iv RADESH POWER COORDINATION COMMITTEE,
NP AG Vidyut Soudha:: Hyderabad
ane eu
One
To
Chief Engineer/IPC_ 1) The Chief General Manager,(Op, Comml. & IPC),
APPCC, APNPDCL, Corporate Office, Opp. NIT Petrol Bunk,
19, Yidyut Soudha, Hanamkonda, Warangal.
7 lyderabad-500082 2) The Chief General Manager, (Comml.)
Fax: 040-23393304) APCPDCL, Corporate Office, Mint Compound, Hyd.
3) The Chief General Manager, (Comml, RA, Plg & PP}
E-mail: APEPDCL, Corporate Office, Seethammadhara, Vizag.
ce.ipe@aptransco.gov.-3§) The Chief General Manager, (Operation),
in. APSPDCL, Corporate Office, Tiruchanoor Road,
Tirupati,
aii
lo. CE/IPC/F IPC {Solar rooftop/Addendum/D No jade. PX 22013
ub: IPC Wing - Solar- Addendum to the guidelines issued for
implementation of solar rooftop net metering scheme —
yf Communicated ~ Reg.
yt m Ref: 1) GO MS No. 58, dt. 25.10.2013,
GO MS No. 27, dt. 19.06.2013,
GO MS No. 22, dt. 25.03.2013,
Lr.No. CE/IPC/Solar/F.Rooftop Netmetering/D.No. 479/A/ 13,
dt. 07.08.2013.
}) Lr.No. CE/IPC/Solar/F. Rooftop Netmetering / D.No. 458/13,
dt. 30.07.2013
ome
(owes
cds
eral anager
it to the Solar rooftop Net metering policy launched by GoAP
we” vidg references 2" & 3 cited, certain Guidelines were communicated to all
Waly SCOMs for implementation of the Solar net metering scheme in the State
vide reference 4" & 5" cited,
Further, it is to inform that the GoAP has issued amendment orders to
the Solar rooftop net metering policy vide reference 3” cited by making
eligible of single phase domestic consumers to set up solar rooftop plants upto
3 KW with a provision of bearing 50% cost of net meter by APDISCOMs upto
a capacity of 3 KW.
Page 1 of 2In this regard, it is to inform that the undersigned is directed by APPCC
to communicate the Addendum to the guidelines issued for solar rooftop net
metering scheme consequent to the GoAP amendment vide reference 3" cited
for implementing the same.
As such, it is requested to communicate the same to concerned filed
authorities as to the GoAP amendment and subsequent Addendum to the
Solar rooftop guidelines to have capacity addition in the sector. Also, it is
requested to place the same in official websites of APDISCOMs for wider
publicity and to build awareness among consumers in the area
Yours faithfully,
Enck: As above OS eft
Chief Engineer/IPC
Copy submitted to
‘The PS to Chairman & Managing Director/APNPDCL/Warangal.
‘The PS to Chairman & Managing Director/APCPDCL/Hyderabad.
‘The PS to Chairman & Managing Director/APEPDCL/Visakhapatnamz.
The PS to Chaitman & Managing Director/APSPDCL/Tirupati, r(*)
‘The PS to Joint Managing Director/(Comml, HRD & IPC)/
APTRANSCO /Hyderabad,
‘The PS to Chairman & Managing Director) APTRANSCO/ Hyderabad. _)
(*) for favour of information,
Forde oe: APSPOW | Pr] BL ee 1é Sete [oe MY / b tre
. Aa Seg “pe
cwerémcmimatieee”
ga es Spo [Ota GINERAL MANAGER
APSPEGE «TIRUPATI
Ce Galt + 4% phe tts be
effirere® Vebacte +t
Ars PDE
Page 2 of 2Addendum to the Guidelines for
implementation of Net Metering for
Rooftop Solar Power System.
Net metering is preferred for 3 phase
service consumers in the DISCOM
area. However, Single phase service
consumers are also. eligible for
establishing solar rooftop systems upto
a capacity of 3 KW, utilizing net
metering facility.
APDISCOMs will bear the 50% cost of
Net meter for ihe capacily up io
3KW for domestic consumers, whoever
commissions it before 31.03.2014.GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Energy Deparment ~ Poliay on Net Metoring for Solar Grid interactive Roof top and
‘Small SPV Power Plants in the State ~ Amendment ~ Orders ~ issued,
ENERGY (RES ~A1) DEPARTMENT
G.OMsNo. 58 Dated 25 -10
Read the following
1, G.OMs.No.22, Energy (RES-A1) Department, dt, 25-03-2015
2, Lr No.CMD/CE/IPC/F.IPC 1/Net metering/ D.No.584/13
bt 27-9-2013 from Chairman/ APPCC & CMD APTRANSCO,
State Government have issued orders for net metering to encourage
harnessing of Solar Power thraugh rooftop installations.
2. In the 2" reference read above, Chairman, APPCC/CMD, APTRANSCO
has requested for certain amendment to the policy to encourage the
implementation of the above policy. They have proposed for permission to
extend Net Metering schemes for single-phase service meters up to certain
capacity and provision for bearing of 50% of Net Metering cost for installation
of Solar Power system up to 3 KW! for those consumers who commission it
before 31-03-2014.
3. After careful consideration of the above proposal, Government hereby
‘orders the following amendments te the above orders,
Para 3 (Il) shall be read a
‘Net Metering faciity shall be preferably allowed for 8 PAasy sanaca
‘consumers. However, Single Phase consumers are also eligible for Net Metesing
tor setting up Salar Root-top Systems up to 3 KW"
ANew clause 3 (X) shall be added as follows
“APDISCOMs will bear 50% of cost of meter for net metering for Solar
Rool-top System of capacity up lo 3 KW for those domestic consumers wha
‘commission itbefore 31.03.2014
4, The Chairman & Managing Director, APTRANSGO & APDISCOMS are requested to
take necessary action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
MAUTUNIAY SAHOO.
SPL CHIEF SECRETARY TO GOVERNMENT
To
‘The Chainman & Managing Drecior APTRARSCO
‘The Chairman & Managing Ditectors all DISOMS.
The Rlanaging Director APGENCO,
The Scemiayy, APERC.
The Vice chaiman & Managing Director, NREDCAP
Copyta
‘The PS. to Pal Seeretary to CM.
The PS, Honble Minister tor Finance
‘The PS to Spl Chie! Secrotary to Govt. Energy,
TheP.A Spl Secretary to Gout. Energy
SF ISC(CNo 3079)RES-A1I2019).
FORWARDED: BY ORDER!
SECTIONOFFICER