Professional Documents
Culture Documents
NDY HEALTH... Healthcare Experience
NDY HEALTH... Healthcare Experience
NDY HEALTH... Healthcare Experience
www.ndy.com
MELBOURNE SYDNEY BRISBANE PERTH CANBERRA AUCKLAND WELLINGTON LONDON MANCHESTER KUALA LUMPUR
Our vision To be acknowledged as
the best practitioner in our field.
ST VINCENT’S HOSPITAL ST JOHN OF GOD HOSPITAL ROYAL BRISBANE HOSPITAL (RBH) NATIONAL IMPLEMENTATION TEAM
REDEVELOPMENT SUBIACO REDEVELOPMENT DEPARTMENT OF HEALTH UK
MELBOURNE PERTH BRISBANE LONDON
As part of the redevelopment of Medical Surgical Training Facility The St John of God Hospital This requirement presented NDY has undertaken the auditing, RBH is the most important Health NDY was engaged by the The challenge of integrating the
St Vincent’s Hospital in Melbourne, The design of all services for a state redevelopment comprises significant change in the design master planning and design of Services complex in the state of Department of Health National Treatment Centres into an existing
NDY was involved in the design of the art medical surgical training substantial expansion and of ventilation systems to achieve building services on a number of Queensland and the largest in Implementation Team to provide NHS hospital and maintaining the
and construction of the $160M facility, which incorporates a refurbishment of existing sepsis control, dust ingress significant RBH projects including: terms of bed numbers in Australia. building services advice to deliver continuity of service and operation
in-patient facility. conference room, lecture theatre, accommodation. during construction and OH&S Treatment Centres throughout the of the hospital required NDY to
• Biological Research Facility Mid 2005, NDY was commissioned
laboratory, mock theatres and in ongoing public access areas. United Kingdom. analyse the infrastructure to
Further NDY contributions at NDY is responsible for design • Central Energy Services Building to undertake a campus-wide
patient simulator. determine reliability of the existing
St Vincent’s Public Hospital include: and documentation of mechanical The engineering solutions have • Pharmacy & Stores quantitative assessment of security The program is worth £2.5B and
systems along with value for money.
The services included lighting services and complex medical been designed and modelled • Royal Children’s – Health risk exposures. plans to deliver over 50 new
MRI
control and dimming systems, gas systems. in 3D using the NDY Automated Services Building Treatment Centre facilities for In some instances, this required
Design of all services for a second A range of risk control options
interfacing with audio-visual Building System platform. • RBH Psychiatric Centre & surgical and diagnostic procedures. Treatment Centres to be stand-
Siemens MRI machine installed in Main aspects of the including CCTV, public duress/
systems, and medical gases. Discharge Unit alone without cross-connection
the basement of the Healy Wing. redevelopment include: Additional design benefits intercom stations, mobile duress Treatment Centres provide
• Royal Children’s Medical Block into the existing infrastructure.
Consulting Suites were highlighted in the large systems, electronic access orthopaedic, ophthalmology,
Healy Building • expansion of the theatre suite • Site-wide Communications
The design of all services for 800m2 and complex theatre suite control systems and patient chemotherapy, ENT surgical
Upgrading electrical, mechanical, and comprehensive Cancer & Technology systems
of new consulting suites for both HVAC systems, where the fly- tagging systems were evaluated suites and diagnostic facilities
hydraulic and fire services to Care Centre
private and public hospitals. through visualisations assisted The recently completed Central which resulted from the for fixed CT and MRI scanners.
rejuvenate the Healy Wing, • an ambulatory care centre
in clarifying the understanding and East Blocks were undertaken assessment.
including a new substation, main comprising day procedure NDY will incorporate international
of constructability and as part of an engineering joint
switchboard, air cooled chillers, unit and consulting facilities Risk control options having a best practice to the NHS by
maintainability issues. venture for the Queensland Health
calorifiers and fire services. • a landmark chapel significant surplus life cycle cost delivering and providing building
Departments $350M redevelopment
• multi-level car parking benefit over the cost of security services technical advice for the
of the Herston Campus.
• progressive refurbishment risk exposures formed the basis Treatment Centre facilities on
of existing accommodation The Herston Hospitals of the technical systems included existing NHS sites and green
Complex includes: in the Security Master Plan. field sites.
Maintaining operational continuity
• Royal Brisbane Hospital
throughout the progressive The Master Plan also offered
• Royal Women’s Hospital
refurbishment and expansion general guidance in relation to
• Royal Children’s Hospital
works is a critical requirement. building internal and external
• University of Queensland
environments, security
• Herston Campus
management, hospital policies,
• Queensland Institute for
fire protection and security
Medical Research.
staffing arrangements.