Download as pdf
Download as pdf
You are on page 1of 86
CP No.: CP1203 File Ref: 1550-60 1550-61 Page: 1 of 86 CERTIFIED TEST REPORT 42kV 1250 Amp Screened Deadbreak Separable Connector System FEES IU SIE aaa DTS1242 Bolted Tee Connector and DTB1242 Bolted Companion Tee For IEC Interface Type “C” Type Test Performed by VEIKI — VNL Electric Large Laboratories Ltd. Budapest Hungary ‘May 25, 2012 » New issue » © Cooper Power Systems, no CP No.: CP1203 File Ref: 1550-60 1550-61 Page: 2 of 86 42kV 1250 Amp Screened Deadbreak Separable Connector System DTS1242 Bolted Tee Connector and DTB1242 Bolted Companion Tee Type Test Report Standards CENELEC HD 629.1 $2: 2006 Test Requirements on Accessories for Use on Power Cables of Rated Voltage from 3.6/6(7.2) kV up to 20.8/36(42) kV Part 1: Cables With Extruded Insulation IEC 60502-4: 2005 Power cables With Extruded Insulation and Their Accessories for Rated Voltages from 1 kV (Um = 1.2 kV) up to 30 kV (Um=36 kV) Part 4: Test Requirements on Accessories for Cables With Rated Voltages from 6 kV (Um=7.2 kV) up to 30 kV (Um=36 kV) CERTIFICATION ‘Statements made and data shown are, to the best of our knowledge and belief, correct and within the usual limits of commercial testing practice. [Wer Rachel Wang Principal Engineer ib ll A 5/23 Joo/e- gz 4 Ve Safir 7 —~John M. Makai DouglasH. Yute Senior Principal Engineer Director, LIPE Engineering CP No.: CP1203 File Ref: 1550-60 1550-61 Page: 3 of 86 INTRODUCTION Type Test Report for Cooper Power Systems 42kV 1250A Deadbreak Connector System DTS1242 - Bolted Tee Connector and DTB1242 — Bolted Companion Tee The type test was performed at the VEIKI ~ VNL test laboratory in Budapest, Hungary. Included in this report is the VEIKI test report identified as: VEIKI — VNL Test Report No. 6471 / VNL Type tests on DTS1242 and DTB1242, 42 kV 1250 A pre-moulded Screened separable bolted Tee connectors for single core extruded Insulation cables for rated voltages of 20.8/36 (42) kV Dated: 28" March 2012 The bolted tee and the bolted companion tee connectors were moulded in Cooper Power Systems facility in Shanghai, China. The connectors tested and qualified per this type test include: DTS1242 Bolted Tee Connector DTB1242 Bolted Companion Tee Connector DPIS1242 Basic Insulating Plug CA1250 Cable Adapter CDT630U95 630A Compression Connector — 95 mm? CDT1250U500 — 1250A Compression Connector - 500 mm? CDT1250S800 —_ 1250A Shear Bolt Connector — 800 mm? CP No.: CP1203 File Ref: 1550-60 1550-61 Page: 4 of 86 Table of Contents Title Page Cooper Power Systems Certification 2 Introduction ... 3 Table of Contents .. 4 VEIKI Test Report No. 6474 / VNL ....... 5-62 (1-58) VEIKI Amendment Cooper Power Systems I$550-60-1 & IS550-61-1: Installation Instructions... 63-86 (1-24) coofer Power Systems. Quality from Cooper Industries .0. Box 1640, Waukesha, WI 53187 VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. WL LEVEE No. 6471 /VNL Test report Type tests on DTS1242 and DTB1242, 42 kV 1250 A pre-moulded screened separable bolted Tee connectors for single core extruded insulation cables for rated voltage of 20.8/36 (42) kV 28" March 2012 © sm H-1158 Budapest, Vasgolyé u. 2-4. Phone:+36.1.417 3157, Fax:+36.1.417 3163 E-mail: vnl@val.hu www.vnl.hu VEU MV ALA I-VNL ELECTRIC LARGE LABORATORI Test Report SLTD. | No. 6471/ VNL 2/23 page Subject Kind of the test Client Reference and date of the order: Our reference number: Place and date of the test: Present at the test in charge of the purchaser: ‘Type tests on DTS1242 and DTB1242, 42 kV 1250 A. pre-moulded screened separable bolted Tee connectors for single core extruded insulation cables for rated voltage of 20.8/36 (42) kV Type test Cooper Power Systems 2300 Badger Drive Waukesha, WI 53188 USA 36/2011, 27" September 2011 NFL-23/2011 VEIKI-VNL Electric Large Laboratories Ltd. H-1158 Budapest, Vasgoly6 u. 2-4. HUNGARY 11" October 2011 — 29" February 2012 ‘VE Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL. 3/23 page Details of the tested object Manufacturer: Cooper Electric Technology (Shanghai) Co. Pudong, Shanghai 201201 P.R. China Designation: Screened separable connector for single-core cables with extruded insulation Types: DTS1242, DTBI242 Rated voltage Uo/U (Um): 20.8/36 (42) kV Rated current: 1250 A The cables used for the tests: Manufacturer: Henan HUATAL Insulation: XLPE Rated voltage: 26/35 (40.5) kV Max. conductor temperature in normal operation: 90°C Type I: YJV — 26/35 1x500 GB/T12706.3-2002, Conductor: 500 mm’, Cu Type 2: YILV — 26/35 1x95 GBIT12706.3-2002 Conductor: 95 mm?, Al Manufacturer: Nexans Type: NEXANS L RHZI 201 ($)26/45kV 1x800 KAL+H130 Conductor: 800 mm’, AL Insulatior XLPE Rated voltage: 26/45 (52) kV Max. conductor temperature in normal operation: 90°C Number of the manufacturer's drawings for the identification of the test objects: Name of Document: Document number: Date of Document: Author: Installation Instruction and product. I$550-60-1 March 2012 Cooper Power Systems information for DTS1242 Bolted (12 pages) Tee Connector Installation Instruction and product IS550-61-1 March 2012 Cooper Power Systems information for DTB1242 Bolted (12 pages) Companion Tee Connector ‘These documents are not attached to the test report but amended. Requirements of manufacturer o purchaser: The tests were carried out in accordance with the following standards HD 629.1 $2:2006 Test requirements on accessories for use on power cables of rated voltage from 3.6/6 (7.2) kV up to 20.8/36 (42) kV Part 1: Cables with extruded insulation EN 61442:2005 ‘Test methods for accessories for power cables with rated voltages from 6 kV (Upp=7.2 KV) up to 36 KV (Uy=42 kV) (IEC 61442:2005, modified) IEC 60502-4:2005 Power cables with extruded insulation and theit accessories for rated voltages from 1 KV (Um=1,2kV) up to 30 KV (Um=36kV) - Part 4: Test requirements on accessories for cables with rated voltages from 6 KV (Um=7,.2kV) up to 30 KV (Um=36kV) WEL Test Report “7_ | VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 123 page Summary of the test results: ‘Type tests were performed on screened separable connector types DIS1242 and DTB1242 for rated voltage of 20.8/36 (42) kV according to the standard HD 629.1 $2. ‘The following tests were performed on the samples: © Test sequence D1 on both types, © Test sequence D2 only on type DTS1242, Special tests Nos.: 17, 18, 19, 21 of Table 7 on both