FY 2017/2018
August 2016
1|P a g e
Table of Contents
Executive Summary.....................................................................................................................................4
CHAPTER ONE..........................................................................................................................................6
BACKGROUND INFORMATION............................................................................................................6
Introduction.............................................................................................................................................6
County Profile.........................................................................................................................................7
CHAPTER TWO.......................................................................................................................................12
SITUATION ANALYSIS.........................................................................................................................12
2.0 Introduction...............................................................................................................................12
CHAPTER THREE........................................................................................................................................49
3.0 Introduction.....................................................................................................................................49
2|P a g e
3.2 Education Youth affairs and Sports..................................................................................................68
On-Going Projects/Programmes......................................................................................................168
On-going Projects/Programmes......................................................................................................172
CHAPTER FOUR...................................................................................................................................177
3|P a g e
4.0 Introduction.............................................................................................................................177
4.5 Water, Natural Resources, Environment, Forestry and Solid Waste Management.......................207
4|P a g e
COUNTY VISION AND MISSION
VISION
To be a leading, prosperous and secure county for high quality life
MISSION
To provide an enabling environment and participatory resource management for efficient and
effective service delivery for all
CORE VALUES
II. Human dignity, equity, social justice, inclusiveness, equality, human rights, non-
discrimination and protection of the marginalized.
III. Good governance, integrity, transparency and accountability;
IV. Sustainable development
5|P a g e
Executive Summary
Preparation of the Annual Development Plan is a stage in county government budget process, as
provided by the Public Finance Management Act CAP 412C, which in section 126 requires
every county government to prepare a development plan in accordance with Article 220(2) of the
Constitution. It states that the ADP should include, among others, strategic priorities for the
medium term that reflect the county government’s priorities and plans; programmes to be
delivered with details for each programme of the strategic priorities to which the programme will
contribute; the services or goods to be provided; measurable indicators of performance where
feasible; and the budget allocated to the programme.
Chapter One: Provides the purpose of the annual development plan and a brief description of
the County in terms of its area, administrative divisions, main physical features,
settlement and demographic patterns, which includes population densities and
distribution among age cohorts
Chapter two: Analyses the situation of the various sectors in terms of institutional capacity
to deliver on agreed development targets, resource endowments, emerging
issues, opportunities and threats, as well as what the county has so far
achieved in addressing development challenges across the sectors.
7|P a g e
CHAPTER ONE
BACKGROUND INFORMATION
Introduction
The Annual Development Plan (ADP) is a component of the County Integrated Development
Plan (CIDP), the 5-year medium term public investment blue print that guides choice and
formulation of all development programmes and projects in the County. The 2017/18 ADP is the
fourth in a series of five annual plans that strategically prioritizes implementation of CIDP issues in
alignment with the national and county fiscal budgetary cycles. It is a mechanism for linking county
planning with the country’s budgetary system and is, thus, formulated within the Medium Term
Expenditure Framework (MTEF), the annual three-year rolling expenditure planning that sets out
expenditure priorities within budget constraints as a measure of ensuring effective and efficient
utilization of available resources.
Preparation of the Annual Development Plan is a stage in county government budget process, as
provided by the Public Finance Management Act CAP 412C, which in section 126 requires
every county government to prepare a development plan in accordance with Article 220(2) of the
Constitution. It states that the ADP should include, among others, strategic priorities for the
medium term that reflect the county government’s priorities and plans; programmes to be
delivered with details for each programme of the strategic priorities to which the programme will
contribute; the services or goods to be provided; measurable indicators of performance where
feasible; and the budget allocated to the programme.
This chapter gives the background information that has a bearing on the development of the
county. It provides description of the county in terms of the location, size, physiographic and
natural conditions and demographic profiles as well as the administrative and political units.
8|P a g e
County Profile
Position and Size
Kilifi County is one of the six counties in coast region. The county lies between latitude 2 o 20’
and 4o 0’South, and between longitude 39o 05’ and 40o 14’ East. It borders Kwale County to the
south west, Taita Taveta County to the west, Tana River County to the north, Mombasa County
to the south and Indian Ocean to the east. The county covers an area of 12,609.7 km2.
Climatic Conditions
The average annual rainfall ranges from 300mm in the hinterland to 1,300mm at the coastal belt.
The coastal belt receives an average annual rainfall of about 900mm to 1,100mm with marked
decrease in intensity to the hinterland. Areas with highest rainfall include Mtwapa and to the
north of the coastal strip around the Arabuko Sokoke Forest. Evaporation ranges from 1800mm
along the coastal strip to 2200mm in the Nyika plateau in the interior. The highest evaporation
rate is experienced during the months of January to March in all parts of the county.
County annual temperatures range between 21oC and 30oC in the coastal belt and between 30 oC
and 34oC in the hinterland. The county experiences relatively low wind speeds ranging between
4.8 km/hr and 12 Km/hr.
9|P a g e
Ecological Conditions
The county’s physical and climatic conditions give it ecological conditions that can be divided
into the following five (5) Agro-Ecological Zones (AEZ): -
Coconut-Cassava Zone: This zone has the highest potential for crop production in the county
spreading along the coastal uplands and low-level coastal plains. Major farming activities
include tree cropping (mango, citrus, cashew nuts, and coconuts), vegetables (chilli, brinjals,
okra etc.), food crops (maize, bananas, cowpeas, green grams etc.) and upland rice. Dairy
farming also does well in this zone. It has an average precipitation of 1,300mm per annum and
mean annual temperature of 24 0C.
Cashew nut - Cassava Zone: This zone stretches northwards along the coastal plain up to
Sokoke Forest. It has an average precipitation of 900mm and mean annual temperature of 24 0 C.
It has agricultural potential with the same crop types as in Coconut-Cassava zone, but with less
production.
Livestock-Millet Zone: The zone is of lower agriculture potential with precipitation of 700 –
900mm. The area is suitable for dry land farming especially drought tolerant crops and livestock
ranching.
Lowland Ranching: It varies in altitude of 90-300m with mean annual temperature of 270 C
and annual precipitation of 350-700mm. Major activities within this zone include ranching and
wildlife.
Coconut Cashew nut-Cassava Zone: This zone is mainly found in Kilifi South and North
Constituencies and is the smallest of all the zones. It varies in altitude from 30-310m above sea
level with mean temperature of 270 C and annual precipitation of 900mm per annum.
10 | P a g e
Sub-county Area (Km2) No. of No. of No. of Sub
divisions Locations Locations
Kilifi North 530.30 1 6 22
Kilifi South 400.60 2 6 16
Ganze 2941.60 4 16 48
Malindi 627.20 2 8 18
Magarini 6979.40 2 8 28
Kaloleni 686.40 5 11 21
Rabai 205.90 3 7 12
12,371.4 19 62 165
Source: KNBS Kilifi, 2012
Demographic Features
Population Size and Composition
The population of the county was estimated to be 1,217,892 in 2013 as projected from results of
the 2009Kenya Population and Housing Census. The population is projected to rise to 1,336,590
and 1,466,856 in 2015 and 2017 respectively at growth rate of 3.05 percent per annum. Table 3
shows the population projections by gender and age cohort for the county.
11 | P a g e
Age Male Female Total Male Female Total Male Female Total Male Female Total
0-4 96446 95740 192186 105845 105071 210916 116161 115311 231473 127483 126549 254032
Cohort
5-9 88450 87494 175944 97070 96021 193091 106531 105379 211910 116913 115650 232564
10-14 75467 75088 150555 82822 82406 165228 90894 90437 181331 99752 99251 199004
15-19 61388 59872 121260 67370 65707 133078 73937 72111 146048 81143 79139 160282
20-24 41798 55517 97315 45871 60927 106799 50342 66865 117208 55248 73382 128630
25-29 35191 43846 79037 38620 48119 86740 42384 52809 95193 46515 57955 104471
30-34 30029 36098 66127 32955 39616 72571 36167 43477 79644 39692 47714 87407
35-39 24564 25878 50442 26958 28400 55358 29585 31168 60753 32468 34205 66674
40-44 18084 19393 37477 19846 21283 41129 21780 23357 45138 23903 25633 49537
45-49 15270 16917 32187 16758 18565 35324 18391 20375 38766 20184 22361 42545
50-54 12433 16284 28717 13644 17871 31515 14974 19612 34587 16434 21524 37958
55-59 10325 10581 20906 11331 11612 22943 12435 12743 25179 13647 13986 27633
60-64 7902 9512 17414 8672 10439 19111 9517 11456 20973 10444 12573 23017
65-69 5694 6682 12376 6248 7333 13582 6857 8047 14905 7526 8832 16358
70-74 4398 5287 9685 4826 5802 10628 5297 6367 11664 5813 6988 12801
75-79 3058 3544 6602 3356 3889 7245 3683 4268 7951 4042 4684 8726
80-84 4534 6006 10540 4975 6591 11567 5460 7233 12694 5993 7938 13931
85+ 495 470 965 543 515 1059 596 566 1162 654 621 1275
TOTAL 535526 574209 110973 587719 630172 121789 644999 691590 133659 707862 758993 1466856
5 2 0
As indicated in Table 3, the county’s population was estimated to be 1,217,892 people by 2012
with 587,719 and 630,172 male and female respectively. Males represent 47.5 percent while
females represent 52.5 percent of the total population indicating a male: female ratio of 1:1.07.
From the table above it is observed that for most age cohort’s female population is more than
that of males except for those below age fourteen and above 85 years. The county’s dependency
ratio stands at 101.45 percent.
12 | P a g e
CHAPTER TWO: SITUATION ANALYSIS
13 | P a g e
CHAPTER TWO
SITUATION ANALYSIS
2.0 Introduction
This section of the plan analyses by sector the county’s institutional capacity to deliver on agreed
development targets, resource endowments, emerging issues, opportunities and threats, as well as
what the county has so far achieved in addressing development challenges across the sectors.
There are both perennial and seasonal cash crops grown within the county at both commercial
and subsistence levels. They include cashew nuts, coconut, castor, Mangoes, Pineapples, Paw
paws, Bananas, Oranges, tangerine ground nuts, peppers, Passion fruits and watermelons. These
crops support community by providing incomes and employment opportunities. However, cash
crop production in the county faces challenges of low yields, lack of value addition in terms of
processing, unreliable rainfall patterns leading to harsh weather conditions and low pricing of
agricultural products. Farming of food crops is mainly under subsistence farming that is mainly
rain dependent. The major food crops grown in the county are maize, wheat, milt, sorghum,
cassava and beans. Other major challenge facing food crop production is low yields, low
adoption of new farming techniques, limited credit line facilitation, low use of appropriate farm
inputs and inadequate extension services.
14 | P a g e
Kilifi county boasts of a wide variety of livestock types reared in the county. The county holds a
good potential in livestock production due to the available large tracts of land suitable for
ranching and favourable weather pattern for livestock keeping. Livestock keeping support the
livelihood of a significant number of the county population. The production potential is however
not being realised due to a variety of challenges. There is widespread keeping of low yielding
animals while adoption of improved animal breeds has not been significant. The extensive
ranches in the county suffer from poor management while animal diseases management at the
community level is weak. This coupled with low use of appropriate inputs due to the low
affordability and minimal adoption of value addition ventures have resulted to low incomes.
Much effort is also required to adopt and strengthen the livestock and livestock products
marketing systems.
The County has a huge potential in both marine capture fisheries and aquaculture in freshwater
and mariculture. This potential is both in terms of the extent of available water resources and in
the variety of marine products available. The industry directly and indirectly supports large
number of people such as fishermen, fish traders and traders in fishing related goods and
services. The industry, however, suffers under exploitation mainly due to low fishing capacity by
the local fishermen. Most fishing activities are artisanal in nature and take place within the 5 nm
stretches along the shoreline leading to overfishing. The industry further suffers from
undeveloped supportive infrastructure, low value addition and processing and weak marketing
structures. The industry further suffers from weak community management and governance
structures resulting in illegal, unregulated and unreported fishing. Aquaculture, both fresh water
and mariculture, requires further investment for its potential is realised.
SWOT Analysis
15 | P a g e
Strength Weakness Opportunities Threats
Skilled and competent Lean and aging Existence of Poverty and
manpower work force stakeholders unemployment
A well-structured Centralized Availability of Low literacy levels
extension service system. County permanent water Alcohol and drug
Dynamic and committed procurement sources abuse
political leadership system Existence of local, overfishing
County Government Weak information regional and High prevalence
commitment to enhance international
management of HIV and AIDS
funding to the sector markets
System Climate change
Established agricultural Existence of 200
.Unfavourable nm EEZ (Exclusive Occurrence of pests
institutions
work Economic Zone) and diseases
Collaboration with other
institutions and environment Existence of new Competition for
stakeholders ( office space , animal and plant resources
Collaboration with inadequate Biotechnologies Insecurity
national Government transport Existence of Poor Land tenure
facilities) diversified agro system
Lack of ecological zones
succession Existence of
management plan farming
Weak co- communities
ordination of Changing consumer
stakeholders Lifestyle and
preference
Inadequate
Potential in
access to financial
ornamental and
services recreational
Existence of a fisheries due to
weak Public high diversity of
private marine species
partnership Existence of animal
concept and plant genetic
Inadequate legal material for
frame works. improvement and
development
16 | P a g e
The County Department Agricultural, Livestock and Fisheries Development has had and
continues to develop and implement appropriate programmes to address the challenges facing the
industry and enhance the exploitation of the existing potential. Major programmes and projects
undertaken in 2015/16 financial year include: -
Procurement and distribution of the following certified seeds: cassava cuttings, cashew nut
and Coconut seedlings to farmers: 100 tonnes of certified maize seeds, 32 tonnes of cow
peas seeds, 32 tonnes green grams, 300,000 cassava cutting, Jap planters 34. Distribution of
20,000 mango seedlings, 66,666 cashew nut seedlings, 100 coconut seedlings is on -going.
Procurement of 1290 bags NPK, 645 bags DAP, 1290 bags CAN fertilizers to be distributed
in the next season, and 5 cassava chippers.
Carried out survey and design of 1 irrigation project (Rare River).
Procured and laid down pipes and fittings for two irrigation schemes - Mangudho and Kwa
Ndezi.
Procured pipes and 7 pumps for two irrigation schemes.
In terms of infrastructure development, 10 tractors were procured and lining of 1200 metres
distribution canals at Mdachi Irrigation schemes.
Constructed 3 water pans Mnyumbuni, Adimaye and Kahanga in Ganze Sub County.
Comlpeted 3 other water pans at Wakala, Marafa Ward, Jimba B and Mleji in Ruruma
Ward , Rabai Sub County.
On capacity the department employed 21 Agricultural Field Assistants, 2 Cooks, 14 Tractor
Operators and 4 Support Staff at Agriculture Training Centre were engaged on permanent
basis.
10 motor cycles were procured to enhance facilitation of field extension officers.
The department strengthened the capacity of its workforce by recruiting 68 new staff who
included fisheries officers, Agriculture and Livestock extension officers, tractor drivers, lab
assistants, support staff and cooks.
17 | P a g e
Development of fish handling and marketing infrastructures by construction of two fish
depots in Mayungu, Kuruwitu fish landing sites and completion of three fish depots in
Magarini, Malindi and Kilifi North.
Rehabilitation of fish handling facility/depot at Ngomeni fish landing site.
Supporting the expansion of mariculture development facility by construction of 6000
m2mariculture ponds for Mtepeni community group at Kilifi South.
Support to fresh water aquaculture through provision of 190,000 monosex Tilapia and 30,000
Catfish Fingerlings to fish farmers.
Support to improved fishing technologies through provision of 31 outboard fishing engines to
fishermen.
Procurement and provision of, 8 deep freezers and 17 cool boxes to support quality and safe
storage and transport of fish and fish products among the BMUs.
Support to sustainable fishing method through provision of 230 recommended gill fishing
nets to fishermen.
Support for safety of the fishermen through provision of 480 life jackets to fishermen.
Support to safe, hygienic and sustainable fish marketing equipments through provision of
160 solar lit fish selling boxes to women doing fish marketing.
Conducted the conduct of 16 elections of BMU executive committees and establishment of 1
BMU in Magarini Sub County.
Developed Thirty five (35) Farmers Field Schools in the areas of coconut, cashew nuts and
chicken and fish farming.
Managed to issue 1,642 fisheries management licences, and 2,142 fisheries trading related
activities.
Through collaboration with FAO carried out 3 trainings for 56 farmers (34 men 22
women)and 13 fisheries staff, constructed a 2000m 2 mariculture pond and provided farming
inputs such as fish feeds and fertilizers.
With collaboration with CAST Kenya assisted Uwezo Women Group (Bofa BMU) to
establish an equipped fish selling out- let and trained30 women group on business skills.
A total of 8 patrols done with a total of 12 arrests of which 10 resulted into convictions and
fined.
18 | P a g e
Completed construction and electrification of Zowerani milk collection and cooling plant at
Tezo ward in Kilifi North Sub county, partly completed was construction of toilet and
drainage system of the same.
Completed construction and electrification of Rabai milk collection and cooling centre at
Mkapuni , Ruruma ward in Rabai Sub county.
Completed construction of Mleji water pan in Ruruma ward inRabai sub county
Completed construction of Vitengeni Livestock sale yard in Sokoke ward, Ganze sub
County.
Completed construction of Tsangatsini livestock sale yard in Mariakani ward in Kaloleni Sub
County.
Completed construction of Kanagoni livestock sale yard at Adu ward in Magarini Sub
County.
Completed construction of Langobaya Livestock sale yard in Jilore ward in Malindi Sub
County.
Procured and distributed 65 dairy cows to 35 farmer dairy farmer groups (one dairy cow to
each of the 35 wards) and 30 to 20 dairy groups in Ruruma ward in Rabai Sub County.
Procured 126000 Napier grass cuttings for dairy farmers in the county.
