
2. 2. 5. 151 Keramik Lantai platinum 30 x 30 Newton brown,
green, grey KW- A M2
2. 2. 5. 152 Keramik Lantai platinum 30 x 30 Mahoni brown,
cream KW- A M2
2. 2. 5. 153 Keramik Lantai platinum 30 x 30 Cargo, brown,
grey, dark brown, dark grey KW- A M2
2. 2. 5. 154 Keramik Lantai platinum 30 x 30 Clarin, bone,
brown, grey KW- A M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 57


1 2 3 4
2. 2. 5. 155 Keramik Lantai platinum 30 x 30 Cordon, bone,
brown, cream KW- A M2
2. 2. 5. 156 Keramik Lantai platinum 30 x 30 Bintan, bone,
brown, cream KW- A M2
2. 2. 5. 157 Keramik Lantai platinum 50 x 50 Ecco grey,
brown KW- A M2
2. 2. 5. 158 Keramik Lantai platinum 50 x 50 Gobi cream, grey
KW- A M2
2. 2. 5. 159 Keramik Lantai platinum 60 x 60 Cavalli, cream,
white KW- A M2
2. 2. 5. 160 Keramik Lantai platinum 60 x 60 Fredo, cream,
grey KW- A M2
2. 2. 5. 161 Keramik Lantai platinum 60 x 60 Fresno, cream,
grey KW- A M2
2. 2. 5. 162 Keramik Lantai platinum 60 x 60 Salsa, cream,
grey KW- A M2
2. 2. 5. 163 Keramik Lantai platinum 60 x 60 Sicillia, grey KW- M2
2. 2. 5. 164 Keramik Lantai platinum 60 x 60 Sonata, brown KW-A M2
2. 2. 5. 165 Keramik Lantai platinum 60 x 60 Strata, cream,
grey KW- A M2
2. 2. 5. 166 Keramik Lantai platinum 60 x 60 Tequila, cream,
white KW- A M2
2. 2. 5. 167 Keramik Lantai platinum 60 x 60 Tosca, cream,
white KW- A M2
2. 2. 5. 168 Keramik Lantai platinum 60 x 60 Tudor, cream,
white KW- A M2
2. 2. 5. 169 Keramik Lantai platinum 60 x 60 Teakwood,
beige, brown, latte KW- A M2
2. 2. 5. 170 Keramik Lantai Arwana Warna Tua 20 x 20 M2
2. 2. 5. 171 Keramik Lantai Arwana Warna Muda 20 x 20 M2
2. 2. 5. 172 Keramik Lantai Arwana Warna Putih 30 x 30 M2
2. 2. 5. 173 Keramik Lantai Arwana Warna Marble 30 x 30 M2
2. 2. 5. 174 Keramik Lantai Arwana Warna Fancy 30 x 30 M2
2. 2. 5. 175 Keramik Lantai Arwana Warna Putih 40 x 40 M2
2. 2. 5. 176 Keramik Lantai Arwana Warna Marble 40 x 40 M2
2. 2. 5. 177 Keramik Lantai Mulia Warna Tua 20 x 20 M2
2. 2. 5. 178 Keramik Lantai Mulia Warna Muda 20 x 20 M2
2. 2. 5. 179 Keramik Lantai Mulia Warna Putih 30 x 30 M2
2. 2. 5. 180 Keramik Lantai Mulia Warna Marble 30 x 30 M2
2. 2. 5. 181 Keramik Lantai Mulia Warna Impresso 30 x 30 M2
2. 2. 5. 182 Keramik Lantai Milan Pure Color 50 x 50 M2
2. 2. 5. 183 Keramik Lantai Milan Classy Color 50 x 50 M2
2. 2. 5. 184 Keramik Lantai Milan Fancy Color 50 x 50 M2
2. 2. 5. 185 Keramik Lantai Milan Accent Color 50 x 50 M2
2. 2. 5. 186 Keramik Lantai Milan Pure Color 25 x 50 M2
2. 2. 5. 187 Keramik Lantai Milan Classy Color 25 x 50 M2
2. 2. 5. 188 Keramik Lantai Milan Fancy Color 25 x 50 M2
2. 2. 5. 189 Keramik Lantai Milan Accent Color 25 x 50 M2
2. 2. 5. 190 Keramik Lantai Milan Pure Color 25 x 25 M2
2. 2. 5. 191 Keramik Lantai Milan Classy Color 25 x 25 M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 58


1 2 3 4
2. 2. 5. 192 Keramik Lantai Milan Fancy Color 25 x 25 M2
2. 2. 5. 193 Keramik Lantai Milan Accent Color 25 x 25 M2
2. 2. 5. 194 Keramik Lantai Milan Putih 40 x 40 M2
2. 2. 5. 195 Keramik Lantai Milan Median 40 x 40 M2
2. 2. 5. 196 Keramik Lantai Milan Gelap 40 x 40 M2
2. 2. 5. 197 Keramik Lantai Milan Rustic 33 x 33 M2
2. 2. 5. 198 Keramik Lantai Milan Rustic 40 x 40 M2
2. 2. 5. 199 Keramik Lantai Milan Supermilan 25 x 33 - Gol. A M2
2. 2. 5. 200 Keramik Lantai Milan Supermilan 25 x 33 - Gol. B M2
2. 2. 5. 201 Keramik Lantai Milan Supermilan 40 x 40 - Putih M2
2. 2. 5. 202 Keramik Lantai Milan Supermilan 40 x 40 - Median M2
2. 2. 5. 203 Keramik Lantai Milan Supermilan 40 x 40 - Gelap M2
2. 2. 5. 204 Keramik Lantai Milan Supermilan 50 x 50 - Putih M2
2. 2. 5. 205 Keramik Lantai Hercules - Gelap 40 x 40 M2
2. 2. 5. 206 Keramik Lantai Hercules - Motif Khusus 40 x 40 M2
2. 2. 5. 207 Keramik Lantai Hercules - Putih 40 x 40 M2
2. 2. 5. 208 Keramik Lantai Hercules - Motif Dasar Putih 40 x 4 M2
2. 2. 5. 209 Keramik Lantai Hercules - Motif Dasar Gelap 40 x M2
2. 2. 5. 210 Keramik Lantai Roman 20 x 20 Golongan A M2
2. 2. 5. 211 Keramik Lantai Roman 20 x 20 Golongan B M2
2. 2. 5. 212 Keramik Lantai Roman 20 x 20 Golongan D M2
2. 2. 5. 213 Keramik Lantai Roman 30 x 30 Golongan B M2
2. 2. 5. 214 Keramik Lantai Roman 30 x 30 Golongan C M2
2. 2. 5. 215 Keramik Lantai Roman 33.3 x 33.3 Golongan A M2
2. 2. 5. 216 Keramik Lantai Roman 33.3 x 33.3 Golongan C M2
2. 2. 5. 217 Keramik Lantai Roman 40 x 40 Golongan A M2
2. 2. 5. 218 Keramik Lantai Roman 40 x 40 Golongan B M2
2. 2. 5. 219 Keramik Lantai Roman 40 x 40 Golongan C M2
2. 2. 5. 220 Keramik Lantai Roman 40 x 40 Golongan D M2
2. 2. 5. 221 Keramik Lantai Roman 45 x 45 Golongan A M2
2. 2. 5. 222 Keramik Lantai Roman 45 x 45 Golongan B M2
2. 2. 5. 223 Keramik Lantai Roman 45 x 45 Golongan E M2
2. 2. 5. 224 Keramik Lantai Roman 50 x 50 Golongan A M2
2. 2. 5. 225 Keramik Lantai Roman 50 x 50 Golongan B M2
2. 2. 5. 226 Keramik Lantai Roman 50 x 50 Golongan C M2
2. 2. 5. 227 Keramik Lantai Roman 60 x 60 Golongan A M2
2. 2. 5. 228 Keramik Lantai Roman 60 x 60 Golongan B M2
2. 2. 5. 229 Keramik Lantai Roman 60 x 60 Golongan C M2
2. 2. 5. 230 Keramik Lantai Roman 16.5 x 66.6 Golongan A M2
2. 2. 5. 231 Keramik Lantai Roman 33.3 x 66.6 Golongan A M2
2. 2. 5. 232 Keramik Lantai Roman 33.3 x 66.6 Golongan B M2
2. 2. 5. 233 Keramik Lantai Roman 33.3 x 66.6 Golongan C M2
2. 2. 5. 234 Keramik Lantai Roman 8 x 30 Hospital Skirting M2
2. 2. 5. 235 Keramik Lantai Roman 10 x 20 Step Nosing M2
2. 2. 5. 236 Keramik Lantai Asia 20 x 20 Zeus grey,white,brow M2
2. 2. 5. 237 Keramik Lantai Asia 20 x 20 Zion grey, white M2
2. 2. 5. 238 Keramik Lantai Asia 20 x 20 Alpha blue, black,
cream, green M2
2. 2. 5. 239 Keramik Lantai Asia 20 x 20 Galaxy black, brown,
cream M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 59


1 2 3 4
2. 2. 5. 240 Keramik Lantai Asia 20 x 20 Oscar black,cream,wit M2
2. 2. 5. 241 Keramik motif Uk. 30 cm x 30 cm M2
2. 2. 5. 242 Keramik motif Uk. 40 cm x 40 cm M2
2. 2. 5. 243 Keramik motif Uk. 50 cm x 50 cm M2
2. 2. 5. 244 Keramik putih Uk. 30 cm x 30 cm M2
2. 2. 5. 245 Keramik putih Uk. 40cm x 40 cm M2
2. 2. 5. 246 Keramik Roman Uk. 20 X 20 cm M2
2. 2. 5. 247 Keramik Roman Uk. 30 X 30 cm M2
2. 2. 5. 248 Keramik Roman Uk. 40 X 40 cm M2
2. 2. 5. 249 Keramik Roman Uk. 50 X 50 cm M2
2. 2. 5. 250 Keramik Roman Uk. 60 X 60 cm M2
2. 2. 5. 251 Keramik tekstur cutting Uk. 31cm x 63 cm M2
2. 2. 5. 252 Keramik tekstur Uk. 20cm x 20 cm M2
2. 2. 5. 253 Keramik tekstur Uk. 30cm x 30 cm M2
2. 2. 5. 254 Keramik Uk. 20Cm x 20Cm M2
2. 2. 5. 255 Keramik warna muda Uk. 20 X 20 cm M2
2. 2. 5. 256 Keramik warna tua Uk. 20 X 20 cm M2
2. 2. 5. 257 Laminate Florring Ex. Belgium + Foam sheet M2
2. 2. 5. 258 Laminate Florring Ex. China + Foam sheet M2
2. 2. 5. 259 Laminate Florring Ex. Germany + Foam sheet M2
2. 2. 5. 260 Laminate Florring Lokal + Foam sheet M2
2. 2. 5. 261 List Keramik (10x20)cm Bh
2. 2. 5. 262 Marmer bakar M2
2. 2. 5. 263 Marmer Hitam M2
2. 2. 5. 264 Marmer Putih M2
2. 2. 5. 265 Marmer Slab lebar (1.80 x 2.40) m M2
2. 2. 5. 266 Ornamen 30 x 30 cm Bh
2. 2. 5. 267 Papan Peredam Suara 120 x 60 x 5 cm Bh
2. 2. 5. 268 Paving Stone (12x12) 5 warna tebal 6 cm M2
2. 2. 5. 269 Paving Stone abu - abu t= 8 cm, K225 M2
2. 2. 5. 270 Paving Stone abu - abu t= 6 cm, K225 M2
2. 2. 5. 271 Paving Stone abu - abu t= 6 cm, K300 M2
2. 2. 5. 272 Paving Stone abu - abu t= 6 cm, K400 M2
2. 2. 5. 273 Paving Stone abu - abu t= 8 cm, K300 M2
2. 2. 5. 274 Paving Stone abu - abu t= 8 cm, K350 M2
2. 2. 5. 275 Paving Stone abu - abu t= 8 cm, K400 M2
2. 2. 5. 276 Paving Stone abu - abu t= 6 cm M2
2. 2. 5. 277 Paving Stone abu - abu t= 8 cm M2
2. 2. 5. 278 Paving Stone segi 6 abu - abu t= 6 cm M2
2. 2. 5. 279 Paving Stone segi 6 abu - abu t= 8 cm M2
2. 2. 5. 280 Paving Stone segi 6 merah t= 6 cm M2
2. 2. 5. 281 Paving Stone segi 6 merah t= 8 cm M2
2. 2. 5. 282 Paving Stone warna t= 6 cm, K225 bh
2. 2. 5. 283 Paving Stone warna t= 8 cm, K225 Bh
2. 2. 5. 284 Plint Keramik / kuku macan Bh
2. 2. 5. 285 Rooster Batu Alam Uk. 20 x 20 cm Bh
2. 2. 5. 286 Rooster Batu Alam Uk. 30 x 30 cm Bh
2. 2. 5. 287 Rooster Beton Uk. 10 x 30 cm Bh
2. 2. 5. 288 Rooster Beton Uk. 20 x 20 cm M2
2. 2. 5. 289 Rooster Lokal Bata Merah Uk. 20 x 20 cm M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 60