types, © Tests according to Table 10 on 95 mm? Al and 800 mt 1 cables on both types. ‘The test sequence D3 was not performed because the test object is not equipped with a sliding contact and therefore has no operating eye The screened separable connector types DTS1242 and DTB1242 for rated voltage of 20.8/36 (42) kV met the type test requirements of test sequence D1, special tests Nos.: 17, 18, 19, 21 of the Table 7 and tests according to Table 10 of the standard HD 629.1 S2 and the type DTS1242 met also the type test requirements of test sequence D2 of the standard HD 629.1 S2. ‘The screened separable connector types DTS$1242 and DTB1242 for rated voltage of 20.8/36 (42) kV also met the type test requirements of test sequence 4.1 and special tests Nos. 16, 17, 18, 20 of the Table 7 and tests according to Table 10 of the standard IEC 60502-4 and the type DTS1242 met also the type test requirements of test sequence 4.3 of the standard IEC 60502-4. This standard describes the same test procedures as the HD 629.1 S2 but the HD 629.1 $2. has the same or more severe requirements regarding all of performed test as IEC 60502-4. 1, Copyright VEIKI-VNL Lid, 2. This Test Report is a confidential document. Handing it over to a third person is not permitted, 3. The test results relate only to the tested items. 4. The measuring uncertainties do not exceed the values given in the standards referred on page 3. 5. The publication and reprint of this Test Report is allowed only in its entirety without any change of its original language. Its publication in any irregular form needs previous permission of VEIKI-VNL Ltd. Budapest, 28" March 2012 VEIKI-VNL Vitlamos Nagy laboratdriumok KA, 158 Budapest, Vasgoly0 W244, 7? Nawed.....eo- bes n. AWA ah Pegaso Sk 4 srs / Csaba Homok / /Ildik6 Fogarasi / 1 Dr. Laszl6 Varga /, Responsible for the work Supervised by Managing director Numbered sheets: | 23 _ | Tables: 3 | Oscillograms: 17 Figures: 5 | Photos: 15 [Documents: : NE Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL 5/23 page 1.1 Description of the tests according to test sequence D1 ‘Type tests were performed on screened separable connector types DTS1242 and DTB1242 for rated voltage of 20.8/36 (42) kV according to the test sequence DI of the standard HD 629.1 S2. ‘The following test lines were prepared for the tests: Lines 1-4 indoor termination + single-core cable with extruded insulation + DTS1242 Tee connector + DTB1242 Tee connector + single-core cable with extruded insulation + indoor termination The following tests were performed on the samples: ‘Test sequence D1 of HD 629.1 $2 Test clause of Test EN 61442 1. [DC voltage dry (15 min, 6Uy) 2._ [AC voltage dry (5 min, 4.5Uo) 3._| Partial discharge at ambient temperature (max 10 pC at 1.73Uo) 4. [Impulse voltage at elevated temperature 5,_| Heating cycle voltage in air (63 cycles, 2.5Uo) 6. 7 8. rolela)alelen Heating cycle voltage in water (63 cycles, 2.5Us) Disconnection / connection _ Partial discharge at elevated and ambient temperature (max 10 pC at 1.73Uo) 9. |Impulse voltage at ambient temperature voltage dry (15 min, 2.5U0) xamination - Blo) 1.1.1 DC voltage test ‘The DC voltage test was ca ‘out according to the Clause 5 of the EN 61442 standard. T Was cartied out at ambient temperature. A DC voltage of negative polarity was applied for 15 minutes to the samples between conductor and screen. The test voltage was 6Uy=125 kV. No breakdown or flashover on the insulation shall occur. 1.1.2 AC voltage test The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard This test was carried out at ambient temperature. A power frequency voltage was applied for 5 minutes to the samples between conductor and sereen. The test voltage was 4.5Uy=93.5 kV. No breakdown or flashover on the insulation shall occur. 1.1.3 Partial discharge measurement Partial discharge measurement was carried out according to the Clause 7 of the EN 61442 standard. This test was carried out at ambient temperature. The test voltage was raised to a pre-stress value which was identical to the power-frequeney voltage test value of 2Uy~42 kV and it was maintained for | min. Then the voltage was decreased to a test voltage of 1.73U-36 kV. The maximum permissible partial discharge level shall not exceed 10 pC at the specified test voltage. NE Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 6/23 page 1.1.4 Impulse voltage test The impulse voltage test was carried out according to the Clause 6 of the EN 61442 standard. This test was carried out at elevated temperature. This test was performed on the samples at a conductor temperature between 95°C-100°C (5 K to 10 K above the maximum conductor temperature in normal operation). The connectors shall withstand 10 impulses of 1.2/50 ps at test voltage of 200 kVpea on both polarities without breakdown and flashover. 1.1.5 Heating cycle voltage test A preliminary calibration on the test cable was performed to determine the actual conductor temperature during the test according to the Annex A of the EN 61442 standard. The Method 2 was used described in A.3.2 of the EN 61442 standard, ‘The heating cycle voltage test was carried out according to the Clause 9 of the EN 61442 standard The test lines were heated with a current, which flowed through the conductor. The cables were heated until the conductor reached the steady temperature between 95°C-100°C (5 K to 10 K above the maximum conductor temperature in normal operation). The temperatures of cables were ‘measured with thermocouples, which were put to the outer surface of the cables. The test lines were energized with a test voltage of 2.5Ug-52 kV. The duration of heating cycles was 8 hours. The heating and the maintained periods were 5 hours, than these were followed by 3 hours of natural cooling in air. This cycle was carried out 126 times. After the 63" cycle the connectors were tested under water with height of | m above the connector. 1.1.6 Disconnection / connection Each of the four test objects was disconnected and connected altogether five times. 