The Department of Agriculture, Livestock Development and Fisheries lead other county
departments in the county to participate in Mombasa Agricultural show in 2015.
The department procured 200 bee hives and distributed equally to Magarini, Malindi,
Kaloleni and Rabai sub counties.
On extension services – technology transfer-: 141 dairy farmers underwent a five days
Residential training at ATC Mtwapa while 7,510 were trained during none residential
course , the department through Livestock Production reached 5,332 farmers during field
days , 3695 during on farm demonstrations, 11,485 farmers during Barazas even as the
directorate conducted 14 Supervision to the wards and 4,631 farm visits.
Veterinary Services Directorate rehabilitated 6 cattle dips,2 of cattle dips in Kaloleni and
Magarini Sub Counties each and 1 in Ganze and Malindi Sub Counties each.
The department constructed 11 vaccination crushes that will be used for dipping services.
19 | P a g e
2 successful vaccination and two baiting campaigns were carried out achieving a total of
3,881 anti rabies,18,426against Foot and Mouth disease,11,097 against Lumpy skin disease,
23,802 against Contagious Caprine pleuropneumonia,13,289 against Anthrax/Black quarter
disease, 74,135 against Rift Valley Fever, New Castle disease 52,909 and 29,411 against
Gumboro disease.
The Veterinary services Directorate in providing its regulator sanitary standards effecting
release of quality animal products and by products collected Kshs 4,611,751.80 as revenue to
the County.
The department conducted Artificial Insemination services programme achieving a total
insemination of 1,114 heads of cattle by bull semen from improved exotic breeds ranging
from Brown Swiss, Guernsey, Aryshire and Fleckvier
A total of 2000kgs of Liquid nitrogen and 2500 doses of bull semen were acquired for
insemination.
The department is committed towards the achievement of quality early childhood education,
stable and Empowered Youth population and higher standards of sports activities. In addition,
the department is bound to achieve national and international development commitments such as
vision 2030 and the Millennium Development Goals (MDGs) respectively.
The county has 799 public and 830 private ECD Centres with a total of 1718 Teachers in public
ECD centres, 492 primary schools and 120 secondary schools as well as 277 adult literacy
centres. The county will need to emphasize a lot on advocacy on the importance of education and
particularly pre-primary education.
In primary schools, the Teacher/Pupil ratio is 1:59 which is higher than the recommended 1:40.
The Gross enrolment rate is 95.8 percent with boys being more than girls in the primary schools.
21 | P a g e
The completion rate is 83.7 percent but the transition rate is only 45 percent thus implying that
there are a high number of pupils who complete primary school but do not proceed to secondary
school. The proportion of the population that is 5 km or more from the nearest primary school is
65.1 percent and thus there is need to invest in more primary schools.
The literacy level of the population aged 15 and above remains low. Those with ability to read
and write stands at 65.5 percent while 34.5 percent cannot. The adult literacy level in the county
is 65.3 per cent.
The gross enrolment rate in secondary school in the county is very low at 42.5 percent while the
net enrolment rate is 34 percent with differentials being reflected with boys having a higher
enrolment rate than girls. There is need to emphasize on the girl child education as well as put up
more secondary schools especially because 72.4 percent of the community have to travel 5 km
or more to access the nearest public secondary school.
The county has nine private accredited colleges; one middle level college (KMTC Kilifi) and 13
youth polytechnics .These institutions offer youth a chance to further their skills to make them
competitive in the labour market. There is one university and at least four satellite campuses of
various universities.
Swot Analysis
22 | P a g e
KEY ACHIEVEMENTS
Phase one construction of an ECD Resource centre Kibarani Ward at Fumbini village.
His Excellency the Governor laid the foundation stone. It consists of 6 classrooms, an
office block, a hostel and toilets. Phase Two is in progress.
Construction of 35 model ECD centres built in 28 wards across the county. 20 are
complete, others are on-going.
Issuance of Kshs. 350,000,000 (million) towards the County Ward Scholarship Fund.
Disbursement has been done to students of secondary schools, colleges, universities and
other vocational institutions.
Equipping of 89 ECD model centres with tables and chairs for children and teachers
Development of policies for pre-primary, sports, youth training and youth affairs.
Minimal co-ordination between the consumer department, finance department and the works
department on the tendering and awarding of tenders. This causes a problem when it comes
to implementation of the projects.
Award of scholarships need to be streamlined to ensure that the objectives of the fund are
realized.
Employment of pre-school teachers has been hampered by a court injunction which demands
all teachers to be under one employer.
The world economy today is driven by ICT and therefore the County lays great emphasis on the
essence of this sector. The focus for this sector is to establish the most competitive ICT hub in
the county for business efficiency, county government management and ICT enterprises. The
County, in conjunction with the relevant National Government Departments and through Public
Private Partnerships, will put in place dynamic information and communication infrastructure
that can facilitate processing, communication and dissemination of information more efficiently
and cost effectively.
SWOT ANALYSIS
24 | P a g e
A well cascaded sizeable field changes in the gaming
professional staff industry
a) Participated in the development of The Kilifi County ICT Road map. This was initiated by
The Kenya ICT Authority funded by The World Bank.
b) Built County connectivity infrastructure by ensuring all 7 Sub Counties HQs offices are
connected to The Kilifi County WAN (Wide Area Network)
c) Deployed a Unified communication system in the County HQ Offices.
d) Deployed a Electronic Data management Systems in the County to manage workflows and
reduce paper usage.
e) Equipped 7 more Polytechnics to make the Number 14 Public Youth Polytechnic equipped with
ICT equipment. (Distoni YP , Gede YP, Adu Yp, Mambayandu YP, JIlore YP.Kakoneni Yp,
Pingilikani YP). This is enabling ICT capacity building in the County especially among the
youth.
f) Construction of four social halls (Mpirani, Malindi, Mariakani and Kambe Ribe).
25 | P a g e
vi. inadequate policies and bills to guide and mainstream culture and social service
activities within the County.
vii. Inadequate budgetary allocations for implementation of key development projects
within the sector.
viii. Lack of utility vehicles for project supervision..
ix. Inadequate technical staff capacity for proper and effective service delivery
x. Lack of unified staff office accommodation
xi. The rapid technological changes in gaming industry
Trade, Industrialization, Co-operative Development, Tourism and Wildlife is one of the twelve
departments that constitute the executive arm of Kilifi county government. The department
comprises of three directorates with seven sections as follows:
SWOT Analysis
26 | P a g e
experienced staff measurements Political goodwill Climatic change
Availability of Dormant co-operative Community support
standards and testing societies Availability of Radicalization
equipment for Poor succession management potential development Beach erosion
verification and and affirmative action in co- partners
inspection operatives Availability of Uncontrolled
Presence of offices Poor governance in co- information development
at the county and operatives technology for
sub counties Collapse of key agricultural marketing e.g. Travel advisories
Guiding policies in sub-sectors e.g. cashew nuts facebook, whatsup,
Public land
place Low value addition of local twitter, instagram,
Existing tourism produce youtube, etc grabbing
facilities Inadequate tourism standards Lay-offs in Hotel
and regulations based Sacco’s
Seasonality of the Tourism
Industry Low levels of
Inadequate ICT equipment technology usage
Inadequate transport High poverty and
Low staff morale illiteracy levels
Inadequate budgetary
allocation
Weak partnership with
government agencies and
stakeholders
Poor interdepartmental
linkages and co-ordination
Poor enforcement of the law
Absence databank and other
real time information on
cooperatives for timely
decision making
Organized two co-operative publicity events .i.e International Co-operative Day and Sacco
Day
Organized and participated in International trade fairs and exhibitions i.e Dar Es Salaam
International Trade Fair
Organized five Tourism Promotional events e.g. Hosting of Kilifi County Miss tourism, Miss
and Mr World beauty pageant, Malindi Multicultural Festival, Watamu rugby and 4x4 off
road motor challenge
Marketed Kilifi County as a Tourism destination through local and international Trade Fairs
Trained 205 beach operators and community eco-tourism guides
Emerging Issues
i. The weakening of the Kenyan shilling affects lending and business growth
ii. Insecurity threat in the region has dampened the vibrancy of businesses and Tourism in the
County.
iii. Emerging of Value chain co-operatives
iv. More Youth and women embracing the co-operative model.
v. Ward development projects
vi. Radicalization of youths threatening security
vii. Close down of financial institutions
viii. Grabbing of public land
ix. Closure of domestic routes by the National carrier
28 | P a g e
Key Challenges
29 | P a g e
The Department of Water, Natural Resources, Environment, Forestry and Solid Waste
Management mandate is to ensure provision of safe water, clean and healthy environment
for all. It holds the sustainability of the Counties Economic Development and Prosperity.
The need to ensure sustainability of all the programmes and projects lies in sound
management of the environment and the natural resources whilst focusing on the social
economic dimensions. This focus on the sustainable management of the environment is
anchored within the Sustainable Development Goals making sound environmental
management a key pillar in economic development. The National Government recognizes
the need for sound environmental management hence the Ministry of Devolution; in the
County 2016/2017 financial year integrated environmental sustainability as a key item in the
performance evaluation. The Department was given the responsibility to manage waste in
the county in June 2015. Appreciating that the county’s waste has not reached
unmanageable levels, key issues to note is the high recurrent costs associated with human
resource wages, vehicle fuel and maintenance costs and waste management infrastructure
acquisition and development including PPEs. The social dimension of integrating
community forms the backbone of waste management as the people are the primary
generators of waste.
The county stands at the national average forest cover of 6.07%. Increasing the forest cover as
envisioned by the constitution faces threats in the county due to increasing deforestation
through illegal logging and charcoal burning, and lack of community motivation to plant
trees. With the finalisation of the Transition Implementation Plans, programs on forestry
should be considered for funding to reverse the above trends. Climate change impacts
continue to be experienced in the county ranging from extreme droughts, rising of the sea
level and erratic weather patterns resulting in poor rainfed agriculture programs in the
County. This threatens the livelihoods of the Kilifi County residents. The focus on
agriculture needs to clearly integrate environmental programs to mitigate climate change
resultant impacts and support coping mechanisms.
The County has plenty of minerals ranging from the already exploited limestone blocks in Tezo,
Ballast in Ganze and Sand in Magarini. Major mining opportunities exist in mineral titanium
in Sokoke and Mambrui and base metals (iron ore and manganese in Ganze Sub County.
Though there is quite a substantial exploitation of minerals in the county, the trickle-down
30 | P a g e
effect to the community is far unreached. The department has managed to do a Minerals
Exploitation Plan, sand harvesting policy and bills with special focus to artisanal and small
scale miners. These programs once supported will improve the livelihood of over fifteen
thousand community members who directly benefit from the minerals exploitation sector.
With the development of the County Outdoor advertisement policy, Environment regulation and
control bill in 2016, the department has developed programs to stream line these areas. Most
revenue collected in the county is currently from the Natural Resources, Environment,
Forestry and Solid Waste Management. This revenue collected can be increased if programs
and projects in the Department are funded. Equally, the section's programmes and projects
would directly support the community cope with climate change impacts of erratic rains,
prolonged droughts, extreme temperatures and crop pests and diseases which are currently
hardly hitting the people of Kilifi county and rarely associated as direct impacts to climate
change.
Water in the county remains a problem for domestic use, livestock and Irrigation. The County
has 1205 shallow wells, 135 water pans, 90 small earth dams and 50 boreholes. The
proportion of households with access to piped water is 48.1 per cent while proportion of
households with access to potable water is 63.3 per cent
Major funding support has been in water infrastructure development in the past year with the
initial focus being in Water Pipeline Extensions, New Water Pipelines, Water Pans, and
storage facilities. This has led to the improvement of the water provided to residents from
63.3% in the county to 75% It has also reduced the average distance of a community
member to draw water from 5km to 3km in the rural areas where water is scarce.
SWOT Analysis
Strengths Weaknesses Opportunities Threats
Existence of a key Dilapidated water Positive attitude Skyrocketing
water resource base infrastructure towards forest cost of power at
(Sabaki, Rare, Lack of machinery and conservation by the the water works
Kombeni, Kafuloni equipment to develop community significantly
rivers; well fields, water infrastructure such Existence of key raising the unit
springs) in the County as dams and boreholes donors and cost of
Existing water Constrained capacity of development partners production of
infrastructure within the 2 Water Service such as The World water
the county (boreholes, Providers (WSP) to better Bank, JICA and UN Infrastructure
31 | P a g e
water treatment works, deliver services keen to work with the vandalism
high lift pumps, Inadequate knowledge and County in advancing Unpredictable
transmission and local human capacity on development goals weather
distribution pipelines mineral exploitation Water demand conditions
and water storage Low capacity to mitigate outstripping supply Poor sanitation
tanks) against drought in areas Availability of Industrial
Availability of land not covered by the water suitable sites for pollution
and variety of natural pipeline supply network water resources Loss of
flora and fauna in the High wastage (Non- development biodiversity
County Revenue Water) due to Development of a through Illegal
Availability of pipe leakages and low sustainable logging and
environmental metering community based charcoal burning
governance Uncoordinated environmental Polythene
institutions created by development of water management menace
EMCA e.g. NEMA structures by various strategies such as Human wildlife
and County players social forestry conflict
Environment Poor waste disposal The initiative to Competing land
Committee Lack of sewerage systems Gazette all the forests use with forestry
Ability to generate in major towns in the in the county
revenue through County Establishment of tree
licensing levies and Lack of gazettement of nurseries
permits etc. some forests Environmental
Existence/formation of Inadequate involvement of Action Plans
the County communities in Draft Government
Government environment management policy on recycling
department charged Weak enforcement of and disposal of non-
with Water and environmental regulations biodegradable
Environment Lack of Gazetted materials such as
Availability of wide environmental law polythene bags
range of unexploited enforcement officers Establishment of
minerals (manganese, Weak enforcement of environmental clubs
titanium, iron ore, coal mining regulations in learning
and lime) institutions
Conducting EIAs and
Environment Audits
The Department has been developing legislation and policies to streamline its operations and
management. The legislation includes the Water Bill, The Environmental (Regulation and
32 | P a g e
Control) Bill, The Sand Harvesting Policy, The Quarry Bill and The Outdoor advertisement
policy. This has also been coupled with the development of other strategic documents to guide
management of the resources including the Natural Resources Exploitation and Management
Plan, The County Environment Action Plan and The outdoor advertisement master plan which is
yet to be developed. The Department also developed the Strategic Plan for five years. Several
programmes have been implemented including the green school programme, commercial
woodlots project, education and awareness on environment, urban greening and beautification
programme, and many water pipelines extensions, dams and boreholes.
33 | P a g e
experienced relates to underfunding of the function. The staff lack PPEs for safety during their
work, and equipments to aid their work. Little funds are available for maintenance of the
vehicles and dumping areas located far from the collection in Mtwapa, Gongoni and Watamu.
Non integration of the County Projects and Development programs with Environmental matters
results in lack of sustainability of most of the projects and threatens the Kilifi People. This is a
major challenge in the wake of climate change being felt in the county. Erratic rains resulting in
poor rain fed agriculture production has become a common phenomenon in Kilifi County.
Drought experienced in some parts of the county are a direct result of deforestation which
threatens both human, crops and livestock. Agriculture and other development projects and
programs must integrate environment aspects for sustainability.
The main challenges facing the water sub-sector revolve around financing and capacity provision
of clean, safe, accessible and affordable water and sanitation services for all is hindered by single
reliable water source (Baricho), old water infrastructure, less storage facilities, low community
participation in water management issues and saline underground water (such as; Chonyi, Roka,
Mtondia, Ngerenya and Ganze).
The County Government through the Department of Water Environment, Forestry and Natural
Resources, with the support of development partners like the National Drought Management
Authority, the Constituency Development Fund and other agencies has invested heavily in
construction of water pans in the hinterlands in an effort to alleviate water shortage within the
county. The national government (through Coast Water Services Board) has also rehabilitated
the Baricho and Mzima water supplies to improve access to potable water. All these efforts are
geared towards reducing walking distances to water points. The county however needs to embark
on the rehabilitation of the existing water schemes to increase their efficiency, including
construction of earth dams and pans. The communities will further be encouraged to build
shallow wells, sub-surface dams and also undertake roof catchments to harvest rainwater.
Environmental Challenges
Lack of proper enforcement of the environmental act
Catchment areas degradation
34 | P a g e
Lack of interest to activities of common good
Scarcity of land due to subdivisions (reducing of land sizes as a unit production per
household
Limited financial resources
Lack of adequate understanding of the nexus between human activities and climate
change among the policy makers, land users and the general public
Weak legal provisions
Ignorance
Water Challenges
Old and dilapidated systems
Low coverage
Single reliable water source (Baricho),
Less storage facilities,
Low community participation in water management issues and
Saline underground
Poor storm
Climate change
water drainage
Inappropriate application of resources
Lack of proper and adequate sewer disposal
35 | P a g e
public service, the county government will invest in a low cost housing scheme on mortgage
basis to be introduced through financial institutions so as to provide homes for those
workers in the county who would like to purchase own houses
To ensure planned formal settlement the county government will demarcate land and assign
housing estates to such in all major towns of the county. These estates will be planned to
have all amenities such as water, electricity, sewerage system and other essential services.
This controlled development will have designs and drawings done by the county public
works.
The county government of kilifi in its current economic transformation strategy for employment
and wealth creation identifies energy as one of the critical pre-requisites towards the
achievements of the countys economic development goals.
SWOT analysis
Strength Weakness Opportunities Threats
The Lands office is in Landlessness There is a high demand The unresolved
place for housing land question
Lack of an
Goodwill from the integrated The National Land Uncontrolled
community framework for policy urban development
physical
Availability of building Availability of abundant
development in the
materials (sand, ballast, sources of renewable
County
cement, coral blocks, energy such as wind and
steel, roofing materials) Weak Building Code solar.
and appropriate building
Inadequate Ongoing energy
technologies
specialized development programs
The County Housing unit equipment for land by the national
has staff and office space mapping and government
surveying.
