Download as pdf
Download as pdf
You are on page 1of 2
GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT ICE INVITING E-BIDD! (Single Stage Two Envelope E-Bidding System). C&W Department, Building Division District Swat, Government of Khyber Pakbtunkhwva invites Electronic Bids from eligible firms / bidders in accordance with KPPRA Procurement rule-20 1 ___on Single Stage Two Envelop Procedure for the following works. Sw ‘Name of work T Required | BiaSeeurity | Periodof | tastdateot | Dateot Date ut Category | 4 Stamp duty | completion | submission of | openingof opens ot of PEC Bids &time | Technical Bid. Financie Bi Establishment of 100 Primary Schools i 1 (B&G 30:70) on need basis In Khyber | Pakheunkhwa | ADP No.173/170207/2019-20. | ; fae seca 7 oat ae asper | 19/11/2019 | OnSane Day | HOSE | 3) cau ROR | Rs:48500/- work | at 12:00 Hrs i“ Luo Firs | 4):GPS Balkarai ne Compete i fee 5): GPS Sambat Cham | ‘Authority | 6): GPS Kass Koza Durashkhela : 1) 76eSDandana (Golae System) i Establishment of 70-Girls Secondary i ; ! ‘Schools in Khyber Pakhtunkhwa, I : 1 | ADP No, 196,/150554/2019-20. 68 |? | SH» 1): G¢ss Chuprial Above | 2)°GGSS Rahat Kot | (Solar System) Estoblishment of 70-Girls Secondary Schools in Khyber Pakhtunkhwa, i i ! | ADP No, 196/150554/2019-20. C68 | SH 1): GOSS Baidara Above \ 4). 668s Darmai | ie ‘Golar System) \ |] Establishment of 30-Boys Secondary | i || Schools in Khyber Pakhtunikhwa, | i | | ADP No. 201/150730/2019-20 piers Rs:21500/-| dow | do | dow 1 | | Si GSS Galshab Matta \ I i (Solar System) Re-construction of 100 Primary | |_| Schools in Khyber Pakhitunkhwa, ADP | | Rs:36000/-] do | do | do er rs:36000/-} do» | edo | do: wth No174/170557 /2019-20. | | SH 1): GPS Bodigram | \ 2): GPS Fazal Baig Gharat coe 3): GPS Bijawra Above ' +4): GPS Baidara No.1 | i 5): GPS Bakoor ' \ | 6): GGPS Aboha. \ (Solar system) | Establishment of 70-Girls Secondary Schools in Khyber Pakhtunkbwa. | ADP No, 196/150554/2019-20, coe ‘SH 1): GGSS Chupriah Above | Re:St000/- | doe) dor jee ae 2): GGSS Rahat Kot I ! (Pumping Machinery) | | Establishment of 70-Girls Secondary Schools in Khyber Pakhtunkhwa, | | [ADP No, 196/150554/2019-20. C68 | sti 1): 668s Batdara Above [BE 51000/- | dow dor |r - | 2); GGSS Darmai | | 4 (Pumping Machinery) | Establishment of 30-Boys Secondary | I | Schools in Khyber Pakhtunkthwa. i | ADP No 201/150730/2019-20 668 | geawso0)- | toe | tom | 1 SH: GSS Galshah Matta | I (Pumping Machinery) I I Rs:40000/-| dow | do- sles shen Bid Documents and instruction to bidder can be downloaded from C&W Web site (w¥ A copy of the technical proposals in the required format is mandatory and to be uploaded as a part « E-Bidding before submitting Financial Bids. Scanned copy of bid security shall be submitted electronically along with technical bid on E-bidding system, ‘The 2% Earnest Money alongwith Additional security if any shall be kept sealed in the financia proposal, however affidavit in the Technical proposal stating that a bid security amounting to U2 without indicating the figure in the letter has been placed in the financial proposal or bid, otherwise the technical proposal will be considered as non-responsive, Venue of Bids opening is Office of the Executive Engineer C&W Building Division Swat. Alll bidders are required to be registered with the Khyber Pakhtunkhwa Revenue Authority under the Khyber Pakhtunkhwa Finance Act, 2013 Act No.XXI of 2013, _ (0.6946-9240117 : Email: bldg.swata endehpaph (2)

You might also like