ANNEX ( ) DESIGNS AND DRAWINGS.

PREPARED BY:

UNITED NATIONS OFFICE FOR PROJECT SERVICES


FUNDED BY:

PROJECT.

SUPPLY AND INSTALL OF HYBRID SOLAR SYSTEM FOR


Bayt As-Sultan Health Center
AMRAN CITY-YEMEN
PROJECT REFERENCE NO.
IUS-OPS-ECS-AMR-001.3

JUNLY, 2019
REMARKS: - INSTALLING THE CABLE FEEDERS TO THESE BOARDS, CURRENT SYSTEMS & LOW VOLTAGE POWER CABLES IS
1.THE LAYOUT DRAWINGS DO NOT SHOW ALL THE SYSTEMS , HOOKING UP OF EQUIPMENT WILL BE THE SYSTEM SUPPLIER 300MM.
ITEMS, OR ACCESSORIES COVERED UNDER THE SCOPE OF RESPONSIBILITY. .23 THE MAXIMUM FILLING RATIO FOR POWER &
ELECTRICAL WORKS TO BE EXECUTED THE LAYOUT .10 CONDUCTORS FOR SINGLE PHASE SOCKETS OUTLETS COMMUNICATION CONDUITS IN SITE WORK ARE:
DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL CIRCUITS SHALL BE 4MM COPPER CONDUCTORS AND · MIN50. MMD FOR POWER CABLE WITH MAX 40%.
RELEVANT OR SPECIALIST DRAWINGS AND SPECIFICATIONS . PROTECTED BY 16A CIRCUIT BREAKERS UNLESS OTHERWISE OF CONDUIT CAPACITY.
2.DO NOT SCALE FROM THE LAYOUT DRAWINGS WORK INDICATED. · MIN50. MMD FOR LOW CURRENT SYSTEMS WITH
ACCORDING TO ARCHITECTURAL OR ELECTRICAL DETAILS .11 IN THE ABSENCE OF ANY INDICATION ON THE DRAWINGS MAX 40%. OF CONDUIT CAPACITY.
UNLESS OTHERWISE AUTHORIZED . OR THE SPECIFICATIONS, THE INSTALLATIONS SHALL BE .24 ALL C.BS WITH FRAME RATING LARGER THAN 100A
3.ALL EQUIPMENT LAYOUTS ARE PROVISIONAL . FINAL DONE TO THE SATISFACTION OF THE ENGINEER. SHOULD HAVE ADJUSTABLE THERMAL OVERLOAD SETTING.
LAYOUT SHALL BE DETERMINED BY THE CONTRACTOR FROM .12 THE CONTRACTOR SHALL PROVIDE ALL IRON ANGLES, .25 CONTRACTOR SHALL PROVIDE CONTROL CONDUIT &
THE CONSTRUCTION /SHOP DRAWINGS AND AFTER AND FIXING ACCESSORIES REQUIRED FOR COMPLETE WIRING AS PER OPERATIONAL REQUIREMENTS SHOWN ON
COORDINATION WITH OTHER TRADES . INSTALLATION OF LIGHTING FIXTURES, OUTLETS & ROUTES. HVAC AND PLUMBING DRAWING.
4.THE SIZE OF CONDUITS AND /OR CABLE TRAYS IS IN .13 FOR EXACT QUANTITY, TYPE & LOCATION OF ELECTRICAL .26 EXACT METHOD OF JOINING CABLE TRAYS,AND CABLE
GENERAL NOT SHOWN ON DRAWINGS . THE SIZE OF ALL OUTLETS REFER TO INTERIOR DESIGN DOCUMENT. TRUNKING SHALL BE IN ACCORDANCE WITH THE
CONDUITS AND/OR CABLE TRAYS SHALL BE SELECTED BY .14 THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESPECTIVE MANUFACTURERS RECOMMENDATION USING
THE CONTRACTOR IN ACCORDANCE WITH BOQ , MODIFYING THE NO. OF CIRCUIT BREAKERS, RATING, AND PROPER COMPONENT.
REGULATIONS AND /OR STANDARDS AND WILL BE FUNCTION WIRING ACCORDING TO MANUFACTURER DATA WITHOUT .27 GROUNDING TO LOW CURRENT SYSTEMS SHALL BE
OF THE NUMBER AND SIZE OF THE RESPECTIVE ANY EXTRA COST. SEPARATE GROUNDING PIT AND CONNECTED TO BUILDING
