WELL CLEAN UP DUE TO SAND PROBLEM (SYSTEM INTERNATIONAL)

A well is not on produstion due to sand problem, well maintenance is by unload sand in the well.

Well data:
9 5/8” 47 lbf/ft casing was set at 2000 m.
7” 32 lbf/ft Top Liner is set 100 m above 9 5/8” Shoe.
7” 32 lbf/ft shoe is at 2.500 m.
Perforation interval 2455 – 2475 m.
Rig rental is USD 12,000/Day.
Previously the well produce 40 BOPD
The oil price is 50 %/BBL
4 ¾” – 2 ¼” ID Drill Collar is 120 m long , ther rest is 3 ½” 13,3 lbf/ft Grade E Drill Pipe.
Triplex single acting pump data:
6" liner diameter.
8" piston stroke length.
130 stroke/menit.

Calculate
‐ Time duration to clean up the well from rig‐up until rig release
‐ Completion fluid circulation velocity:
     * Annulus between 4 ¾” drill collar and Casing 7” casing. 
     * Annulus between 3 ½” drill pipe and 7” casing, and 9 5/8” casing.
‐ The total cost to unload sand.
‐ The pay out time.

Conversion:
3
1 ft  = 7.48 gal
1 gal = 3.785 liters
1 ft =  12 inches
1 inch = 2.54 cm
1 dm = 10 cm
1 dm = 100 mm
1 m = 10 dm
3
1 liters = 100 cm

DETAIL CALCUATION PREPARATION

Data:
Well Depth = 2000 meters
7" TL ‐ 9‐5/8" shoe = 100 meters
7" Top Liner = 1900 meters
7" Casing Shoe = 2500 meters
Top Perforation = 2455 meters
Bottom Perforation = 2475 meters
Rig Rental = 12,000 $/Day
Prod. Rate = 40 BOPD
Oil Price = 50 $/BBL
OD DC = 4.75 inches
DC Length = 120 meters
DP OD = 3.5 inches
Number of Pump = 3 (Triplex)
D Pump Line = 6 inches
Stroke Length = 8 inches
Stroke = 130 stroke/minue

𝜋
𝑃𝑢𝑚𝑝 𝑅𝑎𝑡𝑒 𝐷 𝑆𝑡𝑟𝑜𝑘𝑒 𝐿𝑒𝑛𝑔𝑡ℎ 𝑆𝑡𝑟𝑜𝑘𝑒 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑃𝑢𝑚𝑝
4
Pump Rate = 88216 inches3/minute
382 GPM, using conversion from inch to ft, and from ft3 to gallon
1445 liters/minute, using conversion from gallon to liters.

Length TOL to Top Perf = 7" Top Line ‐ Top Perforation
Length TOL to Top Perf = 555 meters
DP in the 7" liner = Length of TOL to Top Perf ‐ DC Length
DP in the 7" liner = 435 meters

From API Casing Table Spesification:
ID 9 5/8” 47 lbf/ft Casing = 220.50 mm
Capacity 9 5/8” Casing = 38.19 liters/m, using conversion from mm3 to liters, and from dm to m
ID 7” 32 lbf/ft Liner = 154.79 mm
Capacity 7” 32 lbf/ft Liner = 18.82 liters/m, using conversion from mm3 to liters, and from dm to m

Calculation up to  2455 meter, see the Well Maintenance Program


𝜋
𝐴𝑟𝑒𝑎 𝐷𝐶 𝑂𝐷 𝐷𝐶
4
2
Area DC = 114.3 cm , using conversion from inch to cm.
1.143 dm2, using conversion from cm3 to liters.

Vol𝑢𝑚𝑒 𝐷𝐶 𝐴𝑟𝑒𝑎 𝐷𝐶 𝐿𝑒𝑛𝑔𝑡ℎ 𝐷𝐶


Volume DC = 1372 liters, using convesion from meter to dm.