All urban centres have Development partner’s
electricity from the interests in County
national grid development
In fulfilment of its mandate the department implemented the following projects, among others, in
2015/16 financial year: -
36 | P a g e
Development of the county spatial plan. The plan identifies programs and projects for the
development of land, indicate areas where priority spending is required and set out a capital
investment framework for the county’s development program.
County Resource Mapping. This took stock and compiled an inventory on the status of all the
resources within the county. This ensures that resources are exploited in a sustainable manner
for the benefit of the citizens.
Titling survey of Mwele adjudication section. Registry Index map of 1625 plots. Part of a
total of 17933 surveyed plots for titling purposes in the years under review.
Titling survey of Mleji adjudication section. Registry Index map of 1800 plots. Part of a total
of 17933 surveyed plots for titling purposes in the years under review.
Titling survey of Kitengwani adjudication section. Registry Index map of 2675 plots Part of a
total of 17933 surveyed plots for titling purposes in the years under review.
Titling survey of Tsangalaweni adjudication section. Index map of 2730 plots. Part of a total
of 17933 surveyed plots for titling purposes in the years under review. Registry Index map of
560 plots.
Titling survey of Petanguo adjudication section. Registry Index map of 560 plots Part of a
total of 17933 surveyed plots for titling purposes in the years under review.
Titling survey of Baricho adjudication section. Registry Index map of 1605 plots Part of a
total of 17933 surveyed plots for titling.
Survey of Gongoni squatter settlement scheme. Registry Index Map of 833 plots Scheme
planning & surveying of plots
Part of a total of 17933 surveyed plots for titling purposes in the years under review.
Survey of Bureni squatter settlement scheme. Registry Index Map of 251 plots Scheme
planning & survey of plots
Part of a total of 17933 surveyed plots for titling purposes in the years under review.
Survey of Chakama II settlement scheme. Registry Index map of 1956 plots Part of a total of
17933 surveyed plots for titling purposes in the years under review.
Planning of Kaloleni town. Notice of completion published. Inception report, base map,
preparation data capture &processing, stakeholder’sengagements, land use plans,
development strategies and guidelines.
37 | P a g e
County land audit. Determination of ownership of various land parcels within Mariakani
Township, Mtwapa, Mazeras/Bonje and Kilifi-Mnarani in dispute.
Housing audit. Auditing of all county housing estates and public buildings, formulation of a
repair and maintenance plan and coming up with projections of county housing needs in all
urban centers.
Housing survey. Determination of housing units and their physical conditions for both
private and public, documentation of challenges facing the affordability of quality housing,
and finding out the general housing market trend. It was also expected to provide an analysis
of the type of building materials used in the county.
Energy audit. Kilifi county energy audit.
Purchase of land. Purchase of 11 acres for bus park ,market, stadium and court
38 | P a g e
2.7 Finance and Economic Planning Department
The department of Finance and Economic Planning is one of twelve departments that constitute
the executive arm of the County Government of Kilifi. It comprises of six sections namely
Accounting Services; Supply Chain Management; Internal Audit; Budget Management and
Economic Planning; Revenue Management and Corporate Services. The mandate of the
department includes mobilizing financial resources; management of County finances and other
assets; provision of advisory services on public financial management and overseeing
formulation and implementation of County development policy and plans.
SWOT Analysis
The department has in the last three financial years developed and facilitated enactment of
various legislations to streamline its operations; actualize devolution and improve service
delivery. The legislations include Appropriation Acts (2013; 2014; and 2015); Rating Act 2016;
Valuation for Rating Act 2016, the Kilifi County Ward Scholarship Fund Administration Act,
2013; Valuation for Rating Bill 2014, Finance Acts (2014; 2015), Emergency Fund Draft Bill,
Tax Waiver Bill, Ward Development Programme Policy and County Donation Policy, 2016.
This is in addition to developing the first County Integrated Development Plan (CIDP 2013-
2017), deepening the use of the Integrated Financial Management Information System (IFMIS),
39 | P a g e
and training of staff on the same. The department has also prepared a five-year strategic plan
which forms the basis for staff performance and appraisal. This has revolutionized financial
transactions and related services that constitute the core service delivery mandate of the
department.
The county has five level 5 public hospitals, 13 public health Centres, 120 public dispensaries,
one mission hospital, two private hospitals, one armed forces hospital, five private nursing
homes and 107 private clinics. The bed capacity in hospitals is 498, in health Centres it is 30
and in nursing homes is 16. The doctor/patient ratio is 1:42,625, clinical officer/patient ratio
is 1:30,194 while the nurse/patient ratio is 1:3,396. Malindi, Kilifi and Mariakani district
hospitals are the only referral hospitals in the county. Kilifi District hospital hosts KEMRI
that is involved in various health research activities. The inpatient bed capacity in health
facilities in the county is 508 beds.
The average morbidity rates in the county are 12.9 percent with females having higher
morbidity rates at 15.4 percent as compared with men at 9.9 percent. The most common
causes of morbidity in the county are malaria/fever, lower respiratory infections, stomach
ache, diarrhoea and flu.
The contraceptive prevalence rate is low at 37.3 percent thus implying a low utilization of family
planning services. This is further exhibited by relatively low Anti-Natal Clinics attendance
by pregnant women at 50.5 percent.
40 | P a g e
A healthy population is essential for higher productivity and sustained long term development of
a nation. We have achieved notable progress, especially in controlling communicable
diseases (tuberculosis, HIV/AIDS and malaria) and attaining marked decrease in child
mortality, but other health challenges associated with affluence and accidents are emerging –
putting pressure on our health care system. The aim of Kilifi County Government in is to
enable all Kenyans access to modern and well-equipped health facilities and well trained and
motivated health care workers. The county government of Kilifi and other partners, will
implement a second generation health care reform strategy involving; recruitment of more
health workers, expansion of training facilities, development of systems to support and
expand health care services and sanitation at the community level. A program for health care
infrastructure upgrade and equipment modernization, especially through leasing, will be
implemented. Kilifi County Government will also finalize the development of a health
policy and institutional and legal framework for enforcement of health care standards. In
addition an efficient, effective and accountable framework for the management of public
resources and medical supplies at the facility levels will be put in place.
SWOT ANALYSIS
Health facilities existing up Human Resource Provision of free maternity Social barriers and
to tier 3 (74 dispensaries, services practices and Tourism
12 Health Centres, 5 Inadequate staffing levels; influence
Hospitals) Low skills development;
Mal distribution of human
resource;
Poor staff attitude;
Low staff morale.
Availability of skilled staff Weak supervision Partnership Emerging and remerging
condition
Availability of management Inadequate space and room Existing social structure Societal norms
teams and Structure
Availability of essential
health products (Medical
drugs and health
commodities
Medical services
(treatment);
Medical services
(treatment);
Rehabilitative
services;
Sexual and
Reproductive
Health ( maternal
and child health
TB/HIV/ Malaria.
Availability and use of Inadequate storage space – Beyond zero initiative;
National health policies and warehousing;
guidelines (MDGs, Vision Alternative traditional
2030) Lack of basic and medicine;
specialized health care
equipment; Tour resort sites and hotels
which can be an avenue for
Lack of standard equipment medical tourism;
guidelines;
Peace and stability in the
Lack of ethical research County;
committee;
Inadequate transport
facilities);
Non-compliance with
standards and guidelines;
Poor dissemination of
guidelines and standards;
42 | P a g e
Inadequate facilitative
supervision;
The department has completed 26 Dispensaries which had been left incomplete by either CDF,
LASDAP or LATIF. The facilities are as below:
The following health facilities were refurbished to enhance preventive maintenance and continued
provision of Heath care services: Chasimba Health Centre, Ganda, Pingilikani, Mwapula, Jaribuni,
Palakumi Dispensaries and Bamba Sub County Hospital.
To increase access to specialized maternal health care,Maternity and operating theatres were
constructed in the following health facilities: Marafa and Rabai Health Centre, Mariakani, Jibana
and Bamba Sub County Hospital.
In addition, the following maternity wards were constructed to increase access to maternal and
43 | P a g e
health care: Kakoneni, Uwanja wa Ndege , Mrima wa Ndege, Jilole and Lenga Dispensaries
Two hundred medical staff cutting across cadres were employed. This is geared towards reducing
the gaps in the staffing levels to improve efficiency and effectiveness in health care service
delivery.
To improve the health facilities capacity and to increase access to specialized diagnostic health
care, the following equipment was procured: Physio/Occupational/ Orthopaedic Equipment, Renal
Dialysis,CT Scan, Digital X-ray Machines, Laboratory Equipment, X-ray Machine, 2 Dental
Chairs, Operating Tables (4No.) for Rabai, Bamba, Jibana and Mariakani, anaesthetic machines
and assorted theatre equipment.
Further, the department procured the following equipment, 12 baby incubators , 80 delivery beds ,
120 patient beds and mattresses, 20 stethoscopes, 20 baby weighing scales, 20 adult weigh scales,
20 suction machines, 20 wheel chairs. 40 office tables, 80 office chairs, 40 screens, 40 drug
cabinets. This equipment has facilitated the operationalization of completed stalled health
facilities.
As strategy to improve Pharmacueticals and non Pharmacueticals and other related commodities
availability has been approached through the construction of a county warehouse at Kilifi County
Hospital. To cater for staff welfare and improve health care service delivery, staff houses were
constructed as below: Mtepeni, Kiwandani, Mtwapa, Jila, Uwanja wa ndege and Ndatani
Dispensaries.
Need to decentralise financial management. The Chief Officers need be empowered to manage
finances at the departmental level while the county treasury oversees the financial operations in
the County and gives technical advice.
There is an increase in diabetic cases and there is need to focus and plan on the strategies to
44 | P a g e
address the same.
Cases of cancer have been on an increasing trend. There is also need to focus and plan on
strategies to address the same. The department of health has made cancer sensitization, screening
and treatment one of its programme for a more strategic and structured approach in public
sensitization, education, screening and treatment.
Community strategy empowers community to take care of their health needs. There is need to
embrace this strategy and to focus more on preventive health services.
Access to health services is still a challenge in some of the parts of our County and in some cases
the patients have to travel for long distances as they seek for health services. However, the County
Government of Kilifi is committed to ensure there will be health facility in every county ward. On
realising this, the next strategy will be to ensure there will be a health facility after every 5
Kilometres as per the WHO standards.
SWOT Analysis
45 | P a g e
KEY ACHIEVEMENTS 2015/2016
The department has in the last financial year achieved the following;
The Board’s mandate cuts across all County Government Departments due to its composition
and placement in the County Government structure. It provides overall policy and leadership
direction in the management of County Human Resource, coordinates policy formulation,
implementation, monitoring and evaluation. The specific functions of the Board as provided for
in Article 59(1) of the County Government Act 2012 are to;-
The above functions are implemented through committees with the support of the secretariat.
Each committee is composed of at least two Board members, secretariat staff and co-opted
members. CPSB has five committees namely Recruitment and Selection Committee,
Performance Management Committee, Planning, Monitoring and Reporting Committee,
Human Resource Management and Development Committee and Compliance and Quality
Assurance Committee.
SWOT ANALYSIS
Strength Weaknesses Opportunities Threats
Diverse background of Inadequate human Good working Wide and diverse
the Board members resource for CPSB relations with demographics
Collaboration between Inadequate stakeholders (competition for the
Secretariat and Board infrastructure Collaboration few job
members with external HR opportunities)
Support from MCAs associations and Higher expectations
and County Executive firms from the members
Board members of public
involved in decision
making
Shared values and
cultures
47 | P a g e
KEY ACHIEVEMENTS 2015/2016
During the period under review the Board achieved the following:
During the period under review, the Board faced a number of challenges in the discharge of its
constitutional mandate. The challenges included:
48 | P a g e
Inadequate human resource due to low remuneration package, mismatch of skills and job
requirements and inability to get staff with the required qualifications on some of the
positions advertised
The Board was not able to share the policies developed with stake holders
Managing the transition process and dealing with low morale of employees of the DLA
Ensuring equitable distribution of the few employment opportunities to meet the
constitutional requirements on gender, youth, religion and marginalized groups
Criterion for absorbing casuals inherited from DLA with no requisite qualifications
Gender disparities making it difficult to meet the two thirds constitutional requirement in
appointments
Handling promotion cases for devolved staff where personal files have not been transferred
Litigations/lawsuits against the Board
49 | P a g e
Chapter Three: Development Projects and Programmes
50 | P a g e
CHAPTER THREE
3.0 Introduction
This section provides an overview of departments’ vision, mission, sector priorities and
programmes and projects proposed to be undertaken in 2017/18 financial year, based on the
CIDP and sector strategic plans. It lists two sets of programmes and projects: one of ongoing
programmes and projects and another of new proposals. Ongoing programmes are those initiated
in previous and current financial year, but which implementation are planned to continue into
2017/18 and even succeeding financial years, according to the annual MTEF three-year rolling
expenditure planning. Projects listed as ongoing are those being implemented in phases and will
be requiring second or final budgetary allocation in 2017/18 fiscal cycle. The other set of
proposals, the new programmes and projects are geared to addressing emerging issues and new
priorities, guided by the CIDP, sector strategic plans and other national development plans and
priorities.
Vision: The Department’s vision is: “Food security for all people in the County”
Mission: To transform and promote agriculture, livestock and fisheries for improved livelihood
and sustainable development
51 | P a g e
regulations chemicals; Enhance capacity building for
farmers and stakeholders;
Improve agricultural Inadequate facilitation for
Streamline Licensing procedures for
productivity extension services
stockist.
Promote value addition of High cost of farm inputs
Encouraging proper timely
agriculture commodities
High post-harvest loses due to harvesting and storage ;
Increase area under irrigation, incidences of pests e.g. weevils;
Promotion disease resistant crop
Modernize agriculture Low productivity of trees crops varieties;
through Research and like coconut and cashew nuts;
Implementation of tree crop
innovation
Poor and fluctuation prices of farm rehabilitation programme for
Promote sustainable land use produce; increased productivity.
and conservation
Poor roads network leading to loss Facilitate access of clean and disease
Develop Market infrastructure in horticultural produce; free planting materials.
Fisheries Sub-Sector
Promote sustainable Low capacity fishing fleet. Promote sustainable fishing
development of fisheries technologies
resources. Low productivity in both capture
Build the capacity and structures of
and aquaculture fisheries.
community management and
To reduce post-harvest losses
governance.
for fish and fishery products. Weak fisheries management and
governance structures.
Develop the sector human resource
Maintain quality of through Inadequate legislation and policy capacity.
the fish value chain.
52 | P a g e
Weak capacity to stop Illegal, Development of relevant legislation
Develop the capacity, Unregulated, unreported fishing.
Support development of access to
efficiency and quality of
financial services to fisher folk.
service provision. Weak information, research and
extension linkages.
Promote and support initiatives to
Support to value addition
develop aquaculture.
initiatives to fish and fishery Inadequate handling and storage
products. facilities;
Development of fisheries training
Inadequate access to financial facility.
To develop and promote fish services,
and fish products marketing
systems. Inadequate skills capacity among Strengthen enforcement of fisheries
the extension staff. regulations
Promote aquaculture
Inadequate facilitation for Promote development of more
development.
extension services. efficient fishing gears and fishing
methods.
Increasing exploitation of
EEZ fishery resources. Inadequate land for establishment
of fish handling infrastructures Promote establishment of
appropriate fish handling,
Development of fisheries
preservation and marketing
training facilities.
infrastructures.
Maintain International fish safety
and quality standards along the fish
value chain
Livestock Development Sub-Sector
Develop strategic water Inadequate water for livestock Construct water pans
reserves – water pans / during drought Drill boreholes
boreholes Erratic rainfall Develop dams
Pasture and fodder -Inadequate pasture and fodder for
Reseeding of degraded land.
development livestock during the dry periodsPromote fodder and pasture
-Lack pasture seeds bulking / production.
stockiest in the county Promote fodder and pasture
Inadequate and Erratic rainfall conservation
Facilitate farmer capacity building
Establishment of Hay shed
( livestock feed reserves)
Dairy development -Inadequate knowledge skill in -Capacity building of the dairy
dairy production farmers
Poor quality dairy cattle - Promote use of Artificial
53 | P a g e
Inadequate livestock feeds( home insemination
grown and commercial feeds) - Facilitate dairy groups with dairy
Low levels of value addition of cows for demonstration
milk. -Facilitate farmers to adopt value
addition technologies.
Poorly organized farmer groups -Promote own grown feeds as well
as home farm feed formulation.
Organize and built strong farmer
marketing groups
Facilitate development of milk
marketing infrastructure.
Meat goats Low productivity of indigenous Introduction of Galla goats for
meat goats upgrading the indigenous goats to
Inadequate fodder and pasture in big mature body weights and
the goats rearing areas produce more meat
Beef cattle production Low productivity of indigenous Introduction of Boran bulls for cross
cattle breeding for fast growth rate and big
mature body weights.
