Activity Name

Earth work
Excavation&clening
Backfilling
Totla
Footing
Formwork
reinforcement
Blinding
concret
Totla
column neck
formwork
reinforcement
concret
Totla
Tie beam
formwork
reinforcement
concret
Totla
foundation backfilling
Totla
ground slab
formwork
reinforcement
concret
Totla
column
formwork
reinforcement
concret
Totla
external wall

blocks and concrete


Totla
slab
formwork
reinforcement
concret
Totla
internal walls
walls
Totla
primary electrical
Total
primary mechanical
Total
Door(farms)
Total
plastering
All Area
Total
Tiling
All Area
Total
windows and door
Total
painting
All Area
Total
Furniture
Total
electrical (finishing)
Total
mechanical (finishing)
Total
Aluminum
Total
cleaning
Total
Activity predecessor
Earth work
Footing Earth work
column neck Footing
Tie beam column neck
foundation backfilling Tie beam
ground slab foundation backfilling
column ground slab
external wall column
slab external wall
internal walls slab and remove formwork
primary mechanical internal walls
primary electrical internal walls
Door(farms) internal walls
primary mechanical
plastering &electrical
Tiling plastering
windows and door Tiling
painting plastering
electrical (finishing) plastering
mechanical (finishing) plastering
Aluminum plastering
cleaning