CONDUCTORS. .15 ALL DISCONNECT SWITCHES FOR A/C SHALL BE GROUNDING NETWORK.
5.PERFORATED CABLE TRAY SHALL BE FIXED AND COVER ADJACENT TO THE UNIT.. .28 THE DISTANCE BETWEEN EARTH PIT SHALL BE DOUBLE
PROPERLY AND SHALL NOT FIXED DIRECT TO ROOF SLAB . .16 UNLESS OTHERWISE INDICATED MINIMUM SIZE CONDUIT; OR MORE THAN LENGTH OF EARTHING ROD.
6.TEARTH CONTINUITY CONDUCTORS ARE NOT INDICATED · FOR EXTERIOR INSTALLATION IS 25MM DIAMETER .29 THE CONTRACTOR SHOULD PROVIDE COMPLETE
ON THE DRAWINGS , BUT SHALL BE RUN WITH ALL CIRCUITS OR AS SHOWN IN PANEL SCHEDULE. CENTRAL INTERFACE BETWEEN THE SOLAR GENERATION
IN ACCORDANCE WITH SPECIFICATIONS , REGULATIONS · FOR INTERIOR INSTALLATION IS 25MM DIAMETER SYSTEM & GENERATOR SET.
AND/OR STANDARDS. OR AS SHOWN IN PANEL SCHEDULE. .30 THE DIMENSION OF ELECTRICAL PANELS AND
7.THE COLOR CODE FOR A FOUR WIRE CIRCUIT IS - ONE .17 CONTRACTOR SHALL PROVIDE MATCHING PLUG IN FOR EQUIPMENT'S SHALL BE AS PER APPROVED FABRICATOR /
BLACK, - ONE RED , ONE BLUE AND ONE YELLOW ANY ALL SPECIAL OUTLETS. SUPPLIER SHOP DRAWING.
CONDUCTOR INTENDED FOR GROUNDING PURPOSE SHALL .18 CONTRACTOR RESPONSIBLE FOR CHANGE ALL EXISTING .31 CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALL
BE GREEN WITH YELLOW STRIPE . FLORESCENT TUBE (T) 8LIGHT BY LED TUBE (T) 8INCLUDE SUITABLE VENTILATION SYSTEM IN BATTERY ROOM TO
8.CONTRACTOR RESPONSIBLE TO DISCONNECT ALL WIRING ALL OPERATION ACCESSORIES FOR ALL LIGHTING FIXTURES ASSURING REFRESHING AIR FLOW INSIDE ROOM .
IN EXISTING DISTRIBUTION BOARD AND RECONNECTED IN AS PER BOQ. .32 CONTRACTOR RESPONSIBLE TO DISTRIBUTE ALL
NEW DISTRIBUTION BOARD AS PER SINGLE LINE DIAGRAM . .19 LED LAMPS SHALL BE FURNISHED AND INSTALLED IN ALL DISTANCE BETWEEN ALL SYSTEM COMPONENTS INSIDE
9.THE CONTROL AND /OR SWITCHBOARDS FOR THE LIGHTING FIXTURES. BATTERY ROOM AS PER MANUFACTURE INSTALLATION
DIFFERENT SYSTEMS SUCH AS THE AIR CONDITIONING .20 ALL OUTDOOR WIRING ACCESSORIES SHALL BE WEATHER INSTRUCTION.
EQUIPMENT MACHINES , ....ETC . WILL BE IN THE SCOPE OF PROOF TYPE.
SUPPLY OF THE SYSTEM SUPPLIER . THE ELECTRICAL .21 FOR GROUND-FAULT CIRCUIT INTERRUPT (GFCI) REFER
CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND TO PLANS AND PANEL SCHEDULES.
.22 THE MINIMUM SEPARATE DISTANCE BETWEEN LOW

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan Health DESIGNED BY: A3 AS SHOWN OF ISSUE
MAIN REMARK IFA 12/07/19
Center
S2-00
REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3
FOR RESULTS THAT MATTER. DRAWING TYPE: APPROVED BY:
DATE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRICAL DESIGN UNOPS DESIGN REVIEW
JULY 12 2019.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.