1 2 3 4
2. 2. 5. 290 Ubin Abu-abu Uk. 20Cm x 20Cm M2
2. 2. 5. 291 Ubin Teraso Uk 30 Cm x 30 Cm M2
2. 2. 5. 292 Ubin Wafel Uk 20Cm x 20Cm Bh
2. 2. 5. 293 Wallpaper Classic m2
2. 2. 5. 294 Wallpaper Minimalis m2
2. 2. 5. 295 Wallpaper Korea m2
2. 2. 5. 296 Wallpaper ( standart ) Bh
2. 2. 5. 297 Wallpaper Sticker m2
2. 2. 5. 298 Wallpaper Smart Wall ukuran 0.53m x 10.00m m2
2. 2. 5. 299 Wallpaper Grand City ukuran 0.53m x 10.00m m2
2. 2. 5. 300 Wallpaper Dream World ukuran 1.06m x 15.60m roll
2. 2. 5. 301 Wallpaper Jade 3d Image ukuran 0.53m x 10.00m roll
2. 2. 5. 302 Wallpaper Clear Spirit ukuran 0.53m x 10.00m roll
2. 2. 5. 303 Wallpaper Modern Wallcoverings ukuran 0.53m x 10.00 roll
2. 2. 5. 304 Wallpaper Jack & Ros ukuran 0.53m x 10.00m roll
2. 2. 5. 305 Wallpaper Daon Vol 3 ukuran 1.06m x 15.60m roll
2. 2. 5. 306 Wallpaper Silk House ukuran 1.06m x 15.60m roll
2. 2. 5. 307 Wallpaper Polaris Vol 3 ukuran 1.06m x 15.60m roll
2. 2. 5. 308 Wallpaper Zinnia ukuran 1.06m x 15.60m roll
2. 2. 5. 309 Wallpaper Kahn Design ukuran 1.06m x 15.60m roll

2. 2. 6. BAHAN PENGECATAN & BAHAN CAIR LAINNYA :


2. 2. 6. 1 Air bersih Ltr
2. 2. 6. 2 Aquaproof Kg
2. 2. 6. 3 Cat besi Kg
2. 2. 6. 4 Cat genteng Kg
2. 2. 6. 5 Cat termoplastik Kg
2. 2. 6. 6 Cat Dasar Kayu Kg
2. 2. 6. 7 Cat Dasar wheathershield Kg
2. 2. 6. 8 Cat Kayu Kg
2. 2. 6. 9 Cat Marka Kg
2. 2. 6. 10 Cat Meny besi Kg
2. 2. 6. 11 Cat Meny kayu Kg
2. 2. 6. 12 Cat Tembok Kg
2. 2. 6. 13 Cat Tembok exterior wheathershield Kg
2. 2. 6. 14 Cat Tembok interior premium Kg
2. 2. 6. 15 Cat Untuk Pekerjaan Baja Jembatan Kg
2. 2. 6. 16 Clear melamin impra dof / gloos Kg
2. 2. 6. 17 Coatting Ltr
2. 2. 6. 18 Dempul Kayu Kg
2. 2. 6. 19 HCL / air keras Ltr
2. 2. 6. 20 Kalsium Kg
2. 2. 6. 21 Kertas gosok ( rempelas ) Lbr
2. 2. 6. 22 Kuas 3 " Bj
2. 2. 6. 23 Kuas 4 " Bj
2. 2. 6. 24 Lem ( Kayu + Tembok ) Bh
2. 2. 6. 25 Lem PVC Tube
2. 2. 6. 26 Meni besi Kg
2. 2. 6. 27 Minyak bekisting Ltr
2. 2. 6. 28 Minyak Cat / Thiner A Ltr

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 61


1 2 3 4
2. 2. 6. 29 Minyak Cat / Thiner B Ltr
2. 2. 6. 30 Minyak Pelumas Ltr
2. 2. 6. 31 Minyak Tanah Ltr
2. 2. 6. 32 Oli Gardan Ltr
2. 2. 6. 33 Oli rem Ltr
2. 2. 6. 34 Oli Hidrolis Ltr
2. 2. 6. 35 Oli Presneleng Ltr
2. 2. 6. 36 Paint Stone Zak
2. 2. 6. 37 Plamur kayu Kg
2. 2. 6. 38 Plamur Tembok Kg
2. 2. 6. 39 Politur jadi Ltr
2. 2. 6. 40 Residu ( Ter ) Ltr
2. 2. 6. 41 Rol kuas Bh
2. 2. 6. 42 Sabun Kg
2. 2. 6. 43 Sending impra ( melamine) Kg
2. 2. 6. 44 Soda api Kg
2. 2. 6. 45 Spiritus Ltr
2. 2. 6. 46 Stempet / Gemuk Kg
2. 2. 6. 47 Teak oil Ltr
2. 2. 6. 48 Vernis Ltr
2. 2. 6. 49 Vet Pkt
2. 2. 6. 50 Water prooffing Kg
2. 2. 6. 51 Wood filler impra ( dempul jati ) Kg
2. 2. 6. 52 Wood stain impra ( Pewarna melamine) Kg

2. 2. 7. BAHAN PENGGANTUNG DAN PENGUNCI :


2. 2. 7. 1 Door Closer ex. Beluci Bh
2. 2. 7. 2 Door Stoper Stainless Bh
2. 2. 7. 3 Engsel pintu kupu - kupu Bh
2. 2. 7. 4 Engsel Jendela ( H ) Bh
2. 2. 7. 5 Engsel Jendela (Arch ) Bh
2. 2. 7. 6 Engsel jendela (kupu-kupu) 3" Bh
2. 2. 7. 7 Engsel jendela ex. Union 3" Bh
2. 2. 7. 8 Engsel kuningan Arc Asli ex. Elitech 4" Set
2. 2. 7. 9 Engsel Pintu ( H ) Bh
2. 2. 7. 10 Engsel Pintu (Arch ) nylon Bh
2. 2. 7. 11 Engsel pintu ex. Union 4" Bh
2. 2. 7. 12 Engsel sendok Bh
2. 2. 7. 13 Engsel Stainlesstel Dekson 3" (GOMPO ) Bh
2. 2. 7. 14 Engsel Stainlesstel Dekson 4" (GOMPO ) Bh
2. 2. 7. 15 Engsel Stainlesstel Dekson 5" (GOMPO ) Bh
2. 2. 7. 16 Grendel biasa (Besar) 8" (GOMPO ) Bh
2. 2. 7. 17 Grendel biasa (Kecil) 3" Bh
2. 2. 7. 18 Engsel Stainlesstel Dekson 3" 304 Bh
2. 2. 7. 19 Engsel Stainlesstel Dekson 3" Bh
2. 2. 7. 20 Engsel Stainlesstel Dekson 4" Bh
2. 2. 7. 21 Engsel Stainlesstel Dekson 5" Bh
2. 2. 7. 22 Grendel biasa (Besar) 8" Bh
2. 2. 7. 23 Grendel biasa (Kecil) 3" Bh

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 62


1 2 3 4
2. 2. 7. 24 Grendel ex. AEG Bh
2. 2. 7. 25 Grendel jendela merk SES Bh
2. 2. 7. 26 Grendel Pintu Panjang ( sespen ) Bh
2. 2. 7. 27 Grendel pintu ganda Dekson 40 cm komplit Bh
2. 2. 7. 28 Grendel Tanam Kuningan Besar ex. Cavel 60mm Set
2. 2. 7. 29 Grendel Tanam Kuningan Besar ex. Cavel 10mm Set
2. 2. 7. 30 Grendel Tanam Kuningan Kecil ex. Beluci 4" Bh
2. 2. 7. 31 Grendel tanam merk SES Set
2. 2. 7. 32 Hak Angin Set
2. 2. 7. 33 Hak angin (Sikutan) biasa Set
2. 2. 7. 34 Hak angin 4mm Lurus/plat 4x150mm Bh
2. 2. 7. 35 Hak angin lurus Bh
2. 2. 7. 36 Hak angin Merk SES Set
2. 2. 7. 37 Handle Bh
2. 2. 7. 38 Handle pintu ganda Dekson 30 cm komplit Set
2. 2. 7. 39 Handle pintu ganda Dekson 40 cm komplit Set
2. 2. 7. 40 Handle pintu stanless steel besar Psg
2. 2. 7. 41 Handle pintu stanless steel kecil Bh
2. 2. 7. 42 Kunci gembok besar stainless 40mm Bh
2. 2. 7. 43 Kunci gembok sedang stainless 30mm Bh
2. 2. 7. 44 Kunci laci (088) Bh
2. 2. 7. 45 Kunci lemari Bh
2. 2. 7. 46 Kunci Slot 2 Putaran ex.CAVEL (dengan handle) Bh
2. 2. 7. 47 Kunci Slot 2 Putaran ex.Kodai Bh
2. 2. 7. 48 Kunci Slot 2 Putaran ex.YALE (dengan handle) Bh
2. 2. 7. 49 Kunci Slot Tanam Kamar Mandi ex.Miller Bh
2. 2. 7. 50 Kunci tanam merk SES ( pelor ) Bh
2. 2. 7. 51 Kunci Tanam Pintu Antik ex. Miler Bh
2. 2. 7. 52 Kunci tanam Slot ex.Kuda (2x Putaran) Bh
2. 2. 7. 53 Pegangan pintu handle Marmer Bh
2. 2. 7. 54 Pegangan pintu handle Marmer Bh
2. 2. 7. 55 Pegangan pintu P=20 Bh
2. 2. 7. 56 Selot ( kunci pintu ) merk SES Bh
2. 2. 7. 57 Selot Rossete Dekson Bh
2. 2. 7. 58 Slot ( Kunci-kunci pintu ) lokal Bh
2. 2. 7. 59 Slot Tanam Kamar Mandi Bh

2. 2. 8. BAHAN SANITAIR :
2. 2. 8. 1 Avor plastik / floor drain Bh
2. 2. 8. 2 Avor staninlees steel Bh
2. 2. 8. 3 Bak cuci traso M2
2. 2. 8. 4 Bak Cuci Stainlesstel (Royal) Bh
2. 2. 8. 5 Bak Kip Bh
2. 2. 8. 6 Bak Mandi Fiber glass, 0.3 m3 Bh
2. 2. 8. 7 Bak Mandi Fiber glass, 1.00 m x 1.00 m Bh
2. 2. 8. 8 Bak Mandi teraso Bh
2. 2. 8. 9 Bak mandi teraso volume 0.3 m3 Bh
2. 2. 8. 10 Double Kran Dupon Bh
2. 2. 8. 11 Kloset Duduk Keramik Bh
2. 2. 8. 12 Kloset Duduk Keramik Komplit ex.AMSTAD Bh

