KEBUTUHAN MATERIAL U RENCANA POTONG HUTM

NAMA MATERIAL JML SATUAN


Tiang Beton 12 meter 2 batang
AAAC 150 mm2 105 meter 18 12
19 12
17 12 C5 X1
Konstruksi JTM C4 2 set C7 X1 Lat
16 12 C1 X1 20 12 .S EX 12
A
irur
SKTM 3x150 80 meter C1 X1 C5 X4 ar
15 12 =1 C5
21 12 ,82
C1-1 X1 km 24 12
14 12 C2 s
C1 X1 C1
13 12
22 12
12 12 C1 X1
C5
C5 X1 23 12
11 12
C1
10 12 C1 X1

A
9 12 C2 X1 EXISTING HUTM A3C 3X150 mm2
C1 X1
8 12
C5 X1
7 12 EXISTING HUTM A3C 3X150 mm2 KONVEYOR TPL
C5

6 12
C1 EXISTING SKTM 3x150 mm2
RENCANA PENARIKAN HUTM ( KONTAK PHASA S ) EXISTING SKTM 3x150 mm2
A3C 3x150 mm2 = 35 METER
5 12
C1 A 30 12
C4 31 12
32 12 33 12
25 12 28 12 29 12 C1
C1 C5
C1 26 12 C2 C4
4 12 27 12
C2
C1 C2 80
1 12 RENCANA PENGGANTIAN
02

3 12
.
PO

C7 SKTM KONTAK 2 Trafo Distribusi 1 Ø


C1 GH TPL
02

25 + 50 kVA
.
PO

35

A
DISCONNECTING
2 12 SWITCH (DS)
1 12 C5 EXISTING HUTM A3C 3X150 mm2 EXISTING HUTM A3C 3X150 mm2
01
PO.
C4
EXISTING HUTM A3C 3X35 mm2
RISE
RISE
POLE
POLE
PO.01
PO.02
Keterangan :
FASA R & T AKTIF / FASA S TIDAK AKTIF
RENCANA RENCANA
PENGGANTIAN PENGGANTIAN : Trafo Distribusi 3 Ø

TIANG HUTM 9 MTR TIANG HUTM KAYU : Renc. Trafo Distribusi

MENJADI 12 MTR MENJADI BETON : HUTM


PT PLN ( PERSERO )
: HUTR UIW SUMATERA UTARA
: Renc. HUTM PLN UP3 SIBOLGA ULP PORSEA
: Renc. HUTR
Gambar Rencana Perbaikan HUTM untuk Penyulang Cadangan Pelanggan Premium PT Toba Pulp Lestari (TPL)
X : Renc. Tiang
di Jal;an Sigura-gura, Kab. Toba Samosir
: Tiang Besi

: Tiang Kayu SKALA : NTS PARAF TGL KOORDINAT


: Luqman Hakim GBR.NO:
--
: Tiang Beton DISURVEY
A : No. Urut Tiang DIGAMBAR : Luqman Hakim
A B B : Panjang Tiang
C D C : Konstruksi HUTM DIPERIKSA : Luqman Hakim
D : Konstruksi HUTR
DISETUJUI : Dedi Sukma LEMBAR 1/1