Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

SL667_STAROSA2 

TRIPOD 270KPH_D 

TOWER RETROFITTING SCHEME 

Figure 1: Overview of retrofitting works 

PACIFICTECH SOLUTION 
SL667_STAROSA2 
TRIPOD 270KPH_D 

PROVIDE 4" Ø PIPE SCH. 40


FOR NEW VERTICAL MEMBER

Figure 2: New tower leg retrofitting 

PROVIDE 3" Ø PIPE SCH. 40


FOR NEW HORIZONTAL BRACINGS.
USE 1 - 16MM DIA. BOLT CONNECTION.

Figure 3: New tower horizontal retrofitting  

PACIFICTECH SOLUTION 
SL667_STAROSA2 
TRIPOD 270KPH_D 

PROVIDE 3" Ø PIPE SCH. 40


FOR NEW DIAGONAL BRACINGS. USE 1 - 16MM DIA.
BOLT DOUBLE SHEAR CONNECTION.

Figure 4: New Tower diagonal retrofitting (sides) 

PROVIDE 2" Ø PIPE SCH. 40


FOR NEW DIAGONAL BRACINGS.
USE 1 - 16MM DIA. BOLT CONNECTION.

Figure 5: New Tower diagonal retrofitting (face) 

PACIFICTECH SOLUTION 
SL667_STAROSA2 
TRIPOD 270KPH_D 

DETAILS:
1. PROVIDE 450X450X200MM CONCRETE PEDESTAL
2. PROVIDE 300 Ø X 10MM THK BASE-PLATE
3. PROVIDE 4 - 16MM Ø DEFORMED BAR WITH HILTI HIT-RE 500 ADHESIVE
4. PROVIDE 150MM EFFECTIVE ANCHORAGE DEPTH.
5. BOLT HOLE = 20MM

Figure 6: Anchorage system 

PACIFICTECH SOLUTION 

You might also like