ANDHRA PRADA POWER COORDINATION COMMITTEE
oof q BPR Widyyt:Soudha Hyderabad
From as.
Y
Chief Enginéer{P@&i) The Chief General Manager,(OP, Comm. & IPC),
APPCC, APNPDCL, Corporate Office, Opp. NIT Petrol Bunk,
Vidyut Soudha Hanamkonda, Warangal
Hyderabad-500082 2) The Chief General Manager, (Comml.)
(Fax: 040 APCPDCL, Corporate Office, Hyderabad.
23393304) ‘The Chief General Manager, (Comml, RA, Ply & PP)
EPDCL, Corporate Office, Seethammadhara
E-mail: Visakhapatnam
“IPTCPaptransco.go The Chief General Manager,(Operation) APSPDCL,
Corporate Office,
Tiruchanoor Road, Tirupati
: ae
.CE/IPC/F.APC-1/Net metering/Exemptions/D.No. /14, dt“? 03.2014
1b: IPC Wing — Policy on Solar Rooftop Net Metering Schemes
Exemptions sought by certain solar developers and MNRE
s for effective implementation of system
channel partn
Directions issued — Reg.
1) Lr.No. CMD/CGM (Comm, & RA)/SF(IPC)/F.Net Metering,
D.No. 6172 /14, dtd, 19.02.2014
&&&
to inform that the CMD / APCPDPCL vide
has sought certain exemptions in effective implementation of solar roof top
net metering schemes based on suggestions of certain roof top developers
and MNRE channel partners,
ence cited above
2, After careful examination of the issues, the undersigned is directed to
communicate certain instructions to the APDISCOMs in addition to the
guidelines communicated earlier to have considerable progr
metering schemes as follows.
sin solar net
i) 5 KW solar injections in any of the phase of 3 phase service
connection shall be allowed as below 5 KW inverters of 3 phase are
stated to be not available in the market
ii There shall be no requirement of CEIG certification on LT Net
q
metering services up to 10 KW capacity. However, the consumer or
SPV source shall give a 30 days notice of his intention to
commission the plant to the supplier as well as to the concerned
inspector (CEIG). In case the capacity is beyond 10 KW, the CEIGcertification is a must as per section 47 A of Indian Electricity
Rules 1956.
iii) APDISCOMs shall provide net metering (net meter along with its
connected CTs, PTs, wherever applicable) on cost basis.
iv) The insurance coverage can be optional for the LT consumers
opting solar net met the consumer/SPV
source may be advised to take the insurance coverage to avoid
risks at the time of accidents.
) The solar rooftop develop:
allowed to attend the departmental procedures on. behalf of
ng scheme. Howeve
s/MNRE channel partners may be
applicant, except in case of signing the agreement
vi) In case of HT dedicated feeders, the metering may be installed at
DISCOM substation as per cla 2(f) of APERC Regulation No, 4
of 2013.
vii) A check meter with import) export, MRI compatible, tri-veetor
neter with provision to record 3-line currents, 3 phase voltages, V-
THD & 1THD in load survey may be provided in
generation more than 10 KW.
case of solar
As such, above directions may be followed accordingly and place
the same in official websites for wider publicity
Yours faithfully,
Chief on
Copy submitted for information to
1) PS to the Chairman & Managing Director, APNPDCL, Warangal
2) PS to the Chairman & Managing Director, APCPDCL, Hyderabad.
3) PS to the Chairman & Managing Director, APEPDCL, Visakhapatnam
4) PS to the Chairman & Managing Director, APSPDCL, Tirupati
5) PS to the Joint Managing Director (HRD, Comml & IPC)/APTRANSCO.
6) PS to the Joint Managing Director (Vig & Sec)/ APTRANSCO/Hyd
7) PS to the Director (Finance & Revenue)/APTRANSCO/VS/Hyd
8) PS to the VC & Managing Director /NRDECAP/Hyderabad.
9) PS to the Chairman & Managing Director! APTRANSCO/VS/Hyd
10) PS to the Spl. Chief Secretary, Energy dept, APSeeretariat, Hyderabad
" The Executive Director/Plg, Reforms & RAC/APTRANSCO,VS Hyd.
12) The Chief Engineer/ Comml/APPCC/VS/Hyderabad
13) The Chief Engineer! SLDC/APPCC/VS/Hyderabad
Encl oo: car P27, The) Aeseoer |rPr EC NE metiy)
See SN frye Mey.
vo
een aealgyrnte ya
HEF ALN SER
vag Sen epw ai :
A Deg “apr mae Tee fy ma APSPDCL =: