Producto: EXCAVATOR
Modelo: E200B EXCAVATOR 4SG04715
Configuración: EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGINE
Pruebas y Ajustes
E200B & EL200B EXCAVATORS HYDRAULIC AND ELECTRONIC SYSTEMS
Número de medio -SENR4527-01 Fecha de publicación -01/01/1991 Fecha de actualización -11/10/2001
Introduction
When possible, the bucket must always be lowered to the ground before
service is started. When it is necessary for the boom to be in the raised
position while tests or adjustments are done, be sure that boom, stick
and bucket have correct support.
Always move the machine to a location away from the travel of other
machines. Be sure that other personnel are not near the machine when
the engine is running and tests or adjustments are being made.
During a diagnosis of the hydraulic system, remember that correct oil temperature, flow and
pressure are necessary for correct operation. Pump output (oil flow) is a function of engine speed
(rpm). Oil pressure is caused by resistance to the flow of oil.
Each of the implement circuits has a load check valve to prevent cylinder drift during spool
movement. Each circuit also has makeup valves for flow of oil to both ends of the cylinders and
motors and there is a line relief valve for each of the cylinder and swing motor circuits.
Visual checks and measurements are the first steps when troubleshooting a possible problem. Then
do the Checks During Operation and last the checks and adjustments on the machine.
Use a stopwatch, a magnet and a mm (inch) ruler to measure the following basic checks.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 2 of 36
Visual Checks
A visual inspection of the system is the first step when troubleshooting a problem. Make the
inspection with the engine off and the implements lowered to the ground.
1. Check the level of the oil in the hydraulic tank. Slowly loosen the hydraulic tank air breather cap
and release the pressure before the filler cap is removed.
2. Remove the filter element and check it for material that would give an indication of damage to a
component.
Raise and lower the boom. Move the stick in and out. Open and close the bucket. Move the swing
control for swing right and swing left. Do each of these operations several times.
1. Pilot system operation. Since the pilot system controls the movement of spools in the main control
valves, it is important the pressure and flow of oil from the gear-type pump be according to
specifications. The pressure in the pilot system is controlled by the pilot relief valve.
2. During all machine operations, a main relief valve pressure setting that is too low will result in
increased cycle times and/or the sound of the main relief valve opening.
3. A main relief pressure that is too high will cause a decrease in the service life of hoses and
components.
4. For individual circuit operation, a line relief valve pressure setting that is too low will result in
increased cycle times and/or the sound of the relief valve opening for that circuit.
5. Check cycle times for each of the circuits: boom, bucket/shovel, stick and swing. Cycle times that
are longer than those shown in operational Tests in "Hydraulic System Testing And Adjusting"
could be the result of insufficient pilot system pressure, leakage past cylinder seals, pump wear,
pump speed (rpm), faulty relief valve (main or line) or pump control system adjustment.
6. Drift rate for the boom, bucket/shovel and stick circuits are greater than those shown in
Operational Tests in "Hydraulic System Testing And Adjusting".
Circuit drift (drifting) is caused by leakage past cylinder piston, O-ring seals in the control valves,
check valves or makeup valves that do not seat correctly. Poor adjustment or fit in the pilot and main
control valves will also cause drifting.
7. Check machine travel circuits. Operate the machine in the FORWARD and REVERSE direction
without moving the control levers for steering. If the machine does not travel in a straight line, there
could be a problem with the negative control signal to the pumps, motor wear or a line relief valve
that is not operating correctly.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 3 of 36
Operational Test
Engine Speed
6V3121 Multitach Group.
4. Travel crossover relief pressure of 33300 kPa (4800 psi) for Travel test.
5. Swing relief pressure of 23500 kPa (3400 psi) for Swing test.
6. Line relief pressure of 33300 kPa (4800 psi) for Cylinder test.
StopwatchTape measure
Test Conditions
1. Travel test ground must be hard and as level as possible, and at least 25 m (27.5 yards) long.
2. Draw 25 m (27.5 yards) straight line on the travel test ground as a reference line.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 4 of 36
3. Place the machine so that one track is perfectly in line with the reference line. Put the machine in
the travel position shown in the illustration.