1.1.7. Partial discharge measurement Partial discharge measurement was carried out according to the Clause 7 of the EN 61442 standard. This test was carried out at elevated and ambient temperature. The test voltage was raised to a pre stress value which was identical to the power-frequency voltage test value of 2Uy=42 kV and it was, maintained for | min. Then the voltage was decreased to a test voltage of 1.73U9=36 kV. The maximum permissible partial discharge level shall not exceed 10 pC at the specified test voltage. During the test at elevated temperature the cable conductor was heated and stabilized for 2 h at a temperature of 5 K to 10 K above the maximum cable conductor temperature in normal operation, before and during the partial discharge test. 1.1.8 Impulse voltage test The impulse voltage test was carried out according to the Clause 6 of the E} test was carried out at ambient temperature, The connectors shall withstand 10 impulses of 1.2/50 41s at test voltage of 200 kKVpax on both polarities without breakdown and flashover. 1.1.9 AC voltage test ‘The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard. This test was carried out at ambient temperature. A power frequency voltage was applied for 15 minutes to the samples between conductor and screen. The test voltage was 2.5Us=52 kV. No breakdown or flashover on the insulation shall occur. 61442 standard. This V: VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. Test Report No. 6471 / VNL 7123 page 1.1.10 Examination After the tests the connectors were examined for information only about: any cracking in the filling media and/or tape or tube components; and/or corrosion, tracking, erosion which would, in time, lead to failure; and/or leakage of any insulating material; moisture path bridging a primary seal Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL 8/23 page 1.2 Description of the tests according to test sequence D2 ‘Type tests were performed on screened separable connector type DTS1242 for rated voltage of 20.8/36 (42) kV according to the test sequence D2 of the standard HD 629.1 S2 The following test lines were prepared for the tests: ines 1-3: indoor termination + single-core cable with extruded insulation + DTS1242 Tee connector ‘The following tests were performed on the samples: Test sequence D2 of HD 629.1 S2 Test clause of Test EN 61442 D.C. voltage dry withstand (15 min, 6Uo) a 5 A.C. voltage dry withstand (5 min, 4.5Uo) 4 a Thermal short circuit (sereen) ~ was not performed 10 ‘Thermal short circuit (conductor; 45 kA, 3s) i Dynamic short circuit 12 Disconnection / connection Impulse voltage at ambient temperature AC. voltage dry withstand (15 min, 2.5Us) Examination - 0} 90] afer] |e so] The DTS1242 connectors were assembled to its mating bushing, which were fixed on an oil-tank 1.2.1 DC voltage test ‘The DC voltage test was carried out according to the Clause 5 of the EN 61442 standard. This test was carried out at ambient temperature. A DC voltage of negative polarity was applied for 15 minutes to the samples between conduetor and sereen. The test voltage was 6Uy=125 kV. No breakdown or flashover on the insulation shall occur. 1.2.2 AC voltage test The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard. This test was carried out at ambient temperature. A power frequency voltage was applied for 5 minutes to the samples between conductor and screen. The test voltage was 4.5Up-93.5 kV. No breakdown or flashover on the insulation shall occur. 1.2.3. Thermal short-circuit test (sereen) This test was not performed because the test object is equipped neither with a connection to nor with an adapter for the metal sereen of the cable. 1.2.4 Thermal short-circuit test (conductor) and dynamic short-circuit test The thermal and dynamic short-circuit tests were carried out in three-phase test circuit (See: Figure 4) according to the Clause 11-12 of the EN 61442 standard. The connectors were installed as in normal service condition connecting to an oil tank, however this unit was not filled up with insulating oil. The three-phase short-cireuiting was made by copper bar. Two short-circuits were applied to the test lines. Between the two short-circuits the cable screen cooled to a temperature less than 10 K above its temperature prior to the first short-circuit. ‘The rms. value of the short-circuit current and the duration was calculated by the following formula: NE Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No, 6471 / VNL 9/23 page ; a, 1, (Ose + 2345) Fr =5.11 x 10 x S?x i pases) where 1 is the rum.s. value of the short-circuit current (A) t is the duration (s) s is the conductor cross-sectional area (mm’) ®sc__is the permissible short-circuit conductor temperature (°C) 6, is the temperature at start of test (°C) The calculated short-circuit current for 500 mm? copper cable with a 3 second duration is 52.3 kA. This current level exceeds the 45 kA 3 second rating of the DIS1242 connector system. The short- circuit test was therefore performed per the following parameters: Inms= 45 kA; Tpcak= 100 KAS ‘The single line diagram of the test circuit and the measuring circuit are shown on Figures 4-5. The test arrangement can be seen on Photos 13-15. 3s. The test parameters evaluated from the oscillograms are collected in Table 3. During the tests oscillograms were taken. The currents and phase-voltages were recorded by transient recorder with sampling rate of SO ys. The meanings of the symbols on the enclosed oscillograms are the followin, 7 short-circuit current in phase A (L1) I, short-circuit current in phase B (L2) I short-circuit current in phase C (L3) Uso Phase A voltage (L1) Uno Phase B voltage (L2) Uco Phase C voltage (L3) 1.2.5 Disconnection / connection Each of the three test objects was disconnected and connected altogether five times. 1.2.6 Impulse voltage test The impulse voltage test was carried out according to the Clause 6 of the EN 61442 standard. This test was carried out at ambient temperature. The connectors shall withstand 10 impulses of 1.2/50 ps at test voltage of 200 kVp. on both polarities without breakdown and flashover. 1.2.7 AC voltage test The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard. This test was carried out at ambient temperature. A power frequency voltage was applied for 15 minutes to the samples between conductor and screen. The test voltage was 2.5Up=52 kV. No breakdown or flashover on the insulation shall occur. 