QA-08 (A) & (B) Sum Lab & Field Tests 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Contractor / Turnkey Contractor *: PROPOSED CONSTRUCTION OF NANGA MAKUT / NANGA ENGKUAH ROAD,

DEBESSA DEVELOPMENT SDN BHD Project : KATIBAS

JURUTERA PERUNDING WAHBA SDN. BHD.


Consulting Engineer/Engineer/S.O.R *
Contract No : RECODA/2019/U009

SUMMARY OF LABORATORY & FIELD TESTS


(Concrete Works)

For the period from : / To / / 201

No. of Tests Carried Out No. of Tests

Works Item & Type of Test Passed Failed Remarks


During the
Previously Total (During the Reporting
reporting period
Period)

LABORATORY TESTS :

1. Selection of Material (aggregate) : -

# Gradation Analysis

~ Coarse

~ Fine

# Flakiness Index & Elongation Index

# Water Absorption

# Agg. Crushing Value

# Sodium Sulphate Soundness Test

2. Compressive Strength of Concrete


(28 Days) :-

# Con. Grade : / 20
(Bridge Girders)**

# Con. Grade : / 20
(R. C. Piles)**

# Con. Grade : / 20
(Bridge Works & Bored Piles)**

# Con. Grade : / 20
(Box Culverts, Sumps,
Catchpits & Pile Caps)**

# Con. Grade : / 20
(R.C. Pipe Culverts & Drains)**

** Identify work items appropriate to the grade of concrete


* Select as appropriate