Test Procedure
1. Start the engine. Move the accelerator lever at the full-load position. Then move the machine by
operating both travel levers at the same time.
2. The first 5 m (5.5 yards) are for a preliminary run. Measure the time required for the machine to
travel the remaining 20 m (22 yards) in each direction.
Time Required:
Stopwatch
Test Conditions
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 5 of 36
Test Procedure
3. Pull the accelerator lever to full-load position, to run the raised track.
4. Measure the time required for the track to turn three complete cycles in each direction.
Time Required:
Movement On Slope
Stopwatch150 mm (6 in.) scale
Test Condition
1. Let the machine go up on a slope of 19° and stop it. The slope surface must be hard and smooth.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 6 of 36
Test Procedure
1. Put marks on both track and ground to indicate its relative position to the slope.
3. Measure, with a scale, how much distance the tracks have moved on the slope.
ScaleStopwatch
Test Conditions
1. Place the machine on level ground and put the machine in a position shown in figure.
2. Put marks on both inner and outer races of the swing bearing to indicate relation of two positions.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 7 of 36
Test Procedure
1. Tilt the control lever to the left or right and measure time for 180° swing.
2. Return the swing control lever to NEUTRAL at the end of the 180° swing and measure the
amount of drift (overswing) by the marks put on the swing bearing.
Swing Time:
Swing Drift:
ScaleStopwatch
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 8 of 36
Test Conditions
2. Put the implements to maximum reach and fill the bucket with soil.
1. Put positional marks on inner and outer races of the swing bearing. Place the upper structure at 90
degrees angle to tracks, that is, at 3 or 9 o'clock position.
2. Measure the time needed for swing counter clockwise from 3 o'clock to 12 o'clock positions, and
the time of clockwise from 9 o'clock to 12 o'clock positions.
1. Stop the machine on a slope of 12 degree. Place the upper structure at 3 o'clock position as
shown.
3. Turn ON Swing Brake Release Switch, with the engine kept running.
4. Measure swing drift for three minutes on the circumference of the swing bearing.
5. Turn the upper structure 180 degree angle to 9 o'clock position. Perform steps 2, 3 and 4.
1. Stop the machine on a slope of 12 degree. Place the upper structure at 3 o'clock position as
shown.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGIN... Page 9 of 36
4. Measure swing drift for three minutes on the circumference of the swing bearing.
5. Turn the upper structure 180 degree angle to 9 o'clock position. Perform steps 2, 3 and 4.
Swing Time:
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 10 of 36
StopwatchScale
Test Conditions
Test Procedure
4. Raise the boom until its upper surface becomes parallel to the ground. Stop the engine.
5. Measure how much distance each rod has moved in a minute after the start.
3. Raise the boom high enough to suspend the stick perpendicular to the ground and stop the engine.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 11 of 36
Rod movement:
Stopwatch
Test Conditions
Test Procedures
Boom Cylinders
Extension test ... Measure the operating time required for the boom cylinders to reach full extension
position from bucket-on-ground condition.
Retraction test ... Measure the operating time required for the bucket to contact the ground from full
extension position of boom cylinders.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 12 of 36
Stick Cylinder
Position the boom upper surface parallel to the ground and fully extend the bucket cylinder.
Extension test ... Measure the operating time required for the stick cylinder to reach full extension
position from full retraction position.
Retraction test ... Measure the operating time required for the stick cylinder to reach full retraction
position from full extension position.
Bucket Cylinder
Position the boom upper surface parallel and the stick perpendicular to the ground.
Extension test ... Measure the operating time required for the bucket cylinder to reach full extension
position from full retraction position.
Retraction test ... Measure the operating time required for the bucket cylinder to reach full retraction
position from full extension position.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 13 of 36
Operating Speed:
Release Of Pressure
Release the pressure in the implement hydraulic circuits (boom, stick and bucket) before any
hydraulic lines or components are disconnected or removed. Follow this procedure:
2. Adjust the position of the bucket so that it will be flat on the ground when the boom is lowered.
4. Shut off the engine and put the hydraulic activation control lever in the LOCK position.
5. Move the control levers for boom, bucket, stick and swing full strokes. This will relieve any
pressure that might be present in the pilot system.