Beekeeping Low number of beehives and in Facilitate the farmers to acquire
the county more beehives and harvesting kits
Inadequate bee harvesting kits Capacity building the farmers
Inadequate technical knowledge Facilitate linkage of the farmers to
by the beekeepers the markets
Cashew nut, coconut and Increase area under Distribution on going for
7,416,610 128,666
mangoes promotion cashew nut and 66,666 cashew, 20,000 mango
seedlings
productivity and 100,000 coconut seedlings
Increase farmer’s
income
Construction of Enhance marketing Construction of cassava
12,000,000 1
Agribusiness centre for and income processing plant
55 | P a g e
Cassava processing generation for food
security
Cassava solar drying shed Enhance cassava Construction of a solar dryer
704,900 1
processing that is like a green house
P.3 Agribusiness and Information management
57 | P a g e
Construct New Milk To improve market 4,227,966 One unit completion and equipping the
collection and cooling access for the raw centre
centres milk
Marafa
Complete Construction To improve market 1,204,904 One unit Construction and equipping
works of Zowerani milk access for the raw the centre
collection and cooling milk
centre
Tezo
Construction of Rabai milk To improve market 2,004,000 One unit completion and equipping the
cooling and collection access for the raw centre
centre milk
Rabai
Tsangatsini livestock sale To facilitate market 1,300,000 One unit Construction
yard perimeter fence and access for livestock
toilet
Kayafungo ward
Perimeter fence Langobaya To facilitate market 500,000 One unit Construction
livestock sale yard and access for livestock
toilet construction for
Baolala/ Langobaya
Jilore ward
Purchase of equipments for To improve market 2,500,000 5 Procure and instal the milk
milk collection centres access for the raw cooling tanks at the cooling
( Rabai, Bamba, Ganze, milk centres
Marafa and Manyeso)
58 | P a g e
S.P 6.2 Aquaculture Development
59 | P a g e
3.1.3 New Programmes/Projects 2017/2018
P. 5: Livestock Development
SP. 5.1 Livestock policy and capacity building
Capacity building To enhance the 7,000 Hold residential & none 8m 8.5m 9m
livestock keepers capacity residential trainings,
of various (knowledge educational tours, field
livestock and skills) of days/demonstrations,
production livestock exhibitions & conferences
aspects keepers for
improved
productivity
62 | P a g e
Development of To stabilize 72 acres Fencing, water 35m 45m 10m
the Kavunyalalo livestock feed and development (drilling
livestock farm resource in the borehole), fodder
county 2 establishment & balling,
boreholes construction of farm
4farm structures and equipments.
structures
Dairy cow project Increase 70 Purchase of dairy cows. 14m 14.5m 15m
number of ( 70 cows per year for
farmers with three years)
dairy cows
Distribution of the cows
beneficiary groups
Follow ups
Dairy Goats Increased milk 140 Procurement and 6.3m 6.5m 6.7m
development production distribution of 140dairy
goats per year
Kilifi north, Kilifi
south, Kaloleni, Capacity building of the
Magarini, , farmers
Malindi rabai
and Ganze sub Follow ups
counties
Follow ups
Follow ups
Follow ups
Follow ups
Ganze
64 | P a g e
conservation pasture seed assorted pasture grass
availability all seeds,600,000 napier grass
All wards year round for 600,000 cuttings
sustainable napier
livestock grass
production cuttings
Bamba
Gede
68 | P a g e
Establishment of To support 1feed Procure and install a fish 4m 2m 1m
fish feeds growth of production feed production unit.
production unit aquaculture by unit Trains farmers on feed
available and production technology;
affordable high Support subsidized fish feed
quality fish feed
production materials.
16m 17m 18m
Pond fisheries To increase 20, ponds Purchase 140 ponds liners
development production from completed ( pond liners for every sub
projects. fresh water for every county)
fisheries. sub county
All sub counties. Rehabilitate 140 (20 fresh
water ponds for every sub
county.)
Development of Support the Develop 1 Develop fish port 50m 60m 70m
fish port at development of PPP for fish establishment
Takaungu fish port facility port PPP.
developmen
t.
Mission: To provide quality education, empower youth and promote sports for social and
economic development
69 | P a g e
Sub-Sector Priorities Constraints Strategies
ignorance, child labor and
Education -Early Sensitization and awareness
understaffing
Childhood campaigns e.g. through whole school
education Inadequate infrastructure, approach programme
-Access and poverty
Engage strategic partners, set aside
transition levels
funds for scholarship.
Stable and
Youth Drug abuse, Creation of more opportunities for
empowered
Affairs Hiv Aids, Unemployment, youth
youth through micro-enterprise
population initiatives,
lack of civic education
Construction and equipping of
empowerment and rehabilitation
centres
Sensitization and capacity building
-Talent
Sports Lack of enough sports Upgrading of the existing sports
development fields.
facilities.
-Development Insufficient funds Engaging the county
of sports sportsmen/women in county and
infrastructure national sports competitions.
facilities
Formation of county sports teams.
Equipping Youth Empowerment programmes in
Youth -preference on white-collar
youth with jobs. polytechnics
Training
skills and
-most courses are limited to -introduction of marketable and
knowledge
the artisan levels thereby relevant courses.
not attractive to the youth -Free entry and exit and re-entry
- Lack of fees by trainees
- understaffing
70 | P a g e
Cost (Kshs)
Programme 4: Early Childhood Development Education programme
Fumbini To improve access and 20M A serviceable Phase Two of the project
Resource Centre quality of pre primary resource centre
education
Deciding of venue,
ALL setting dates, Sending
Conduction of 1 County POLYTinvitation letters to all
exhibition for Youth To showcase ECHNIpolytechnic managers,
Polytechnic Products talents CS conducting the event 2M 2M 2M
Deciding of venue,
To celebrate ALL setting dates, Sending
Hold a county vocational POLYT invitation letters to all
Vocational training 2nd training students ECHNI polytechnic managers,
Graduation Ceremony. achievements CS conducting the event 2M 2M 2M
Mapping and selection
of participants,
To collect Development of data
information on collection tools, Pilot
youth to help in testing of
laying out of questionnaires,
intervention ALL Execution, data analysis
Research and feasibility programs WARDS and report writing 4M 4M 4M
Programme 2: Technical Vocational Education and Training programme
Identification and
Assessment of the
Construction of 10 polytechnics,
workshops with Improve the preparation of the BQs,
classrooms and hotels quality of tendering and
across 10 wards infrastructure 10 construction 150m 5M 5M
Construction of 15 new Improve the 15 Identification and 150M 10M 10M
Youth Polytechnics quality of Assessment of the
infrastructure polytechnics,
71 | P a g e
preparation of the BQs,
tendering and
construction
Procurement of modern
tools and equipment for Improve the Needs assessment,
training in 13 Youth quality of procuring and
Polytechnics. learning 13 distribution 26M 3M 3M
Identification and
Assessment of the
Construct of computer polytechnics,
labs for 7youth Improve the preparation of the BQs,
polytechnics of 7wards quality of tendering and
and equipping them in infrastructure 7 construction 42M 5M 5M
72 | P a g e
Identification and
Assessment of the ECD
Fencing of ECD centres Enhance centres, preparation of
detached from primary security of ECD the BQs, tendering and
schools centres 15 construction 150M 100M 100M
Enhance the
capacities of
parents and
Capacity building of stakeholders in Mapping and selection,
parents and other promoting ECD drawing the programs,
stakeholders education 35 stakeholders’ meeting 35M 35M 35M
73 | P a g e
3.3 Information Communication Technology, Culture and Social Services
75 | P a g e
Betting Enact Policies to regulate the industry
Control and and address emerging issues
Licensing
Board.
76 | P a g e
FY 2015/16
Construction of Social 9,616,284.00 Residents within
Hall at Mpirani, the ward.
Magarini Ward,
FY2015/16.
Construction of Social 9,140,660.00 Residents within
Hall at Malindi, the ward.
Malindi town ward,
FY 2015/16.
Construction of social hall 9,503,145.00 Residents within
at Kibaoni, the ward.
Sokoni ward,
2015/16.
77 | P a g e
SP1: ICT Infrastructure Connectivity
Youth To increase ICT Vitengeni, a. Conduct WAN Survey – 15M 3.5M 3.5M
Polytechnic access. Marafa,Muye 0.5M
Connectivity ye,Adu,Gede, b. Building infrastructure –
Infrascture Mkwajuni,kal 11.5M
(WAN) – 15 No oleni,Distoni, c. Connecting Internet -3
YPs. Mwamustung
a,Mariakani,ja
ribuni,jilore,k
uyuni,Mapipo
YP
Develop County To establish a Develop A GIS Application 25M 5M 6.5m
Smart county to establish existing path of
Infrastructure infrastructure Electrict grid,water ,Fibre
Newtwork newtwork for and Road network/
future planning
Lobby To ensure evenly Conduct County ICT 25M 25M 25M
CAK( Comunica distribution of Sector infrastructure
tion authority of internet summit.
Kenya) and broadband & Develop legal frame work
private service mobile network and Incentives programmes
providers coverage to
(Safaricom, households in
Airtel both urban and
orange,zuku rural
fiaba internet,)
to increase
mobile network
coverage in the
county
SP2: ICT and BPO Development
Establish a To Build up a 1 lot of 6 Conduct project feasibility 59.5 23.1M 25.4
county ICT center of months (70 study – 5M M M
incubation hub innovation in the trainees- two Construct Hub/Lab- 15 M
in conjunction County from each and equip the Incubation
with Pwani ward) Hub/Lab. – 30M
university for Recuriting and training one
ICT innovation, lot -10.5M
78 | P a g e
and development
of software
applications
020800 P2: Information And Communication Services
SP 2.4 E-Government Services
Conduct an e- To establish the 35 wards - Conduct a survey 175M 0 0
readiness survey Digital divide
among the among the County
County residents Residents
Citizen To Build a 1 Develop a web portal for 10M 15M 20M
participation / County resident Citizen registration
Customer Database for easy Develop a County USSD
Relationship communication for Registration using
Management and planning Mobile
(CRM) Develop Loyalty
programmes at a all County
Services points.
Setup Digital To Increase 14 wards. Construction -70M 132M 22M 24M
kiosks in all 14 public service (Two wards Equipping -42 M
wards delivery and in each sub Connectivitity and internet
support County) bills-10M p/a
Services deployment-10M
p/a
P.1 General Administration, Planning and Support Services
S.P.4.3 Information Communications Services
Disaster To business Map County ICT Risk 3M 2M 1M
Recovery and continuity Develop disaster Frame
business work.
continuity
Social Protection, Culture and Recreation
P 3: Social Development Services
S.P 3.2: Community Mobilization and development
Construction of To provide a Residents Provision of project 12.5M 15.5M 18.5
a social hall at conducive within the specifications. M
Kikambala. environment for ward.
Construction of social, Residents Award construction 12.5M 15.5M 18.5
a social hall at recreational, within the services. M
Bamba. cultural, leasure ward.
Construction of and life long Residents Monitoring and evaluation 12.5M 15.5M 18.5
a social hall at learning activities within the of the project. M
Gongoni. for community ward.
members within Accept and hand over the
79 | P a g e
the wards in the project to the benefissiaries.
County.
Furnishing and To make the 9 Residents 18M
equipping of 9 social halls and 1 within the
number social amphitheatre ward.
halls; and operational.
Vision: To be a globally competitive and innovative tourism, co-operative, trade and industrial
sector for socio-economic development
82 | P a g e
3.4.2 On-Going Projects/Programmes
Construction of Enhance 25M 1 Market -Site visit, stakeholder involvement and data
Charo Wa Mae efficiency in Constructe capture
Market phase II- trade supply d
Sokoni Ward chain. -Documentation(tender documents)
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Renovation of the Enhance 25M 1 Market -Site visit, stakeholder involvement and data
old market and efficiency in Refurbish capture
construction of a trade supply ed and a
new unit at Kwa chain. new unit -Documentation(tender documents)
Jiwa Market- construct
83 | P a g e
Phase II-Shella ed -Procument
Ward
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
84 | P a g e
-Management and control
85 | P a g e
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Construction of a Improve 1.4M 1 toilet -Site visit, stakeholder involvement and data
4 door public hygienic constructe capture
toilet block at standards in d
Mtondia/Majaoni the market -Documentation(tender documents)
trading centre- centre
-Procument
Tezo Ward
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Garashi open air Enhance 2M 1 market -Site visit, stakeholder involvement and data
market-Garashi efficiency in constructe capture
Ward trade supply d
chain -Documentation(tender documents)
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
86 | P a g e
-Management and control
Rehabilitation of -Enhance 2.5M -1 toilet -Site visit, stakeholder involvement and data
Marafa market- efficiency in constructe capture
Marafa Ward trade supply d
chain -Documentation(tender documents)
-1 market
-Improve refurbishe -Procument
hygienic d
-Site handing over
standards in
markets -Construction
-M&E (site inspections and supervision)
-Management and control
Construction of Enhance 40M 1market -Site visit, stakeholder involvement and data
Mtwapa market- efficiency in constructe capture
Shimo La Tewa trade supply d
Ward chain -Documentation(tender documents)
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Completion of Enhance 7.5M 1 market -Site visit, stakeholder involvement and data
Matanomanne efficiency in completed capture
market – trade supply
Vitengeni Ward chain -Documentation(tender documents)
87 | P a g e
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Construction of Enhance 6.8M 1 market -Site visit, stakeholder involvement and data
Ganze market- efficiency in constructe capture
Ganze Ward trade supply d
chain -Documentation(tender documents)
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
88 | P a g e
-Management and control
89 | P a g e
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
Charo Wa Mae Improve 4.9M -1 toilet -Site visit, stakeholder involvement and data
market phase I- efficiency in refurbishe capture
Sokoni Ward trade supply d
chain -Documentation(tender documents)
-Perimeter
wall -Procument
constructe
-Site handing over
d
-Construction
-Septic
tank -M&E (site inspections and supervision)
constructe
d -Management and control
-Water
tower
constructe
d
Mariakani market Improve 3.8M -14 -Site visit, stakeholder involvement and data
stalls-Mariakani business market capture
Ward working stalls
environment constructe -Documentation(tender documents)
d
-Procurement
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
90 | P a g e
-Construction
-M&E (site inspections and supervision)
-Management and control
Watamu market- Improve 1.25M 1 market -Site visit, stakeholder involvement and data
Watamu Ward efficiency in refurbish capture
trade supply ed
chain -Documentation(tender documents)
-Procument
-Site handing over
-Construction
-M&E (site inspections and supervision)
-Management and control
91 | P a g e
Societies Awareness Boda -Bench Marking Exposure Visits to Counties
on the Riders, with Successful Boda Boda, Women and
Importance Women Fishermen Co-operatives
of the Co- and Fisher -Formation of Boda Boda, Women and
operative folk Women Co-operatives
Business Sensitized -Organization of First Annual General
Model on Co- Meetings
operatives -Induction and Capacity Building of Co-
operative Officials
No of
Boda
Boda,
Women
and
Fishermen
Co-
operatives
92 | P a g e
3.4.3 Projects/Programmes 2017/2018
Project Name Objectives Targets Description of Activities Est. cost Projected Cost
/Location 2017/18
2018/19 2019/20
94 | P a g e
Rehabilitation To improve 1 market -Site visit, stakeholder input 5M
of Ganda trade supply rehabilit and data capture
market chain ated - Documentation(preparation
of tender documents)
-Procurement (Floating and
awarding of tenders)
-Site handing over
-Construction
- M&E (site inspections and
supervisions)
-Management and control
Construction To improve 1 toilet -Site visit, stakeholder input 2M
of a toilet hygienic block and data capture
block at GIS standards in construct - Documentation(preparation
of tender documents)
Market markets ed
-Procurement (Floating and
awarding of tenders)
-Site handing over
-Construction
- M&E (site inspections and
supervisions)
-Management and control
Construction To improve 1 toilet -Site visit, stakeholder input 2M
of a toilet hygienic block and data capture
block at standards in construct - Documentation(preparation
of tender documents)
Kakoneni markets ed
-Procurement (Floating and
Market awarding of tenders)
-Site handing over
-Construction
- M&E (site inspections and
supervisions)
-Management and control
Rehabilitation To improve 1 market -Site visit, stakeholder input 10M
and trade supply rehabilit and data capture
construction of chain ated and - Documentation(preparation
of tender documents)
a perimeter 1
-Procurement (Floating and
wall at perimete awarding of tenders)
Kakuyuni r wall -Site handing over
market erected -Construction
- M&E (site inspections and
supervisions)
-Management and control
Securing of To secure 30 Develop TORs 10M 10M 10M
95 | P a g e
Markets land public Land/ Markets Field visits
resources Data capture
Survey
Processing of title deeds
Facilitate To formalize 500 -Recruitment of MSEs 3M 3M 3M
registration of the MSE MSEs -Sensitization and capacity
Business sector for building
Names sustainable -Facilitation of registration
growth -M&E
Generation of To maintain 0ver -Designing a data capture tool 0.5M 0.5M 0.5M
a County up to date 22,000 -Obtaining businesses licensed
Integrated records/infor licensed details
Business mation on all business -Compiling
Register(CIBR businesses es -Data analysis and Report
) operating in
the County
96 | P a g e
Building them with MSEs Preparation of training
Programme for skills to programmes
MSEs manage their Procurement of venue
businesses and training materials
professionally Facilitations
97 | P a g e
education
98 | P a g e
operative institutionalizoperative Register
Research e research Profile all active co-
and data operative societies in
management the County
Establish a county co-
operative data bank
Carry out continuous
research on co-
operatives
SUB-PROGRAMMEE 3.3: CO-OPERATIVE ADVISORY SERVICES
Promotion of Formation of 30 new
Sensitization Meetings 2M 2M 2M
co-operative co-operatives co-Facilitate Registration
ventures operative
Induction Seminars
s Publicity and
awareness creation
events
Strengthen Co- To improve 100 co- - Implementation and 5M 5M 7M
operative management operative enforcement of co-
extension and of co- s operative legislations
advisory operative Trainings and
services societies education
Enhance the Capacity
of staff
Acquire office
equipment
PROGRAMMEE 4: TOURISM DEVELOPMENT AND PROMOTION
100 | P a g e
products Tourists Tourist Feasibility conducted
Destinati
on
The sector is comprised of the following subsectors; lands, energy, housing and physical
planning.
Vision: Excellent land use planning management and efficient access to affordable housing for
sustainable development of Kilifi County.