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 63


1 2 3 4
2. 2. 8. 13 Kloset Duduk Keramik Komplit ex.INA Bh
2. 2. 8. 14 Kloset Duduk Keramik Komplit ex.TOTO Bh
2. 2. 8. 15 Kloset Jongkok Keramik ex.AMSTAD Bh
2. 2. 8. 16 Kloset Jongkok Keramik ex.INA Bh
2. 2. 8. 17 Kloset Jongkok teraso Bh
2. 2. 8. 18 Kloset Monoblok Lokal Bh
2. 2. 8. 19 Knee drat dalam PVC AW Ø 0,5" Bh
2. 2. 8. 20 Knee drat dalam PVC AW Ø 0,75" Bh
2. 2. 8. 21 Knee PVC AW Ø 0,5" Bh
2. 2. 8. 22 Knee PVC AW Ø 0,75" Bh
2. 2. 8. 23 Knee PVC AW Ø 1" Bh
2. 2. 8. 24 Knee PVC AW Ø 1,5" Bh
2. 2. 8. 25 Knee PVC AW Ø 2" Bh
2. 2. 8. 26 Knee PVC AW Ø 2,5" Bh
2. 2. 8. 27 Knee PVC AW Ø 3" Bh
2. 2. 8. 28 Knee PVC AW Ø 4" Bh
2. 2. 8. 29 Kran cucian dia 3/4" Bh
2. 2. 8. 30 Kran Dia 1/2 " Bh
2. 2. 8. 31 Kran Dia 3/4 " Bh
2. 2. 8. 32 Kran Dupon Bh
2. 2. 8. 33 Kran Toto 1/2" Bh
2. 2. 8. 34 Pipa kurasan plastik Bh
2. 2. 8. 35 Pipa PVC Class B Ø 1,25" Mof (limbah) M' / bhn
2. 2. 8. 36 Pipa PVC Class B Ø 1,5" Mof (limbah) M' / bhn
2. 2. 8. 37 Pipa PVC Class B Ø 2" Mof (limbah) M' / bhn
2. 2. 8. 38 Pipa PVC Class B Ø 2,5" Mof (limbah) M' / bhn
2. 2. 8. 39 Pipa PVC Class B Ø 3" Mof (limbah) M' / bhn
2. 2. 8. 40 Pipa PVC Class B Ø 4" Mof (limbah) M' / bhn
2. 2. 8. 41 Pipa PVC Class B Ø 6" Mof (limbah) M' / bhn
2. 2. 8. 42 Pipa PVC Class B Ø 8" Mof (limbah) M' / bhn
2. 2. 8. 43 PVC AW Dia 0.5 " ( putih ) M' / bhn
2. 2. 8. 44 PVC AW Dia 0.75 " ( putih ) M' / bhn
2. 2. 8. 45 PVC AW Dia 1 " ( putih ) M' / bhn
2. 2. 8. 46 PVC AW Dia 1,25 " ( putih ) M' / bhn
2. 2. 8. 47 PVC AW Dia 1,5 " ( putih ) M' / bhn
2. 2. 8. 48 PVC AW Dia 2 " ( putih ) M' / bhn
2. 2. 8. 49 PVC AW Dia 2 ,5" ( putih ) M' / bhn
2. 2. 8. 50 PVC AW Dia 3 " ( putih ) M' / bhn
2. 2. 8. 51 PVC AW Dia 4 " ( putih ) M' / bhn
2. 2. 8. 52 PVC AW Dia 5 " ( putih ) M' / bhn
2. 2. 8. 53 PVC AW Dia 6 " ( putih ) M' / bhn
2. 2. 8. 54 PVC AW Dia 8 " ( putih ) M' / bhn
2. 2. 8. 55 PVC AW Dia 10 " ( putih ) M' / bhn
2. 2. 8. 56 PVC AW Dia 12 " ( putih ) M' / bhn
2. 2. 8. 57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn
2. 2. 8. 58 PVC AW Dia 0.75 " ( abu - abu ) M' / bhn
2. 2. 8. 59 PVC AW Dia 1 " ( abu - abu ) M' / bhn
2. 2. 8. 60 PVC AW Dia 1,25 " ( abu - abu ) M' / bhn
2. 2. 8. 61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn
2. 2. 8. 62 PVC AW Dia 2 " ( abu - abu ) M' / bhn

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 64


1 2 3 4
2. 2. 8. 63 PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn
2. 2. 8. 64 PVC AW Dia 3 " ( abu - abu ) M' / bhn
2. 2. 8. 65 PVC AW Dia 4 " ( abu - abu ) M' / bhn
2. 2. 8. 66 PVC AW Dia 5 " ( abu - abu ) M' / bhn
2. 2. 8. 67 PVC AW Dia 6 " ( abu - abu ) M' / bhn
2. 2. 8. 68 PVC AW Dia 8 " ( abu - abu ) M' / bhn
2. 2. 8. 69 PVC AW Dia 10 " ( abu - abu ) M' / bhn
2. 2. 8. 70 PVC AW Dia 12 " ( abu - abu ) M' / bhn
2. 2. 8. 71 PVC AW Dia 14 " ( abu - abu ) M' / bhn
2. 2. 8. 72 PVC AW Dia 16 " ( abu - abu ) M' / bhn
2. 2. 8. 73 PVC (Class C) Dia 1.5 " M' / bhn
2. 2. 8. 74 PVC (Class C) Dia 2 " M' / bhn
2. 2. 8. 75 PVC (Class C) Dia 2.5 " M' / bhn
2. 2. 8. 76 PVC (Class C) Dia 3 " M' / bhn
2. 2. 8. 77 PVC (Class C) Dia 4 " M' / bhn
2. 2. 8. 78 PVC (Class D) Dia 1.25 " ( putih ) M' / bhn
2. 2. 8. 79 PVC (Class D) Dia 1.5 " ( putih ) M' / bhn
2. 2. 8. 80 PVC (Class D) Dia 2 " ( putih ) M' / bhn
2. 2. 8. 81 PVC (Class D) Dia 2.5 " ( putih ) M' / bhn
2. 2. 8. 82 PVC (Class D) Dia 3 " ( putih ) M' / bhn
2. 2. 8. 83 PVC (Class D) Dia 4 " ( putih ) M' / bhn
2. 2. 8. 84 PVC (Class D) Dia 5 " ( putih ) M' / bhn
2. 2. 8. 85 PVC (Class D) Dia 6 " ( putih ) M' / bhn
2. 2. 8. 86 PVC (Class D) Dia 8 " ( putih ) M' / bhn
2. 2. 8. 87 PVC (Class D) Dia 10 " ( putih ) M' / bhn
2. 2. 8. 88 PVC (Class D) Dia 12 " ( putih ) M' / bhn
2. 2. 8. 89 PVC (Class D) Dia 1.25 " ( abu - abu ) M' / bhn
2. 2. 8. 90 PVC (Class D) Dia 1.5 " ( abu - abu ) M' / bhn
2. 2. 8. 91 PVC (Class D) Dia 2 " ( abu - abu ) M' / bhn
2. 2. 8. 92 PVC (Class D) Dia 2.5 " ( abu - abu ) M' / bhn
2. 2. 8. 93 PVC (Class D) Dia 3 " ( abu - abu ) M' / bhn
2. 2. 8. 94 PVC (Class D) Dia 4 " ( abu - abu ) M' / bhn
2. 2. 8. 95 PVC (Class D) Dia 5 " ( abu - abu ) M' / bhn
2. 2. 8. 96 PVC (Class D) Dia 6 " ( abu - abu ) M' / bhn
2. 2. 8. 97 PVC (Class D) Dia 8 " ( abu - abu ) M' / bhn
2. 2. 8. 98 PVC (Class D) Dia 10 " ( abu - abu ) M' / bhn
2. 2. 8. 99 PVC (Class D) Dia 12 " ( abu - abu ) M' / bhn
2. 2. 8. 100 PVC (Class D) Dia 14 " ( abu - abu ) M' / bhn
2. 2. 8. 101 PVC (Class D) Dia 16 " ( abu - abu ) M' / bhn
2. 2. 8. 102 PVC (Class D) Dia 20 " ( abu - abu ) M' / bhn
2. 2. 8. 103 Shock drat dalam PVC AW Ø 0,5" Bh
2. 2. 8. 104 Shock drat dalam PVC AW Ø 0,75" Bh
2. 2. 8. 105 Shock PVC AW Ø 0,5" Bh
2. 2. 8. 106 Shock PVC AW Ø 0,75" Bh
2. 2. 8. 107 Shock PVC AW Ø 1" Bh
2. 2. 8. 108 Shock PVC AW Ø 1,5" Bh
2. 2. 8. 109 Shock PVC AW Ø 2" Bh
2. 2. 8. 110 Shock PVC AW Ø 2,5" Bh
2. 2. 8. 111 Shock PVC AW Ø 3" Bh
2. 2. 8. 112 Shock PVC AW Ø 4" Bh

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 65


1 2 3 4
2. 2. 8. 113 Shower Dupon Set
2. 2. 8. 114 Slang Spiral Saluran Pembuangan Bak Cuci Bh
2. 2. 8. 115 Seal Tape Bh
2. 2. 8. 116 Stop Kran Dia 1 " Bh
2. 2. 8. 117 Stop Kran Dia 1/2 " Bh
2. 2. 8. 118 Stop Kran Dia 3/4 " Bh
2. 2. 8. 119 Stop kran dia 1" kuningan Bh
2. 2. 8. 120 Stop kran dia 1" plastik Bh
2. 2. 8. 121 Stop kran dia 1/2" kuningan Bh
2. 2. 8. 122 Stop kran dia 3/4" kuningan Bh
2. 2. 8. 123 Stop Kran Ǿ 1/2" Bh
2. 2. 8. 124 Tandon Air Fiberglass ex. Grand Kap. 1.100 Ltr
(Profil Tank) Bh
2. 2. 8. 125 Tandon Air Fiberglass ex. Grand Kap. 800 Ltr
(Profil Tank) Bh
2. 2. 8. 126 Tandon air stainlees steel kap. 1.000 ltr Bh
2. 2. 8. 127 Tandon air stainlees steel kap. 550 ltr Bh
2. 2. 8. 128 Tee PVC AW Ø 0,5" Bh
2. 2. 8. 129 Tee PVC AW Ø 0,75" Bh
2. 2. 8. 130 Tee PVC AW Ø 1" Bh
2. 2. 8. 131 Tee PVC AW Ø 1,5" Bh
2. 2. 8. 132 Tee PVC AW Ø 2" Bh
2. 2. 8. 133 Tee PVC AW Ø 2,5" Bh
2. 2. 8. 134 Tee PVC AW Ø 3" Bh
2. 2. 8. 135 Tee PVC AW Ø 4" Bh
2. 2. 8. 136 Tempat Sabun Keramik ex.INA Bh
2. 2. 8. 137 Urinoir Bh
2. 2. 8. 138 Wastafel Besar Warna Muda ex.INA Bh
2. 2. 8. 139 Wastafel Besar Warna Tua ex.INA Kg
2. 2. 8. 140 Wiremesh M7 Uk. (2,1x5.4) m Bh

2. 2. 9. BAHAN JENIS KACA :


2. 2. 9. 1 Cutting Stiker M2
2. 2. 9. 2 Glass bird Kg
2. 2. 9. 3 Glass Block Bening (20x20)cm Bh
2. 2. 9. 4 Glass Block Buram (20x20)cm Bh
2. 2. 9. 5 Kaca air 5 Cm M2
2. 2. 9. 6 Kaca bluegreen t=8mm M2
2. 2. 9. 7 Kaca patry M2
2. 2. 9. 8 Kaca Bening t= 3 mm M2
2. 2. 9. 9 Kaca Bening t= 5 mm M2
2. 2. 9. 10 Kaca Bening t= 7 mm M2
2. 2. 9. 11 Kaca Bening t= 10 mm M2
2. 2. 9. 12 Kaca Buram t=3mm M2
2. 2. 9. 13 Kaca Cermin t=3mm M2
2. 2. 9. 14 Kaca Cermin t=5mm M2
2. 2. 9. 15 Kaca Es t=3mm M2
2. 2. 9. 16 Kaca profil (Bevel / moulding) M'
2. 2. 9. 17 Kaca Ray-band t= 5 mm M2
2. 2. 9. 18 Kaca Ray-band t= 7 mm M2

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 66


1 2 3 4
2. 2. 9. 19 Kaca Ray-band t= 10 mm M2
2. 2. 9. 20 Kaca Stained Glass M2
2. 2. 9. 21 Kaca clear tempered t = 5 mm M2
2. 2. 9. 22 Kaca clear tempered t = 6 mm M2
2. 2. 9. 23 Kaca clear tempered t = 8 mm M2
2. 2. 9. 24 Kaca clear tempered t = 10 mm M2
2. 2. 9. 25 Kaca clear tempered t = 12 mm M2
2. 2. 9. 26 Kaca clear tempered t = 15 mm M2
2. 2. 9. 27 Kaca clear tempered t = 19 mm M2
2. 2. 9. 28 Kaca Warna t - 5 mm M2
2. 2. 9. 29 Naco (Kerangka dan Daun ) M2
2. 2. 9. 30 Sealant Tube

2. 2. 10. BAHAN BETON CETAKAN :