6. Slowly loosen the air breather cap on the hydraulic tank and release the pressure.
8. The pressure in the system has been released and lines and components can be removed.
Relief Valves
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 14 of 36
Specifications
Adjustment Procedures
6V3121 Multitach Group.6V4161 Pressure Gauge Kit.1U8761 Flow Meter.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 15 of 36
NOTE: The above figures indicate approximate value. Use pressure gauge for adjustment.
Preparation
2. Release the remaining pressure in the hydraulic system according to the section, Release of
Pressure.
3. Connect 60000 kPa (8700 psi) pressure gauge to pump. Tap (1) is for the front pump. Tap (2) is
for the rear pump.
Pilot Manifold
(3) Tap.
4. Connect 6000 kPa (870 psi) pressure gauge to tap (3) of the pilot manifold.
5. Start the engine and raise hydraulic oil temperature to 45 to 55°C (115 to 130°F).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 16 of 36
6. Pull the accelerator lever to the rearmost position. Confirm whether the engine is running at the
high idle speed of 1950 ± 50 rpm under no load.
7. To do steps 5 and 6, use the thermometer contained in 1U8761 Flow Meter and the 6V3121
Multitach.
Normal operations (see characteristic curves) of the engine and pumps are necessary for the pressure
adjustments. If the results of the pressure adjustment are not correct, then the engine and pump
characteristic curve needs to be checked.
Bucket Position
1. Loosen locknut of adjusting screw on the line relief valve for bucket cylinder rod end (5), and turn
adjusting screw a quarter turn clockwise.
2. Hold the bucket control lever at fully dump position. Turn in or out the adjusting screw of main
relief valve (4) until adjusted to 35300 kPa (5120 psi).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 17 of 36
Rod end line relief valves of boom (9), bucket (5) and stick (10) are installed on bottom of the
control valves.
Keep the machine in position as shown. Adjust pressure to 33300 ± 980 kPa (4800 ± 140 psi) (6KF1
-676, 7DF1-1539) or 34300 ± 980 kPa (5000 ± 140 psi) (6KF677-UP, 7DF1540-UP), then tighten
locknuts to a torque of 29 ± 3 N·m (22 ± 2 lb ft).
After line relief valve adjustments, adjust main relief valve to its normal setting. Reference the
section main relief valve.
Stick Cylinder
Stick Out
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 18 of 36
1. Operate the stick control lever for stick OUT, and hold the lever in this position. Then adjust the
pressure for stick cylinder (rod end) (10).
2. Operate the stick control lever for stick IN, and adjust pressure for stick cylinder (head end) (6) in
the same way as in Step 1.
Bucket Cylinder
Bucket Close
1. Operate control lever of the bucket for close. And hold the lever in this position. Then adjust
pressure for bucket cylinder (head end) (7).
2. Operate the bucket control lever for bucket dump, and adjust pressure for bucket cylinder (rod
end) (5) in the same way as in Step 1.
Boom Cylinders
Boom Raise
Operate the boom control lever for raise, and hold the lever in this position. Then adjust pressure for
boom cylinder (head end) (8).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 19 of 36
Boom Lower
Operate the boom control lever for lowering. And hold the lever in this position. Then adjust
pressure for boom cylinder (rod end) (9).
NOTE: If flat ground prevents the machine from lowering its boom, line relief valve on head end
(8) should be replaced with the one in rod end (9) for convenience of the adjustment. Adjust its
pressure in full extension of the cylinder.
* After adjustment, put line relief valves (8) and (9) back in their respective places.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 20 of 36
1. Insert a stopper (round bar) between the track link and the lower teeth of the right or left travel
sprocket wheel to block the track.
2. Move the right travel control lever to the FORWARD position and hold the lever as it is.
3. Adjust pressure to 33300 ± 980 kPa (4800 ± 140 psi) (6KF1-676, 7DF1-1539) or 34300 ± 980
kPa (5000 ± 140 psi) (6KF677-UP, 7DF1540-UP) by adjusting screw of crossover relief valve (14).
