Professional Documents
Culture Documents
BCT504 CLO2 Video Recording 30% Covid19
BCT504 CLO2 Video Recording 30% Covid19
UNIVERSITI TECHNOLOGY OF MARA, FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING, BUILDING DEPARTMENT
PROGRAMME/CODE BACHELOR OF SCIENCE (Hons) CONSTRUCTION TECHNOLOGY / AP256
COURSE TITLE INDUSTRIALISED BUILDING SYSTEM
SEMESTER (Group) 3 (AAP2563A)
COURSE CODE BCT504
CREDIT/CONTACT 4 / 2L 2M 1T
Course description
This course introduces application of IBS towards our construction industry. Starting with introduction and basic concept of IBS, advantages
and disadvantages towards construction. It also outlines five main types of IBS, method of installations and implementation of IBS with
Modular Coordination.
Display the
assembling
Students required to
skills related to display the skills related
through video recording to
construction assembling IBS component.
2 process of 2/2 P4
Virtual
Simulation 30% Marks will be given on
virtual simulation lab report
and students’ skill by video
IBS wall panel in recording to emphasize the
industry.
MQF2 LOD2 / P4
CLO2 Display the assembling skills related to construction process of IBS wall panel in
Construction industry.
Students required to display the skills related through video recording to assembling IBS
component. Marks will be given on virtual simulation lab report and students’ skill
(practical test) by video recording to emphasize the attribute of ‘practical skill’.
Every students must do their own task individually. This project must be submitted at week 13 rd.
1|Page
[BCT504: INDUSTRIALISED BUILDING SYSTEM]
Format
1. Preparation of materials.
2. How to construct a precast wall panel, SOP of cube test, and showing the results –
satisfactory/fail)
2|Page
[BCT504: INDUSTRIALISED BUILDING SYSTEM]
7.
An excellent and Good and active A quite active A fair active team A passive team
Team Work active team player. team member. team member. member . member.
[ /10]
(5%) X 10
8. Student is able Student is able to
Student is able to Student is able to Student is not able
to carry out field carry out field
Time perform field work perform field work
work within work with
to carry out field [ /10]
Management within time given within time given work within time
(5%) accurately. moderately.
time given additional time
given satisfactorily. X5
moderately. given.
Total Marks
3|Page