1.2.8 Examination After the tests the connectors were examined for information only about: = any cracking in the filling media and/or tape or tube components; = and/or corrosion, tracking, erosion which would, in time, lead to failure: ~ and/or leakage of any insulating material; = moisture path bridging a primary seal Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL Vv 10/23 page 1.3 Description of the special tests Type tests were performed on screened separable connector types DTS1242 and DTB124? for rated voltage of 20.8/36 (42) kV according to test Nos.: 17, 18, 19, 21 of the Table 7 of the standard HD 629.1 S2. The following tests were performed on the samples —|—— po Special tests of HD 629.1 S2 ‘Test clause of Test EN 61442 |__| Screen resistance measurement [Eas 18, | Leakage current measurement 16 19. | Screen fault current initiation test | 7 ~ solidly earthed system ~ unearthed/impedance earthed system ~ 20. | Operating force test — was not performed 18 21. 20 1.3.1, Screen resistance measurement ‘The screen resistance measurement was carried out according to the Clause 15 of the EN 61442 standard, This test was carried out on one-one single connector body. During the test two aluminium. electrodes with a width of 5 mm were fixed to the screen, The screen resistance should be maximum. of 5000 2. ‘The samples were then subjected to the thermal ageing in an air oven at 120°C for 168 hours. The sereen resistance measurement was measured at ambient temperature again as above. 1.3.2, Leakage current measurement ‘The leakage current measurement was carried out according to the Sub-Clause 16 of the EN 61442 standard. The separable connector was installed on a short length of cable and connected to its mating bushing. A metal foil of 50 mm x 50 mm was fixed as far as possible from the earthing point (Figure 9b of EN 61442). A power frequency voltage was applied to the samples between the metal foil and earth. The test voltage was Up=42 kV. The leakage current should be maximum of 0.5 mA. 1.3.3. Sereen fault current initiation test The sereen fault current initiation test was carried out according to the Sub-Clause 17 of the EN 61442 standard. The purpose of this testis, a) in the ease of a solidly earthed system or resistance earthed system, in which the first earth cleared, to demonstrate the ability of the separable connector screen 10 initiate a fault to earth which produces sufficient current to operate the circuit protection, should its insulation fa b) in the case of an unearthed or impedance earthed system, in which the first earth fault is held, to demonstrate the ability of the separable connector screen to initiate and sustain a fault current to earth, should its insulation fail Two test configurations were prepared for the test - DTBI242, - DTB1242+DTS1242 connected together; in this case the test object was the connector type DTS1242 W. Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL 11/23 page Both arrangements were subjected to tests under condition of: = solidly or resistance earthed system and; = unearthed or impedance earthed system. Each test was carried out on new connectors. For the tests the connectors were put on an horizontal insulated platform. During all tests oscillograms were taken. All quantities were registered by transient recorder. On the oscillograms and in the Figures enclosed to the test report the next notations are applied: U_ no-load voltage / are voltage 5 earth fault current 1.3.3.1 Solidly or res ance earthed system ‘The test shall be carried out at ambient temperature. The circuit shall be adjusted to impose the separable connector phase-to-earth voltage Up on the test specimen and a short-circuit current of 10 kA r.m.s. The test specimen shall be subjected to two tests that cause initiation of a fault current are to earth, each operation having a minimum current flow duration of 0.2 s. Between the two tests, the test sample shall be allowed to cool to a temperature less than 10 K above its temperature prior to the first test. Both types screened separable connectors were equipped with flexible copper cables with cross section of 500 mm”. The single line diagram of the test circuit and the measuring circuit is shown on Figure 1, the test arrangement can be seen on Photos 1-6. ‘The test parameters evaluated from the oscillograms are collected in Table 1 1.3.3.2 Unearthed or impedance earthed system The test shall be carried out at ambient temperature. The circuit shall be adjusted to impose the separable connector phase-to-earth voltage Uy on the test specimen and a short-circuit current of at least 10 A. The current for the short-circuit test shall be agreed upon between the manufacturer and the customer, taking into account the actual short-circuit conditions of the network. The test voltage and current shall be recorded continuously during the entire period. The cable connectors were prepared with flexible aluminium cables having 95 r s section. The sequence of the test was as follows a) voltage switched on for | b) voltage switched off for 2 ¢) voltage switched on for 2 min; 4d) voltage switched off for 2 min; €) voltage switched on for 1 min; 1) voltage switched off. ‘The single line diagram of the test circuit and the measuring circuit is shown on Figures 2. The test object prepared for the test is shown on Photos 7-12. m’ cro: ‘The test parameters evaluated from the oscillograms are collected in Table 2. 1.3.4 Operating force test The operating force test was not performed because per EN 61442, Clause 18, the operating force test nly required for screened separable connectors equipped with a sliding contact”. Test Report <** | VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 12/23 page 1.3.5 Test of capacitive test point performance The test of capacitive test point performance was carried out according to the Clause 20 of the EN 61442 standard. A separable connector was installed on a cable and the outer sereen earthed in accordance with the manufacturer's instructions. The separable connector was not connected to its mating bushing The following capacitances were measured at ambient temperature: — Cy: capacitance between the test point and the cable conductor; — Ce: capacitance between the test point and the earth, The capacitance of test point to cable conductor should be C,> 1 pF. The ratio of capacitance of test point to earth C\. and capacitance of test point to cable conductor Cue! Cre/Cre $ 12. WE Test Report <== | VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 13/23 page 1.4 Description of the tests according to Table 10 on cable 95 mm? and 800 mm” ‘Type tests were performed on sereened separable connector types DI'S1242 and DTB1242 for rated voltage of 20.8/36 (42) kV according to Table 10 of the standard HD 629.1 The following test lines were prepared for the tests: Lines 1-2: indoor termination + single-core cable 95 mm? with extruded insulation + DTS1242 Tee connector + DTB1242 Tee connector + single-core cable 95mm’ with extruded insulation + indoor termination Line: indoor termination + single-core cable 800 mm’ with extruded insulation + DTS1242 Tee connector + DTBI242 Tee connector + single-core cable 800mm? with extruded insulation + indoor termination The following tests were performed on the samples: Test according to Table 10 of HD 629.1 S2 ‘Test clause of Test EN 61442 6Us) 5 DC voltage dry (15 mi 2.