Tighten lock nut to specified torque of 69 ± 7 N·m (50 ± 5 lb ft).
5. Move the right travel control lever to the REVERSE position and hold it in this position.
7. Adjust crossover relief valve pressure of the left motor in the same way as that of the right.
2. Move the swing control lever to the right for clockwise swing. Hold the control lever in this
position.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 21 of 36
4. Move the swing control lever to the left for counterclockwise swing. Check the pressure of relief
valve (16).
5. If the pressure deviates from 23500 ± 980 kPa (3400 ± 140 psi), replace the relief valve.
1. Move the bucket control lever for CLOSE, and hold it in this position.
2. Loosen the adjusting screw of main relief valve (4). Adjust it to the pressure of 31400 ± 490 kPa
(4600 ± 72 psi).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 22 of 36
Pilot Manifold
(17) Pilot relief valve.
1. Loosen the locknut of pilot relief valve (17), then adjust pressure to 3450 +490 -0 kPa (500 +72 -0
psi) (6KF1-676, 7DF1-1539) or 3750 +200 -290 kPa (540 +28 -43 psi) (6KF677-UP, 7DF1540-UP)
using the adjusting screw.
Preparation
1. Connect 49000 kPa (7100 psi) pressure gauge to tap (20) of the rear pump.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 23 of 36
2. Disconnect the hydraulic line from speed change port (21) of the right travel motor and connect
4900 kPa (700 psi) pressure gauge to the line. Install a plug to port (21).
5. Be sure that the pilot relief pressure is 3450 kPa (500 psi).
Procedure
1. Slowly move the right control lever for FORWARD travel until the rear pump pressure becomes
27500 kPa (4000 psi). At this point, adjust adjusting screw (22) of ATS valve until the pressure of
speed change port (21) is 0.
2. Fully move the right travel control lever for FORWARD travel until the rear pump pressure
becomes 31400 kPa (4550 psi). Then slowly decrease the pressure to 14000 kPa (2050 psi). At this
point, check to be sure that the pressure of speed change port (21) is 3450 kPa (500 psi).
1. First, check the display of the electronic controller. Reference the module, Electronic Power Unit,
SENR4502. If the electronic controller display checks okay, then perform the operational tests.
2. If operational tests (for example cycle times) indicates that a power problem is common to the
circuits of one pump, then the problem is most likely in the hydraulic system. As a result, Pump
Flow Tests should be made.
NOTE: If the machine does not travel in a straight line at low speed (and travel motors are okay),
then it is recommended that the Negative Control Test be done first to determine if the problem is
located in the pump or in the control valve. Otherwise, first do the Hydraulic Horsepower/High
Pressure Cut Test.
3. If operational tests indicate a power problem common to both pump circuits, then the engine, fuel
or working altitude may be the problem.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 24 of 36
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 25 of 36
Illustration Of Flow Meter Tool Layout (For Horsepower And HPC Test)
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 26 of 36
Circuit Diagram For Horsepower Control (P-Q)/High Pressure Cut Tests (Front Pump)
(1) Line (front pump output). (4) Line (rear pump output). (5) Pressure tap (front pump circuit). (6) Pressure tap (rear
pump circuit). (7) Negative flow control line (front pump). (8) Control valve. (9) Test hose. (10) Hose port. (11) Cooler.
(12) Test hose. (13) Flow meter. (14) Plug. (15) Pressure port (negative flow signal). (16) Port (power shift). (17)
Pressure port (negative flow signal). (18) Negative flow control line (rear pump). (19) Line (power shift). (20) Test line.
(21) Pressure tap (pilot oil). (22) Pilot oil manifold. (23) Multitach. (24) Main pumps.
