4.6.3.

2 BS 4870 Specification for Automatic Fusion Welding of


Materials, Including Welding Operator Approval
4.6.3.3 BS 4871 Specification for Approval Testing of Welders Working
to Approved Welding Procedures
4.6.3.4 BS 3019 TIG Welding
4.6.3.5 BS 3571 MIG Welding
4.6.3.6 BSEN 287 Approval testing of Welders for fusion welding
4.6.3.7 BS 7475 Specification for fusion welding of Austenitic stainless
steel
4.7 Sample Installations: Construct sample installations of the final exterior wall
assemblies.
4.7.1 General: Sample installations will be used as a standard for judging
acceptability of work for the Project. Replace unsatisfactory work as
directed. Maintain sample installations during construction as a
standard for judging acceptability of the exterior wall work. Properly
finished, maintained, and performing sample installations shall be
retained as a portion of the completed work.
4.7.2 Size: Provide one (1) full sized sample installations for the exterior
curtain wall assembly and a typical window wall erected to the unit
mental cladding. Sample installation shall be a minimum of one bay in
width and one bay in height. Sample installations shall be built on site
complete with all glass, aluminum framing, adjacent cladding
materials, anchors, connections, flashings, sealants, and joint fillers as
accepted on the final shop drawings. Do not take special precautions or
use techniques that do not represent those to be used on the work. Do
not enclose the interior side of the wall with interior finishes and
insulation materials
4.8 Preinstallation Conference: Conduct conference at Project site to comply
with requirements in Division 1 Section "Project Management and
Coordination." Prior to the start of the curtain wall work, and at the
Contractor's direction, meet at the site and review the construction schedule,
availability of materials, installers personnel qualifications, equipment and
facilities needed to make progress and avoid delays, installation procedures,
testing, inspecting, and certification procedures, and coordination with other
work. Meeting shall include Contractor, Owner, curtain wall installer, sealant
installer, as well as any other subcontractors or material technical service
representatives whose work, or products, must be coordinated with the
curtain wall work.