Khimti-Dhalkebar 220 kV Transmission Line Project

Package A2- Supply and Installation of 132 kV Substation Extensions at Khimti and Dhalkebar

SCHEDULE -4
Bidderʹs Name……………………………..
IFB No: ICB-KD 2005/06-2

GUARANTEED TECHNICAL PARTICULARS OF 132 kV CAPACITOR VOLTAGE TRANSFORMERS

DESCRIPTION UNIT REQUIREMENT OFFERED DATA

1. Manufacturer and Country of origin


2. Years of manufacturing experience Years 10
3. Manufacturer's designation as per
submitted catalogue /Model No. To be furnished
4. Applicable standard IEC
5. Type Outdoor oil
immersed
6. Frequency Hz 50
7. Rated primary voltage
a) Nominal kV 132/√3
b) Maximum voltage kV 145/√3
8. Insulation level
a) Impulse withstand voltage kV 650
(primary)
b) Power frequency withstand (1 kV 275
min. rms) (primary)
9. Crepage distance mm 3300
10. High voltage capacitor
a) Number of capacitor
b) Capacitance of each stack pF
c) Manufacturing tolerance (+/-%)
d) Total value of the high voltage pF
capacitor
11. Intermediate voltage capacitor
a. Number of stacks
b. Capacitance of each stack pF
c. Manufacturing tolerance +/-%)
d. Total value of intermediate pF
voltage capacitor
e. Equivalent capacitance for pF
carrier coupling
f. Capacitance of CCVT pF 8800
12. Value of the equivalent capacitance pF > 4400
13. Open circuit intermediate voltage V
14. Rating
a) Voltage ratio kV 132/√3:
0.11/√3
b) Rated burden VA 80 VA for
protection and 50
for metering

Volume III Sec VII -53


Khimti-Dhalkebar 220 kV Transmission Line Project
Package A2- Supply and Installation of 132 kV Substation Extensions at Khimti and Dhalkebar

DESCRIPTION UNIT REQUIREMENT OFFERED DATA

c) Accuracy class 3P & 0.2 for


metering
d) Overvoltage factor
- Continuous 1.1
- 30 seconds 1.5
e) Connection
f) Secondary fuse
- Type
- Manufacturer
- Amp rating A
g) Power factor 0.85
h) Number of secondary windings 3(*)
2(**)
15. Knife switch and fuse on secondary Yes/No
provided
16. Dimension (LxWxH) mm
17. Weight kg
18. Delivery of equipment in months month
following award of contract
(allowing time for approval of
drawing)
(*) For Khimti
(**) For Dhalkebar

Deviations from technical requirements and reasons for such deviations:

Date: (Signature)……………………………
Place: (Printed Name)……………………….
(Designation)………………………….
(Common Seal)……………………….

Volume III Sec VII -54