2 BS 4870 Specification for Automatic Fusion Welding of
Materials, Including Welding Operator Approval 4.6.3.3 BS 4871 Specification for Approval Testing of Welders Working to Approved Welding Procedures 4.6.3.4 BS 3019 TIG Welding 4.6.3.5 BS 3571 MIG Welding 4.6.3.6 BSEN 287 Approval testing of Welders for fusion welding 4.6.3.7 BS 7475 Specification for fusion welding of Austenitic stainless steel 4.7 Sample Installations: Construct sample installations of the final exterior wall assemblies. 4.7.1 General: Sample installations will be used as a standard for judging acceptability of work for the Project. Replace unsatisfactory work as directed. Maintain sample installations during construction as a standard for judging acceptability of the exterior wall work. Properly finished, maintained, and performing sample installations shall be retained as a portion of the completed work. 4.7.2 Size: Provide one (1) full sized sample installations for the exterior curtain wall assembly and a typical window wall erected to the unit mental cladding. Sample installation shall be a minimum of one bay in width and one bay in height. Sample installations shall be built on site complete with all glass, aluminum framing, adjacent cladding materials, anchors, connections, flashings, sealants, and joint fillers as accepted on the final shop drawings. Do not take special precautions or use techniques that do not represent those to be used on the work. Do not enclose the interior side of the wall with interior finishes and insulation materials 4.8 Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Prior to the start of the curtain wall work, and at the Contractor's direction, meet at the site and review the construction schedule, availability of materials, installers personnel qualifications, equipment and facilities needed to make progress and avoid delays, installation procedures, testing, inspecting, and certification procedures, and coordination with other work. Meeting shall include Contractor, Owner, curtain wall installer, sealant installer, as well as any other subcontractors or material technical service representatives whose work, or products, must be coordinated with the curtain wall work.
Mkomagi Et Al 2023. Relationship-Between-Project-Benefits-And-Sustainability-Of-Activities-A-Comparative-Analysis-Of-Selected-Donor-Funded-Agriculture-Related-Projects-In-Tanzania