This test should be done first because it affects high pressure cut and negative flow control.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 27 of 36
Circuit Diagram For Horsepower Control (P-Q)/High Pressure Cut Tests (Front Pump)
(1) Line (front pump output). (4) Line (rear pump output). (5) Pressure tap (front pump circuit). (6) Pressure tap (rear
pump circuit). (7) Negative flow control line (front pump). (8) Control valve. (9) Test hose. (10) Hose port. (11) Cooler.
(12) Test hose. (13) Flow meter. (14) Plug. (15) Pressure port (negative flow signal). (16) Port (power shift). (17)
Pressure port (negative flow signal). (18) Negative flow control line (rear pump). (19) Line (power shift). (20) Test line.
(21) Pressure tap (pilot oil). (22) Pilot oil manifold. (23) Multitach. (24) Main pumps.
This test should be done first because it affects negative flow control.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 28 of 36
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 29 of 36
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 30 of 36
Pump Compartment
(21) Pressure tap (pilot). (22) Pilot oil manifold.
Preparation
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 31 of 36
2. Release air pressure in the hydraulic tank by loosening the vent cap on the side of the tank.
Radiator Compartment
(10) Hose port.
a. 6000 kPa (870 psi) gauge and tee at pressure tap (21) on the pilot manifold (20).
b. Test line and 60000 kPa (8700 psi) gauge at pressure tap (5) for front pump output.
c. Test line and 60000 kPa (8700 psi) gauge at pressure tap (6) for rear pump output.
e. Disconnect line (7) from the pump. Plug line (7) and leave port (15) open to the air.
f. Disconnect power shift line (19) from the power shift port (16). Plug the line. Install a cap on the
power shift port. Connect test line (20) between tee at tap (21) on the pilot manifold and power shift
port (16) on the right side of the pump.
g. Disconnect pump output line (1). Install plug (14) in the line. Remove plug (10) from the return
line located in the radiator compartment. Install flow meter (13) and test hoses (12) and (9) from the
pump to return line. Make sure the flow meter is fully open before proceeding.
4. Put mode selector switch in Mode III position and turn AEC switch off.
5. Start the engine and increase the temperature of the hydraulic oil to 45 to 55°C (115 to 130°F) by
stalling an implement circuit using the pilot control lever. Approximately every 30 seconds, operate
the implement to a different position to circulate the oil.
Test
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 32 of 36
1. Start the engine. Adjust pilot relief pressure to 2050 kPa (300 psi).
2. Slowly close the flow meter valve and record the temperature, RPM and flow at each of the
following pressures:
Loosen the locknut for horsepower control screw (25). Turn adjustment screw (25) clockwise to
increase flow rate. A quarter turn of the screw changes the flow approximately 20 liter/min. (5.3
U.S. gpm).
NOTE: To adjust horsepower control characteristics for the rear pump, follow the same procedure
as for the front pump.
Maximum flow should be 185 ± 3 liter/min. (49 ± 1.3 U.S. gpm). If flow is out of specification,
follow the procedure below.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 33 of 36
2. Turn adjustment screw (29) clockwise to decrease and counterclockwise to increase the flow rate.
A quarter turn of the adjustment screw changes the flow approximately 5 liter/min. (1.3 U.S. gpm).
NOTE: To adjust maximum flow for the rear pump, follow the same procedure as for front pump.
Minimum flow should be 17.5 ± 2.5 liter/min. (4.6 ± 0.7 U.S. gpm). If flow is out of specification,
follow the procedure below.
2. Turn adjustment screw (26) clockwise to increase flow and counterclockwise to decrease flow. A
quarter turn of screw (26) changes the flow approximately 5 liter/min. (1.3 U.S. gpm).
NOTE: To adjust minimum flow for the rear pump, adjust screw (28) using the same procedure as
for the front pump.
NOTE: Hydraulic horsepower (P-Q) adjustment should be done first. This adjustment affects high
pressure cut and minimum flow.
High pressure cut should start at approximately 29400 kPa (4250 psi). Flow should decrease very
fast to a minimum flow of 17.5 liter/min. (4.6 U.S. gpm) at approximately a pressure of 30900 kPa
(4500 psi).
1. To adjust the high pressure cut, turn adjustment screw (31) clockwise to increase pressure and
vise versa to decrease pressure. A quarter turn of the adjusting screw changes the pressure
approximately 4020 kPa (580 psi).
