February 08, 2020

SAFETY MESSAGE OF THE DAY:


-

Safety Statistics Audit Observations

INCIDENTS OBSERVATIONS (TA to date)


112
HSE Dpt.
First-Aid Case Unsafe Act 231 Unsafe Condition 145 Observations

VESSEL ENTRIES ON VESSEL ENTRIES TILL MSA


Medical Treatment case (Feb 07, 2020) (Feb 07, 2020)
Observations

462
Restricted work case 25 102
TILL TILL
Lost Time Accident AREA Feb 07 NOW AREA Feb 07 NOW
Audits/ Feb 07 TILL

Fatality A-100 A-500


No of MSA Audits 14 55
Near Miss/ Incidents A-200 A-600

Accident A-300 DHDS MSA Observations 25 112

Fire A-400 U&OM


SAFETY OBSERVATIONS REPORTED HSE Dpt. Observations 57 462

Work at Height:
Fall from Height:

14 17 Work under suspended load:


20 4 1
7 20 20 Traffic Incidents/violations:

33 Work Permit Violation:


- 5
40 Use of Non-Standard Tools:
-
36 Non-Compliance of PPEs:
Behavior issue:
Procedure Violation:
141 8 Fire potential:
Slip/ Trip/ Fall:
-
Mis-operation:
Electrical Hazard:
Miscellaneous:

1. INCIDENTS:

-
-
-
-
-
TA-04
Day-08
February 08, 2020

2. UNSAFE ACTS: 3. UNSAFE CONDITIONS:


1. In A-400, During Bundle Pulling of 300-E2A, area below lifted
bundle extractor not barricaded and movement of worker
1. During Confined Space entry in 130-V1, worker not wearing chin
observed while showering of water in progress.
strap with helmet in A-200.
2. Scaffolding issue observed near 200-V1, platform planks not
2. Hot job of cutting, welding and grinding job on spool piece near
properly tied and cross bracing missing while green tag at-
300-H1 was in progress while new Hot job work permit was not
tached.(No Inspection date and inspector name mentioned on
issued.
the tag.
3. Lifting of spool piece through crane was in progress. While two
3. During material Shifting by crane, outriggers not fully extend-
workers were performing Scaffolding job on 200-E3 which was
ed, guiding rope not tied to spool piece near 100-V1.
under the boom of the crane. Area was also not barricaded.
4. Scaffolding at east side of cooling tower was in progress, dam-
4. Cutting welding and grinding job was in progress on process line
aged/ corroded planks and tubes were being used
of 200-V2, in A-400. Near by drains were not covered properly.
5. Excavation 6ft deep at east side of cooling tower was in pro-
5. Compressor was being used for supplying air for ventilation at
west side of A-500 near 802-V53 while near by drains were not gress, edge was of excavation was not protected
covered. 6. Poor housekeeping conditions were observed on top platform
6. Drums were overfilled in area also waste segregation not of CDU:
properly done hazardous waste present in green drum 7. Glass wool insulation was present. Loose scaffolding pipes and
7. Road was closed without road closure permit. DEL supervisor couplers were present.
Hammad having road closure permit without authorized by HSE 8. Air Hose pipes present in front of top man-way of 200-V03
and without giving intimation to fire department (HSE). causing access block and tripping hazard in A-400.
8. During welding of stack spool, heavy spatters were coming out. 9. Confined space entry in Stripper Column was stopped while
Fire blankets were not provided properly to cover the area near during no entry in confined no sign post or barrication tape
110-H1. placed at manhole.
9. De-bolting of Gate valves was being carried out. Helper Mohsin 10. Welding job was in progress on naphtha line. Canopy was not
was found in front of hammer near 100-P6B. properly arranged due to which heavy spatters were coming
out. No proper excess was arrange to approach 10 ft. height.
10.Two workers found on working on uncertified scaffold in A-300
Welder Altaf was not safety oriented near 100-E1B.
(recycle scrubber knockout drum).
11.Rigger Akmal found on height without hooked up with harness
near 200-PV151.

4. MAJOR CONCERNS:
1. Oxy-acetylene cutting job was being performed while OSHA
recommended protection of eyes" Filter Lenses for Protection
Against Radiant Energy" not carried out by performer ( 29
CFR 1910.133(a)(5))
2. No fire watcher was deputed for welding and grinding job.
Also workers were using iron hammer in Main corridors of A-
500.
3. Canopies were not proper at different locations ( 110-H1,
411-E12, DHDS main corridor TP-12, 100-E1B).