Professional Documents
Culture Documents
14) 63a MCCB 36 Ways Panel (B-PPG-2)
14) 63a MCCB 36 Ways Panel (B-PPG-2)
F F
04
Drawn by: Obaid Jalal
02
Checked by: Eng Zahid Sikandar
01
00 25-04-2020 First Issue
E Approved by: Eng Yasser Fouda E
Rev.No Date Nature of Revision Drawn by
Manufacturer :
Client:
C C
MOC hasa project
Consultant :
Panel name :
Document status::
As Built Production
A A
Item No: Quantity: Scale: Sheet No: Next Sheet:
01 1 No NTS 01 02
1 2 3 4 5 6 7
SPACE
SPACE
20A 20A
800.00
800.00
32A 32A
63A
INCOMING
FROM BOTTOM
NB EB
BOTTOM VIEW
Panel Name : Rev: Description of Revisions Date Drawn by: Obaid Jalal
00 First Issue 25-04-2020 Checked by: Eng Zahid Sikandar
14) 63A MCCB 36 WAYS PANEL (B-PPG-2)
01 Approved by: Eng Yasser Fouda
Client : FOR Panel Board
Al Shayiee Contracting Establishment 02 Drawing No:
Project : 03
MF 63/20/HQ-REV(04)
MOC hasa project Sheet: 02 Scale: NTS 04
INCOMER
380/220V,3PH,4W,60HZ.
QM LEGENDS:-
63A QM-MAIN MCCB
MCCB Q1-Q30 BRANCHES
--TO-- --TO--
1P 1P 1P 1P 1P 1P
32A 32A 32A 20A 20A 20A
MCB MCB MCB MCB MCB MCB
Panel Name : Rev: Description of Revisions Date Drawn by: Obaid Jalal
00 First Issue 25-04-2020 Checked by: Eng Zahid Sikandar
14) 63A MCCB 36 WAYS PANEL (B-PPG-2)
01 Approved by: Eng Yasser Fouda
Client : FOR Panel Board
Al Shayiee Contracting Establishment 02 Drawing No:
Project : 03
MF 63/20/HQ-REV(04)
MOC hasa project Sheet: 03 Scale: NTS 04
14) 63A MCCB 36 WAYS PANEL (B-PPG-2)
Panel Name : Rev: Description of Revisions Date Drawn by: Obaid Jalal
00 First Issue 25-04-2020 Checked by: Eng Zahid Sikandar
14) 63A MCCB 36 WAYS PANEL (B-PPG-2)
01 Approved by: Eng Yasser Fouda
Client : FOR Panel Board
Al Shayiee Contracting Establishment 02 Drawing No:
Project : 03
MF 63/20/HQ-REV(04)
MOC hasa project Sheet: 04 Scale: NTS 04