Mission: To improve livelihoods of residents through proper land use, planning and sustainable
management of land resources.
101 | P a g e
Energy Development and Poor exploitation of Strengthen the policy framework;
utilization of clean alternative energy Enhance development of clean energy;
energy sources promote utilization of clean energy ;
Unsustainable utilization Institutionalize clean energy incubation and
of conventional energy development
sources
Estimated
Project name/Location Objectives cost Targets Description of Activities
Develop and Develop and Develop and implement
implement implement policies and regulations
County energy policy 2,000,000
policies and policies and
regulations regulations
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 3,000 ha individual plots within
sections Mwahera E
tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 3,000 ha individual plots within
section Tsangatsini
tenure Approximately adjudication sectio
Survey of Adjudication Demarcation and Survey of
sections Secure of Land 5,000,000 3,000 ha individual plots within
Jimba/Kaliangombe tenure Approximately adjudication sectio
Survey of Adjudication Demarcation and Survey of
sections Secure of Land 5,000,000 2,320 ha individual plots within
Viragoni/Migwaleni tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 2,320 ha individual plots within
Sections Maluwani
tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 6,000,000 3,500 ha individual plots within
sections Kamale/Adu II
tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 3,000 ha individual plots within
Sections Misufini
tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 3,000 ha individual plots within
sections Kinangoni
tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication
Secure of Land 5,000,000 3,000 ha individual plots within
sections Chengoni
tenure Approximately adjudication sectio
Survey of Adjudication Secure of Land 5,000,000 3,000 ha Demarcation and Survey of
102 | P a g e
sections Mtsara wa individual plots within
Tsatsu tenure Approximately adjudication sectio
Demarcation and Survey of
Survey of Matsangoni
Secure of Land 2,500 ha individual plots within
Trading Centres
tenure 3,000,000 Approximately adjudication sectio
Demarcation and Survey of
Survey of
Secure of Land 2,300 ha individual plots within
MatanoTrading Centres
tenure 3,000,000 Approximately adjudication sectio
Demarcation and Survey of
Survey of Trading
Secure of Land 2,000,000 1500 ha individual plots within
Centres
tenure Approximately adjudication sectio
Demarcation and Survey of
Titlilng of County 4,000 ha individual plots within
Assets Land tenure 1,500,000 Approximately adjudication sectio
To prepare
structure
plans,showing
current and 5,000,000
Preparation Jakaba proposed land Demarcation and Survey of
Informal Settlement use and 2,320 ha individual plots within
Plans infrastructure Approximately adjudication sectio
Demarcation and Survey of
Survey of Adjudication Secure of Land 4,000,000 2,320 ha individual plots within
Sections Mitsedzini tenure Approximately adjudication sectio
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 5,000,000 meetings,Situational
Preparation Makaburini proposed land analysis,Draft
Informal Settlement use and 2,320 ha plan,Publication,Final
Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 4,000,000 meetings,Situational
Preparation Njoro Chini proposed land analysis,Draft
Informal Settlement use and 2,320 ha plan,Publication,Final
Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 3,500,000 meetings,Situational
Preparation Njoro proposed land analysis,Draft
Takatifu Informal use and 2,320 ha plan,Publication,Final
Settlement Plans infrastructure Approximately plans,Endorsement,Approval
Preparation of Shariani To prepare 4,000,000 2,320 ha .Intension to plan,Stakeholders
103 | P a g e
structure
plans,showing
current and meetings,Situational
proposed land analysis,Draft
Local Physical use and plan,Publication,Final
Development Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 4,000,000 meetings,Situational
Preparation of Gongoni proposed land analysis,Draft
Local Physical use and 2,320 ha plan,Publication,Final
Development Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 4,000,000 meetings,Situational
Preparation Ganze proposed land analysis,Draft
Local Physical use and 2,800 ha plan,Publication,Final
Development Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 2,000,000 meetings,Situational
Preparation of Mkapuni proposed land analysis,Draft
Local Physical use and 2,500 ha plan,Publication,Final
Development Plans infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 3,700,000 meetings,Situational
proposed land analysis,Draft
Planning and survey of use and 2,320 ha plan,Publication,Final
Roka settlement scheme infrastructure Approximately plans,Endorsement,Approval
To prepare
structure
plans,showing .Intension to plan,Stakeholders
current and 4,000,000 meetings,Situational
Preparation of Majengo- proposed land analysis,Draft
KanamaiLocal Physical use and 2,500 ha plan,Publication,Final
Development Plans infrastructure Approximately plans,Endorsement,Approval
Complete
Completion of Lands
5,000,000 headquaters Formulatation of BQ,Evaluate
offices
builiding standards of builiding
Renovation of County Ensure 5,000,000 Mwangea estate
Estates provision of
104 | P a g e
adequate and
quality housing
one charcoal
construction of modern
Promote the conversion kiln
charcoal conversion
utilisation and 2,000,000 and two brick
kiln) -Magarini
of energy making .Monitor and supervise
subcounty
saving jikos machine, Construction
Spur
development of
housing and
Opening up of Access
also improve
roads in KKB 7,000,000
accessibility
Settlement Scheme
and living
condition for
the residents 25km site clearance and grading
Promote the
utilisation and
development of
Construction of 4 biogas Four biogas .Monitor and supervise
biogas plants technologies 4,000,000 plants Construction
Development of County Develop and Develop and Develop and implement
Land use policy implement implement policies and regulations
policies and policies and
regulations1,995,000 regulations
Development of County Develop and Develop and Develop and implement
Development Control implement implement policies and regulations
bill policies and policies and
regulations2,000,000 regulations
Development Control Develop and Develop and Develop and implement
Manual implement implement policies and regulations
policies and policies and
regulations2,000,000 regulations
Development of County Develop and Develop and Develop and implement
Housing Policy implement implement policies and regulations
policies and policies and
regulations2,000,000 regulations
Demarcation and Survey of
Secure of Land 2,320 ha individual plots within
Land adjudication tenure 7,000,000 Approximately adjudication sectio
Resource Mapping and Digitizing Sub county Expanding land information
GIS system records 9,370,498 Level system to other subcounties
Demarcation and Survey of
Baricho adj Secure of Land 2,320 ha individual plots within
section(Malindi) tenure 3,000,000 Approximately adjudication sectio
Viriko adj sec (Malindi) Secure of Land 2,320 ha Demarcation and Survey of
tenure 3,000,000 Approximately individual plots within
105 | P a g e
adjudication sectio
Demarcation and Survey of
Planning of Jilore Secure of Land 2,320 ha individual plots within
adjudication centre tenure 1,000,000 Approximately adjudication sectio
Land survey in
Mitsedzini,
Malanga/Ndugumnani Demarcation and Survey of
and 3,000 acres in Secure of Land 2,320 ha individual plots within
Ndigiria Sub-Location tenure 2,000,000 Approximately adjudication sectio
Demarcation and Survey of
Survey for Kambe Secure of Land 2,320 ha individual plots within
Polytechnic Land tenure 700,000 Approximately adjudication sectio
Kamala Adu Demarcation and Survey of
Adjudication Section Secure of Land 2,320 ha individual plots within
tenure 4,456,800 Approximately adjudication sectio
MtsarawaTsatsu scheme Demarcation and Survey of
Secure of Land 2,320 ha individual plots within
tenure 3,350,000 Approximately adjudication sectio
MwembeKati/Kasidi Demarcation and Survey of
Secure of Land 2,320 ha individual plots within
tenure 3,350,000 Approximately adjudication sectio
Viriko Demarcation and Survey of
Secure of Land 2,320 ha individual plots within
tenure 5,000,000 Approximately adjudication sectio
Baricho/Bakadha Demarcation and Survey of
Secure of Land 2,320 ha individual plots within
tenure 3,350,000 Approximately adjudication sectio
Tsangalaweni B Demarcation and Survey of
Adjucation Section Secure of Land 2,320 ha individual plots within
tenure 2,450,240 Approximately adjudication sectio
Kidutani settlemt Demarcation and Survey of
scheme Secure of Land 2,320 ha individual plots within
tenure 4,120,478 Approximately adjudication sectio
Titling of County Assets Secure of Land Demarcation and Survey of
tenure 4,000 ha individual plots within
7,260,000 Approximately adjudication sectio
Preparation of
upgrading development Demarcation and Survey of
plans for:- Misufini, Secure of Land 2,320 ha individual plots within
Tsangatsini tenure 14,000,000 Approximately adjudication sectio
Revision of Mtwapa Demarcation and Survey of
Mariakani and Kilifi Secure of Land 2,320 ha individual plots within
ISUDP tenure 2,000,000 Approximately adjudication sectio
Automation of Land Digitizing
Information records Sub county Expanding land information
Management 15,000,000 Level system to other subcounties
106 | P a g e
Land Clinics Sensitization of
public on all Hold public barazas at ward
Land issues 2,000,000 Entire county levels
Completion of lands Ensure adequate
Head quarter building office space for
county staff 2,328,022 Construction of office blocks
Ensure
provision of
Top up for purchase of adequate and Two hydrofoam Provide specification and
hydrofoam machine quality housing 3,000,000 machines inspect goods supplied
Solar Lanterns and Bio Promote the
gas Kits utilisation and
of energy
saving lights Sub county Provide specification and
and jikos 6,500,000 Level inspect goods supplied
Upgrading of Informal Spur
Settlement:- development of
Prison/Kiwandani, and housing and
Chakama Phase 2 and also improve
Shingila accessibility
and living
condition for 80 km access
the residents 1,505,868 road site clearance and grading
108 | P a g e
Viriko
Dakacha
Mwembe kati
Various
Review of
Security of Settlement
Grants and
Land tenure Schemes within
Dispositions
the county 10M
Sensitization
of public on Hold Public barazas at Ward
Land Clinics 35 barazas
all land levels. Invite all relevant land
issues experts to sensitize the public 10M
Purchase of
survey Efficient
2no.
equipment execution Procurement of RTK GPS
(RTK GPS ) equipment 20M
Programme 2. Land Policy and Planning
SP. 2.1 Land Information Management
Scanning and geo-referencing
of survey maps and plans.
Digitizing
Expansion of Expanding Attribute data creation
GIS database the land
information Integration with other land
system to information
other sub- 20
counties Kilifi South M
Detail topographical
Maps contour intervals
indicating all the details
including building,
Obtain
roads, and footpaths
Digital mapping digital data
Horizontal and vertical
for GIS for all urban All urban areas
control data whose
Database areas within
nature and position is
the county
fully described using
photographs, and
sketches
100 110 120
110 | P a g e
Malanga
SP 2.4 LAND USE
-Intension to revise
-Stakeholders meeting
Restore
-Situational analysis
Order and
Revision of Mtwapa town and -Draft plan
harmony in
Mtwapa Town its environs -Publication
Mtwapa
-Final plans
town
-Endorsement
-Approval 60 00 00
To prepare -Intention to plan
structure -Stakeholders meetings
plans, -Situational analysis
Planning of showing -Draft plan
Lango baya town
lango baya current and -Publication
proposed -Final plans
land use and -Endorsement
infrastructure -Approval 11 00 00
To prepare -Intention to plan
structure -Stakeholders meetings
plans, -Situational analysis
Planning of showing -Draft plan
Mwawesa town
mwawesa current and -Publication
proposed -Final plans
land use and -Endorsement
infrastructure -Approval 11M 00 00
To prepare -Intention to plan
structure -Stakeholders meetings
plans, -Situational analysis
Planning of showing -Draft plan
Ganda town
ganda current and -Publication
proposed -Final plans
land use and -Endorsement
infrastructure -Approval 13M 00 00
Intention notice
-Stakeholders meetings
Prepare a
-mapping
zoning plan
Zoning plan for -Draft zoning plan
foe Malindi Malindi town
Malindi town -Publication
and its
-Final zoning plans
environs
-Endorsement
-Approval 20 00 00
PROGRAMME 3 URBAN AND METROPOLITANT DEVELOPMENT
SP 3.1 URBAN MOBILITY AND TRANSPORT
Upgrading of Spur 30km of housing Grading and gravelling 40 4 4
111 | P a g e
informal
settlements(infr
development
astructure
of housing
development)-
and also
KKB,Shingila
improve the access roads
in Kilifi, Jiwe
living
Jeupe in
condition of
Watamu,
the residents
Tabora
Mariakani 4 8.4
SP 3.2 URBAN PLANNING, INVESTMENT AND SEARCH
Intention notice
-Stakeholders meetings
Prepare -Situational analysis
Urban design for urban Kilifi town and its -Draft design plan
kilifi town design for environs -Publication
kilifi town -Final design plans
-Endorsement
-Approval 12 00 00
SP 3.3 URBAN MARKET DEVELOPMENT
To prepare
structure -Intention to plan
plans, -Stakeholders meetings
showing -Situational analysis
Planning of Shomela trading
current and -Draft plan
shomela center
proposed -Publication
land use and -Final plans
infrastructur -Endorsement
e -Approval 10 00 00
To prepare
structure -Intention to plan
plans, -Stakeholders meetings
showing -Situational analysis
Planning of Fundisa trading
current and -Draft plan
fundisa center
proposed -Publication
land use and -Final plans
infrastructur -Endorsement
e -Approval 10 00 00
Programme P4 Development of alternative Energy Technologies
112 | P a g e
-Monitor and Supervise
construction
Promotion
-Selecting best design of plant
Construction of the
Biogas utilization Formulation of BQ
plant/Bahari and
girls/Mwangea development Three Biogas -Site planning
girls and Ganze of biogas Plants of size
girls technology 70m3 20
Solar street Formulation of BQ
lights / -Site planning
-diamond -Monitor and supervise
tuskys installation work
road(400m),
-Top life G4S
Road (1700M)
-Mnarani to
beach
road(1000m)
-extension from
Mazeras to
kombeni girls
road(1000m)
-mazeras to Improve
kokotoni security and
trading boost
centre(800m) business Roads light with
operations solar energy 80 00 00
Supply of 5 Enhance Five Kilns . Formulation of BQ
modern Sustainable supplied
charcoal use of wood -Evaluate standards of supplied
conversion fuel Kilns
kiln/Kamale,Ga resources -Commissioning of Kilns
nze,Bamba,Sok
oke and Jaribuni
wards 5 00 00
Construction of Accelerate Two unit to be -Formulation of BQ 8 00 00
Kiln units for modernized established
-Site identification
making biomass
improved energy use -Site planning
cookstoves(ICs)
/Ganze and Monitor and supervise
Magarini youth installation work
Polytechnique
Supply of 7 Enhance Seven briquetting Evaluate the standards of 8 00 00
113 | P a g e
briquetting Sustainable Machines supplied briquetting machines
making use of wood Supplied
machine/Jujus,T fuel
ezo,watamu,chu resources
mani,kakanjuni,
Kaloleni and
kakuyuni youth
groups
Supply of two Increase ECD students in Formulation of specifications 6
thousand solar access of magarini and
lanterns quality light ganze subcounties
to school
going
children
Construction of A training One Centre -Formulation of BQ 50 82 84
an energy and
-Acquisition of Land
Centre promotion
center for -Planning of Site
renewable
energy
technologies
SP4.2 Rural Electrification
Ten Improve Thirteen -Formulation of BQ 110
Highmast/kakan security and (13)Highmast
-Site identification
juni,marereni,m boost constructed
kwajuni,ngeren business -Site planning
ya,mavueni,kak operations
uyuni,bamba,dz -Monitor and supervise
itsoni,vitengeni installation work
,rabai health
centre,wanja
ndege
stage,kokotoni
trading centre
and shomella
115 | P a g e
SP 5.2 Estate Management
Renovation of Ensure
county housing efficient
estates ngala 1 management
and ngala 11 in of housing Roofing, painting and drainage
60 housing units
malindi, Ngala and improve works
in Kilifi and the living
Green estate in condition of 0 0
Mariakani the residents 50 0 0
Ensure
efficient
management
Fencing of
of housing
county housing
and improve
estates- 2 housing estates Construction of wall fence
the living
Mwangea and
condition of
Ngala in Kilifi
the residents
and enhance 0 0
security 40 0 0
Programme. 6 Government Buildings
SP 6.1 Stalled and new Government buildings
Ensure
Construction of adequate
county office space Construction of office blocks
Headquarters for county 302.
staff 250 275 5
Improving
Construction of working
Construction of an extra storey
lands office environment 1 office block
on the existing lands building
space at Kilifi for public
officers 30 15 10
117 | P a g e
Ensure development
Development
of affordable and 24
of county Construction of
quality housing units housing
housing units apartments
through PPP model units 60.5
in Kilifi
of financing 50m 55m m
Physical Planning
Project Estimated
Description of
name and Objectives Targets Cost Projected Projected
Activities
Location 2017/2018 2018/2019 2019/2020
-Intension to revive
-Stakeholders meeting
Restore
-Situational analysis
Revision of Order and Mtwapa town
-Draft plan
Mtwapa harmony in and its
-Publication
Town Mtwapa environs
-Final plans
town
-Endorsement
-Approval 60m 66m 72.6m
Mission: To provide effective coordination and implementation of sound financial and economic
planning policies for sustainable development of the county
119 | P a g e
Managem revenue access interior parts of the new resources in the county
ent collection; County Revenue Resource mapping
Poor inspection and Automation of Revenue collection
enforcement mechanism
system
Disjointed structures of
revenue collection.