| AC voltage dry (5 min, 4.5Uy) ieee 3. Partial discharge at ambient temperature (max 10 pC at 1.73Uo) 4.| Impulse voltage at ambient temperature 3. 6. . | Heating cycle voltage in air (10 cycles, 2.5Un) Partial discharge at elevated and ambient temperature (max 10 pC at 1.73U) 7.[ AC voltage dry (15 min, 2.5Us) 8. [Examination - fp] wa folals)a 1.4.1 DC voltage test The DC voltage test was carried out according to the Clause 5 of the EN 61442 standard. This test was carried out at ambient temperature. A DC voltage of negative polarity was applied for 15 minutes to the samples between conductor and screen. The test voltage was 6Uy=125 kV. No breakdown or flashover on the insulation shall occur. 1.4.2 AC voltage test ‘The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard. This test was carried out at ambient temperature. A power frequency voltage was applied for 5 minutes to the samples between conductor and screen. The test voltage was 4.5Up=93.5 kV. No breakdown or flashover on the insulation shall occur. 1.4.3 Partial discharge measurement Partial discharge measurement was carried out according to the Clause 7 of the EN 61442 standard. This test was carried out at ambient temperature. The test voltage was raised to a pre-stress value which was identical to the power-frequency voltage test value of 2U)=42 kV and it was maintained for 1 min, Then the voltage was decreased to a test voltage of 1.73Uy=36 kV. The maximum permissible partial discharge level shall not exceed 10 pC at the specified test voltage WU Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL Vv 14/23 page 1.4.4 Impulse voltage test The impulse voltage test was carried out according to the Clause 6 of the EN 61442 standard. This test was carried out at ambient temperature, The connectors shall withstand 10 impulses of 1.2/50 pis at test voltage of 200 kVpeax on both polarities without breakdown and flashover. 1.4.5 Heating cycle voltage test A preliminary calibration on the test cable was performed to determine the actual conductor temperature during the test according to the Annex A of the EN 61442 standard. The Method 2 was used described in A.3.2 of the EN 61442 standard. The heating cycle voltage test was carried out according to the Clause 9 of the EN 61442 standard. ‘The test lines were heated with a current, which flowed through the conductor. The cables were heated until the conductor reached the steady temperature between 95°C-100°C (5 K to 10 K above the maximum conductor temperature in normal operation). The temperatures of cables were measured with thermocouples, which were put to the outer surface of the cables. The test lines were energized with a test voltage of 2.5Up=52 kV. The duration of heating cycles was 8 hours. The heating and the maintained periods were 5 hours, than these were followed by 3 hours of natural cooling in air. This cycle was carried out 10 times. 1.4.6 Partial discharge measurement Partial discharge measurement was carried out according to the Clause 7 of the EN 61442 standard. This test was carried out at elevated and ambient temperature. The test voltage was raised to a pre- stress value which was identical to the power-frequency voltage test value of 2Up=42 kV and it was maintained for | min, Then the voltage was decreased to a test voltage of 1.73Up=36 kV. The maximum permissible partial discharge level shall not exceed 10 pC at the specified test voltage During the test at elevated temperature the cable conductor was heated and stabilized for 2 h at a temperature of SK to 10 K above the maximum cable conductor temperature in normal operation, before and during the partial discharge test. 1.4.7 AC voltage test The AC voltage test was carried out according to the Sub-Clause 4.1 of the EN 61442 standard. ‘This test was carried out at ambient temperature. A power frequency voltage was applied for 15 minutes to the samples between conductor and screen. The test voltage was 2.5U=52 kV. No breakdown or flashover on the insulation shall occur. 1.4.8 Examination fier the tests the cable accessories were examined for information only about: ~ any cracking in the filling media and/or tape or tube components; = and/or corrosion, tracking, erosion which would, in time, lead to failure; - and/or leakage of any insulating material; - moisture path bridging a primary seal. NE Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL 15/23 page 2.1 Results of the tests according to test sequence D1 2.1.1 DC voltage test During the DC voltage test described in 1.1.1 no breakdown of the insulation occurred. 2.1.2 AC voltage test During the AC voltage test described in 1.1.2 no breakdown of the insulation occurred. 2.1.3. Partial discharge measurement ‘The result of the partial discharge measurement described in 1.1.3: Partial discharge valves [pC] | *Basie disturbance level at same value These values are lower than the maximum permissible value of 10 pC. 2.1.4 Impulse voltage test The connectors withstood 10 impulses of 200 kVjeax on both polarities without breakdown. The typical oscillograms of the test from both polarities are included in the test report. 2.1.5 Heating cycles voltage test During the heating cycles voltage test described in 1.1.5 no breakdown of the insul occurred. 2.1.6 Disconnection / connection Each of the four test objects was disconnected and connected altogether five times. No visible damage was found on the contact. 2.1.7 Partial discharge measurement ‘The result of the partial discharge measurement described in 1.1.7: Partial discharge values at test voltage of 1.73Uo [pC] Measurement at elevated | Measurement at ambient temperature temperature Line 1 10 1.0 Line 2 ost 0.s* Line 3 s+ 0.s* Lines os* ost *Basic disturbance level at same value ‘These values are lower than the maximum permissible value of 10 pC. Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No, 6471 / VNL V 16/23 page 2.1.8 Impulse voltage test ‘The connectors withstood 10 impulses of 200 kVpeak on both polarities without breakdown and flashover. The typical oscillograms of the test from both polarities are included in the test report. 2.1.9 AC voltage test During the AC voltage test described in 1.1.9 no breakdown of the insul: n occurred, According to the test results described in 2.1.1-2.1.9 the screened separable connector types DTS1242 and DTB1242 met the type test requirements of the standard HD 629.1 $2 according to test sequence DI. 2.1.10 Examination Afier the tests the connectors were examined and it could established, that there were not any: = cracking in the filling media and/or tape or tube components; = and/or corrosion, tracking, erosion which would, in time, lead to failure; = and/or leakage of any insulating material; ~ moisture path bridging a primary seal Test Report <2 | VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 17/23 page 2.2 Results of the tests according to test sequence D2 2.2.1 DC voltage test During the DC voltage test described in 1.2.1 no breakdown of the insulation occurred. 2.2.2 AC voltage test During the AC voltage test described in 1.2.2 no breakdown of the insulation occurred. 2.2.3. ‘Thermal short-circuit test (screen) This test was not performed because the test object is equipped neither with a connection to nor with an adapter for the metal screen of the cable 2.24 Thermal short-circuit test (conductor) and dynamic short-circuit tests The circumstances of the thermal and dynamical short-circuit tests can be seen in Table 3. After the tests deformation or failure of any component did not occur. 2.2.5 Disconneetion / connection Each of the three test objects was disconnected and connected altogether damage was found on the contact. e times. No visible 2.2.6 — Impulse voltage test ‘The connectors withstood 10 impulses of 200 kVjcq on both polarities without breakdown. The typical oscillograms of the test from both polarities are included in the test report. 2.2.7 AC voltage test During the AC voltage test described in 1.2.7 no breakdown of the insulation occurred. According to the test results described in 2.2.1-2.2.8 the screened separable connector type DTS1242 met the type test requirements of the standard HD 629.1 S2 according to test sequence D2 2.2.8 Examination ‘After the tests the connectors were examined and it could established, that there were not any = cracking in the filling media and/or tape or tube components: = corrosion, tracking, erosion which would, in time, lead to failure: = leakage of any insulating material; = moisture path. VL Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471/ VNL 18 / 23 page 2.3. Results of the special tests 2.3.1 Screen resistance measurement The measured screen resistances regarding the tests deseribed in 1.3.1: ___ Screen resistance [2] rai Before thermal ageing | _Afier thermal ageing DTS1242 3226 490.1 DTBI242 2655 775.6 | ‘The measured screen resistances were lower than the maximum permissible value of 5000 ©. 2.3.2. Leakage current measurement During the leakage current measurement described in 1.3.2 the measured leakage current was 170A on screened separable connector type DTS1242 and 215A on screened separable connector type DTB1242 at test voltage of Up=42 kV which values were lower than the maximum, permissible value of 0.5 mA. 2.3.3 Screen fault current initiation test ‘The tests were carried out on new screened separable connectors in the order indicated below: muta Name of the test Figures, Photos, | Results of tests Diagrams Sereen fault current initiation test under condition . : : Figure 1; Table 1 1. | of solidly earthed or resistance-earthed systems ces aaa (Configuration: DTS1242) oe 2. Visual examination : Passed Sereen fault current initiation test under condition |p. Sai 3 of solidly earthed or resistance-earthed systems. pe ae Paseal (Configuration: DTS1242+DTB1242) 4 Visual examination : Passed Sereen fault current initiation test under condition |p. 9, Tate: 5. of unearthed or impedance-earthed systems Phabe er Beet (Configuration: DTS1242) a Visual examination 5 Passed Seren fault current initiation test under condition |. 9. ies 7. of unearthed or impedance-earthed systems pies fae nel (Configuration: DTS1242+DTB1242) 8. Visual examination - Passed With the test conditions and the prescribed test sequence of solidly earthed or resistance-earthed systems the sereen of both tested cable connectors were able to initiate and maintain an earth fault with a fault current of ~10.4 kA. During both tests the connections made for the screen were melted, therefore power are developed. With the test conditions and the prescribed operating sequence of unearthed or impedance-earthed systems the screen of both tested cable connector were able to initiate and maintain an earth fault with a fault current of ~10.8 A. 2.3.4 Operating force test Not required. Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 19/23 page 2.3.5 Test of capacitive test point performance 1e measured values regarding the tests described Capacitance of test point [pF] | __Result Ce Ce | Ratio | Drsi242 9.55 9.03 095 DIBI242 9.05. ass | 04 ‘The capacitance of test point to cable conductor was C,> 1 pF on both connectors. The ratio of capacitance of test point to earth Cj. and capacitance of test point to cable conductor was Cyc: Cye/Ce = 0.95 on screened separable connector type DTS1242 and Cyc: Cre/Ce = 0.94 on sereened separable connector type DTB1242 which values were lower than the maximum permissible value of 12. According to the test results described in 2,3.1-2.3.5 the screened separable connector types DTS1242 and DTB1242 met the type test requirements according to tests Nos.: 17, 18, 19, 21 of Table 7 of the standard HD 629.1 82. NL Test Report ae VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL. 20/23 page 2.4. Results of the tests according to Table 10 on cable 95 mm? and 800 mm? 2.4.1 DC voltage test During the DC voltage test described in 1.4.1 no breakdown of the insulation oceurred. 2.4.2 AC voltage test During the AC voltage test described in 1.4.2 no breakdown of the insulation occurred. 24,3. Partial discharge measurement The result of the partial discharge measurement described in 1.4.3: Partial discharge values [pC] at test voltage of 1.73U9 Line 1, 9Sm1 0.5* Line 2, 95mm 0.5* Line 1, 800mm? _| 0.5* Bese Line 2, 800mr 0.5* *Basic disturbance level at same value These values are lower than the maximum permissible value of 10 pC. 2.4.4 Impulse voltage test The cable accessories withstood 10 impulses of 200 kV>cak on each polarity without breakdown. The typical oscillograms of the test from each polarity are included in the test report. 2.4.5 Heating cycles voltage test During the heating eycles voltage test described in 1.4.5 no breakdown of the insulation occurred. 2.4.6 Partial discharge measurement The result of the partial discharge measurement described in 1.4.6: Partial discharge values at test voltage of 1.73Up I ___ [pC] Measurement at elevated | Measurement at ambient : temperature temperature Line 1, 95mm? 0.5* o.s* Line 2, 95mm? _| 0.s* 0.5* sal Line 1, 800mm’ ___.05* ost Line 2, 800m see se ae *Basic disturbance level at same value ‘These values are lower than the maximum permissible value of 10 pC. 2.4.7 AC voltage test During the AC voltage test described in 1.4.7 no breakdown of the insulation occurred. According to the test results described in 2.4.1-2.4.7 the screened separable connector types DTS1242 and DTB1242 met the type test requirements of the referred standard according to Table 10. Test Report No. 6471 / VNL 21/23 page 2. 8 Examination Afier the tests the connectors were examined and it could established, that there were not any cracking in the filling media and/or tape or tube components; and/or corrosion, tracking, erosion which would, in time, lead to failure; and/or leakage of any insulating material; moisture path bridging a primary seal Vu VE) Veri1.vNL ELECTRIC LARGE LABORATORIES LID, Test Report No. 6471 / VNL- 22/23 page 3. Uncertainty of the measurements Uncertainty of the d.c. voltage measurement: £1.00% Uncertainty of the conductivity of water: £1.00% Uncertainty of the temperature measurement during heating ¢ ts +1°C Uncertainty of the current measurement during heating cycle test: 40.50% Uncertainty of the impulse voltage measurement: 40.50 Uncertainty of the power frequency measurement: +1.00% Uncertainty of the partial discharge measurement: £1pC Uncertainty of the Voltage measurement during short-circuit tests +£0.30 % Uncertainty of the Rogowski during short-circuit tests: 40.20% Uncertainty of the voltage measurement during screen fault current initiation test: 40.57% Uncertainty of the current measurement during sereen fault current 40.57% Uncertainty of the resistance measuremen +£0.10% £0.10% Uncertainty of the capacitance measurement: The uncertainty values given in this report are the standard deviation values multiplied by k=2 Measurement uncertainties were estimated according to the method described in the document. 4/02 Electronics Ltd Test Report ECTRIC LARGE LABORATORIES LTD. | No. 6471/ VNL 23/23 page Measuring devices used for the tests: No. Designation Manufacturer Type Serial number u Impulse generator MICAFIL SH 11-24 B1698 21 Divider VEIKI TA o1 a) oe eee Dr. Strauss TR-AS 100-10 350 {4]| Transformer (1500 kV) TUR PEO 500/500 ABI 860115 [5] Voltage divider TUR MCF 40/600 881066 [6] Termination TUR WMUTS/H6 851459 (7) Meter TUR WMUTS 894966 [8] Transformer (700kV) TUR PEO 1 350/350A/K | 851181 851182 0) Divider TUR KDIS 350/04 32863/1 32863/2 fo} Termination TUR Ho 852520 oy Meter SIEMENS MU-1S 880019 (12) Coupling capacitor MICAFIL TEPI-P800 77734 (13]| Partial discharge measuring TETTEX 9124 OX 133528 (4) Data Logger FLUKE 2286 613994 (15) PSO 9001 ECKELMANN PSO 9001 1294-3015 2010-RC- i au re | 001/2010-1U-001/1 (16) Rogowski 3D-Motion Control | NM Ry 2010-RC- A,B,C Mémokiroda Kit. . 002/2010-1U-001/2 Converter ZOD RS 003/2010-IU-001/3 uw Rog 3D Motion Control. | DCM-RI Rogowski | 2010-RC-002 1] (Rogowski measuring system) | Mémikiroda KA. | Coil DCM-RI 2010-1U-002 [18] VD/A,B.C _1kV/100V VEIKI RCR (19}| VD 42 kV (100 V VEIKI RCR 7 [20] PSO 9070LS ECKELMANN PSO 9070LS (0400001-0400016 pt LCR Meter Wameken 134310 0846106 aus) Test Report No. 6471 / VNL VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. swiois4s poy aaut (VAI 005x2) stamuoysuen sauod asuyd-opzurs Joprooes yusISUeI, S0L06 OSd 410 payjuea ‘|ptjos Jo uonspuod sopun ysa1 + $10L06 Osa = doy - aA | una (iL 0S) AX 077 VE WE | vec-vNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL Test Report S203 FO, F2, F3 TS Rog ep kv soHz ) QV ( } se03 K) Fo ka Tel 1206 vp u Test objet regulating transformer Trl, Tr4- transformers reactors VD - voltage dividers making switch K4 - protective circuit-breaker Rogowski current measuring system Figure 2 ‘The connection diagram of the screen fault current initiation tests under condition of unearthed or impedance earthed system Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL ‘Test arrangement PSO 9001 | ‘Transient recorder seen ag ee N= 50 Hz power network VD - voltage dividers [19] MS - making switch PSO.9001 - transient recorder [15] Rog - Rogowski current measuring system [17] Figure 3 The measuring circuit of the sereen fault current initiation tests under cons unearthed or impedance earthed system Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL 120 kV Sot ( PA S03 ro ka Tet 1201105 bv 15 > =e Y a | 7 fe Ri ty So) 43 s0s204v 7p ) vb Rogowski 2 Us, Uw, Us l Test object S203. - regulating transformer Trl, TiS - transformers FO,F2,F3 reactors VD (Uso, Uso, Uso) voltage dividers TS = making switch K4 - protective cireuit-breaker Rogowski (I, 1.) - Rogowski current measuring system Figure 4 Test circuit for dynamic and thermal short-circuit test Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL ‘Test arrangement RogowskvA feos ame J | L | > | ene: ; t +—(N)—-— To — t | WY LJ z lym | oe = | | l Rogonntie \ | J a voc |_ ul MS: Cue a PSO 9001 Transient recorder N = SOHzpowernetwork VD/A:B;C - voltage dividers [18] MS - making switch PSO 9001 - transient recorder [15] Rogowski /A:B;C - Rogowski current measuring system [16] Figure 5 ‘The measuring circuit of the dynamic and thermal short-circuit tests Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL Screen fault current initiation tests on sereened separable connectors under condition or solidly earthed or resistance-earthed systems No-load RMSS. value of the | Duration of