MAIN DISTRIBUTION
MDB BOARD.

EMERGENCY MAIN
EMDB DISTRIBUTION BOARD.

WALL MOUNTED STREET


LIGHT FIXTURE

AC COUPLING PANEL
WATER PROOF
BOX 15CM X 15CM
EXISTING MDB

MTS MANUAL TRANSFER


SWITCH

MDB
CONNECTION BOX

MTS
BETWEEN CHARGE
CONTROLLER AND
BATTERY RACK
3/4" PVC PIPE
SCH. 40.
3*4sqmm cable
AC≈
HYBRID INVERTER
CABLE
DC=
ROUTING
MPPT BATTERY CHARGER
WATER PROOF
3/4" PVC PIPE BOX 15CM X 15CM
SCH. 40. 3*4sqmm BATTERY RACK.
cable

CABLE TRAY
DC =

AC
COUPLING
PANEL
AC≈

BOX 15CM X 15CM


WATER PROOF
2RACKS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
NEW ELECTRICAL INSTALLATION TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-01
PLAN CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.

AC

DC =
COUPLING
PANEL

AC≈
S&H D CONNECTION BOX
BETWEEN CHARGE
CONTROLLER AND
BATTERY RACK

AC≈
HYBRID INVERTER
DC=

2RACKS
MPPT BATTERY CHARGER

BATTERY RACK.

AC COUPLING PANEL

EXHAUST FAN

BATTERY SMOKE & HEAT


S&H D
DETECTOR
S&H D
FIRE EXTINGUISHER POWDER

FIRE EXTINGUISHER CO2

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
CONTROL ROOM TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-02
CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. 1:4
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL CABLE SHALL BE ROUTE IN PERFORATED GI
CABLE TRAY.
5. CABLE TRAY SHALL BE FIXED ABOVE UNISTRUT NOT
DIRECT IN ROOFTOP.
_ _ _ _ _ _
+ + + + + +

PHOTOVOLTAIC MODULE

+
_
DC-COMBINER
BOX COMBINER BOX

_ _ _ _ _ _
+ + + + + + SOLAR SINGLE CORE CABLE
1C X 6 SQ.MM (RED COLOR)

SOLAR SINGLE CORE CABLE


1C X 6 SQ.MM (BLACK COLOR)

SOLAR SINGLE CORE CABLE


1C X 35 SQ.MM (RED COLOR)

SOLAR SINGLE CORE CABLE


1C X 35 SQ.MM (BLACK
COLOR)
DC-COMBINER
BOX
SWH SOLAR WATER HEATER

CABLE
TRAY SWH
COMBINER BOX

100

50
GI CABLE TRAY
100MM * 50MM

COLD FORMED STEEL


C CHANNEL

FROM COMBINER BOX ANCHOR


BOLT

TO CONTROL ROOM NOT TO SCALE.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-03
ROOFTOP PLAN DETAILS. CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. LIGHTNING ARRESTER SHALL BE INSTALL IN
SUITABLE LOCATION AND HEIGHT TO COVER ALL
ROOFTOP AREA.
5. ALL EACH PV STRINGS SHALL BE EARTHED
SEPARATELY UP TO EARTHING BUS BAR IN
_ _ _ _ _ _ ROOFTOP.
+ + + + + +