Poor contract agreement
terms on revenue outsourcing
Donor fund Lack of fund raising unit Develop appropriate laws and
raising Lack of office for revenue policies to enhance revenue
officers in sub-counties collection
Unavailability of systems in Enforce terms and conditions of the
other revenue collection outsourcing revenue collection
centres
Capacity build revenue collection
Default in payment of revenue
directorate
Establish a fund raising Unit
Set up a debt recovery unit
Strengthen internal controls
Inadequate office space
Financial Ensure prudent systems
manageme management of Poor maintenance of ICT Build capacity of finance staff
nt financial equipment
Automation of financial systems
resources
Misallocation of funds in the Streamline accounting and
budget. reporting systems
Weak internal controls Streamline assets management
Poor record keeping
systems
Poor asset management
Constructing of an annex to the
system.
county treasury
Accumulation of pending
bills. Refurbishment of the planning
Lack of standardized building.
operating procedures in Attain ISO certification
matters of finance Develop standard operation
procedure for payment.
Lack of audit committees. Monitoring and evaluating
Risk Non-implementation of audit compliance with the stipulated
Transparency
manageme recommendations laws.
and
nt (Audit)
Accountability In adequate training on all Enforcing implementation of audit
systems recommendation
Constitute audit committees
Training on all systems being used
Procureme Reduced Lack of Re-order levels Operationalize the service charter
nt turnaround time Lack of enough capacity Introduce Re-order levels and
120 | P a g e
departmen on procurement maintain them.
t of goods and Build capacity of supply chain
services. management
Enhance
inventory
management
system.
Ensure linkages Lack of coordination in the Prioritize Allocation of public
between policy allocation of resources resources
Budget
planning and Vested interest Ensure development of all inclusive
expenditur
budgeting and Improper coordination and
e budgeting systems
implementation poor communication in the Prudent management of
of programmes budget process
Monitoring and institutional budget
Failure to implement budget
Evaluation Improve coordination of budget
according to plan
Allocate Poor linkages between operations/implementation
resources to planning, budgeting and
priority sectors implementation of County
development programmes
Lack of a comprehensive Promote participatory approaches
project/programme in project management.
Economic Implementation,
monitoring and evaluation Roll out use of County Project
Planning monitoring and
framework Management Information System
evaluation of
Inadequate Capacity (ProMIS)
programmes
programme/project
management in the County
121 | P a g e
3.6.3 New Projects and Programmes 2017/2018
122 | P a g e
3.7 Department of Water, Environment, Natural Resources and Waste
Management
Mission: To provide safe water, protection, conservation and sustainable management of the
environment and natural resources
Urban greening and Budget allocation for beautification Beautification of all major towns of
beautification inadequate Kilifi County
programme
Increase Funding for natural resources Develop appropriate natural resources
community livelihood improvement inadequate policies and legislation
livelihoods from Lack of appropriate legislation to guide
Natural Resources natural resources management Support artisanal and ballast miners
Increase water In Adequate funding to construct Construction of large and climate proof
storage facilities for facilities of the desired capacities and water tanks
use in case of modern data collection equipments
failure of water
supply
126 | P a g e
To avail affordable 300 people -Survey, Design, de-silting and
clean and safe water to 200L.u of expansion of the reservoir
the residents of local breed -Construction of related civil works
Girimacha Dam Girimacha 10m
To avail clean and safe 300 people -Survey, Design, de-silting and
Befaraji water water to the residents 200L.u of expansion of the reservoir
pan of Befaraji village 6m local breed -Construction of related civil works
SP. 4.3 Water Supply Infrastructure
To avail affordable 1. Construction of 4km pipeline
clean and safe water to 1 Primary stretch of 100mm HDP 16 Bar pipes
Construction of the residents of School 2. Construction of Water Kiosks 3No.
Ngwenzeni Ngwenzeni villages 10,000 amounted with plastic tanks of 5m3
water supply households capacity on each
pipeline project 6m
To avail affordable 200 people 1. Construction of 3km pipeline
clean and safe water to stretch of 100mm HDP 16 Bar pipes
Construction of the residents of 2. Construction of Water Kiosks 3No.
Kitsaumbi- Kitsaumbi and Kaloleni amounted with plastic tanks of 5m3
Kaloleni water areas capacity on each
pipeline project 2m
To avail affordable 300 people Drilling, casing, development,
clean and safe water to Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Kabatheni Kabatheni treated water tank), plumbing,
borehole. 10m reticulation and water fetching points.
To avail affordable 300 people 1. Construction of 4km pipeline
Construction of clean and safe water to stretch of 100mm HDP 16 Bar pipes
Kibaokiche- the residents of 2. Construction of Water Kiosks 3No.
Kajongooni/Got Kajongooni and Gotani amounted with plastic tanks of 5m3
ani water capacity on each
project 6m
To avail affordable 300 people Drilling, casing, development,
clean and safe water to Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Ngwenzeni Ngwenzeni treated water tank), plumbing,
borehole 10m reticulation and water fetching points
128 | P a g e
To avail affordable 600 people 1. Construction of 6km pipeline
clean and safe water to stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 5No.
Kapecha and Shariani amounted with plastic tanks of 5m3
capacity on each
Kapecha- Construction of a 50m3 blue scope
Shariani water water storage tank
supply project 16m
To extend availability 500 people 1. Construction of 6km pipeline
of affordable clean and stretch of 100mm HDP 16 Bar pipes
safe water to the 2. Construction of Water Kiosks 5No.
residents of Mtepeni amounted with plastic tanks of 5m3
Mtepeni- and Majengo capacity on each
Majengo Phase Construction of a 50m3 blue scope
II Water supply water storage tank
project 16m
To avail affordable 5,000 1. Construction of 6km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 5No.
Mtomondoni amounted with plastic tanks of 5m3
Mtwapa capacity on each
Scheme/Mtomo Construction of a 100m3 blue scope
ndoni water water storage tank
supply project 20m
To extend availability 3,000 1. Construction of 5km pipeline
of affordable clean and people stretch of 100mm HDP 16 Bar pipes
Bungale water safe water to the 2. Construction of Water Kiosks 5No.
pipeline residents of Bungale amounted with plastic tanks of 5m3
rehabilitation capacity on each
Phase II 10m
To avail affordable 2,000 1. Construction of 10km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 8No.
Kambicha and amounted with plastic tanks of 5m3
Kambicha- Marereni capacity on each
Marereni water Construction of a 100m3 blue scope
supply pipeline water storage tank
project 25m
To avail affordable 1,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps,
the residents of Bombi water storage tank), plumbing,
Bombi borehole 15m reticulation and water fetching points
Mitulani To avail affordable 3,000 Drilling, casing, development,
borehole clean and safe water to 15m people Equipping (solar panels, pumps,
the residents of water storage tank), plumbing,
129 | P a g e
Mitulani reticulation and water fetching points
To avail affordable 3,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps,
Hawewanje the residents of water storage tank), plumbing,
borehole Hawewanje 15m reticulation and water fetching points
To avail affordable 2,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Kanyumbuni Kanyumbuni treated water tank), plumbing,
borehole 15m reticulation and water fetching points
To avail affordable 3,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Shakahola Shakahola treated water tank), plumbing,
borehole 15m reticulation and water fetching points
To avail affordable 1000 people 1. Construction of 3km pipeline
clean and safe water to stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 2No.
Ramada-Kwa Ramada and Kwa amounted with plastic tanks of 5m3
Mboya pipeline Mboya capacity on each
rehabilitation 4m
To avail affordable 800 people Construct a standard water kiosk and
4 No. Sabaki- clean and safe water to amount a plastic water storage tank
Maboromokoni the residents of Sabaki of 5m3 capacity
Water Kiosks Maboromokoni 2m
To avail affordable 300 people Carryout pump testing at the existing
clean and safe water to 200L.u of well, Equipping (solar panels, pumps,
the residents of kaya local breed raw water tank, reverse osmosis
Dagamra plant, treated water tank), plumbing,
Kaya Dagamra improve the reticulation system to
wells 10m Bate trading center and the environs
To avail affordable 3,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Karimboni Karimboni treated water tank), plumbing,
borehole 15m reticulation and water fetching points
To avail affordable 4,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Mapotea Mapotea treated water tank), plumbing,
borehole 15m reticulation and water fetching points
Construction of To avail affordable 20m 2,000 1. Construction of 10km pipeline
the proposed clean and safe water to people stretch of 100mm HDP 16 Bar pipes
Dagamra well - the residents of 2. Construction of Water Kiosks 8No.
Garashi water Dagamra and Garashi amounted with plastic tanks of 5m3
pipeline project capacity on each
130 | P a g e
Construction of To avail affordable 3,000 1. Construction of 10km pipeline
the proposed clean and safe water to people stretch of 100mm HDP 16 Bar pipes
Garashi – the residents of 2. Construction of Water Kiosks 8No.
Mikuyuni Mikuyuni amounted with plastic tanks of 5m3
water pipeline capacity on each
project 20m
Carryout To avail affordable 800 people 1. Construction of 7km pipeline
pipeline clean and safe water to stretch of 100mm HDP 16 Bar pipes
extension from the residents along the 2. Construction of Water Kiosks 8No.
the existing pipeline amounted with plastic tanks of 5m3
Makumba capacity on each
borehole
pipeline to
Marafa 15m
Construction of To avail affordable 1,000 1. Construction of 10km pipeline
the proposed clean and safe water to people stretch of 100mm HDP 16 Bar pipes
Garashi – the residents of 2. Construction of Water Kiosks 8No.
Masindeni Masindeni amounted with plastic tanks of 5m3
water pipeline capacity on each
project 20m
Construction of To avail affordable 3,000 1. Construction of 10km pipeline
the proposed clean and safe water to people stretch of 100mm HDP 16 Bar pipes
kundeni – the residents of 2. Construction of Water Kiosks 8No.
Borekoromi Kundeni and Bore amounted with plastic tanks of 5m3
water pipeline Koromi capacity on each
project 20m
To avail affordable 3,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Karimboni treated water tank), plumbing,
reticulation and water fetching points
Karimbonibore for Karimboni borehole site to
hole 15m kundeni
To avail affordable Construction of the proposed
clean and safe water to makumba bore hole site –
makumba bore the residents of Kadzifitseni water pipeline project
hole II Makumba area 15m
To avail affordable 3,000 1. Construction of 4km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 2No.
Kaliapapo amounted with plastic tanks of 5m3
Kaliapapo water capacity on each
project Phase II 5m
KazunguKitho To avail affordable 2,000 1. Construction of 3km pipeline
weo water clean and safe water to 6m people stretch of 100mm HDP 16 Bar pipes
131 | P a g e
the residents of 2. Construction of Water Kiosks 2No.
kazungukitheweo area amounted with plastic tanks of 5m3
capacity on each
pipeline project
To avail affordable 1,000 1. Construction of 3km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of Sabaki 2. Construction of Water Kiosks 2No.
Sabaki- Veterinary areas amounted with plastic tanks of 5m3
Veterinary capacity on each
water project 6m
To avail affordable 3,000 1. Construction of 3km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 2No.
Baramare amounted with plastic tanks of 5m3
Baramare water capacity on each
supply pipeline 6m
To avail affordable 200 people 1. Construction of 3km pipeline
clean and safe water to stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 2No.
Manoloni amounted with plastic tanks of 5m3
Manoloni water capacity on each
supply pipeline 6m
To avail affordable 3,000 1. Construction of 3km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 2No.
Mwakuchi Mwakuchi amounted with plastic tanks of 5m3
water supply capacity on each
pipeline 6m
To avail affordable 3,000 Drilling, casing, development,
clean and safe water to people Equipping (solar panels, pumps, raw
the residents of water tank, reverse osmosis plant,
Makonjeni Makonjeni treated water tank), plumbing,
borehole 10m reticulation and water fetching points
To avail affordable 3,000 1. Construction of 2km pipeline
clean and safe water to people stretch of 100mm HDP 16 Bar pipes
the residents of 2. Construction of Water Kiosks 1No.
Kibaokiche- Masaani amounted with plastic tanks of 5m3
Masaani capacity on
pipeline project 5m
To avail affordable 300 people Construct a standard water kiosk and
clean and safe water to amount a plastic water storage tank
Mwachidemu the residents of of 5m3 capacity
water kiosk Mwachidemu 0.6m
Watamu To avail affordable 15M 4 Tourist 1. Construction of 10km pipeline
-Kanani clean and safe water to Hotels stretch of 100mm HDP 16 Bar pipes
pipeline water the residents of 1 Primary 2. Construction of Standard Water
132 | P a g e
Watamu-Kanani Schools Kiosks 5 No.
project Phase villages 10,000
11-Malindi households
Accessibility of clean 4000 people
piped water and One primary BRANCH A
improved sanitation to school Jomeka-Baya Mose primary school
primary school pupils And several Procure UPVC pipes 90mm diam
and the community of livestock class E for a 3km pipeline 500pcs
Baya Mose -Purchase of pipe fittings
-Provide labour for the construction
of pipeline A
-BRANCH B
-Jomeka-Kadzandani primary school
Procure a UPVC pipes 90 dia class D
for 1.5km pipeline 250pcs
-Provide labour for the construction
of pipeline B
-Purchase of pipe fittings for pipeline
B
-Purchase of 2 UPVC 10m3 storage
tanks for two primary schools and
transport site
Chasimba -construction of valve chambers,
Mbomboniphas mark posts, support pillars and
eII anchor blocks along the pipelin
12M
133 | P a g e
Climate Change To support Ganze Sub -Planting of Drought 30 M 20M 10M
Adaptation community cope County tolerant trees
Project with climate
change impacts - 1000,000 -Purchase and install
drought trees 10 rain water
Grown harvesting tanks to 10
schools
-50 Rain
Water -Create awareness on
harvesting climate change
Tanks adaptation and coping
Installed, 10 mechanisms
water pans
-Awareness to
200,000
community
members
Climate Put up All wards -Recruit 2 community 30M 30M 30M
Mitigation mechanisms for groups to establish
Project dealing with -2 woodlots woodlots
climate change per ward
impacts -Hold barazas to
Establish educate on Climate
occurrence community
reduction Change
nurseries in
each ward -Integrate
participatory scenario
-Awareness planning to tree
on climate growing
change to 500
people per
ward
County outdoor To increase 10 outdoor Procure outdoor 30M 15M 15M
advertisement revenue from advertisement advertisement
infrastructure outdoor infrastructure infrastructure
project advertisement
Noise To reduce menace -10 modern -Procurement of 10 10M 6M 6M
Abatement from Noise Noise Meters modern noise meters
Project related issues in
the County -1 Noise -zoning of noise
Pollution pollution areas
Zoning
-7 Anti Disco
matanga -Anti disco matanga
awareness campaign at the sub
county level
134 | P a g e
campaign -Noise pollution road
show from Mariakani,
-1 noise Kaloleni, Mtwapa,
pollution road Kilifi , Malindi,
show Gongoni,
campaign
Air Pollution To enhance 1 air pollution -Purchase 1 ultra 30M 15M 15M
Control Project departmental measuring modern Air pollution
capacity to reduce gadget measurement gadget
point and non
point air pollution -Training on air
pollution to
environmental officers
Annual County Inculcate All sub -Procure 10M 10M 10M
Environmental environmental counties-14 environmental awards
Competition consciousness to green schools to 14 green schools
school going in each sub
children county -Set up competition
criteria for the green
school
-Facilitate
environmental
competition for the
schools
Annual To come up with 1 County -Mobilize all national 3M 3M 3M
Environment the plan for environmenta and county
Action Plan proper county l management departments to
environment plan document on their
management sectors
-Compile and present
the plan
-publish, print and
distribute the plan to
stakeholders for use
Upgrading of To eradicate 7 landfill in Procure dumpsites 30M 30M 30M
dampsites to dampsites in the all sub machinery
Land fills county county -Bulldozers, shovel
Solid Waste Provide proper All sub Procure 2 Trucks, 14 50M 50M 50M
Collection alternatives for counties Skips, 4 Compactors
Infrastructure waste collection and 2 Skip Loaders
from the
receptacles
135 | P a g e
Community Awareness on 10 groups Procure equipment for 20M 20M 20M
waste handling solid waste urban centres waste collection
groups support management to in the county
the groups Develop legislation to
aid waste collection by
Development of groups
legislation on
groups waste
management
Procure solid
waste
management
equipments for
the groups
Streamline
incentives for
groups doing
waste collection
in the community
Conduct EIAs to To conduct EIAs All county Carry out EIA/EA for 15M 15M 15M
all county all for all county projects all county projects
count projects
development
projects
Protection of Safe guard Kilifi and Construction of 20m 5m 5m
public Cemetery encroachment and Malindi perimeter wall and
enhance assembling sites
management for
public use
SP. 3.1 Forest Conservation and Management
Establishment of Establishment of Rabai Construction of walk 10 30m 5m
public public Malindi. way pavements,
recreational recreational parks Mtwapa and concrete seats , land
parks Watamu scaping Public Toilets
Establishment of To improve Magarini and Establishment of 30 10m 5m 5m
tree plantations charcoal Ganze Acres tree plantations
for charcoal production for charcoal production
production industry
Rehabilitation of Reclaim 4 sub -Plant fast growing 50M 20M 20M
degraded areas community lands counties- colonizing trees
almost considered including cassia siamea,
136 | P a g e
waste 10000 casuarinaetc
-Back filling and
leveling of abandoned
quarry sites
Construction of Construction of Dakacha and Construction of forest 20m 10m
forest guards forest guards Mwangea guards houses
houses houses
Improvement of Increase the Procure nursery 8M 8M
County Tree number of maintenance
Nurseries seedlings infrastructure
available for tree
growing in the
county
River bank Reduce erosion Ganze, Nursery establishment 20M 20M
protection and conserve the Rabai,Malindi
river banks , Kilifi South Vertiver grass growing
Training
Tree planting
Marine Reduce mangrove Kilifi North, Beach clean up 20M 20M 20M
Conservation and marine Rabai,
habitats Malindi, Kilifi Community
degradation South and sensitization
Magarini Mangrove planting
Provision of To provide water Kilif North, Procure Mini Water 1.3M 1.2M 1.2M
water Mini for watering Kilifi South, Bowsers
bowser for flower beds Malindi, Kilifi
watering flower and mariakani
beds
Green Schools To increase the 28 Schools in Fence existing tree 28M 14M 14M
Program forest cover in all sub nurseries
Upgrading schools through counties
Project tree planting by Procure and instal
students and 10000L Water tanks to
teachers 14 schools
Plant more than 1000
trees in each school
Procure and distribute
5000 seedlings to
parents
P.3 Natural Resources Conservation and Management
137 | P a g e
Natural Ganze,Magarini Salt 3 Capacity Building 50M 50M 40M
Resources and Kilifi North harvesting Trainings on NRM and
Investors belt, sand environment
Support Project harvesting conservation
belt,
limestone Develop proper 3 Public
miners in Private Partnerships for
Kilifi North natural Resources
and miners in Extraction
Ganze Develop 30 KM access
roads for natural
resources exploitation
40000m3 Water Provide water 2000 people Carry out survey design 15m 4000 Provide
pan supply to 1 tank and construct a 0m3 water
Kanyumbuni MnagoWa Shibe 40,000m3 dam with all Water supply to
Adu( MnagoWa villlage relevant civil works pan MnagoWa
Shibe) Kany Shibe
umbu villlage
ni
Adu(
Mnag
oWa
Shibe
)
Construction of To increase 5000 people, Carry out survey design Const
Earth Dam at surface water 10,000 and construct a ructio
Sosobora, storage and avail cattle& 40,000m3 dam with all n of
Girimacha water for shoats- relevant civil works Earth
livestock-Jilore Malindi Dam
at
Sosob
ora,
Girim
7.7m acha
Construction of To increase 2000 people, Carry out survey design Constr To
Water Pan at surface water 6000 cattle & and construct a uction increa
Raukani, storage and avail shoats- 40,000m3 dam with all of se
Chakama water for Magarini relevant civil works Water surfac
Location livestock -Adu Pan at e
Rauka water
ni, storag
Chaka e and
ma avail
Locati water
on for
livest
ock
-Adu
Jeuri Pan To avail 2000 people Construction 20000m3 10m Jeuri To avail
affordable clean water pan Pan affordable
and safe water to clean and
the residents of safe water
Jeuri village to the
140 | P a g e
residents of
Jeuri
village
Jimba Pan To avail 500 people Construction 15000m3 10M Jimba To avail
affordable clean water pan Pan affordable
and safe water to clean and
the residents of safe water
Jimba villages to the
residents of
Jimba
villages
Mwanjama Pan To avail 3000 people Construction 20000m3 10m Mwa To avail
affordable clean water pan njama affordable
and safe water to Pan clean and
the residents of safe water
Mwanjama to the
residents of
Mwanjama
Katumbiri Pan To avail 2000 people Construction 15000m3 10M Katu To avail
affordable clean water pan mbiri affordable
and safe water to Pan clean and
the residents of safe water
katumbiri village to the
residents of
katumbiri
village
Kaliangombe To avail 3000 people Construction 20000m3 10M Kalia To avail
Pan affordable clean water pan ngom affordable
and safe water to be clean and
the residents of Pan safe water
Kaliangombe to the
village residents of
Kaliangom
be village
Dungicha Water To avail 3000 people Construction 20000m3 10M Dund To avail
Pan affordable clean 60 L.U. water pan icha affordable
and safe water to Pan clean and
the residents of safe water
Dungicha village to residents
of
Dungicha
Kwa Mulungu To avail 3000 people Construction 20000m3 10M Kwa To avail
Water Pan affordable clean 60 L.U. water pan mulu affordable
and safe water to ngu clean and
the residents of Pan safe water
Kwa Mulungu to residents
141 | P a g e
village of Kwa
Mulungu
Kwa Mwango To avail 3000 people Construction 20000m3 10M Kwa To avail
Water Pan affordable clean 60 L.U. water pan mwan affordable
and safe water to go clean and
the residents of Pan safe water
Kwa Mwango to residents
village of Kwa
Mwango
Mtsara wa To avail 3000 people Construction 20000m3 10M Mtsar To avail
Magungu Water affordable clean 60 L.U. water pan a wa affordable
Pan and safe water to Magu clean and
the residents of ngu safe water
Petanguo village Pan to residents
of
Petanguo
Gareheni Water To avail 3000 people Construction 20000m3 10M Gareh To avail
Pan affordable clean 60 L.U. water pan eni affordable
and safe water to Pan clean and
the residents of safe water
Migudomani to residents
village of
Migudoma
ni
Kwa Ngite To avail 3000 people Construction 20000m3 10M Kwa To avail
Water Pan affordable clean 60 L.U. water pan Ngite affordable
and safe water to Pan clean and
the residents of safe water
Migudomani to residents
village of
Migudoma
ni
SP. 4.3 Water Supply Infrastructure
Rima rapera Water Quality 200 people Supply and install a Ksh.6
bore hole enhancement and 60L.U. desalination plant m
Dooni bore hole Water Quality 200 people Supply and install a Ksh.6
enhancement and 60L.U. desalination plant
Kibaokiche- To avail 10,000 people 1. Construction of 15km kshs. 10m 10m
masaaniMikoma affordable clean pipeline stretch of 15m
ni pipeline water and safe water to 100mm HDP 16 Bar
project, Rabai the residents of pipes
Kibaokiche- 2. Construction of
masaaniMikoman Standard Water Kiosk10
i villages No.