2. 2. 10. 1 Box culvert BC. 80.80.120.11 cm (gandar 10T) unit
2. 2. 10. 2 Box culvert BC. 80.80.120.11 cm (gandar 20T) unit
2. 2. 10. 3 Box culvert BC. 100.100.120.12,5 cm (gandar 10T) unit
2. 2. 10. 4 Box culvert BC. 100.100.120.12,5 cm (gandar 20T) unit
2. 2. 10. 5 Box culvert BC. 150.150.120.20 cm (gandar 10T) unit
2. 2. 10. 6 Box culvert BC. 150.150.120.20 cm (gandar 20T) unit
2. 2. 10. 7 Box culvert BC. 200.2000.120.20 cm (gandar 10T) unit
2. 2. 10. 8 Box culvert BC. 200.2000.120.20 cm (gandar 20T) unit
2. 2. 10. 9 Tiang pancang 20.20 (k.500) m'
2. 2. 10. 10 Tiang pancang 25.25 (k.500) m'
2. 2. 10. 11 Buis Beton 1/2 ø 20 Cm M'
2. 2. 10. 12 Buis Beton 1/2 ø 30 Cm M'
2. 2. 10. 13 Buis Beton 1/2 ø 40 Cm M'
2. 2. 10. 14 Buis Beton ø 100 Cm M'
2. 2. 10. 15 Buis Beton ø 20 Cm M'
2. 2. 10. 16 Buis Beton ø 30 Cm M'
2. 2. 10. 17 Buis Beton ø 40 Cm M'
2. 2. 10. 18 Buis Beton ø 50 Cm M'
2. 2. 10. 19 Buis Beton ø 60 Cm M'
2. 2. 10. 20 Buis Beton ø 80 Cm M'
2. 2. 10. 21 Concrete Block 20 Bh
2. 2. 10. 22 Concrete Block 15 Bh
2. 2. 10. 23 Concrete Block 10 Bh
2. 2. 10. 24 CU - ditch 30.8.120 cm G. 10T Unit
2. 2. 10. 25 CU - ditch 40.12.120 cm G. 10T Unit
2. 2. 10. 26 CU - ditch 60.12.120 cm G. 10T Unit
2. 2. 10. 27 CU - ditch 30.40.120.5 cm G. 10T Unit
2. 2. 10. 28 CU - ditch 40.50.120.6 cm G. 10T Unit
2. 2. 10. 29 CU - ditch 60.70.120.8 cm G. 10T Unit
2. 2. 10. 30 Hollow Block 20 Bh
2. 2. 10. 31 Hollow Block 15 Bh
2. 2. 10. 32 Hollow Block 10 Bh
2. 2. 10. 33 Kanstin (K225) uk. 40x20x10 cm Bh
2. 2. 10. 34 Kanstin (K225) uk. 40x20x15 cm Bh
2. 2. 10. 35 Pasang tiang listrik cor beton Titik
2. 2. 10. 36 U-DITCH (300X300X1200)mm, berat = 160 Kg unit

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 67


1 2 3 4
2. 2. 10. 37 U-DITCH (300X400X1200)mm, berat = 190 Kg unit
2. 2. 10. 38 U-DITCH (300X500X1200)mm, berat = 220 Kg unit
2. 2. 10. 39 U-DITCH (400X400X1200)mm, berat = 250 Kg unit
2. 2. 10. 40 U-DITCH (400X500X1200)mm, berat = 270 Kg unit
2. 2. 10. 41 U-DITCH (400X600X1200)mm, berat = 320 Kg unit
2. 2. 10. 42 U-DITCH (500X500X1200)mm, berat = 380 Kg unit
2. 2. 10. 43 U-DITCH (500X600X1200)mm, berat = 420 Kg unit
2. 2. 10. 44 U-DITCH (600X600X1200)mm, berat = 480 Kg unit
2. 2. 10. 45 U-DITCH (600X700X1200)mm, berat = 500 Kg unit
2. 2. 10. 46 U-DITCH (600X800X1200)mm, berat = 550 Kg unit
2. 2. 10. 47 U-DITCH (800X800X1200)mm, berat = 730 Kg unit
2. 2. 10. 48 U-DITCH (800X900X1200)mm, berat = 890 Kg unit
2. 2. 10. 49 U-DITCH (800X1000X1200)mm, berat = 950 Kg unit
2. 2. 10. 50 U-DITCH (800X1200X1200)mm, berat = 1100 Kg unit
2. 2. 10. 51 U-DITCH (1000X1000X1200)mm, berat = 1250 Kg unit
2. 2. 10. 52 U-DITCH (1000X1200X1200)mm, berat = 1450 Kg unit
2. 2. 10. 53 U-DITCH (1200X1200X1200)mm, berat = 1650 Kg unit
2. 2. 10. 54 U-DITCH (1200X1400X1200)mm, berat = 1800 Kg unit
2. 2. 10. 55 U-DITCH (1500X1500X1200)mm, berat = 2950 Kg unit
2. 2. 10. 56 U-DITCH (1500X1600X1200)mm, berat = 3050 Kg unit
2. 2. 10. 57 U-DITCH (1500X1700X1200)mm, berat = 3150 Kg unit
2. 2. 10. 58 U-DITCH (1800X1800X1200)mm, berat = 3500 Kg unit
2. 2. 10. 59 U-DITCH (1800X1900X1200)mm, berat = 3600 Kg unit
2. 2. 10. 60 U-DITCH (1800X2000X1200)mm, berat = 3700 Kg unit
2. 2. 10. 61 U-DITCH (2000X2000X1200)mm, berat = 3900 Kg unit
2. 2. 10. 62 U-DITCH (2000X2100X1200)mm, berat = 4000 Kg unit
2. 2. 10. 63 U-DITCH (2000X2200X1200)mm, berat = 4100 Kg unit
2. 2. 10. 64 Tutup U-DITCH 300-60/1200 mm, Berat = 75Kg
Gandar = 5 ton/m' unit
2. 2. 10. 65 Tutup U-DITCH 400-80/1200 mm, Berat = 120Kg
Gandar = 5 ton/m' unit
2. 2. 10. 66 Tutup U-DITCH 500-80/1200 mm, Berat = 130Kg
Gandar = 5 ton/m' unit
2. 2. 10. 67 Tutup U-DITCH 600-100/1200 mm, Berat =
250Kg Gandar = 5 ton/m' unit
2. 2. 10. 68 Tutup U-DITCH 800-100/1200 mm, Berat =
290Kg Gandar = 5 ton/m' unit
2. 2. 10. 69 Tutup U-DITCH 1000-120/1200 mm, Berat =
470Kg Gandar = 5 ton/m' unit
2. 2. 10. 70 Tutup U-DITCH 1200-120/1200 mm, Berat =
520Kg Gandar = 5 ton/m' unit
2. 2. 10. 71 Tutup U-DITCH 1500-150/1200 mm, Berat =
820Kg Gandar = 5 ton/m' unit
2. 2. 10. 72 Tutup U-DITCH 1800-150/1200 mm, Berat =
950Kg Gandar = 5 ton/m' unit
2. 2. 10. 73 Tutup U-DITCH 2000-150/1200 mm, Berat =
1050Kg Gandar = 5 ton/m' unit
2. 2. 10. 74 Tutup U-DITCH 300-100/1200 mm, Berat =
120Kg Gandar = 10 ton/m' unit

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 68


1 2 3 4
2. 2. 10. 75 Tutup U-DITCH 400-110/1200 mm, Berat =
170Kg Gandar = 10 ton/m' unit
2. 2. 10. 76 Tutup U-DITCH 500-110/1200 mm, Berat =
210Kg Gandar = 10 ton/m' unit
2. 2. 10. 77 Tutup U-DITCH 600-150/1200 mm, Berat =
330Kg Gandar = 10 ton/m' unit
2. 2. 10. 78 Tutup U-DITCH 800-150/1200 mm, Berat =
420Kg Gandar = 10 ton/m' unit
2. 2. 10. 79 Tutup U-DITCH 1000-150/1200 mm, Berat =
600Kg Gandar = 10 ton/m' unit
2. 2. 10. 80 Tutup U-DITCH 1200-150/1200 mm, Berat =
630Kg Gandar = 10 ton/m' unit
2. 2. 10. 81 Tutup U-DITCH 1500-200/1200 mm, Berat =
1100Kg Gandar = 10 ton/m' unit
2. 2. 10. 82 Tutup U-DITCH 1800-200/1200 mm, Berat =
1300Kg Gandar = 10 ton/m' unit
2. 2. 10. 83 Tutup U-DITCH 2000-200/1200 mm, Berat =
1400Kg Gandar = 10 ton/m' unit
2. 2. 10. 84 BC 80.80.120.11 cm Gandar = 10 ton unit
2. 2. 10. 85 BC 100.100.120.12,5 cm Gandar = 10 ton unit
2. 2. 10. 86 BC 150.150.120.20 cm Gandar = 10 ton unit
2. 2. 10. 87 BC 200.200.120.20 cm Gandar = 10 ton unit
2. 2. 10. 88 BC 80.80.120.11 cm Gandar = 20 ton unit
2. 2. 10. 89 BC 100.100.120.12,5 cm Gandar = 20 ton unit
2. 2. 10. 90 BC 150.150.120.20 cm Gandar = 20 ton unit
2. 2. 10. 91 BC 200.200.120.20 cm Gandar = 20 ton unit

2. 2. 11. BAHAN PIPA


2. 2. 11. 1. POMPA AIR MINUM
2. 2. 11. 1.1 Pompa GRUNDFOS, Type CM 10-3 Unit
2. 2. 11. 1.2 Panel 2,2 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.3 Pompa GRUNDFOS, Type CM 10-2 Unit
2. 2. 11. 1.4 Panel 2,2 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.5 Pompa GRUNDFOS, Type CR 20-17, 18,5 KW Unit
2. 2. 11. 1.6 Panel 18,5 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.7 Pompa GRUNDFOS, Type CR 15-14, 11 KW Unit
2. 2. 11. 1.8 Panel 11 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.9 Pompa GRUNDFOS, Type CR 10-22, 7,5 KW Unit
2. 2. 11. 1.10 Panel 7,5 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.11 Pompa GRUNDFOS, Type CR 5-20, 3 KW Unit
2. 2. 11. 1.12 Panel 3 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.13 Pompa GRUNDFOS, Type CR 10-9, 3 KW Unit
2. 2. 11. 1.14 Panel 3 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.15 Pompa GRUNDFOS, Type SP 17-37, 22 KW Unit
2. 2. 11. 1.16 Panel 22 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.17 Pompa GRUNDFOS, Type SP 8A-37, 5,5 KW Unit
2. 2. 11. 1.18 Panel 5,5 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.19 Pompa GRUNDFOS, Type SP 5A-33, 3 KW Unit
2. 2. 11. 1.20 Panel 3 KW/3x380Volt/Single WLC Unit
2. 2. 11. 1.21 Pompa JD Basic 5 Unit

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 69


1 2 3 4
2. 2. 11. 1.22 Pompa GRUNDFOS, Type CR 10-16, 5,5 KW Unit
2. 2. 11. 1.23 Panel Pompa > 10 KW Unit
2. 2. 11. 1.24 Panel Pompa < 10 KW Unit
2. 2. 11. 1.25 Pompa GRUNDFOS, Type CR 15-17, 15 KW Unit
2. 2. 11. 1.26 Panel 15 KW start Delta Unit
2. 2. 11. 1.27 Pompa GRUNDFOS, Type CR 45-12, 15 KW Unit
2. 2. 11. 1.28 Panel 45 KW/3X380Volt/Single WLC/ start Delta Unit
2. 2. 11. 1.29 Pompa GRUNDFOS, Type CR 20-14, 15 KW Unit

2. 2. 11. 2. PIPA AIR MINUM


2. 2. 11. 2.1 Pipa GI Med. Ø 0,5" (SNI 0039:2013) M'
2. 2. 11. 2.2 Pipa GI Med. Ø 0,75" (SNI 0039:2013) M'
2. 2. 11. 2.3 Pipa GI Med. Ø 1" (SNI 0039:2013) M'
2. 2. 11. 2.4 Pipa GI Med. Ø 1,5" (SNI 0039:2013) M'
2. 2. 11. 2.5 Pipa GI Med. Ø 2" (SNI 0039:2013) M'
2. 2. 11. 2.6 Pipa GI Med. Ø 2,5" (SNI 0039:2013) M'
2. 2. 11. 2.7 Pipa GI Med. Ø 3" (SNI 0039:2013) M'
2. 2. 11. 2.8 Pipa GI Med. Ø 4" (SNI 0039:2013) M'
2. 2. 11. 2.9 Pipa PN-10 Diameter 1" (Pipa PE) M'
2. 2. 11. 2.10 Pipa PN-10 Diameter 1,5" (Pipa PE) M'
2. 2. 11. 2.11 Pipa PN-10 Diameter 2" (Pipa PE) M'
2. 2. 11. 2.12 Pipa PN-10 Diameter 2,5" (Pipa PE) M'
2. 2. 11. 2.13 Pipa PN-10 Diameter 3" (Pipa PE) M'
2. 2. 11. 2.14 Pipa PN-10 Diameter 4" (Pipa PE) M'
2. 2. 11. 2.15 Pipa PN-10 Diameter 6" (Pipa PE) M'
2. 2. 11. 2.16 PVC. Diameter 0,5" (S 12,5) (MOF) M'
2. 2. 11. 2.17 PVC. Diameter 0,75" (S 12,5) (MOF) M'
2. 2. 11. 2.18 PVC. Diameter 1" (S 12,5) (MOF) M'
2. 2. 11. 2.19 PVC. Diameter 1,25" (S 12,5) (MOF) M'
2. 2. 11. 2.20 PVC. Diameter 1,5" (S 12,5) (MOF) M'
2. 2. 11. 2.21 PVC. Diameter 2" (S 12,5) (RR) M'
2. 2. 11. 2.22 PVC. Diameter 2,5" (S 12,5) (RR) M'
2. 2. 11. 2.23 PVC. Diameter 3" (S 12,5) (RR) M'
2. 2. 11. 2.24 PVC. Diameter 4" (S 12,5) (RR) M'
2. 2. 11. 2.25 PVC. Diameter 6" (S 12,5) (RR) M'
2. 2. 11. 2.26 PVC. Diameter 8" (S 12,5) (RR) M'
2. 2. 11. 2.27 Pipa HDPE s-12,5 diameter 2" (pipa PE) M'
2. 2. 11. 2.28 Pipa HDPE s-12,5 diameter 2,5" (pipa PE) M'
2. 2. 11. 2.29 Pipa HDPE s-12,5 diameter 3" (pipa PE) M'