1C*6SQ.MM
PHOTOVOLTAIC MODULE

+
_
_ _ _ _ _ _
+ + + + + +
DC-COMBINER
BOX COMBINER BOX

EARTHING BUS BAR

EARTHING CABLE

DC-COMBINER
BOX

1C*10SQ.MM LIGHTNING ARRESTOR

LIGHTNING
ARRESTOR. CABLE TRAY

TO EARTHING

TO LIGHTINING PIT TO LIGHTNING


ARRESTER
PIT
FROM COMBINER BOX 1C*25 SQ.MM
TO CONTROL ROOM
TO EARTHING EARTHING
BUS BAR NO.2 BUS BAR NO.1
1C*16SQ.MM

LIGHTNING TO EARTHING EARTHING


PIT BUS BAR NO.2 PIT
1C*25SQ.MM

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-04
EARTHING PLAN DETAILS. CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTNING DETAILS. TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-05
CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

MANUAL CHANGE OVER

AC FUSE

CIRCUIT BREAKER
(MCCB/MCB)

HYBRID SOLAR SYSTEM INVERTER OUTPUT AC FUSE

MTS 100A

10A, 1P
MCB

EXISTING MDB
OUTDOOR
LIGHTING

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SINGLE LINE TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-06
DIAGRAM CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY /13/2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED

PV Module Combiner Box Battery Charger Hybrid INVERTER


ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
Connection PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

PHOTOVOLTAIC MODULE

+
_
DC =
AC≈
HYBRID INVERTER

MANUAL CHANGE OVER


Total: 0.99Kwp
3 PV MODULE
STR NO.1

_
+

MPPT BATTERY CHARGER


Total: 0.99Kwp
3 PV MODULE
STR NO.2

85A SURGE ARRESTER


150 VDC
_
+

XPLE/PVC/CU1.0KV
3X6
4X6 SQ.mm

CIRCUIT BREAKER (MCB)


AC≈
Total: 0.99Kwp
3 PV MODULE

HYBRID SOLAR SYSTEM INVERTER OUTPUT


STR NO.3

DC = CIRCUIT BREAKER (RCBO)


_
+

XPLE/PVC/CU1.0KV
3X6 SQ.mm
2(1x50 SQ.mm)
Total: 0.99Kwp
3 PV MODULE

DC FUSE
STR NO.4

(RED& BLACK)
_
+

2(1x35 SQ.mm)
(RED& BLACK)
POSITIVE & NEGATIVE
CONNECTION BOX
125A,2P
2(1x50 SQ.mm)
(RED& BLACK)

DC SWITCH ISOLATOR
Bus Bar 150A
Positive & Negative

2(1x50 SQ.mm)
(RED& BLACK)

125 A, 2P
Battery Rack

1x50 SQ.mm

24 Batteries
2V ,600 Ah
48 Volt

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
Bayt As-Sultan Health Center

S2-07
DIAGRAM DETAILS. CHECKED BY:
PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-001.3 A3.
FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. AS SHOWEN.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan 6PV MOUNTING ANCHOR T-DSGN-BY
A3 AS SHOWN OF ISSUE

BOLTS ROOFTOP PLAN IFA 12/07/19


Health Center PROJECT NO:

S2-08
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR.001.3
FOR RESULTS THAT MATTER. DRAWING TYPE:
APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY 12 2019.
GALV (L)
50x50x3
STAINLESS
STEEL BOLTS ∅8 3mm
E-70 Channel C 80x40x1.25
GROUT
A B

2400
GALVANIZED BASE
PLATE 200x150x4 mm
1.25

80
350
2 2

10
4∅ 10 ANCHOR
GALVANIZED CONCRETE BOLTS 40
C 80x40x1.25 14cm LENGTH
FOR ALL POSTS
350 Channel C 60x30x1.25

2900
2 BASE PLATE - PLAN
STRUCTURE DETAILS

60
1.25
4∅ 10 ANCHOR
CONCRETE BOLTS

30
14cm LENGTH CONCRETE WITH
GALVANIZED EPOXY GROUT
BASE PLATE
1 1 4 mm THICK
GALV (L)
50x50x3 MASTER
SEAL 470
ROOF TILES RSH 43 in DN