Volume Annulus between 7" Liner and DC = Capacity Liner * DC Length ‐ Volume DC
Vol Annulus 7"Casing and DC = 886 liters
𝜋
𝐴𝑟𝑒𝑎 𝐷𝑃 𝑂𝐷 𝐷𝑃
4
Area DP = 62.1 cm2, using conversion from inch to cm.
2
0.621 dm , using conversion from cm3 to liters.

𝑉𝑜𝑙𝑢𝑚𝑒 𝐷𝑃 𝑖𝑛 7"𝐿𝑖𝑛𝑒𝑟 𝐴𝑟𝑒𝑎 𝐷𝑃 𝐿𝑒𝑛𝑔𝑡ℎ 𝐷𝑃 𝑖𝑛 7" 𝐿𝑖𝑛𝑒𝑟


Volume DP in 7" Liner = 2700 liters, using conversion from meter to dm.

Volume Annulus between 7" Liner and DP = Capacity Liner * Length DP in 7" Liner ‐ Volume DP
Vol Annulus 7"Casing and DP = 5486 liters

𝑉𝑜𝑙𝑢𝑚𝑒 𝐷𝑃 𝑖𝑛 9 5 8 "𝐿𝑖𝑛𝑒𝑟 𝐴𝑟𝑒𝑎 𝐷𝑃 𝐿𝑒𝑛𝑔𝑡ℎ 𝐷𝑃 𝑖𝑛 9 5 8 " 𝐿𝑖𝑛𝑒𝑟


Volume DP in 95/8" Liner = 11794 liters, using conversion from meter to dm.

Volume Annulus between 9‐5/8" Casing and DP = Capacity Casing * Casing Length ‐ Volume DP
Vol Annulus 7"Casing and DP = 60760 liters

Volume Total up to 2455 meters = Volume All Annulus above.


Volume Total = 67132 liters

Drill Bit at  2480 meters

Volume Annulus between 7" Liner and DC = Capacity Liner * DC Length ‐ Volume DC
Vol Annulus 7"Casing and DC = 886 liters

Volume Annulus between 7" Liner and DP = Capacity Liner * (Depth Bit ‐ DC Length ‐ 7" TOL) ‐
                                                                               Volume DP * (Depth Bit ‐ DC Length ‐ 7" TOL)
Vol Annulus 7"Casing and DP = 5801 liters, using conversion from meter to dm.

Volume Annulus between 9‐5/8" Casing and DP = Capacity Casing * Casing Length ‐ Volume DP
Vol Annulus 7"Casing and DP = 60760 liters

Volume Total up to 2480 meters = Volume All Annulus above.


Volume Total = 67448 liters

WELL MAINTENANCE PROGRAM

‐  Rig Up well dan install all rig equiupment for 12 hours 12 jam.
‐ Monitor Well Pressure, Rig Down Beam Pump Cek, Stuffing Box, and Rig Up BOP 7‐1/16” – 3000 Psi, for 4 hours.
‐ Pull Out of Hole with 2‐½” plunger, 7/8” and ¾” sucker rod from 2420 to surface at speed of 30 m for every 4 minutes.
‐ Release and POOH with TLE 2 ½” Pump on 2 7/8” EUE tubing from 2425 m at speed of 30 m for every 6 minutes
‐ Trip In with 6” Bit to top of sand at 2455 m, at speed of 30 m for every 5 menit.
‐ Buttom Up Circulation Once.
‐ Clean up sand at speed of 20 cm for every minute from 2480 m.
‐ Buttom Up Circulation Twice
‐ Trip Out with 6” Bit to surface at speed of 30 m for every 6 minutes.
‐ RIH with TLE 2 ½” Pump on 2 7/8” EUE tubing to 2430 m at speed of 30 m for every 5 minutes
‐ RIH with 2‐½” plunger, 7/8” and ¾” sucker rod to 2425 m at speed of 30 m for every 4 minutes.
‐ Rig Down 7 1/16” – 3.000 Psi BOP, install Beam Pump and accessories, and perform production test for 6 hours at 40 BOPD.
‐ Rig Down dan Rig Release for 12 hour.