2. 2. 11. 3. ACEESORIES PIPA AIR MINUM


2. 2. 11. 3.1 Ball Valve Ǿ 2" Bh
2. 2. 11. 3.2 Baut Mur 3/4 x 2 1/2" buah
2. 2. 11. 3.3 Baut Mur 3/4 x 3" buah
2. 2. 11. 3.4 Baut Mur 5/8 x 2 1/2" buah
2. 2. 11. 3.5 Baut Mur 5/8 x 2" buah
2. 2. 11. 3.6 Baut Mur 5/8 x 3" buah
2. 2. 11. 3.7 Baut Mur 5/8 x 4" buah
2. 2. 11. 3.8 Bend All Flange 11,25' 2" buah
2. 2. 11. 3.9 Bend All Flange 11,25' 3" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 70


1 2 3 4
2. 2. 11. 3.10 Bend All Flange 11,25' 4" buah
2. 2. 11. 3.11 Bend All Flange 11,25' 6" buah
2. 2. 11. 3.12 Bend All Flange 11,25' 8" buah
2. 2. 11. 3.13 Bend All Flange 22,5' 2" buah
2. 2. 11. 3.14 Bend All Flange 22,5' 3" buah
2. 2. 11. 3.15 Bend All Flange 22,5' 4" buah
2. 2. 11. 3.16 Bend All Flange 22,5' 6" buah
2. 2. 11. 3.17 Bend All Flange 22,5' 8" buah
2. 2. 11. 3.18 Bend All Flange 45' 2" buah
2. 2. 11. 3.19 Bend All Flange 45' 3" buah
2. 2. 11. 3.20 Bend All Flange 45' 4" buah
2. 2. 11. 3.21 Bend All Flange 45' 6" buah
2. 2. 11. 3.22 Bend All Flange 45' 8" buah
2. 2. 11. 3.23 Bend All Flange 90' 2" buah
2. 2. 11. 3.24 Bend All Flange 90' 3" buah
2. 2. 11. 3.25 Bend All Flange 90' 4" buah
2. 2. 11. 3.26 Bend All Flange 90' 6" buah
2. 2. 11. 3.27 Bend All Flange 90' 8" buah
2. 2. 11. 3.28 Bend GI. Ǿ 2" Bh
2. 2. 11. 3.29 Bend GI. Ǿ 2,5" Bh
2. 2. 11. 3.30 Bend GI. Ǿ 3" Bh
2. 2. 11. 3.31 Bend GI. Ǿ 4" Bh
2. 2. 11. 3.32 Bend PVC 45 Ǿ 1,5" Bh
2. 2. 11. 3.33 Bend PVC 90 Ǿ 2" Bh
2. 2. 11. 3.34 Bend PVC All Socket 45 Ǿ 2" Bh
2. 2. 11. 3.35 Bend PVC All Socket 45 Ǿ 2,5" Bh
2. 2. 11. 3.36 Bend PVC All Socket 45 Ǿ 3" Bh
2. 2. 11. 3.37 Bend PVC All Socket 45 Ǿ 4" Bh
2. 2. 11. 3.38 Bend PVC All Socket 90 Ǿ 1,5" Bh
2. 2. 11. 3.39 Bend PVC All Socket 90 Ǿ 2" Bh
2. 2. 11. 3.40 Bend PVC All Socket 90 Ǿ 2,5" Bh
2. 2. 11. 3.41 Bend PVC All Socket 90 Ǿ 3" Bh
2. 2. 11. 3.42 Bend PVC All Socket 90 Ǿ 4" Bh
2. 2. 11. 3.43 Bend Socket Spigot 11,25' 2" buah
2. 2. 11. 3.44 Bend Socket Spigot 11,25' 3" buah
2. 2. 11. 3.45 Bend Socket Spigot 11,25' 4" buah
2. 2. 11. 3.46 Bend Socket Spigot 11,25' 6" buah
2. 2. 11. 3.47 Bend Socket Spigot 11,25' 8" buah
2. 2. 11. 3.48 Bend Socket Spigot 11,25' 2 1/2" buah
2. 2. 11. 3.49 Bend Socket Spigot 22,5' 2" buah
2. 2. 11. 3.50 Bend Socket Spigot 22,5' 3" buah
2. 2. 11. 3.51 Bend Socket Spigot 22,5' 4" buah
2. 2. 11. 3.52 Bend Socket Spigot 22,5' 6" buah
2. 2. 11. 3.53 Bend Socket Spigot 22,5' 8" buah
2. 2. 11. 3.54 Bend Socket Spigot 22,5' 2 1/2" buah
2. 2. 11. 3.55 Bend Socket Spigot 45' 2" buah
2. 2. 11. 3.56 Bend Socket Spigot 45' 3" buah
2. 2. 11. 3.57 Bend Socket Spigot 45' 4" buah
2. 2. 11. 3.58 Bend Socket Spigot 45' 6" buah
2. 2. 11. 3.59 Bend Socket Spigot 45' 8" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 71


1 2 3 4
2. 2. 11. 3.60 Bend Socket Spigot 45' 2 1/2" buah
2. 2. 11. 3.61 Bend Socket Spigot 90' 2" buah
2. 2. 11. 3.62 Bend Socket Spigot 90' 3" buah
2. 2. 11. 3.63 Bend Socket Spigot 90' 4" buah
2. 2. 11. 3.64 Bend Socket Spigot 90' 2 1/2" buah
2. 2. 11. 3.65 Bend Socket Spigot 90' 6" buah
2. 2. 11. 3.66 Bend Socket Spigot 90' 8" buah
2. 2. 11. 3.67 Box Meter buah
2. 2. 11. 3.68 Butterfly Valve 2" buah
2. 2. 11. 3.69 Butterfly Valve 3" buah
2. 2. 11. 3.70 Butterfly Valve 4" buah
2. 2. 11. 3.71 Butterfly Valve 6" buah
2. 2. 11. 3.72 Butterfly Valve 8" buah
2. 2. 11. 3.73 Check Valve Flange 2" buah
2. 2. 11. 3.74 Check Valve Flange 3" buah
2. 2. 11. 3.75 Check Valve Flange 4" buah
2. 2. 11. 3.76 Check Valve Flange 6" buah
2. 2. 11. 3.77 Check Valve Flange 8" buah
2. 2. 11. 3.78 Clam Sadle Ǿ 2" x 3/4" Bh
2. 2. 11. 3.79 Clam Sadle Ǿ 3" x 3/4" Bh
2. 2. 11. 3.80 Clamp Sadle 1 1/2" x 1/2" buah
2. 2. 11. 3.81 Clamp Sadle 1 1/2" x 3/4" buah
2. 2. 11. 3.82 Clamp Sadle 10" x 3/4" buah
2. 2. 11. 3.83 Clamp Sadle 2" x 1" buah
2. 2. 11. 3.84 Clamp Sadle 2" x 1/2" buah
2. 2. 11. 3.85 Clamp Sadle 2" x 3/4" buah
2. 2. 11. 3.86 Clamp Sadle 3" x 1" buah
2. 2. 11. 3.87 Clamp Sadle 3" x 1/2" buah
2. 2. 11. 3.88 Clamp Sadle 3" x 3/4" buah
2. 2. 11. 3.89 Clamp Sadle 4" x 1" buah
2. 2. 11. 3.90 Clamp Sadle 4" x 1/2" buah
2. 2. 11. 3.91 Clamp Sadle 4" x 3/4" buah
2. 2. 11. 3.92 Clamp Sadle 6" x 1" buah
2. 2. 11. 3.93 Clamp Sadle 6" x 1/2" buah
2. 2. 11. 3.94 Clamp Sadle 6" x 3/4" buah
2. 2. 11. 3.95 Clamp Sadle 8" x 3/4" buah
2. 2. 11. 3.96 Coupler / Join Ø 2" buah
2. 2. 11. 3.97 Coupler / Join Ǿ 2,5" Bh
2. 2. 11. 3.98 Coupler / Join Ǿ 3" Bh
2. 2. 11. 3.99 Dop GI 1 1/2" buah
2. 2. 11. 3.100 Dop GI 1 1/4" buah
2. 2. 11. 3.101 Dop GI 1" buah
2. 2. 11. 3.102 Dop GI 1/2" buah
2. 2. 11. 3.103 Dop GI 2 1/2" buah
2. 2. 11. 3.104 Dop GI 2" buah
2. 2. 11. 3.105 Dop GI 3" buah
2. 2. 11. 3.106 Dop GI 3/4" buah
2. 2. 11. 3.107 Dop GI 4" buah
2. 2. 11. 3.108 Dop GI 6" buah
2. 2. 11. 3.109 Dop PVC dia 1,5" Moof Bh

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 72


1 2 3 4
2. 2. 11. 3.110 Dop PVC Moof 1" buah
2. 2. 11. 3.111 Dop PVC Moof 2 1/2" buah
2. 2. 11. 3.112 Dop PVC Moof 2" buah
2. 2. 11. 3.113 Dop PVC Moof 3" buah
2. 2. 11. 3.114 Dop PVC Moof 4" buah
2. 2. 11. 3.115 Dop PVC Moof 6" buah
2. 2. 11. 3.116 Dop PVC RRJ 2 1/2" buah
2. 2. 11. 3.117 Dop PVC RRJ 2" buah
2. 2. 11. 3.118 Dop PVC RRJ 3" buah
2. 2. 11. 3.119 Dop PVC RRJ 4" buah
2. 2. 11. 3.120 Dop PVC RRJ 6" buah
2. 2. 11. 3.121 Double Air Valve 2" buah
2. 2. 11. 3.122 Double Air Valve 3" buah
2. 2. 11. 3.123 Double Air Valve 4" buah
2. 2. 11. 3.124 Double Neple 1 1/2" buah
2. 2. 11. 3.125 Double Neple 1 1/4" buah
2. 2. 11. 3.126 Double Neple 1" buah
2. 2. 11. 3.127 Double Neple 1/2" buah
2. 2. 11. 3.128 Double Neple 2 1/2" buah
2. 2. 11. 3.129 Double Neple 2" buah
2. 2. 11. 3.130 Double Neple 3" buah
2. 2. 11. 3.131 Double Neple 3/4" buah
2. 2. 11. 3.132 Double Neple 4" buah
2. 2. 11. 3.133 Double Neple 6" buah
2. 2. 11. 3.134 Equal Elbow Coupling Ø 2,5'' Bh
2. 2. 11. 3.135 Equal Elbow Coupling Ø Ø 3'' Bh
2. 2. 11. 3.136 Flange Buta 2" buah
2. 2. 11. 3.137 Flange Buta 3" buah
2. 2. 11. 3.138 Flange Buta 4" buah
2. 2. 11. 3.139 Flange Buta 6" buah
2. 2. 11. 3.140 Flange Buta 8" buah
2. 2. 11. 3.141 Flange Drat GI Dia 2" Bh
2. 2. 11. 3.142 Flange Drat GI Dia 2,5" Bh
2. 2. 11. 3.143 Flange Drat GI Dia 3" Bh
2. 2. 11. 3.144 Flange Drat GI Dia 4" Bh
2. 2. 11. 3.145 Flange Las 2 1/2" buah
2. 2. 11. 3.146 Flange Las 2" buah
2. 2. 11. 3.147 Flange Las 3" buah
2. 2. 11. 3.148 Flange Las 4" buah
2. 2. 11. 3.149 Flange Las 6" buah
2. 2. 11. 3.150 Flange Las 8" buah
2. 2. 11. 3.151 Flange Socket Ǿ 2,5" Bh
2. 2. 11. 3.152 Flange Socket PVC RR 2" buah
2. 2. 11. 3.153 Flange Socket PVC RR 3" buah
2. 2. 11. 3.154 Flange Socket PVC RR 4" buah
2. 2. 11. 3.155 Flange Socket PVC RR 6" buah
2. 2. 11. 3.156 Flange Socket PVC RR 8" buah
2. 2. 11. 3.157 Flange Spigot PVC 2" buah
2. 2. 11. 3.158 Flange Spigot PVC 3" buah
2. 2. 11. 3.159 Flange Spigot PVC 4" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 73