100
120
A B CEMENT
MORTAL 1.5mm
in
EXISTING 3/4
MASTER FLOW ROOF SLAB
GROUT
932 AN(EPOXY)

1 ANCHOR BOLTS PLAN CONNECTION - SEC - DETAILS


STRUCTURE DETAILS 3 STRUCTURE DETAILS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan 6PV MOUNTING T-DSGN-BY
A3 AS SHOWN OF ISSUE
IFA 12/07/19
OPERATIONAL EXCELLENCE
FOR RESULTS THAT MATTER.
Health Center

Amran CITY-YEMEN
ANCHOR BOLTS PLAN
DRAWING TYPE:
REVIEWED BY:

APPROVED BY:
PROJECT NO:

DATE:
IUS-OPS-ECS-AMR.001.3
S2-09
SANA'A - YEMEN. STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY 12 2019.
A B
A B
350 2400 350
2 2
2 2
C (60x30x1.25)

C (60x30x1.25)
C 80x40x1.25

C 80x40x1.25
C (60x30x1.25)

C (60x30x1.25)

1 1 1 1
A

1 FULL FRAMING PLAN


A STRUCTURE DETAILS B
A B
2 PV PANELS PLAN

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
T-DSGN-BY
A3 AS SHOWN OF ISSUE
Bayt As-Sultan 6PV MOUNTING IFA 12/07/19
PROJECT NO:
Health Center FULL PLAN
S2-10
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR.001.3

FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:


SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY 12 2019.
GALV (L) SECTION
GALV (C) SECTION
(40x40x3) mm
(60x30x1.25) mm
4 STAINLESS
2 STAINLESS STEEL BOLTS ∅6
STEEL BOLTS ∅6

420
50 860 DETAIL A
4 STAINLESS
420
420 STEEL BOLTS ∅8

860
420

2 JOINT - DETAIL A
STRUCTURE DETAILS
RSH 43 in DN,
1.5mm THICK C 80x40x1.25

DETAIL B

GALV RSH 43 in DN,


1 2 1.5mm THICK

2 STAINLESS
SIDE SECTION A-A STEEL BOLTS ∅8
1 STRUCTURE DETAILS

3 JOINT - DETAIL B

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan 6PV MOUNTING
T-DSGN-BY
A3 AS SHOWN OF ISSUE
IFA 12/07/19
Health Center SIDE ELEVATION
S2-11
REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR.001.3

FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:


SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY 12 2019.
DETAIL B

DETAIL A

L25X1.25

BACK ELEVATION
1 STRUCTURE DETAILS

2 1
C 80x40x1.25
GALV (L25x1.25) 2 08mm

PL 3mm
L25x1.25
2 08mm
JOINT - DETAIL A 3 JOINT - DETAIL B
2 STRUCTURE DETAILS STRUCTURE DETAILS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan 6PV MOUNTING
T-DSGN-BY
A3 AS SHOWN OF ISSUE
IFA 12/07/19
Health Center BACK ELEVATION PROJECT NO:

S2-12
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR.001.3

FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:


SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY 12 2019.
A 2

B 1
3D VIEW
1 STRUCTURE DETAILS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:

Bayt As-Sultan 6PV MOUNTING


T-DSGN-BY
A3 AS SHOWN OF ISSUE

OPERATIONAL EXCELLENCE
FOR RESULTS THAT MATTER.
Health Center 3D VIEW
DRAWING TYPE:
REVIEWED BY: PROJECT NO:

DATE:
IUS-OPS-ECS-AMR.001.3
IFA 12/07/19
S2-13
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY 12 2019.
GENERAL
·
·

STRUCTURE

·
· CONCRETE
·
·

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan Health DESIGNED BY: A3 AS SHOWN OF ISSUE
12/7/19
MAIN NOTES IFA
Center
R-01
REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR.001.2

FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE:


APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY. 2019
NOTE:
ALL REINFORCED CONCRETE SHOULD BE OF CLASS (A)
CYLINDER STRENGTH @ 28 DAYS = 210 Kg/cm

20 20 4Ø14 Ø8 @ 200mm
80

80
30

30

30
60 60
20

60 60 N.T.S
20 20
80

80
30

30

6Ø14
BOTH DIR.

