Professional Documents
Culture Documents
Production Casing Cementing: 1 Casing Data Hole Data Tubulars Data 1 Pre-Casing Data
Production Casing Cementing: 1 Casing Data Hole Data Tubulars Data 1 Pre-Casing Data
The information contained in these documents is confidential, written permission should be attained from Agiba Petroleum company.
1
AGIBA PETROLEUM COMPANY
Properties
Name Lead Light Weight Tail
Density 11.5 12.5 15.8
Yield, ft3/sk 2.103 1.236 1.224
Mix Water, gal/sk 11.751 3.817 4.373
Mix Fluid, gal/sk 11.791 5.587 5.433
Excess 10% 10% 10%
Slurry Top, ft 2000 5000 8000
Open Hole Vol, ft3
Additives UOM Lead Light Weight Tail
FP‐9L gal/sk 0.04 0.04 0.04
BA‐10A %BWOC 2 0.4 0.4
FL‐66 %BWOC 2.5 1 1
R‐21LSG gal/sk 0.005 0.02 0.02
CD‐33 %BWOC 0.8 0.8
BA‐58L gal/sk 1 1
Pumping Rates
Fluid Rate, bpm Rate, gpm Rate, st/min
13 3/8'',
Washer 6 252 65 68.0 lb/ft 9 5/8'', 47.0
Spacer 6 252 65 CSG @328' lb/ft CSG
Lead 5 ‐ ‐ @250'
Light Weight 5 ‐ ‐
Lead Top @2000'
Tail 5 ‐ ‐
9 5/8'', 43.5 lb/ft
Displacing Fluid 5 210 54
CSG Shoe
Displacing Fluid 1 42 11 @2624'
Friction Pressures Light Slurry Top
Rate, bpm Rate, gpm Rate, st/min Pressure, psi @5000'
5 210 54 375 8 1/2'' Hole
4 168 43 328
3 126 32 277
Tail Top @8000'
2 84 22 218
1 42 11 146 7'', 29.0 lb/ft
CSG
CSG Shoe
@12000'
The information contained in these documents is confidential, written permission should be attained from Agiba Petroleum company.
2
AGIBA PETROLEUM COMPANY
Open Hole Cased Hole
8 1/2'' Hole capacity 0.0702 7'', 29.0 lb/ft CSG 0.0371
8 1/2'' hole & 7'', 29.0 lb/ft CSG 0.0226 7'', 26.0 lb/ft CSG 0.0383
9 5/8'', 47.0 lb/ft CSG 0.0732
9 5/8'', 43.5 lb/ft CSG & 7'', 26.0 lb/ft CSG 0.0269
13 3/8'', 68.0 lb/ft CSG & 7'', 26.0 lb/ft CSG 0.1021
13 3/8'', 68.0 lb/ft CSG & 9 5/8'', 47.0 lb/ft CSG 0.0597
SLURRY RESULTS
Slurry Volume Number of Sacks
Volume Lead Light Weight Tail Lead 202
Open Hole 59 89 118 Light Weight 403
Cased Hole 17 0 0 Tail 542
Total 76 89 118 Total 1147
Mix Water Mix Fluid
Slurry gal bbl Slurry gal bbl
Lead 2378 57 Lead 2386 57
Light Weight 1537 37 Light Weight 2250 54
Tail 2946 70 Tail 2946 70
Total 6861 163 Total 7581 181
Chemicals
Chemicals & UOM Without Dead Volume With Dead Volume
Additives UOM Lead Light Weight Tail Lead Light Weight Tail
FP‐9L gal/sk 8 16 22 11 22 28
BA‐10A %BWOC 380 151 204 514 208 262
FL‐66 %BWOC 476 379 510 643 520 655
R‐21LSG gal/sk 1 8 11 1 11 14
CD‐33 %BWOC 0 303 408 0 416 524
BA‐58L gal/sk 0 403 542 0 553 697
Displacement Volume
Volume bbl Pump Strokes
Total Volume 461 4988
Normal Circ Rate 446 4826
Slow Circ Rate 15 162
The information contained in these documents is confidential, written permission should be attained from Agiba Petroleum company.
3
AGIBA PETROLEUM COMPANY
Area Volume, bbl
Total String Volume 464
Total Annular Volume 314
Complete Cycle Volume 778
Job Time PRESSURES
Fluid Vol, bbl bpm Time, min Cum. Time TYPE psi Comment
Washer 100 6 17 17
One stage cement is
Spacer 60 6 10 27 P 2603
enough
Lead 76 5 15 42
Light Weight 89 5 18 60 F.D.P 2749 at 1 bpm
Tail 118 5 24 83 Circulation at current
Displacing Fluid 446 5 89 187 Gel Breaking 494 gel Strength may
Displacing Fluid 15 1 15 202 break the shoe
LOSSES
Losses During Pumping bbl
Losses During Dispalcement bbl
Washer
Spacer
Lead
Light Weight Total Losses
Tail
Total Losses
Expecting Fluids Out Of Shoe
Washer The Washer will be out of shoe after pumping 21 bbls of displacing fluid
Spacer The Spacer will be out of shoe after pumping 121 bbls of displacing fluid
Lead The Lead will be out of shoe after pumping 181 bbls of displacing fluid
Light Weight The Light Weight will be out of shoe after pumping 257 bbls of displacing fluid
Tail The Tail will be out of shoe after pumping 346 bbls of displacing fluid
Expecting Fluids At Surface
Washer The Washer should be expected at surface after pumping 336 bbls of displacing fluid
Spacer The Spacer should be expected at surface after pumping 436 bbls of displacing fluid
Lead There would be no return
Expected Volumes At surface Assuming No losses
Washer All (100 bbls) of Washer should return at surface
Spacer There should be 25 bbls of Spacer at surface
Lead There would be no return