1 2 3 4
2. 2. 11. 3.160 Flange Spigot PVC 6" buah
2. 2. 11. 3.161 Flange Spigot PVC 8" buah
2. 2. 11. 3.162 Gate Valve 2" buah
2. 2. 11. 3.163 Gate Valve 3" buah
2. 2. 11. 3.164 Gate Valve 4" buah
2. 2. 11. 3.165 Gate Valve 6" buah
2. 2. 11. 3.166 Gate Valve 8" buah
2. 2. 11. 3.167 Gate Valve GI Ǿ 3" Bh
2. 2. 11. 3.168 Gate Valve GI Ǿ 4" Bh
2. 2. 11. 3.169 Giboult Joint u/ ACP 2" buah
2. 2. 11. 3.170 Giboult Joint u/ ACP 3" buah
2. 2. 11. 3.171 Giboult Joint u/ ACP 4" buah
2. 2. 11. 3.172 Giboult Joint u/ ACP 6" buah
2. 2. 11. 3.173 Giboult Joint u/ ACP 8" buah
2. 2. 11. 3.174 Giboult Joint u/ DGII 2" buah
2. 2. 11. 3.175 Giboult Joint u/ DGII 3" buah
2. 2. 11. 3.176 Giboult Joint u/ DGII 4" buah
2. 2. 11. 3.177 Giboult Joint u/ DGII 6" buah
2. 2. 11. 3.178 Giboult Joint u/ DGII 8" buah
2. 2. 11. 3.179 Giboult Joint u/ PVC 2" buah
2. 2. 11. 3.180 Giboult Joint u/ PVC 3" buah
2. 2. 11. 3.181 Giboult Joint u/ PVC 4" buah
2. 2. 11. 3.182 Giboult Joint u/ PVC 6" buah
2. 2. 11. 3.183 Giboult Joint u/ PVC 8" buah
2. 2. 11. 3.184 HU (Hidran Umum) 1 m3 buah
2. 2. 11. 3.185 HU (Hidran Umum) 2 m3 buah
2. 2. 11. 3.186 HU (Hidran Umum) 3 m3 buah
2. 2. 11. 3.187 Karet Packing 2" buah
2. 2. 11. 3.188 Karet Packing 3" buah
2. 2. 11. 3.189 Karet Packing 4" buah
2. 2. 11. 3.190 Karet Packing 6" buah
2. 2. 11. 3.191 Karet Packing 8" buah
2. 2. 11. 3.192 Karet packing Ǿ 1,5" Bh
2. 2. 11. 3.193 Kenie Drat GI 1 1/2" buah
2. 2. 11. 3.194 Kenie Drat GI 1 1/4" buah
2. 2. 11. 3.195 Kenie Drat GI 1" buah
2. 2. 11. 3.196 Kenie Drat GI 1/2" buah
2. 2. 11. 3.197 Kenie Drat GI 2 1/2" buah
2. 2. 11. 3.198 Kenie Drat GI 2" buah
2. 2. 11. 3.199 Kenie Drat GI 3" buah
2. 2. 11. 3.200 Kenie Drat GI 3/4" buah
2. 2. 11. 3.201 Kenie Drat GI 4" buah
2. 2. 11. 3.202 Kenie Drat GI 6" buah
2. 2. 11. 3.203 Kenie PVC 1 1/2" buah
2. 2. 11. 3.204 Kenie PVC 1 1/4" buah
2. 2. 11. 3.205 Kenie PVC 1" buah
2. 2. 11. 3.206 Kenie PVC 1/2" buah
2. 2. 11. 3.207 Kenie PVC 2 1/2" buah
2. 2. 11. 3.208 Kenie PVC 2" buah
2. 2. 11. 3.209 Kenie PVC 3" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 74


1 2 3 4
2. 2. 11. 3.210 Kenie PVC 3/4" buah
2. 2. 11. 3.211 Kenie PVC 4" buah
2. 2. 11. 3.212 Kenie PVC 6" buah
2. 2. 11. 3.213 Kran Air 1/2" buah
2. 2. 11. 3.214 Kran Air 3/4" buah
2. 2. 11. 3.215 Las Boch 2" buah
2. 2. 11. 3.216 Las Boch 3" buah
2. 2. 11. 3.217 Las Boch 4" buah
2. 2. 11. 3.218 Las Boch 6" buah
2. 2. 11. 3.219 Las Boch 8" buah
2. 2. 11. 3.220 Manhole 0.6 m x 0.6 m
2. 2. 11. 3.221 Manometer buah
2. 2. 11. 3.222 Reducer GI Ǿ 1 - Ǿ 3/4 Bh
2. 2. 11. 3.223 Reducer GI Ǿ 1 1/4 - Ǿ 2 Bh
2. 2. 11. 3.224 Reducer GI Ǿ 1,5 - Ǿ 1,25 Bh
2. 2. 11. 3.225 Reducer GI Ǿ 2 - Ǿ 1 Unit
2. 2. 11. 3.226 Reducer GI Ǿ 2 - Ǿ 1,5 Unit
2. 2. 11. 3.227 Reducer GI Ǿ 3 - Ǿ 2 Unit
2. 2. 11. 3.228 Reducer GI Ǿ 4 - Ǿ 2 Unit
2. 2. 11. 3.229 Reducer GI Ǿ 4 - Ǿ 3 Unit
2. 2. 11. 3.230 Reducer PVC Ǿ 1,5" - 1" Unit
2. 2. 11. 3.231 Reducer PVC Ǿ 2 x 1,5" Bh
2. 2. 11. 3.232 Reducer PVC Ǿ 2,5 - 2" Unit
2. 2. 11. 3.233 Reducer PVC Ǿ 3" - 2" Bh
2. 2. 11. 3.234 Reducer PVC Ǿ 3" - 2,5" Bh
2. 2. 11. 3.235 Reducer PVC Ǿ 4" - 3" Bh
2. 2. 11. 3.236 Reduser All Flange 3" x 2" buah
2. 2. 11. 3.237 Reduser All Flange 4" x 2" buah
2. 2. 11. 3.238 Reduser All Flange 4" x 3" buah
2. 2. 11. 3.239 Reduser All Flange 6" x 2" buah
2. 2. 11. 3.240 Reduser All Flange 6" x 3" buah
2. 2. 11. 3.241 Reduser All Flange 6" x 4" buah
2. 2. 11. 3.242 Reduser All Flange 8" x 2" buah
2. 2. 11. 3.243 Reduser All Flange 8" x 3" buah
2. 2. 11. 3.244 Reduser All Flange 8" x 4" buah
2. 2. 11. 3.245 Reduser All Flange 8" x 6" buah
2. 2. 11. 3.246 Reduser All Socket PVC RR 10" x 6" buah
2. 2. 11. 3.247 Reduser All Socket PVC RR 10" x 8" buah
2. 2. 11. 3.248 Reduser All Socket PVC RR 3" x 2" buah
2. 2. 11. 3.249 Reduser All Socket PVC RR 4" x 2" buah
2. 2. 11. 3.250 Reduser All Socket PVC RR 4" x 3" buah
2. 2. 11. 3.251 Reduser All Socket PVC RR 6" x 2" buah
2. 2. 11. 3.252 Reduser All Socket PVC RR 6" x 3" buah
2. 2. 11. 3.253 Reduser All Socket PVC RR 6" x 4" buah
2. 2. 11. 3.254 Reduser All Socket PVC RR 8" x 6" buah
2. 2. 11. 3.255 Reduser GI 3" x 2" buah
2. 2. 11. 3.256 Reduser GI 4" x 2" buah
2. 2. 11. 3.257 Reduser GI 4" x 3" buah
2. 2. 11. 3.258 Reduser GI 6" x 4" buah
2. 2. 11. 3.259 Reduser GI 6" x 2" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 75


1 2 3 4
2. 2. 11. 3.260 Reduser GI 6" x 3" buah
2. 2. 11. 3.261 Reduser PVC Moof 1 1/2" x 1" buah
2. 2. 11. 3.262 Reduser PVC Moof 2" x 1 1/2" buah
2. 2. 11. 3.263 Reduser PVC Moof 2" x 1" buah
2. 2. 11. 3.264 Reduser PVC Moof 3" x 2" buah
2. 2. 11. 3.265 Reduser PVC Moof 4" x 2" buah
2. 2. 11. 3.266 Reduser PVC Moof 4" x 3" buah
2. 2. 11. 3.267 Reduser PVC Moof 6" x 3" buah
2. 2. 11. 3.268 Reduser PVC Moof 6" x 4" buah
2. 2. 11. 3.269 Reduser PVC Moof 8" x 6" buah
2. 2. 11. 3.270 Screen Ǿ 2" Bh
2. 2. 11. 3.271 Screen Ǿ 3" Bh
2. 2. 11. 3.272 Screen Ǿ 4" Bh
2. 2. 11. 3.273 Screnner CI 2" buah
2. 2. 11. 3.274 Screnner CI 3" buah
2. 2. 11. 3.275 Screnner CI 4" buah
2. 2. 11. 3.276 Screnner CI 6" buah
2. 2. 11. 3.277 Screnner CI 8" buah
2. 2. 11. 3.278 Single Air Valve 1" buah
2. 2. 11. 3.279 Single Air Valve 1/2" buah
2. 2. 11. 3.280 Single Air Valve 2" buah
2. 2. 11. 3.281 Single Air Valve 3" buah
2. 2. 11. 3.282 Single Air Valve 3/4" buah
2. 2. 11. 3.283 Single Air Valve 4" buah
2. 2. 11. 3.284 Single Air Valve Dia 2,5" Bh
2. 2. 11. 3.285 Sock Drat Dalam PVC 1 1/2" buah
2. 2. 11. 3.286 Sock Drat Dalam PVC 1 1/4" buah
2. 2. 11. 3.287 Sock Drat Dalam PVC 1" buah
2. 2. 11. 3.288 Sock Drat Dalam PVC 1/2" buah
2. 2. 11. 3.289 Sock Drat Dalam PVC 2 1/2" buah
2. 2. 11. 3.290 Sock Drat Dalam PVC 2" buah
2. 2. 11. 3.291 Sock Drat Dalam PVC 3" buah
2. 2. 11. 3.292 Sock Drat Dalam PVC 3/4" buah
2. 2. 11. 3.293 Sock Drat Dalam PVC 4" buah
2. 2. 11. 3.294 Sock Drat GI 1 1/2" buah
2. 2. 11. 3.295 Sock Drat GI 1 1/4" buah
2. 2. 11. 3.296 Sock Drat GI 1" buah
2. 2. 11. 3.297 Sock Drat GI 1/2" buah
2. 2. 11. 3.298 Sock Drat GI 2 1/2" buah
2. 2. 11. 3.299 Sock Drat GI 2" buah
2. 2. 11. 3.300 Sock Drat GI 3" buah
2. 2. 11. 3.301 Sock Drat GI 3/4" buah
2. 2. 11. 3.302 Sock Drat GI 4" buah
2. 2. 11. 3.303 Sock Drat GI 6" buah
2. 2. 11. 3.304 Sock Drat Luar PVC 1 1/2" buah
2. 2. 11. 3.305 Sock Drat Luar PVC 1 1/4" buah
2. 2. 11. 3.306 Sock Drat Luar PVC 1" buah
2. 2. 11. 3.307 Sock Drat Luar PVC 1/2" buah
2. 2. 11. 3.308 Sock Drat Luar PVC 2 1/2" buah
2. 2. 11. 3.309 Sock Drat Luar PVC 2" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 76