NOTE: To adjust high pressure cut for the rear pump, adjust screw (32) using the same procedure as
for the front pump.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 34 of 36
Circuit Diagram For Negative Control Test (Front Pump) (6KF1-589, 7DF1-1404)
(1) Line (front pump output). (4) Line (rear pump output). (5) Pressure tap (front pump circuit). (6) Pressure tap (rear
pump circuit). (7) Negative flow control line (front pump). (8) Control valve. (9) Test hose. (10) Hose port. (11) Cooler.
(12) Test hose. (13) Flow meter. (14) Plug. (15) Pressure port (negative flow signal). (16) Port (power shift). (17)
Pressure port (negative flow signal). (18) Negative flow control line (rear pump). (19) Line (power shift). (20) Test line.
(21) Pressure tap (pilot oil). (22) Pilot oil manifold. (23) Multitach. (24) Main pumps.
The Negative Control Test is a diagnostic test. This test can be used to determine if the problem is in
the pump or in the control valve.
NOTE: The Negative Control Test should not be necessary when the machine travels straight.
Preparation
2. Release air pressure in hydraulic tank by loosening the vent cap on the side of the hydraulic tank.
3. Install the flow meter between the pump and return line (see the layout for Hydraulic
Horsepower/High Pressure Cut Test).
4. Disconnect negative signal line (7) from pressure port (15). Plug the end of line (7). Connect test
line (20) between tee at tap (21) on the pilot manifold and pressure port (15) on the pump.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 35 of 36
Circuit Diagram For Negative Control Test (Front Pump) (6KF590-UP, 7DF1405-UP)
(1) Line (front pump output). (4) Line (rear pump output). (5) Pressure tap (front pump circuit). (6) Pressure tap (rear
pump circuit). (7) Negative flow control line (front pump). (8) Control valve. (9) Test hose. (10) Hose port. (11) Cooler.
(12) Test hose. (13) Flow meter. (14) Plug. (15) Pressure port (negative flow signal). (16) Port (power shift). (17)
Pressure port (negative flow signal). (18) Negative flow control line (rear pump). (19) Line (power shift). (20) Test line.
(21) Pressure tap (pilot oil). (22) Pilot oil manifold. (23) Multitach. (24) Main pumps.
The Negative Control Test is a diagnostic test. This test can be used to determine if the problem is in
the pump or in the control valve.
NOTE: The Negative Control Test should not be necessary when the machine travels straight.
Preparation
2. Release air pressure in hydraulic tank by loosening the vent cap on the side of the hydraulic tank.
3. Install the flow meter between the pump and return line (see the layout for Hydraulic Horsepower
Test).
4. Disconnect negative signal line (7) from pressure port (15). Plug the end of line (7). Connect test
line (20) between tee at tap (21) on the pilot manifold and pressure port (15) on the pump.
5. Disconnect power shift line (19) from pump power shift port (16). Plug line (19) and leave port
(16) open to the air.
Test
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020
EL200B EXCAVATOR 4SG00001-UP (MACHINE) POWERED BY S6KT ENGI... Page 36 of 36
1. Adjust front pump pressure to 6850 kPa (1000 psi) by restricting flow through flow meter (13).
2. Adjust pilot pressure at pilot manifold (22) to the pressure in the chart below. At each pressure,
record the flow from the front pump. The recorded flow must then be corrected by the formula
below the chart.
3. Repeat the above test for the rear pump. This would involve rear pump negative flow control line
(18); negative flow signal pressure port (17); and the rear pump output line (4).
However, when measured values are largely different from the above chart, first check a source that
has caused the deviation rather than adjust it by the shim.
Refer to (Hyd #26) machine does not travel straight because of incorrect negative control pressure in
the section "Checking Procedure (Hydraulic System)".
Copyright 1993 - 2020 Caterpillar Inc. Fri Mar 20 14:08:06 EST 2020
Todos los derechos reservados.
Red privada para licenciados del SIS.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 20/03/2020