QR-BMRCL (P 1)/15
1 PH (8.0 to 12)
Remarks:
Page 59 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
RFI No:
REQUEST FOR INSPECTION
(RFI for activities/sub activities)
1. Name of the station /Viaduct location :
2. Pier No
3. Date & time :
We have completed the activities of the work mentioned below. Our Engineers have checked the same as per specification and
drawings found to be in order.The checklists are enclosed .We hereby request for inspection of the following activity falling in
next 24 Hr..
Page 71 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/29
PILING ACTIVITY
PERMISSION FOR BORING, PILE NO…….
S. No Description Yes No Remarks
3 Verticality of guide.
4 Casing checked.
REMARKS:
………………………………………………………………………………………………………………………………………..
Permission granted/not granted.
Name of contractor’s representative: Name of BMRCL representative:
Signature: Signature:
Date & time: Date & time:
Page 74 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/30
Page 75 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/31
REMARKS:
Bar Bending schedule is approved/not approved.
Name of contractor’s representative: Name of BMRCL representative:
Signature: Signature:
Date & time: Date & time:
Page 76 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/32
Casing TOP RL
Ground RL
1
Cut off level
Casing bottom
Depth of permanent liner
Rebar cage fabricated as per drawing
2
no.
3 Approval of bar bending schedule
4 Bar tied as specified
For 100% lapping/couplers, precautions
5
taken
6 Provision of cover blocks
……………………………………………………………………………………………………………………………………
Permission granted/not granted.
Name of contractor’s representative: Name of BMRCL representative:
Signature: Signature:
Date & time: Date & time:
Page 77 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/33
Page 79 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/34
Page 80 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/20
Page 63 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
QR-BMRCL (P 1)/36
Pile No: …………… Pile Diameter: …………… Slump of concrete :……………... Actual Quantity: …………….
A. PILING DETAILS:
DETAILS RL DETAILS DATE TIME
Flushing Completed
Concrete Started
Concrete Completed
Page 85 of 192
BANGALORE METRO RAIL PROJECT, PHASE-2,Reach5 P1
CONSTRUCTION OF ELEVATED STRUCTURES (VIADUCT & STATIONS) OF LENGTH 6.418 KM (APPROX.) FROM
BOMMASANDRA TO HOSA ROAD STATION (EXCL.) (CHAINAGE 18591.06 M TO 12173.092) INCLUDING DEPOT
ENTRY LINE TO HEBBAGODI DEPOT, ROAD WIDENING & ALLIED WORKS AND 5 NUMBERS OF METRO STATIONS
VIZ., BOMMASANDRA, HEBBAGODI, HUSKUR ROAD, ELECTRONIC CITY-II, ELECTRONIC CITY-I IN REACH-5 LINE
OF BANGALORE METRO RAIL PROJECT, PHASE-2
Signature : Signature :
Date : Date :
56