1 2 3 4
2. 2. 11. 3.310 Sock Drat Luar PVC 3" buah
2. 2. 11. 3.311 Sock Drat Luar PVC 3/4" buah
2. 2. 11. 3.312 Sock Drat Luar PVC 4" buah
2. 2. 11. 3.313 Sreener CI 2" buah
2. 2. 11. 3.314 Sreener CI 3" buah
2. 2. 11. 3.315 Sreener CI 4" buah
2. 2. 11. 3.316 Sreener CI 6" buah
2. 2. 11. 3.317 Sreener CI 8" buah
2. 2. 11. 3.318 Stop Kran 1 1/2" buah
2. 2. 11. 3.319 Stop Kran 1 1/4" buah
2. 2. 11. 3.320 Stop Kran 1" buah
2. 2. 11. 3.321 Stop Kran 1/2" buah
2. 2. 11. 3.322 Stop Kran 2" buah
2. 2. 11. 3.323 Stop Kran 3" buah
2. 2. 11. 3.324 Stop Kran 3/4" buah
2. 2. 11. 3.325 Stop Kran 4" buah
2. 2. 11. 3.326 Stop Kran PVC Ǿ 3" Bh
2. 2. 11. 3.327 Straatpot 2" buah
2. 2. 11. 3.328 Straatpot 3" buah
2. 2. 11. 3.329 Straatpot 4" buah
2. 2. 11. 3.330 Straatpot 6" buah
2. 2. 11. 3.331 Straatpot 8" buah
2. 2. 11. 3.332 Tee All Flange 2" x 2" buah
2. 2. 11. 3.333 Tee All Flange 3" x 2" buah
2. 2. 11. 3.334 Tee All Flange 3" x 3" buah
2. 2. 11. 3.335 Tee All Flange 4" x 2" buah
2. 2. 11. 3.336 Tee All Flange 4" x 3" buah
2. 2. 11. 3.337 Tee All Flange 4" x 4" buah
2. 2. 11. 3.338 Tee All Flange 6" x 2" buah
2. 2. 11. 3.339 Tee All Flange 6" x 3" buah
2. 2. 11. 3.340 Tee All Flange 6" x 4" buah
2. 2. 11. 3.341 Tee All Flange 6" x 6" buah
2. 2. 11. 3.342 Tee All Flange 8" x 2" buah
2. 2. 11. 3.343 Tee All Flange 8" x 3" buah
2. 2. 11. 3.344 Tee All Flange 8" x 4" buah
2. 2. 11. 3.345 Tee All Flange 8" x 6" buah
2. 2. 11. 3.346 Tee All Flange 8" x 8" buah
2. 2. 11. 3.347 Tee All Socket PVC Moof 1 1/2" x 1 1/2" buah
2. 2. 11. 3.348 Tee All Socket PVC Moof 2" x 2" buah
2. 2. 11. 3.349 Tee All Socket PVC Moof 3" x 2" buah
2. 2. 11. 3.350 Tee All Socket PVC Moof 3" x 3" buah
2. 2. 11. 3.351 Tee All Socket PVC Moof 4" x 2" buah
2. 2. 11. 3.352 Tee All Socket PVC Moof 4" x 3" buah
2. 2. 11. 3.353 Tee All Socket PVC Moof 4" x 4" buah
2. 2. 11. 3.354 Tee All Socket PVC Moof 6" x 2" buah
2. 2. 11. 3.355 Tee All Socket PVC Moof 6" x 3" buah
2. 2. 11. 3.356 Tee All Socket PVC Moof 6" x 4" buah
2. 2. 11. 3.357 Tee All Socket PVC Moof 6" x 6" buah
2. 2. 11. 3.358 Tee All Socket PVC Moof 8" x 3" buah
2. 2. 11. 3.359 Tee All Socket PVC Moof 8" x 4" buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 77


1 2 3 4
2. 2. 11. 3.360 Tee All Socket PVC Moof 8" x 6" buah
2. 2. 11. 3.361 Tee All Socket PVC Moof 8" x 8" buah
2. 2. 11. 3.362 Tee All Socket PVC Moof Ǿ 2" x Ǿ 1,5" Bh
2. 2. 11. 3.363 Tee All Socket PVC RR 2" x 2" buah
2. 2. 11. 3.364 Tee All Socket PVC RR 3" x 2" buah
2. 2. 11. 3.365 Tee All Socket PVC RR 3" x 3" buah
2. 2. 11. 3.366 Tee All Socket PVC RR 4" x 2" buah
2. 2. 11. 3.367 Tee All Socket PVC RR 4" x 3" buah
2. 2. 11. 3.368 Tee All Socket PVC RR 4" x 4" buah
2. 2. 11. 3.369 Tee All Socket PVC RR 6" x 2" buah
2. 2. 11. 3.370 Tee All Socket PVC RR 6" x 3" buah
2. 2. 11. 3.371 Tee All Socket PVC RR 6" x 4" buah
2. 2. 11. 3.372 Tee All Socket PVC RR 6" x 6" buah
2. 2. 11. 3.373 Tee All Socket PVC RR 8" x 3" buah
2. 2. 11. 3.374 Tee All Socket PVC RR 8" x 4" buah
2. 2. 11. 3.375 Tee All Socket PVC RR 8" x 6" buah
2. 2. 11. 3.376 Tee All Socket PVC RR 8" x 8" buah
2. 2. 11. 3.377 Tee Drat GI 1 1/2" buah
2. 2. 11. 3.378 Tee Drat GI 1 1/4" buah
2. 2. 11. 3.379 Tee Drat GI 1" buah
2. 2. 11. 3.380 Tee Drat GI 1/2" buah
2. 2. 11. 3.381 Tee Drat GI 2 1/2" buah
2. 2. 11. 3.382 Tee Drat GI 2" buah
2. 2. 11. 3.383 Tee Drat GI 3" buah
2. 2. 11. 3.384 Tee Drat GI 3/4" buah
2. 2. 11. 3.385 Tee Drat GI 4" buah
2. 2. 11. 3.386 Tee Drat GI 6" buah
2. 2. 11. 3.387 Tee GI Ǿ 2" x Ǿ 0,5" Bh
2. 2. 11. 3.388 Tee PVC Ǿ 1,5" x Ǿ 1,5" Bh
2. 2. 11. 3.389 Tee PVC Ǿ 2" x Ǿ 1" Bh
2. 2. 11. 3.390 Tee PVC Ǿ 2" x Ǿ 1,5" Bh
2. 2. 11. 3.391 Tee PVC Ǿ 2" x Ǿ 2" Bh
2. 2. 11. 3.392 Tee PVC Ǿ 3" x Ǿ 1,5" Bh
2. 2. 11. 3.393 Tee PVC Ǿ 3" x Ǿ 2" Bh
2. 2. 11. 3.394 Tusen Klap GI Ǿ 1,5" Bh
2. 2. 11. 3.395 Tusen Klap GI Ǿ 2" Bh
2. 2. 11. 3.396 Tusen Klap GI Ǿ 3" Bh
2. 2. 11. 3.397 Tusen Klap GI Ǿ 4" Bh
2. 2. 11. 3.398 Vent / Air Valve GI 1 1/2" Buah
2. 2. 11. 3.399 Vent / Air Valve GI 1" Buah
2. 2. 11. 3.400 Vent / Air Valve GI 1/2" buah
2. 2. 11. 3.401 Vent / Air Valve GI 2" Buah
2. 2. 11. 3.402 Vent / Air Valve GI 3" Buah
2. 2. 11. 3.403 Vent / Air Valve GI 3/4" buah
2. 2. 11. 3.404 Vent / Air Valve GI 4" Buah
2. 2. 11. 3.405 Vent / Air Valve GI 6" Buah
2. 2. 11. 3.406 Vent GI Ǿ 2" Bh
2. 2. 11. 3.407 Vent GI Ǿ 3" Bh
2. 2. 11. 3.408 Vent GI Ǿ 4" Bh
2. 2. 11. 3.409 Verlop Sock GI 1 1/2" x 1" Buah

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 78


1 2 3 4
2. 2. 11. 3.410 Verlop Sock GI 1" x 3/4" Buah
2. 2. 11. 3.411 Verlop Sock GI 2" x 1" Buah
2. 2. 11. 3.412 Verlop Sock GI 2" x 1,5" Buah
2. 2. 11. 3.413 Verlop Sock GI 2" x 3/4" Buah
2. 2. 11. 3.414 Verlop Sock GI 2,5" x 2" Buah
2. 2. 11. 3.415 Verlop Sock GI 3" x 1,5" Buah
2. 2. 11. 3.416 Verlop Sock GI 3" x 2" Buah
2. 2. 11. 3.417 Verlop Sock GI 3" x 3/4" Buah
2. 2. 11. 3.418 Verlop Sock GI 3/4" x 1/2" Buah
2. 2. 11. 3.419 Verlop Sock GI 4" x 3" Buah
2. 2. 11. 3.420 Wall Pipe Seal Bh
2. 2. 11. 3.421 Water Meter Flange CI 2" buah
2. 2. 11. 3.422 Water Meter Flange CI 3" buah
2. 2. 11. 3.423 Water Meter Flange CI 4" buah
2. 2. 11. 3.424 Water Meter Flange CI 6" buah
2. 2. 11. 3.425 Water Meter Flange CI 8" buah
2. 2. 11. 3.426 Water Meter Kuningan 1 1/2" buah
2. 2. 11. 3.427 Water Meter Kuningan 1" buah
2. 2. 11. 3.428 Water Meter Kuningan 1/2" buah
2. 2. 11. 3.429 Water Meter Kuningan 3/4" buah
2. 2. 11. 3.430 Water Moer 1 1/2" buah
2. 2. 11. 3.431 Water Moer 1 1/4" buah
2. 2. 11. 3.432 Water Moer 1" buah
2. 2. 11. 3.433 Water Moer 1/2" buah
2. 2. 11. 3.434 Water Moer 2 1/2" buah
2. 2. 11. 3.435 Water Moer 2" buah
2. 2. 11. 3.436 Water Moer 3" buah
2. 2. 11. 3.437 Water Moer 3/4" buah
2. 2. 11. 3.438 Water Moer 4" buah
2. 2. 11. 3.439 Water Stop WSA-200 mm Meter
2. 2. 11. 3.440 Water Stop WSA-220 mm Meter
2. 2. 11. 3.441 Water Stop WSA-250 mm Meter
2. 2. 11. 3.442 Water Stop WSA-320 mm Meter
2. 2. 11. 3.443 Water Stop WSA-400 mm Meter
2. 2. 11. 3.444 Water Stop WSF-150 mm Meter
2. 2. 11. 3.445 Water Stop WSF-200 mm Meter
2. 2. 11. 3.446 Water Stop WSF-250 mm Meter
2. 2. 11. 3.447 Water Stop WSH-150 mm Meter
2. 2. 11. 3.448 Water Stop WSH-200 mm Meter
2. 2. 11. 3.449 Water Stop WSH-250 mm Meter
2. 2. 11. 3.450 Water Stop WSRR-200 mm Meter
2. 2. 11. 3.451 Water Stop WSRR-250 mm Meter
2. 2. 11. 3.452 Water Stop WSRS-200 mm Meter
2. 2. 11. 3.453 Water Stop WSRS-250 mm Meter

2. 2. 12. BAHAN JENIS PAKU :


2. 2. 12. 1 Paku biasa Kg
2. 2. 12. 2 Paku Eternit / Triplek Kg
2. 2. 12. 3 Paku Gypsum Kg
2. 2. 12. 4 Paku Kalsiboard Kg

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 79


1 2 3 4
2. 2. 12. 5 Paku Kayu Uk.2,5"-5" Kg
2. 2. 12. 6 Paku Reng Kayu 2" Kg
2. 2. 12. 7 Paku Usuk 3" Kg
2. 2. 12. 8 Paku Asbes Kg
2. 2. 12. 9 Paku beton 5cm Bh
2. 2. 12. 10 Paku Kait ( pancing ) Bh
2. 2. 12. 11 Paku Ramset / dinabolt Bh
2. 2. 12. 12 Paku Sekrup Bh
2. 2. 12. 13 Paku Seng ( Paku payung ) Kg
2. 2. 12. 14 Paku Sumbat Bh
2. 2. 12. 15 Skrup Fixer Bh

2. 2. 13. BAHAN FABRIKASI, ELEKTRIK, POMPA :


2. 2. 13. 1 Alat - alat kerja Set
2. 2. 13. 2 Arde Bh
2. 2. 13. 3 Beton 1 : 1 1/2 : 2 1/2 m3
2. 2. 13. 4 Beton Pracetak (Kolom) (5x50x200) Btg
2. 2. 13. 5 Beton Pracetak (Panel) (5x50x200) Lbr
2. 2. 13. 6 Biaya Penyambungan dan Uji PLN Titik
2. 2. 13. 7 Boull Valve Bh
2. 2. 13. 8 Box Meter Bh
2. 2. 13. 9 BPU VA
2. 2. 13. 10 Cassing Pompa PVC dia 10" S 10 Bh
2. 2. 13. 11 Elektroda Kg
2. 2. 13. 12 Exhaust dinding 20 x 20 cm Unit
2. 2. 13. 13 Exhaust dinding 30 x 30 cm Unit
2. 2. 13. 14 Exhaust dinding 40 x 40 cm Unit
2. 2. 13. 15 Exhaust langit-langit 20/20 cm M'
2. 2. 13. 16 Exhaust langit-langit 25/25 cm Unit
2. 2. 13. 17 Kabel cocial Bh
2. 2. 13. 18 Kipas Angin langit-langit Bh
2. 2. 13. 19 Kompor Gas 1 tungku ( untuk biogas ) Bh
2. 2. 13. 20 Kompor Gas 2 tungku ( untuk biogas ) Bh
2. 2. 13. 21 Large angle Bh
2. 2. 13. 22 Manometer Bh
2. 2. 13. 23 Manometer Kecil Bh
2. 2. 13. 24 Mesin Diesel 5 HP / 2200 RPM Unit
2. 2. 13. 25 Pompa Tangan Unit
2. 2. 13. 26 Pompa diesel (ex. honda wb 30 xh) Unit
2. 2. 13. 27 Storox-100 Unit
2. 2. 13. 28 Venetion Blinds And Vertical Blinds (Tirai) Unit
2. 2. 13. 29 Pompa air listrik 40 lt/menit 125 watt Unit
2. 2. 13. 30 Panel kontrol 2WLC DOL 7,5 kw 3x380 V 50 Hz Unit
2. 2. 13. 31 Pelampung/water level kontrol Bh
2. 2. 13. 32 Perbaikan Pintu Ulir Unit
2. 2. 13. 33 Pintu air Type A Unit
2. 2. 13. 34 Pintu air Type A* Unit
2. 2. 13. 35 Pintu air Type B Unit
2. 2. 13. 36 Pintu air Type B* Unit
2. 2. 13. 37 Pintu air Type C2 Unit

