This document summarizes the delivery of reinforcing steel bars by Toyo Construction Co., Ltd. for a flood control project in the Philippines. It details the diameter, weight, length, quantity, and mill certificate information for bars delivered on January 5, 2020. A total of 127,821.72 kg of reinforcing steel bars across 7 diameters were delivered in 14 tension and bending test sample sets.
This document summarizes the delivery of reinforcing steel bars by Toyo Construction Co., Ltd. for a flood control project in the Philippines. It details the diameter, weight, length, quantity, and mill certificate information for bars delivered on January 5, 2020. A total of 127,821.72 kg of reinforcing steel bars across 7 diameters were delivered in 14 tension and bending test sample sets.
This document summarizes the delivery of reinforcing steel bars by Toyo Construction Co., Ltd. for a flood control project in the Philippines. It details the diameter, weight, length, quantity, and mill certificate information for bars delivered on January 5, 2020. A total of 127,821.72 kg of reinforcing steel bars across 7 diameters were delivered in 14 tension and bending test sample sets.
UNIFIED PROJECT MANAGEMENT OFFICE - FLOOD CONTROL MANAGEMENT CLUSTER 18Z00028 - FLOOD CONTROL PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR) CONCTRACT PACKAGE NO. 2 (CONSOLACION)
TOYO CONSTRUCTION CO., LTD.
REINFORCED STEEL BAR DELIVERY - JANUARY 05, 2020
NO. OF SAMPLES NO. DIAMETER LINEAR WEIGHT LENGTH QUANTITY WEIGHT WEIGHT PER DIA. (Tension & Bending) 1 10 0.617 10.5 1000 6,478.50 16,473.90 2 sets 2 10 0.617 12 1350 9,995.40 3 12 0.888 10.5 550 5,128.20 23,776.20 3 sets 4 12 0.888 12 1750 18,648.00 5 16 1.578 10.5 1200 19,882.80 38,818.80 4 sets 6 16 1.578 12 1000 18,936.00 7 20 2.466 9 1750 38,839.50 48,752.82 5 sets 8 20 2.466 12 335 9,913.32 TOTAL WEIGHT 127,821.72 REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS UNIFIED PROJECT MANAGEMENT OFFICE - FLOOD CONTROL MANAGEMENT CLUSTER 18Z00028 - FLOOD CONTROL PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR) CONCTRACT PACKAGE NO. 2 (CONSOLACION)
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS UNIFIED PROJECT MANAGEMENT OFFICE - FLOOD CONTROL MANAGEMENT CLUSTER 18Z00028 - FLOOD CONTROL PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR) CONCTRACT PACKAGE NO. 2 (CONSOLACION)
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS UNIFIED PROJECT MANAGEMENT OFFICE - FLOOD CONTROL MANAGEMENT CLUSTER 18Z00028 - FLOOD CONTROL PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR) CONCTRACT PACKAGE NO. 2 (CONSOLACION)