Summer Action plan and amount required to mitigate drinking water supply in the year 2020-21 (July 2020 to

March 2021) Rs. In Lakhs


Wheth
er
water Amount
Amount Amount
will be Required Amount
Sustainabi Required Required
Population as on suffici for Required for
S No. Name of the ULB Source lity for flushing for Repairs Total Remarks
2020 ent till transport Repairs to
(days) of to Pumps
July ation of Pipe lines
borewells and Motors
2020 water
(Yes/N
o)

1 2 3 4 5 6 7 8 9 10 11 12
As on today (13-04-2020) very
meagre inflow is available in
Godavari canal that is insufficient to
run 2 no 150 HP motors
continuously to draw water from
godavari canal to malkapuram
summer storage tank of full
Godav capacity 3000 M.L Also there is no
285176 sufficient flow available in krishna
Eluru ari,
( including canal to feed 680 ML full capacity of
Municipal Krishn
1 merged 7 55 No 10.00 5.00 15.00 20.00 50.00 3 no old S.S tanks in the head water
corporation a
panchyat works compound.Eluru is at tail
. Canal end point for both Godavari and
population)
water ekrishna canal.canal closure of
godavari is going to take place on
20-04-2020, from both the above
sources stainability for 55 days after
canalclosure date is on 20-04-2020.
Wheth
er
water Amount
Amount Amount
will be Required Amount
Sustainabi Required Required
Population as on suffici for Required for
S No. Name of the ULB Source lity for flushing for Repairs Total Remarks
2020 ent till transport Repairs to
(days) of to Pumps
July ation of Pipe lines
borewells and Motors
2020 water
(Yes/N
o)

1 2 3 4 5 6 7 8 9 10 11 12