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 80


1 2 3 4
2. 2. 13. 38 Pintu air Type C3 Unit
2. 2. 13. 39 Pintu air Type C5 Unit
2. 2. 13. 40 Pintu air WIN WERK Unit
2. 2. 13. 41 Pintu Scot Balk Balau M3
2. 2. 13. 42 Pompa air Alcon Dia 3" (setara Honda WB 30 XT) Unit
2. 2. 13. 43 Pompa air listrik 40 lt/menit 125 watt Bh
2. 2. 13. 44 Pompa Sub Mersible Sp. 17.37 Unit
2. 2. 13. 45 Pompa Tangan Bh
2. 2. 13. 46 Rambu lalu lintas Bh
2. 2. 13. 47 Storox-100 Kg
2. 2. 13. 48 TC (Twisted Cable) : 3 x 70 + 1 x 50 Bh
2. 2. 13. 49 Travo Unit
2. 2. 13. 50 Trek Schok Bh
2. 2. 13. 51 Treker dia 12 mm Unit
2. 2. 13. 52 Venetion Blinds And Vertical Blinds (Tirai) M2
2. 2. 13. 53 Water Meter Dia 0.5" Bh
2. 2. 13. 54 Water Meter Dia 1" Bh
2. 2. 13. 55 Water Meter Dia 1.25" Bh
2. 2. 13. 56 Water Meter Dia 1.5" Bh
2. 2. 13. 57 Water Meter Dia 2" Bh
2. 2. 13. 58 Water Meter Dia 2.5" Bh
2. 2. 13. 59 Water Meter Dia 3" Bh
2. 2. 13. 60 Water Meter Dia 4" Bh
2. 2. 13. 61 Waterstop (Lbr 150mm) m
2. 2. 13. 62 Waterstop (Lbr 200mm) m
2. 2. 13. 63 Waterstop (Lbr 230-320mm) m

2. 3. BIAYA TES PROYEK JALAN DAN JEMBATAN


2. 3. 1 Tes Beton bh
2. 3. 2 Tes Paving /paket
2. 3. 3 Tes Telford ttk
2. 3. 4 Tes Lapen /titik
2. 3. 5 Tes Abrasi /uji
2. 3. 6 Tes Kepadatan (BJ) Hotmix /uji
2. 3. 7 Tes Hammer /titik
2. 3. 8 JMF Beton dan Trial /mutu beton
2. 3. 9 Test Ekstraksi Hotmix /sampel
2. 3. 10 Test Penetrasi Aspal /sampel
2. 3. 11 Test Titik Bakar / Titik leleh /sampel
2. 3. 12 Test Sondir /titik
2. 3. 13 Test Core drill hotmix /titik
2. 3. 14 Test Sandcone /titik
2. 3. 15 JMF Sub base / Sub Grade dan Trial /paket

2. 4. BIAYA KEGIATAN LAIN-LAIN


2. 4. 1 Papan nama kegiatan kayu unit
2. 4. 2 Papan nama kegiatan banner unit
2. 4. 3 Prasasti batu marmer (uk. 50x80) cm unit

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 81


1 2 3 4
2. 4. 4 Pembersihan telford lama m2
2. 4. 5 Pengeboran sumur bor ( manual ) m1
2. 4. 6 Sewa alat ukur water pass per - hari
2. 4. 7 Sewa alat ukur theodolit per - hari
2. 4. 8 Sewa alat ukur GPS per - hari
2. 4. 9 Sewa kamera digital per - hari
2. 4. 10 Sewa direksi keet per-bulan
2. 4. 11 Sewa kantor konsultan per-bulan
2. 4. 12 Penebangan pohon : Ø < 50 cm ttk
2. 4. 13 Penebangan pohon : Ø ≥ 50 cm ttk
2. 4. 14 Pengukuran ( uitzet ) jalan > 500 m per - km

BPKAD KAB. TULUNGAGUNG // SSH 2019 // KELOMPOK BAHAN MATERIAL …………… 82


PERHITUNGAN VOLUME PEKERJAAN

NAMA PEKERJAAN : PEMBANGUNAN GUDANG


LOKASI PEKERJAAN : KECAMATAN REJOTANGAN, KABUPATEN TULUNGAGUNG

No Perhitungan Volume Pekerjaan Volume / Sat


1 2 3
I PEKERJAAN PERSIAPAN
1 Pengukuran / Bouwplank = 1.00 ls

2 Pembersihan Lokasi = 1.00 ls


.
IV PEKERJAAN RANGKA DAN PENUTUP ATAP
1 Pemasangan Baja Profil
- Tiang Baja WF 300;150;6.5;9
4.60 x 2.00 x 6.00 x 36.70 → Tiang Baja WF 300;150;6.5;9 = 2,025.84 Kg
- Gording & Pengaku
32.00 x 16.00 x 4.14 → Gording CNP 125;50;20;2.1 = 2,119.68 Kg
30.00 x 2.00 x 2.00 x 6.77 → Pengaku CNP 150;65;20;3.2 = 812.40 Kg
- Plat Pada Tiang Kuda-Kuda
0.30 x 0.20 x 2.00 x 6.00 x 97.22 → Plat Sepatu Tiang T. 12mm = 70.00 Kg
0.30 x 0.15 x 2.00 x 6.00 x 81.01 → Plat Riep Tiang T. 10mm = 43.74 Kg
0.30 x 0.15 x 2.00 x 6.00 x 48.61 → Plat Penutup T. 6mm = 26.25 Kg
- Plat Pada Kuda-Kuda
0.60 x 0.15 x 2.00 x 6.00 x 81.01 → End Plat Kuda2 T. 10mm = 87.49 Kg
0.60 x 0.15 x 2.00 x 6.00 x 81.01 → End Plat Nok T. 10mm = 87.49 Kg
0.30 x 0.15 x 4.00 x 6.00 x 81.01 → Plat Riep Kuda2 T. 10mm = 87.49 Kg
- Plat Pada Konsol
0.40 x 0.100 x 2.00 x 6.00 x 81.01 → End Plat Konsol T. 10mm = 38.88 Kg
0.20 x 0.100 x 2.00 x 6.00 x 64.93 → Plat Riep Konsol T. 8mm = 15.58 Kg +
4,957.92 Kg
2 Pemasangan Rangka Kuda Kuda Baja Profil
8.70 x 2.00 x 6.00 x 36.70 → Kuda2 WF 300;150;6,5;9 = 3,831.48 Kg
0.67 x 2.00 x 6.00 x 21.30 → Konsol WF 200;100;5.5;8 = 169.97 Kg
0.55 x 2.00 x 6.00 x 36.70 → Dagu WF 300;150;6,5;9 = 242.22 Kg
2.25 x 1.00 x 6.00 x 36.70 → Dagu Nok WF 300;150;6,5;9 = 495.45 Kg
0.30 x 1.00 x 6.00 x 21.30 → Sekur WF 200;100;5.5;8 = 38.34 Kg +
3,831.48 Kg

3 Perakitan Kuda-Kuda Baja


→ Volume sama dengan pasang kuda-kuda baja
3831.48 = 3,831.48 Kg +
3,831.48 Kg
1 2 3
4 Pekerjaan Pengelasan
0.60 x 4.00 + 0.15 x 4.00 x 12.00 → Sambungan Tiang dg Kuda2 = 36.00 m'
0.40 x 4.00 + 0.10 x 4.00 x 12.00 → Sambungan Tiang dg Konsol = 24.00 m'
0.60 x 4.00 + 0.15 x 4.00 x 6.00 → Sambungan Kuda-Kuda = 18.00 m'
0.30 x 2.00 x 2.00 x 2.00 x 6.00 → Plat Riep Kuda-Kuda = 14.40 m'
0.30 x 2.00 x 1.00 x 2.00 x 6.00 → Plat Riep Tiang = 7.20 m'
0.30 x 2.00 + 0.15 x 2.00 x 12.00 → Plat Plendes dg Tiang = 10.80 m'
0.10 x 6.00 x 16.00 → Gording = 9.60 m' +
120.00 m'
1 2 3

5 Pasang Trekstang Ø 10 mm
8.70 + 8.70 x 4.00 x 0.617 = 42.94 Kg +
42.94 Kg

6 Pasang Ikatan Angin Ø 16 mm


9.85 + 9.85 x 8.00 x 1.578 = 248.69 Kg +
248.69 Kg

7 Jarum Keras Ø 16 mm
4.00 x 8.00 → Jarum Keras Ikatan Angin = 32.00 Pc +
32.00 Pc

8 Pasang Penutup Atap Zincalum


8.70 + 8.70 x 32.00 = 556.80 m² +
556.80 m²

9 Pasang Bubungan Zincalum


32.00 = 32.00 m' +
32.00 m'

10 Pasang Talang Zincalum


32.00 x 2.00 = 64.00 m' +
64.00 m'

11 Pasang Pipa PVC Ø 4"


5.50 x 2.00 x 6.00 = 66.00 m' +
66.00 m'
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNAN GUDANG


LOKASI : KECAMATAN REJOTANGAN, KABUPATEN TULUNGAGUNG

Satuan
No. Uraian Pekerjaan Kode Analisa Volume Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN
1 Pengukuran / Bouwplank - 1.00 ls 150,000.00 150,000.00
3 Pembersihan Lokasi - 1.00 ls 250,000.00 250,000.00
400,000.00
II PEKERJAAN BAJA
1 Pemasangan Baja Profil A.4.2.1.1 4,957.92 Kg 13,138.20 65,138,144.54
2 Pemasangan Rangka Kuda Kuda Baja Profil A.4.2.1.2 3,831.48 Kg 11,712.60 44,876,592.65
3 Perakitan Kuda-Kuda Baja A.4.2.1.3 3,831.48 Kg 341.20 1,307,317.83
4 Pekerjaan Pengelasan A.4.2.1.5 120.00 m' 5,566.32 667,958.40
5 Pasang Trekstang Ø 10 mm A.4.1.1.17 42.94 Kg 1,326.46 56,958.02
6 Pasang Ikatan Angin Ø 16 mm A.4.1.1.17 248.69 Kg 1,326.46 329,876.34
7 Jarum Keras Ø 16 mm - 32.00 Pc 25,000.00 800,000.00
8 Pasang Penutup Atap Zincalum - 556.80 m² 16,698.96 9,297,980.93
9 Pasang Bubungan Zincalum - 32.00 m' 12,500.00 400,000.00
10 Pasang Talang Zincalum A.4.2.1.19 64.00 m' 46,150.56 2,953,635.84
11 Pasang Pipa PVC Ø 4" A.5.1.1.32 66.00 m' 20,256.48 1,336,927.68
127,165,392.23

JUMLAH TOTAL 127,565,392.23


DIBULATKAN 127,565,000.00

TERBILANG: ''SERATUS DUA PULUH TUJUH JUTA LIMA RATUS ENAM PULUH LIMA RIBU RUPIAH.''
REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN GUDANG


LOKASI : KECAMATAN REJOTANGAN, KABUPATEN TULUNGAGUNG

No. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN BAJA

A JUMLAH
B PPN 10 %
JUMLAH TOTAL A+B
TERBILANG: ''SERATUS DUA PULUH TUJUH JUTA LIMA RATUS ENAM PULUH LIMA RIBU RUPIAH.''

Tulungagung, 2017
Direncanakan Oleh :
Pejabat Pembuat Komitmen CV. UNICON
…………………………………………………
Kabupaten Tulungagung

………………………………….. IKHSAN, ST
NIP. …………………………. Direktur

………………………………………………………
Kabupaten Tulungagung

………………………………………
Pembina Utama Muda
NIP. ……………………
JUMLAH

400,000.00
127,165,392.23

127,565,392.23
12,756,539.22
140,321,900.00
MA RIBU RUPIAH.''

ng, 2017
encanakan Oleh :