JMC PROJECTS INDIA LTD

DMRC PROJECT

PROPOSED LABOUR RATES FOR SHUTTERING WORKS

S.NO. ITEM UNIT RATE IN RS


1 MAKING OF SHUTTERING WITH PLYWOOD SQM
2 REMAKING OF SHUTTERING SQM
3 PCC SIDE SHUTTERING SQM
BELOW PLINTH
4 SHUTTERING FOR RAFT SQM
5 SHUTTERING FOR COLUMN SQM
6 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
ABOVE PLINTH ( 0M TO 5 M )
7 SHUTTERING FOR COLUMN SQM
8 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
9 EXTRA FOR STAGING ABOVE 3M INCL SHIFTING CUM
ABOVE PLINTH ( 5 M TO 10 M )
10 SHUTTERING FOR COLUMN SQM
11 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
12 EXTRA FOR STAGING ABOVE 3M INCL SHIFTING CUM
ABOVE PLINTH ( 10M TO 15 M )
13 SHUTTERING FOR COLUMN SQM
14 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
15 EXTRA FOR STAGING ABOVE 3M INCL SHIFTING CUM
ABOVE PLINTH ( 15M TO 20 M )
16 SHUTTERING FOR COLUMN SQM
17 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
18 EXTRA FOR STAGING ABOVE 3M INCL SHIFTING CUM
ABOVE PLINTH ( 20M TO 25 M )
19 SHUTTERING FOR COLUMN SQM
20 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM
21 EXTRA FOR STAGING ABOVE 3M INCL SHIFTING CUM
GENERAL ITEMS
22 EXTRA FOR CIRCULAR SHUTTERING FOR COL./BEAM
23 FIXING OF EXPANSION JOINT SQM
24 EXTRA FOR RISERS OF STAIR CASE NOS
SHIFTING OF SHUTTERING MATERIAL & STACKING
NOS
25 AFTER DESHUTTERING
26 FIXING OF INSERT PLATES, EMBEDDED STR. STEEL KG
27 FIXING OF BOLTS / TEMPLATES NOS
28 MAKING & FIXING OF STARTER FOR COLUMN NOS
29 MAKING & FIXING OF STARTER FOR BEAM / WALL RMT
30 MAKING & PROVIDING POCKETS NOS
31 FIXING OF STOPPER FOR RAFT/WALL/SLAB RMT
32 FIXING OF WATER STOPPER RMT
33 MAKING OF TIE ROD WITH THREADING INCH
34 DEPT. SUPPLY OF CARPENTERS ( 8 HRS ) NOS
35 DEPT. SUPPLY OF HELPERS ( 8 HRS ) NOS
JMC PROJECTS INDIA LTD

DMRC PROJECT

PROPOSED LABOUR RATES FOR SHUTTERING WORKS

S.NO. ITEM UNIT RATE IN RS


1 MAKING OF SHUTTERING WITH PLYWOOD SQM 15
2 REMAKING OF SHUTTERING SQM 12
3 PCC SIDE SHUTTERING SQM 20
BELOW PLINTH
4 SHUTTERING FOR RAFT SQM 32
5 SHUTTERING FOR COLUMN SQM 34
6 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 32
ABOVE PLINTH ( 0M TO 5 M )
7 SHUTTERING FOR COLUMN SQM 34
8 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 32
9 EXTRA FOR STAGING INCL. SHIFTING CUM 5
ABOVE PLINTH ( 5 M TO 10 M )
10 SHUTTERING FOR COLUMN SQM 36
11 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 34
12 EXTRA FOR STAGING INCL. SHIFTING CUM 6
ABOVE PLINTH ( 10M TO 15 M )
13 SHUTTERING FOR COLUMN SQM 38
14 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 36
15 EXTRA FOR STAGING INCL. SHIFTING CUM 6
ABOVE PLINTH ( 15M TO 20 M )
16 SHUTTERING FOR COLUMN SQM 40
17 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 38
18 EXTRA FOR STAGING INCL. SHIFTING CUM 6
ABOVE PLINTH ( 20M TO 25 M )
19 SHUTTERING FOR COLUMN SQM 42
20 SHUTTERING FOR SLAB / BEAM / STAIR CASE SQM 40
21 EXTRA FOR STAGING INCL. SHIFTING CUM 6
GENERAL ITEMS
22 EXTRA FOR CIRCULAR SHUTTERING FOR COL./BEAM
23 FIXING OF EXPANSION JOINT SQM 10
24 EXTRA FOR RISERS OF STAIR CASE NOS 40
SHIFTING OF SHUTTERING MATERIAL & STACKING
NOS 1
25 AFTER DESHUTTERING
26 FIXING OF INSERT PLATES, EMBEDDED STR. STEEL KG 2
27 FIXING OF BOLTS / TEMPLATES NOS 25
28 MAKING & FIXING OF STARTER FOR COLUMN NOS 15
29 MAKING & FIXING OF STARTER FOR BEAM / WALL RMT 10
30 MAKING & PROVIDING POCKETS NOS 35
31 FIXING OF STOPPER FOR RAFT/WALL/SLAB RMT 10
32 FIXING OF WATER STOPPER RMT 10
33 MAKING OF TIE ROD WITH THREADING INCH 1.5
34 DEPT. SUPPLY OF CARPENTERS ( 8 HRS ) NOS 110
35 DEPT. SUPPLY OF HELPERS ( 8 HRS ) NOS 70
JMC PROJECTS INDIA LTD