10

30
10
A A
SCALE: 1:40. N.T.S
SCALE: 1:40.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:

Bayt As-Sultan Health DESIGNED BY: A3 AS SHOWN OF ISSUE


12/7/19
Batteries Room Plan IFA

R-02
PROJECT NO:
OPERATIONAL EXCELLENCE Center Details - 1 REVIEWED BY:
IUS-OPS-ECS-AMR.001.2

FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE:


APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY. 2019
NOTE:
ALL REINFORCED CONCRETE SHOULD BE OF CLASS (A)
CYLINDER STRENGTH @ 28 DAYS = 210 Kg/cm

Ø8 @ 200mm

5Ø10 /M 5Ø8 /M 2Ø14

30
5Ø10/M

5Ø8/M
2Ø14
20
N.T.S

Ø8 @ 200mm
2Ø14

30
2Ø14
20
A A
N.T.S
SCALE: 1:40. SCALE: 1:40.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
Bayt As-Sultan Health DESIGNED BY: A3 AS SHOWN OF ISSUE
12/7/19
Batteries Room Plan IFA
Center
R-03
PROJECT NO:
OPERATIONAL EXCELLENCE Details - 2 REVIEWED BY:
IUS-OPS-ECS-AMR.001.2

FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE:


APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY. 2019
LOUVERS 1.25mm THICKNESS 5Ø10/M
SURROUNDING WITH BOTH DIRECTION +3.6 (Parapet Level)
60X30X1.25mm STEEL TUBE
FOR EACH LOUVER PANEL
+3.4 (Roof Level)

Ø7.5CM PVC DOWNSPOUT

20x20CM R.C DOOR BEAM


(ONLY IN THIS SIDE) NOTE:
ALL REINFORCED CONCRETE SHOULD BE OF CLASS (A)
CYLINDER STRENGTH @ 28 DAYS = 210 Kg/cm
40mm THICK SOLID SINGLE DOOR

CONCRETE HOLLOW
BLOCKS (40X20X20CM).

5Ø8/M +0.30 (Floor Level)


BOTH DIRECTION.
+0.25 (Sidewalk Level)
1M WIDTH SIDEWALK
AROUND ROOM +0.00 (Ground Level)
(KERBSTONE HEIGHT 30CM)

15CM WELL GRADED


COMPACTED SOIL 2Ø12
20 Ø8 @ 200mm

20
2Ø12

SCALE: 1:20.
N.T.S N.T.S

10
60X30X1.25 mm STEEL TUBE Ø8 @ 200mm
1.25 mm THICKNESS
DEFORMATED STEEL PLATE
2Ø14

30
2Ø14
20
0
8.
2.0

2.0

DETAIL OF LOUVERS STEEL


(N.T.S)

N.T.S

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:

Bayt As-Sultan Health


DESIGNED BY: A3 AS SHOWN OF ISSUE
12/7/19
Batteries Room IFA

R-04
PROJECT NO:
OPERATIONAL EXCELLENCE Center Elevation Details REVIEWED BY:
IUS-OPS-ECS-AMR.001.2

FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE:


APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY. 2019
NOTE:
ALL REINFORCED CONCRETE SHOULD BE OF CLASS (A)
CYLINDER STRENGTH @ 28 DAYS = 210 Kg/cm

LED BULB (9 W)

SOCKET - 13A

TWO POLE ONE-WAY SWITCH

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:

Bayt As-Sultan Health


DESIGNED BY: A3 AS SHOWN OF ISSUE
12/7/19
Batteries Room IFA

R-05
PROJECT NO:
OPERATIONAL EXCELLENCE Center Elevation Details REVIEWED BY:
IUS-OPS-ECS-AMR.001.3

FOR RESULTS THAT MATTER. PROJECT LOCATION: DRAWING TYPE:


APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRICAL DESIGN UNOPS DESIGN REVIEW JULY. 2019