3. 100m3 Masonry
Storage Tanks 1 No.
142 | P a g e
Vishakani-Mleji To avail 3,000 people 1. Construction of 4km 7M
pipeline water affordable clean pipeline stretch of
project, Rabai . and safe water to 90mm HDP 16 Bar
the residents of pipes
Vishakani-Mleji 2. Construction of
Standard Water Kiosk1
No.
3. 50m3 Masonry
Storage Tanks 1No.
Gede- chumani To avail 50,000 people Survey and design and 20m 80M 50M
– tezo - Kilifi affordable clean construction
water pipeline and safe water to
project, Kilifi the residents of
North. Gede-Kilifi
villages
Tezo - Chumani To avail 20,000 people 1. Construction of 15km 15M 10M 5M
- Uyombo water affordable clean pipeline of 100mm HDP
project Kilifi and safe water to 16 bar pipes
North the residents of 2. Construction of
Tezo - Chumani - Standard Water Kiosks
Uyombo villages 10 No.
3. Construction of
143 | P a g e
200m3 Masonry Tank
Baricho – To avail 15,000 people -Survey and design 25M 20M 0
Balagha- affordable clean -Construction of 15km
Matolani – and safe water to pipeline of 100mm HDP
Bombi pipeline the residents of 16 bar pipes
extension water Baricho – 2. Construction of
project Magarini Balagha- Standard Water Kiosks
Matolani – Bombi 10 No.
3. Construction of
500m3 R.C. Tank
Kirepwe Island To avail 4000 People -Hydro geological 20M 3M 3M
Borehole affordable clean survey, drilling and
and safe water to equipping with
residents of submersible pumps
Kirepwe Village Construct pump houses
Gede Shirango To avail 2000 People -Hydro geological 20M 3M
Borehole affordable clean survey, drilling and
and safe water to equipping with
residents for submersible pumps
GedeShirango Construct pump houses
Village Ganze
Mwawesa To avail 1500 people -Hydro geological 20M 3M
Borehole affordable clean survey, drilling and
and safe water to equipping with
residents of submersible pumps
Mwawesa Village Construct pump houses
Disaster Availability of Affected areas Procurement of 1 No. 14M
Mitigation clean and safe water bowsers for water
water to hard hit tracking and relevant
areas during accessories
disaster
Kamukunji To harvest 15,000 people Development of 20m 20M 20m
quarry water surface runoff for Kamkunji quarry water
system Rabai livestock and system
domestic and
minor irrigation
uses
Water Exploit ground 36 shallow 25M 20M 20m
Resources water for wells 1. identification of sites
Development livestock, 2. Hydro-geological
domestic and survey
minor irrigation 3. Construction of 36
uses No. shallow wells
Mwijo- To avail 4000 people- -Survey and design 9.7m 6.5m
Makomboani affordable clean Kaloleni -Construction of 10km
Water Project and safe water in pipeline of 100mm HDP
144 | P a g e
Kaloleni Ward 16 bar pipes
2. Construction of
Standard Water Kiosks
5 No.
3. Construction of
100m3 blue scope Tank
Kizurini Water To avail 3500 people- -Survey and design 0 0
Project affordable clean Kaloleni -Construction of 6km
and safe water in pipeline of 100mm HDP
Kaloleni 16 bar pipes
2. Construction of
Standard Water Kiosks
3 No.
3. Construction of 3No.
plastic tanks of 5m3
capacity each Tank 4.5m
Katolani- To avail 4000 people- -Survey and design 10m 5M
Tsangatsini affordable clean Kaloleni -Construction of 15km
Water project and safe water in pipeline of 100mm HDP
Kayafungo Ward 16 bar pipes
2. Construction of
Standard Water Kiosks
10 No.
3. Construction of
500m3 R.C. Tank 20M
Kakunaa water To avail 3000 people -Survey and design
pipeline with affordable clean -Kaloleni -Construction of 7km
50m3 storage and safe water in pipeline of 100mm HDP
tank Kakunaa,Mariaka 16 bar pipes
ni Ward 2. Construction of
Standard Water Kiosks
3 No.
3. Construction of 3No.
plastic tanks of 5m3
capacity each Tank 5M 2M
Mwareni water To avail -Survey and design
pipeline project affordable clean 4000 people- -Construction of 15km
with 100m3 tank and safe water in Kaloleni pipeline of 100mm HDP
Mariakani Ward 16 bar pipes
2. Construction of
Standard Water Kiosks
10 No.
3. Construction of
500m3 R.C. Tank 15m 10m 0
Tsongoni- To avail 1500 people -Survey and design 10m 0
Kitsaumbi- affordable clean -Construction of 15km 15m
145 | P a g e
Mwabayanyund and safe water in pipeline of 100mm HDP
o water project Kayafungo Ward 16 bar pipes
2. Construction of
Standard Water Kiosks
10 No.
3. Construction of
500m3 R.C. Tank
Kanyumbuni To increase 1500 people -Hydro geological 20m
Borehole access to safe survey, drilling and
water in equipping with
Kayafungo Ward submersible pumps
Construct pump houses 0 0
HademuNguluw To avail 1500 people -Survey and design
eni-Kizurini affordable clean -Construction of 15km
water project and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Standard Water Kiosks
10 No.
3. Construction of
500m3 blue scope Tank 15m 10m 10m
Maboyani- To avail 2000 people -Survey and design
Kabateni Water affordable clean -Construction of 17km
Project and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Standard Water Kiosks
10 No.
3. Construction of
500m3 blue scope .
Tank 25m 10m 8m
Gotani-Miyani- To increase 1500 people -Survey and design
Kasemeni water access to safe -Construction of 18km
project water in pipeline of 100mm HDP
Kayafungo Ward 16 bar pipes
2. Construction of
Standard Water Kiosks
8No.
3. Construction of
100m3 bluescope . Tank 15m 10m 10M
Hademu- To avail 1100 people -Survey and design 5m
Kilonga Water affordable clean -Construction of 3km 5m
Project and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Standard Water Kiosks
146 | P a g e
3No.
3. installation of 5m3
water plastic Tanks
Juhudi- To avail 1300 people -Survey and design
Kakomani affordable clean -Construction of 5km
Water Project and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Standard Water Kiosks
5No.
3. installation of 5m3
water plastic Tanks 7m 7M
Juhudi- To avail 1500 people -Survey and design
Kithengwani affordable clean -Construction of 9km
water project and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Standard Water Kiosks
9No.
3. installation of 5m3
water plastic Tanks 10m 5M
To avail 1500 people -Survey and design 5M
affordable clean -Construction of 8km 10m
and safe water in pipeline of 100mm HDP
mwanamwinga 16 bar pipes
Ward 2. Construction of
Tsanzuni- Standard Water Kiosks
Migumomiri- 8No.
Mtsengo water 3. installation of 5m3
pipeline water plastic Tanks
Mida/Matsangon Increase access to 15,000 people -rehabilitation of the 20m 5m 0
i water project safe and portable and several existing pipelines.
water and livestock units -Extension of the
reliability of pipelines to the villages
services to the of Uyombo, Mkongani,
Mida, Madeteni, Kadaini
Mkangagani, -Construction of water
Matsangoni, storage tanks
Mkongani, -Construction of water
Uyombo kiosks
Kaembeni- Increase access to 50,000 people -survey and design 100m 50m 40m
Matsangoni, safe and portable and several -Construction of a
Matsangoni- water and livestock units pipeline from
Tezo, reliability of Kaembenioff taking
Matsangoni- services by from 32’ Baricho
Uyombo water boosting the pipeline through the
147 | P a g e
project water supply to Arabuko forest to
Matsangoni, Matsangoni
Uyombo, Roka, -Construct a pipeline
Chumani, from Matsangoni to
Ngerenya, Tezo Uyombo
and hence
increase the
supply to Kilifi
town
Maweya Kati- Increase access to 4000 people, Construction of pipeline 37m 10m 5m
Timboni- clean portable a school and -construction of water
Watamu water to the several kiosk
residents of livestock -construction of storage
Maweya Kati, tank
Timboni and
Watamu
Kadzinuni- Increase access to 1500 people, -Construction of a 15m 12m Nil
Tandia pipeline safe and adequate a primary pipeline
piped water and school and -Construction of water
reliability of some kiosk
services to the livestock -Construction of storage
residents of tank
Kadzinuni
Kizingo As an alternative 250 people -Borehole cleaning 2m 0.8m Nil
borehole water resources to and several machinery mobilization
rehabilitation piped water in livestock to site
Kizingo -Removal of
submersible pump and
draw pipes from the
borehole
-Cleaning of the
borehole to the designed
depth
-Fitting of the draw
pipes and installation of
submersible pump
-Pumping test and
service of generator
prime mover
-Purchase and supply of
a 10m3 UPVC storage
tank to site
Matandale – To avail 10,000 people -Survey and design 15m 7m Nil
Junju – Chodari affordable clean -Construction of 10km
pipeline and safe water to pipeline of 100mm HDP
extension water the residents of 16 bar pipes
148 | P a g e
project Kilifi 2. Construction of
south Standard Water Kiosks
8 No.
3. Construction of
100m3 blue scope Tank
Panga Moshi To avail 8000 people -Survey and design 17m 16m Nil
water project, affordable clean -Construction of 12km
Kilifi South. and safe water to pipeline of 100mm HDP
the residents of pipes
Panga Moshi 2. Construction of
villages Standard Water Kiosks
6 No.
3. Construction of 2 No.
150m3 blue scope tanks.
Adu-Ramada- To avail 4000 people -Carry out survey & 12m 25m 10m
Maziachenda affordable clean design. -Construction of
pipeline and safe water to 7.5km pipeline 100mm
the residents of HDPE
MaziaChenda -5water kiosks with
villages 5plastic tanks of 5m3
capacity each
-150m3 blue scope
water storage tank
Sosoni -Kirosa- To avail 11000 people Construction of 20km 16m 50m 50m
Chamari water affordable clean pipeline from Dakacha
project and safe water to tanks to chamari
the residents of Village. Booster station
KirosaKiluluCha 10 water kiosks valve
mari villages chambers and marker
posts
Ramada Bora To avail 20000 people Construction of 45km 100m 100m 100m
ImaniMarereniV affordable clean pipeline from Ramada to
ibaoViiri and safe water to Vibaoviiri 160mm
the residents of
Bora
ImaniMarereni
and Kanagoni
Kadzandani- To avail 3000 people Carry out Survey & 0.5M 10m 10m
Mogole- affordable clean design. Construction
Chamari and safe water to works
pipeline the residents of
ChamariWatalaM
ogole and Chalalu
villages
Construction of Provide storage 20,000 people Install 4no steel elevated 40m
149 | P a g e
4no.250m3 for Kadzandani & 4 N0. tanks
elevated tanks at Marafa –Chanjalo construction
kisima Cha Kufa pipelines for tanks
Supply to
Ramada, Fundiisa
Bora imani areas
Borehole Provide water 6500 people, Carry out hydro 15m
drillling at supply to 1 borehole geological survey, drill
Madzayani MadzayaniPumw equip and construct
ani and water tower with solar
kadzifitseni power system
Villages
Timboni Ground water 20000 people Construct elevated 20m 20m 20m
Gongoni Wells protection and tanks, well slabs
supply water to pumping units and solar
Gongoni town power units
and surrounding
villages
Construction of To increase 50,000 Construction of a
3500m3 buffer storage on the people- 3500m3 blue scope
storage for the main Watamu Malindi tank as a buffer storage
Kakuyuni- pipeline for the Kakuyuni-
Watamu system Kakuyuni, Watamu system &
& Improvement Dabaso, Watamu, Improvement of Mida-
of Mida- Matsangoni Matsangoni Pipeline
Matsangoni system
Pipeline system 200M
Mazeras- Improve water 2000 people Rehabilitation of 90mm 16m 15m 10m
BuniKisimaniM service provision DN HDP pipe16Bar
watsama water for Buni, pipes 20km pipeline
pipeline Kisimani and 2. Construction of
Mwatsama Standard Water Kiosks
Villages 10 No.