Oscillogram voltage / A.C. component the Remarks No. are voltage of the current short-circuit [kV] [kA [ms] BCL 1101 20.79 - - a BCL 1103 - 10.43 219 e@ BCL 1104 211 10.05 209 G6 BCL 1105 2.35 10.91 210 a6 Remarks: (1 No-load voltage of the test cireui (2 Prospective current of the test circuit Screened separable connector (type: DTS 1242): (3 At the beginning of the test the temperature of the cable connector was 5.2 °C; the connecting wire of the sereen melted during the test and power arc developed, Screened separable connectors (type: DTS1242 + DTB1242): (4 At the beginning of the test the temperature of the cable connector was 5.9 °C: the connecting wire of the screen melted during the test and power are developed (5 The tested cable connectors were able to initiate and maintain the earth fault current Table 1 Parameters evaluated from the oscillograms taken during the screen fault current initiation tests Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL Screen fault current initiation tests on screened separable connectors under condition or unearthed or impedance earthed systems No-load RMSS. value of the | Duration of Oscillogram voltage / A.C, component the current Remarks No. are voltage of the current flow [kv] [A] [s] BCL 1402 20.81 : : a BCL 1502 : 10.73 0.21 Q BCL 1503 3.29 10.11 1.01 G30 BCL 1504 3.27 10.57 120.69 4:0 BCL 1505 0.38 1131 60.33 630 BCL 1506 3.10 10.41 1.10 6:9 BCL 1507 3.06 11.10 120.11 730 BCL 1508 041 141 60.17 830 Remarks: 1. No-load voltage of the test circuit 2. Prospective current of the test circuit Screened separable connector (type: DTS 1242): 3. Ci, operation from the prescribed Ci, — Comin = Ozmin = Cimin Operating 4. Comin operation from the prescribed C1, — Onmin = Comin ~ O2min ~ Cimin operating cycle 5. Cimin operation from the prescribed C), ~ Ozmia ~ Canin ~ Oanin ~ Cinin operating cycle Screened separable connectors (type: DTS1242 + DTB1242): 6. Ci, operation from the prescribed C}, ~ Ozmin = Canin = Ozmin = Cimin operating cycle 7. Comin operation from the prescribed Cis — Osmin - Comin = O2min ~ Cimin Operating cycle 8. Cinin operation from the prescribed Cs ~ Osnin ~ Comin - Oamin ~ Cimin OPerating cycle 9. The tested cable connectors were able to initiate and maintain the earth fault current Table 2 Parameters evaluated from the oscillograms taken during the screen fault current initiation tests Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL. Thermal and dynamic short-circuit tes on screened separable connector type DT'S1242 RMS. value of Highest peak value, the A.C. Duration of Oscillogram | of the short-circuit component of the short- Reme No current the short-circuit ci current : [kA] [kA] [s] iIkA’s} [ou [eee e - Tac |dy ode BCL 1512 | 109.3) 77.3 |83.7)44.1|48.6/44.8} 0.31 * a BCL 1514 | 105.3/ 93.5 |79.9|43.3]46.6|43.7) 0.21 ‘ @ BCL 1513 | 100.6] 68.9 |97.1|43.9[47.4/44.4] 3.02 | S881 | 6804 | so, G Remarks: (1 Prospective short-circuit-current (2 Dynamic short-circuit test (3 Thermal short-circuit test After the tests no deformations or failure could be observed. Table 3 Parameters evaluated from the oscillograms taken during the thermal and dynami short-circuit tests CTRIC LARGE LABORATORIES LTD. YL VEIKI-VNL Test Report No. 6471 / VNI Photos 1-2 The connector type DTS1242 prepared for the test sereen fault current under condition of solidly earthed systems. Test Report CTRIC LARGE LABORATORIES LTD. | No, 6471 / VNL. VEIKI-VNL ELE Photo 3 The condition of cable connector type DTS1242 after the screen fault current initiation test under condition of solidly earthed systems Test Report VEIKI-VNI ‘TRIC LARGE LABORATORIES LTD. | No. 6471 / VNI Photos 4-5 The test configuration of cable connector type DTS1242 and DTB1242 prepared for the screen fault current initiation test under condition of solidly earthed systems Test Report No. 6471 / VNL Photo 6 ‘The condition of the cable connectors type DTS1242 and DTB1242 after the screen fault current initiation tests under condition of solidly earthed systems Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL Photos 7-8 The connector type DTS1242 prepared for the test screen fault current initi under condition of unearthed or impedance earthed systems ‘Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No, 6471 / VNL. Photo 9 The condition of cable connector type DTS1242 after the screen fault current initiation test under condition of unearthed systems Vez VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. Test Report No. 6471 / VNL Photos 10-11 ‘The test configuration of cable connector type DTS1242 and DTB1242 prepared for the screen fault current initiation test under condition of unearthed systems. ME ‘Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL- Photo 12 The condition of the cable connectors type DTS1242 and DTB1242 after the sereen fault current initiation tests under condition of unearthed systems Test Report Ye VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. | No. 6471 / VNL Photo 13 ‘The test set up prepared for the dynamical and thermal short-circuit tests Photo 14 The connection of the test configuration to the test circuit Test Report VEIKI-VNL ELECTRIC LARGE LABORATORIES LTD. No. 6471 / VNL Photo 15 The method of the short-circuiting used for the dynamic and thermal short-circuit tests sou 00 soe toot ° steve =u) sai a) “ro 829 ne66- dq A tena i) ANA bg 22M estonia OLLOe ON DSO; MS a ie DISA ow ANA L299 2 colL 108 "0N'280 ZAI ssedepng—ARONDH AA s eee AAA VVVVVVVV VV V 50 0g sie ajduies ANA/ Lep9 EY “gunn vOLL TO "ON'280 FA/S Jeedeong- AaIvONTE UU | WV TT ; ee fh AAAS AN wanes ue ssedepna - alvONTI MAIN ANA THY : Popa pipe LAPP sou 108 "ON a0 s bp0z "44 "bb ea ‘80 05 ied e\dues ANA/1Lp9 sae eee Zor og 0N280 FA/s ee UNA DIA 0 05 ANA/ bLP9 zosL 10g "ON'280 FAs sw ools ozs our cozy ooue ooze AAAAAAAAAAAAAAAL |. Oey ry AANAAAR I\ : A VVVVVV AARAATY if “L402 “LL st sate Sh og ae aawes INA / bZ9 aM urns, £0} 198 PON'9SO rN rece WAR sw oor o'0ve:-—='00z1— ULL oar 008 008 oon 0009 o'00s oor oe oooz os by0z "bb st 210 INA/ L2b9 = I vost 10g “ON'980 FA soit $601 S68 mM NA/ bLp9 = IW sos. 10a ON2S0 FA ses mM o isadepng - ANVONTH ANA | L299 gost tog oN'2s0 FA PH INADA a ee os oor =e UO ie INA / L209 = 20s. 10g -0N°s0 Ff seu sot sea S69 ss a see sez se. a a ANA LZp9 \ g0sL IO ON2SO Ff scm su stestst) us SzS Sly Ste Sueteete : : : k : 2 8 E v 0 sph

You might also like