Summary
Operation Depth Meter Minute Top Vol Rate Times Duration Remarks
Rig Up  ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12         ‐
Rig Down Beam Pump ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4         ‐
POOH Rod 2420 30 4 ‐ ‐ ‐ ‐ 5.38 Depth * Meters / Minutes, Conv min. to hrs.
POOH TLE Pump 2425 30 6 ‐ ‐ ‐ ‐ 8.08 Depth * Meters / Minutes, Conv min. to hrs.
Trip In Bit 2455 30 5 ‐ ‐ ‐ ‐ 6.82 Depth * Meters / Minutes, Conv min. to hrs.
Bottom Up Once ‐ ‐ ‐ ‐ 67132 1445 1 0.77 Vol / Rate * Times, Conv min. to hrs.
Clean Up Sand 2480 0.2 1 2455 ‐ ‐ ‐ 2.08 (Depth ‐ Top) * Meters / Minutes, Conv min. to hrs.
Bottom Up Twice ‐ ‐ ‐ ‐ 67448 1445 2 1.56 Vol / Rate * Times, Conv min. to hrs.
Trip In Bit 2480 30 6 ‐ ‐ ‐ ‐ 8.27 Depth * Meters / Minutes, Conv min. to hrs.
RIH Pump 2430 30 5 ‐ ‐ ‐ ‐ 6.75 Depth * Meters / Minutes, Conv min. to hrs.
RIH Rod 2425 30 4 ‐ ‐ ‐ ‐ 5.39 Depth * Meters / Minutes, Conv min. to hrs.
Rig Up Beam Pump and Prod. Test ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6         ‐
Rig Down Beam Pump ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12         ‐
TOTAL HOURS 79.10 Hours

FLUID VELOCITY

From API Casing Table Spesification:
ID 7” 32 lbf/ft Liner = 6.094 inches
𝜋
𝐴𝑟𝑒𝑎 𝐴𝑛𝑛𝑢𝑙𝑢𝑠 𝐷𝐶 𝑎𝑛𝑑 𝐿𝑖𝑛𝑒𝑟 𝐼𝐷 𝐿𝑖𝑛𝑒𝑟 2 𝑂𝐷 𝐷𝐶 2
4
2
Area Annulus = 73.85 cm , using conversion from inch to cm 
2
0.7385 dm
Velocity Annulus 7" Liner and DC = Pump Rate / Annulus Area
Velocity Annulus 7" Liner and DC = 1957 dm/min
196 m/min

𝜋
𝐴𝑟𝑒𝑎 𝐴𝑛𝑛𝑢𝑙𝑢𝑠 𝐷𝑃 𝑎𝑛𝑑 𝐿𝑖𝑛𝑒𝑟 𝐼𝐷 𝐿𝑖𝑛𝑒𝑟 2 𝑂𝐷 𝐷𝑃 2
4
2
Area Annulus = 126.10 cm , using conversion from inch to cm 
2
1.2610 dm
Velocity Annulus 7" Liner and DP = Pump Rate / Annulus Area
Velocity Annulus 7" Liner and DP = 1146 dm/min
115 m/min

From API Casing Table Spesification:
ID 9 5/8” 47 lbf/ft Casing = 8.681 inches
𝜋
𝐴𝑟𝑒𝑎 𝐴𝑛𝑛𝑢𝑙𝑢𝑠 𝐷𝑃 𝑎𝑛𝑑 𝐶𝑎𝑠𝑖𝑛𝑔 𝐼𝐷 𝐶𝑎𝑠𝑖𝑛𝑔 2 𝑂𝐷 𝐷𝑃 2
4
2
Area Annulus = 319.78 cm , using conversion from inch to cm 
3.20 dm2
Velocity Annulus 9‐5/8" Casing and DP = Pump Rate / Annulus Area
Velocity Annulus 9‐5/8" Liner and DP = 452 dm/min
45 m/min

TOTAL COST

Total Cost = Rig Cost * Total Hours / 24
Total Cost = 39,550 USD

PYA OUT TIME

Daily Gross Income = BOPD * Crude Price
Daily Gross Income = 2,000 USD/Day
Pay Out time = Total Cost / Daily Gross Income
Pay Out Time = 19.8 Days