DMRC PROJECT

PROPOSED LABOUR RATES FOR UNSKILLED WORKERS

S.NO. ITEM UNIT


1 EXCAVATION IN ORDINARY SOIL CUM
2 LEAD IN EXCAVATION FOR DISPOSAL MORE THAN 50 M RATE PER 50 M LEAD CUM
3 BACKFIILLING WITH COMPACTION CUM
4 SAND FILLING WITH COMPACTION CUM
5 LAYING PCC WITH MIXER MACHINE CUM
6 LAYING PCC WITH TRANSIT MIXER CUM
7 LAYING RCC FOR RAFT BY MIXER MACHINE CUM
8 LAYING RCC FOR RAFT BY TRANSIT MIXER CUM
9 LAYING RCC FOR RAFT BY PUMP CUM
10 LAYING RCC FOR COLUMN BY MIXER MACHINE CUM
11 LAYING RCC FOR COLUMN BY CRANE BUCKET CUM
12 LAYING RCC FOR SLAB BY PUMP CUM
13 LAYING RCC FOR SLAB BY MIXER MACHINE CUM
14 SHIFTING OF SHUTTERING MATERIAL NOS
15 SHIFTING OF CEMENT BAGS FROM GODOWN TO SITE ( INTERNAL SHIFTING ) NOS
SHIFTING OF CEMENT BAGS FROM GODOWN TO BP NOS
16 SHIFTING OF AGGREGATES MANUALLY CUM
17 SHIFTING OF SAND MANUALLY CUM
18 DRESSING OF EARTH UPTO 200 MM SQM
19 SHIFTING OF MIXER MACHINE / WEIGH BATCHER NOS
20 AREA CLEANING / DEBRIS / VEGETATION REMOVAL SQM
21 EXTRA BREAKING OF FOOTPATH / BITUMEN ROAD CUM
22 SHIFTING OF BRICKS ABOVE 30M LEAD NOS
23 UNLOADING OF TRUCK / TEMPO NOS
24 LABOUR SUPPLY ( 8 HRS ) NOS
KERS

RATE IN RS
30
5
25
20
100
70
110
75
30
140
70
30
130
0.5
0.75
1
20
15
8
75
1

0.1
350
60
JMC PROJECTS INDIA LTD

DMRC PROJECT

PROPOSED LABOUR RATES FOR SHUTTERING WORKS

S.NO. ITEM UNIT RATE IN RS


1 UNLOADING OF R/F MT 75
2 SHIFTING OF R/F FROM YARD TO SITE BY TRACTOR MT 100
3 SHIFTING OF R/F FROM SITE TO FIXING PLACE MANUALLY MT 50
4 CUTTING & BENDING OF R/F 8MM, 10MM, 12MM,16MM MT 550
5 CUTTING & BENDING OF R/F 20MM, 25MM, 28MM,32MM, 36MM MT 475
BELOW PLINTH
6 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM MT 450
7 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM MT 425
ABOVE PLINTH ( 0M TO 5 M )
8 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM SQM 450
9 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM SQM 425
ABOVE PLINTH ( 5 M TO 10 M )
10 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM SQM 500
11 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM SQM 475
ABOVE PLINTH ( 10M TO 15 M )
12 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM SQM 550
13 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM SQM 525
ABOVE PLINTH ( 15M TO 20 M )
14 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM SQM 600
15 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM SQM 575
ABOVE PLINTH ( 20M TO 25 M )
16 FIXING OF R/F INCL SHIFTING AT SITE 8MM, 10MM, 12MM,16MM SQM 650
17 FIXING OF OF R/F AT SITE INCL SHIFTING 20MM, 25MM, 28MM,32MM, 36MM SQM 625
GENERAL ITEMS
18 DEPT. SUPPLY OF FITTERS ( 8 HRS ) NOS 90
19 DEPT. SUPPLY OF HELPERS ( 8 HRS ) NOS 70