Introduction

This is the third week of the summer training in Saudi Aramco. The purpose of this report is
to highlight all kind of activities.

Work

This report contains activities, work, and new concepts. I learned the following Concepts
either by meetings or getting this course by my supervisor Mr. Mark Field at ITC ( industrial
Training center in Dhahran) .

Concepts

Work permit: is for any kind of new or regular action inside Saudi Aramco and normally the loss
prevention provides it. There are four types of work permit and these are listed in table 1.

Table.1: Types of work primate

Confined space entry Release work


Hot work permit Cold work permit
work permit permit

This work primate is This work primate is This is an important This work permit is
for extremely dangers for the less dangers work primate especially for in gas that needs
situation but also situation. For example, in the refinery because to be released.
required to be done. the problem of the fire it has H2S which is a
For example, if a hydrant that was on the highly toxic gas. It is
contractor wants to last week got a cold well known that H2S
fix any equipment in work primate to fix it. has higher density then
the refinery so he has the air. So it will
to get a hot work accumulate in low
primate. levels. That is why
confined spaces need
work primate before
entering.

The colors that are provided in Table.1 are the colors of the work permits. Here are the work
permits forms:

1|Page
2|Page
3|Page
4|Page
5|Page
6|Page
7|Page
8|Page
This is the courses that I took it in safety compliance division to preparing me to go to fields and
construction site.

9|Page

You might also like