3. Construction of 3No.
100m3 blue scope Tanks
Manoloni water To avail 2000 people Pipeline extension 7.7m
pipeline affordable clean 100mm HDPE 1km
and safe water to Construction of 1No.
the residents of water kiosk
Manaloni village
Baramare water To avail 2000 people Extension of 2.5km 7.7m
pipeline affordable clean pipeline 63mm HDPE
and safe water to Construction of 1No.
the residents of water kiosk
Baramare villages
Mwandoni To avail 2000 people Pipeline extension 6.5m
150 | P a g e
Pipeline affordable clean 50mm HDPE 3km
and safe water to 1No. water kiosk
the residents of
Mwandoni
village
MtandikeniMasa To avail 500 people 1km extension 50mm 2.5m
ani affordable clean HDPE
and safe water to
the residents of
Masaani villages
Colorado- Improve water 4000 poeple Rehabilitation with 20M 1M
BwagaMoyo service provision 100mm HDPE 4.5km
rehabilitation for Bwagamoyo
villages
Kibao- To avail 10000 people Construction of a 90mm 30m
KicheMasaaniK affordable clean HDPE 10km
adzuyuni and safe water to
Mwanjama the residents of
Masaani and
Mwanjama
villages
Dzivo- To avail 1500 people Pipeline extension 6m
Mwamruu affordable clean HDPE 90mm 2km
and safe water to
the residents of
Mwamruu
villages
152 | P a g e
Improve access to 1 Completion of Dispensary
Completion of Jimba health care services construction
Dispensary (Ruruma
ward) 4,590,078
Completion of Dispensary Improve access to 1 Completion of Dispensary
at Mtangani (Sabaki health care services construction
Ward) 8,456,233
Completion of Garithe Improve access to 1 Completion of Dispensary
Dispensary and Staff health care services construction
Quarters (Gongoni ward) 10,598,453
Completion of Improve access to 1 Completion of Dispensary
Mwakuhenga Dispensary health care services construction
(Mnarani ward) 7,576,185
153 | P a g e
Construction of Drug store Strengthen 1 Construction of Drug store
at Mariakani Sub County commodities storage
Hospital and management 1,700,000
Construction of Drug store Strengthen 1 Construction of Drug store
at Malindi Sub County commodities storage
Hospital and management 1,700,000
Construction of Drug store Strengthen 1 Construction of Drug store
at Bamba Sub County commodities storage
Hospital and management 1,700,000
Construction of Drug store Strengthen 1 Construction of Drug store
at Jibana Sub County commodities storage
Hospital and management 2,000,000
Construction of staff Improve access to 1 Construction of staff
house at Mwembe kati health care services house
Dispensary 8,000,000
Construction of Improve access to 1 Construction of
Laboratory at Bamba Sub diagnostic health Laboratory
County Hospital care services 8,000,000
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Chamari Dispensary
management 882,088
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Mitsanjeni Dispensary
management 589,641
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
GedeDispensary
management 672,882
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Tsangatsini Dispensary
management 683,885
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at waste disposal Tank and Soak Pit
Sosoni Dispensary management 698,124
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Kadtfiteseni Dispensary
management 893,668
Septic tank and Soak Pit at Improve liquid 683,885 1 Construction of Septic
Ndatani Dispensary waste disposal
154 | P a g e
management Tank and Soak Pit
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Mulunguni Dispensary
management 882,668
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Jila Dispensary
management 867,281
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Kachoroni Dispensary
management 735,109
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Tunzanane Dispensary
management 683,885
Improve liquid 1 Construction of Septic
Septic tank and Soak Pit at
waste disposal Tank and Soak Pit
Kiwandani Dispensary
management 817,429
Purchase of assorted Improve access to Assorted Supply and Delivery
equipment for diagnostic health assorted equipment for
Laboratories care services 20,000,000 Laboratories
155 | P a g e
Completion of Improve access to 1 Completion of Dispensary
Kithengwani Dispensary health care services Construction
(Mwanamwinga ward) 7,397,362
Completion of Chakama Improve access to 1 Completion of Dispensary
Dispensary health care services 15,029,391 Construction
Contraction of twin one Improve access to 1 Contraction of twin one
bedroom staff house for health care services bedroom staff house
Uwanja Wa Ndege
Dispensary 7,340,617
Extension of Mijomboni Improve access to 1 Extension of Dispensary
Dispensary health care services 7,202,618
Extension of Kalimboni Improve access to 1 Extension of Dispensary
Dispensary health care services 7,202,618
156 | P a g e
Empower the 2 Establish community units
Establish 14 community Community to take
units Care of their Health
1,600,000
Enhance the 343 Purchase of Bicycles
mobility of CHVs
Purchase of Bicycles and Ease their
Access to
Households 3,432,000
Strengthen 1 Rehabilitation of
Rehabilitation of Ganda
Preventive Dispensary
Dispensary
maintenance 4,000,000
Construction of staff Improve access to 1 Construction of staff
House at Mtwapa Health health care services House
Centre 7,000,000
160 | P a g e
Hospital emergency centre
centre to
handle
such cases.
Construct and Increase Construct and Construct and 20,000,000 20,000,000
equip eye access of equip eye unit equip eye unit
centre in Kilifi specialized
County eye care
Hospital
Construction Improve Construct 1 Construct 25,000,000 25,000,000 10,000,000
and equipping access to cancer cancer
of Cancer specialized diagnostic diagnostic
Diagnostic health care centre centre
Centre at Kilifi services
County
Hospital
purchase of Increase purchase of 2 purchase of 45,000,000 45,000,000 0
Oxygen Plant access of Oxygen Plants Oxygen Plant
for Malindi chemical
and Mariakani and
Sub County industrial
Hospital gases and
reduce the
costs
Construct and Improve Construct and Construct and 40,0 40,000,000 40,000,000
equip 4 new last office equip 4 new equip 4 new
mortuaries at services mortuaries mortuaries at 000,000
Mariakani,
Bamba &
Bamba
Marafa & Marafa & Rabai
Rabai
163 | P a g e
Purchase of Increase Purchase of Purchase of 600 7,000,000 7,000,000 7,000,000
600 patients bed space 600 patients patients beds for
beds for in the beds hospitals and
hospitals and health centres.
inpatient
health centres. County wide.
County wide.
Procure Improve Procure 6 Procure 20,000,000 20,000,000 20,000,000
anaesthetic quality of anaesthetic anaesthetic
machines for health care machines for machines for
hospitals, hospitals hospitals
Bamba &
Jibana, Rabai
and Gede).
Purchase of 9 Improve Purchase of 9 Purchase of 9 X- 6,000,000 6,00,000 6,00,000
X-ray diagnostic X-ray ray machines
machines for health care machines
Gede, Bamba,
Rabai, Marafa,
Jibana,
Vipingo,
Mariakani,
Kilifi and
Malindi
Purchase 6 Improve Purchase 6 Purchase 6 Ultra 4,400,000 4,400,000 4,400,000
Ultra Sound diagnostic Ultra Sound Sound machines
machines health care machines
Gede, Bamba,
Rabai, Marafa,
Jibana,
Vipingo
Purchase 2 CT Improve Purchase 2 CT Purchase 2 CT 60,000,000 60,000,000 0
Scan (Malindi diagnostic Scan Scan (Malindi &
& Mariakani) health care Mariakani
164 | P a g e
Mariakani,
Malindi
Purchase Improve Purchase Purchase 50,000,000 50,000,000 50,000,000
assorted diagnostic assorted assorted medical
medical health care medical equipment for
equipment’s
equipment all sub County
for all sub
County hospitals
hospitals
Purchase of Improve Purchase of Purchase of 6,000,000 6,000,000 6,000,000
medical gases diagnostic medical gases medical gases –
– portable health care – portable portable 45kgs
45kgs and 45kgs and and 25kgs
25kgs
cylinders-All 25kgs cylinders
Health cylinders
Facilities
Purchase Improve Purchase Purchase 50,000,000 50,000,000 50,000,000
assorted diagnostic assorted assorted medical
medical health care medical equipment for
equipment for equipment for all primary care
all primary
care facilities all primary facilities
care facilities
165 | P a g e
/Location Kshs Kshs Kshs
millions millions millions
Sensitization Ensure Sensitization 5,000,000 5,000,000 5,000,000
Sensitization,
on HIV/AIDS early on Cancer and
Screening and
and TB in all detection TB in all 35
treatment
35 Wards in and Ward in the
the County treatment County
Sensitization Ensure Sensitization 5,000,000 5,000,000 5,000,000
Sensitization,
on Cancer , early on Cancer and
Screening and
Diabetes and detection TB in all 35
treatment
High Blood and Ward in the
Pressure in all treatment County
35 Wards in
the County
Establish 35 Empower Establish 30 4,700,000 4,700,000 4,700,000
Establish and
Community the Community
functionalize
Units at in all Communit Units
Community
wards. y to take
Units
care of
their
Health
Purchase 6 Ensure Purchase 6 Purchase 6 10,000,000 10,000,000 10,000,000
fumigation infection fumigation fumigation
machines at prevention machines. machines.
Kilifi, Malindi, and control
and Mariakani.
166 | P a g e
nt
167 | P a g e
3.8 Roads, Transport and Public Works Services
On-Going Projects/Programmes
168 | P a g e
To enhance SP 1.2 10,000,00 To To carry out routine
Mbaraka Rehabilita 0 rehabilitati grading and gravelling
motorability of roads
Chembe Road tion of on 8km works; bush clearing;
and reduce
roads road unblocking culverts of
maintenanace costs
the road projects
To enhance SP 1.2 20,000,00 To To carry out routine
motorability of roads Rehabilita 0 rehabilitati grading and gravelling
Petanguo to tion of on 15km works; bush clearing;
Dungicha Road and reduce
roads road unblocking culverts of
maintenanace costs
the road projects
To enhance SP 1.2 20,000,00 To To carry out routine
motorability of roads Rehabilita 0 rehabilitati grading and gravelling
and reduce tion of on 10km works; bush clearing;
Mapimo Road roads road unblocking culverts of
maintenanace costs
the road projects
Cabro To enhance SP1.1 10,000,00 To Pave To carry out routine
Completion of motorability of roads constructi 0 600m road grading and gravelling
Bus Park - St. and reduce on of works; bush clearing;
Luke's Road roads and unblocking culverts of
maintenanace costs
bridges the road projects
To enhance SP1.2 25,000,00 To To carry out routine
Majengo Rehabilita 0 rehabilitati
grading and gravelling
motorability of roads
Kanamai to tion of on 8km works; bush clearing;
Jumuia Road and reduce
roads road unblocking culverts of
maintenanace costs
the road projects
To enhance SP1.1 5,000,000 To Pave To carry out routine
motorability of roads constructi 500m road grading and gravelling
Completion of on of works; bush clearing;
Shella Cabro and reduce
roads and unblocking culverts of
maintenanace costs
bridges the road projects
To enhance SP1.1 150,000,0 To pave To carry out routine
motorability of roads constructi 00 grading and gravelling
Completion of on of works; bush clearing;
Mtwapa Buspark and reduce
roads and unblocking culverts of
maintenanace costs
bridges the road projects
4.2km To enhance SP1.1 273,000,0 To pave Upgrading of the roads
Upgrading of A7 motorability of roads constructi 00 4.2km to bitumen standards
(Kanu Office - and reduce on of
Kisumu ndogo roads and
maintenanace costs
(Mbuyuni road), bridges
Bus park -
169 | P a g e
Muyeye)
On-going Projects/Programmes
173 | P a g e
Monitoring
and mid term
evaluation.
174 | P a g e
3.11 COUNTY PUBLIC SERVICE BOARD
Project Estimated
Description of
name and Objectives Targets Cost Projected Projected
Activities
Location 2017/2018 2018/2019 2019/2020
ONE 1 open
Partitioning plan office;
and three 3 offices;
to create
furnishing of one 1
more
CPSB boardroom;
office staff
extension one 1 registry;
offices one 1 Partitioning and
storeroom. furnishing 12,000 0 0
175 | P a g e
Chapter Four: Implementation, Monitoring and
Evaluation
176 | P a g e
CHAPTER FOUR
4.0 Introduction
This chapter presents by sector all projects and programmes, which implementation will be
continuing on or newly initiated in 2017/18 financial year. Ongoing projects/programmes will
be in their second or third year of implementation in 2017/18 fiscal year while those proposed
are those starting during this period and continued in the next two fiscal year (2018/19 and
2019/20) or completed in one year. The implementation matrices therefore indicate the total
estimated cost of each project/programme in its implementation period of one, two or three fiscal
years. The matrices also indicate the agency responsible for each programme/project
implementation and funding, output indicators and how implementation will be monitored.
Project Name Est. Time Frame Monitori Monitori Impleme Source Projec
Location Cost ng ng Tools nting of t
Kshs Q1 Q2 Q3 Q4 Indictors Agency Funds Imple
million mentat
ion
Status
P 1. General Administration Planning and Support Services
178 | P a g e
Procurement of 112 M No of Inspection Agric CGK Propos
tractors. tractors Report Directora ed
County wide Delivery te
note
Log book
farmers capacity 2m No of Training Agric CGK Propos
building on farmers reports Directora ed
climate change trained te
mitigation
Cashew nut, 7.5m No. of reports Agric CGK ongoin
coconut and cashewnut, Directora g
mangoes mango and te
promotion coconut
seedlings
Rehabilitation of 18m No. of Delivery Agric CGK Propos
tree crops cashewnut note Directora ed
orchards - seedlings te
Cashewnut
programme
Provision of low 18M No. of Delivery Agric CGK Propos
cost fertilizer and bags note Directora ed
inputs. delivered Reports te
County wide List of
beneficiari
es
Reports
Provisionof 7m Tonnes of Reports Agric CGK Propos
certified certified Directora ed
seeds( Assorted ) seeds te
Agricultural 20M No. Of Report Agric CGK Propos
mechanization machinery Photo Directora ed
programme procured te
county wide Number of
equipment
procured
SP 2.2 Food security initiative
Promotion of fruit 20M Agric CGK Propos
processing No of Reports Directora ed
(mango, passion, cottage Field te
pine apple) industries visits
through
establishment of
cottage industries
in villages.
County wide
Farmers capacity 5.1m No of FFS Reports Agric CGK Propos
building through established Directora ed
FFS No. of te
Groups
179 | P a g e
trainined
mangoes and 35M No. of Reports Agric CGK Propos
coconut beneficiari Directora ed
rehabilitation es te
County wide No of
sedlings
Cassava 2M No. of Reports Agric CGK Propos
promotion and beneficiari Delivery Directora ed
value addition es note te
County wide No of
cuttings
delivered
181 | P a g e
50m Increase Reports Agric CGK Propos
Implementation of irrigation Directora ed
Dagamra by 5ha te
Irrigation scheme
Water harvesting 50m Construct 6 Reports Agric CGK Propos
–Construction of dams Directora ed
dams te
LIVESTOCK
P5: Livestock Development
182 | P a g e
and Ganze sub State
counties Actors
Promotion of 3.5M No of Reports Livestoc CoGKfi On
Rabbits rabbits Field k Partners going
production purchased visits producti
Kilifi north, Kilifi & on
south, Kaloleni, distributed directora
Magarini, , te Non
Malindi Rabai State
and Ganze sub Actors
counties
Up scaling of 6M No of bee Reports Livestoc CoGKfi On
Beekeeping hives Field k Partners going
Kilifi South , No of visits producti
Magarini Kilifi accessories on
North , Ganze, directora
Malindi, Rabai, te Non
Kaloleni State
Actors
Local Poultry 3M No of Reports Livestoc CoGKfi Propos
development poultry Field k Partners ed
County wide purchased visits producti
and on
distributed directora
te Non
State
Actors
Meat Goats 28.4M No of goats Reports Livestoc CoGKfi On
(Galla) purchased Field k Partners going
development visits producti
All Sub Counties on
directora
te Non
State
Actors
Improvement of 4.6M No of Reports Livestoc CoGKfi On
local Zebu Boran bull Field k going
Malindi, Ganze, visits producti
Magarini and on
kaloleni directora
te
183 | P a g e
established
SP:5.3 Livestock Products Value Addition and Marketing
184 | P a g e
collection and To reports k g
cooling centres improve Completi producti
Bamba market on on
access for certificate directora
the raw te
milk
Construct New 4.7m To M&E Livestoc CGK ongoin
Milk collection improve reports k g
and cooling market Completi producti
centres access for on on
Ganze the raw certificate directora
milk te
Construct New 4.2m To M&E Livestoc CGK ongoin
Milk collection improve reports k g
and cooling market Completi producti
centres access for on on
Marafa the raw certificate directora
milk te
Construction of 2m To M&E Livestoc CGK ongoin
Rabai milk improve reports k g
cooling and market Completi producti
collection centre access for on on
Rabai the raw certificate directora
milk te
Tsangatsini 1.3m To M&E Livestoc CGK ongoin
livestock sale improve reports k g
yard perimeter market Completi producti
fence and toilet access to on on
Kayafungo ward livestock certificate directora
te
Perimeter fence 0.5m To M&E Livestoc CGK ongoin
Langobaya facilitate reports k g
livestock sale market producti
yard and toilet access for Completi on
construction for livestock on directora
Baolala/ certificate te
Langobaya
Jilore ward
Construction of 30m To M& E Livestoc CGK new
Manyeso milk improve reports, k
cooling and market completio producti
collection centre access for n on
the raw certificate directora
milk s te
FISHERIES
P:6 Fisheries Development
186 | P a g e
landing site
Development of 15m No of Reports Fisheries CGK New
30 Crab fattening cages List of Directora
project developed beneficiar te
No of ies
ponds Delivery
established reports
-No of
training
held
Pond fisheries 16m No of Report Fisheries new
development ponds List of directora CGK
projects. establishm beneficiar te
All sub counties. ent ies
4m % of Monitorin Fisheries CGK new
Establishment of Completio g Directora
fish Feeds n of te
production unit establishm
ent of feed
unit
Veterinary Services
1)Programme: Livestock policy and capacity building
187 | P a g e
SP5. 2 Artificial Insemination project
i) Purchase and 2m -Kgs of M&E CO/CDV COGK ON-
provision of Liquid S GOIN
Liquid nitrogen. nitrogen G
Location: All received
wards and
distributed
-Kgs of
Liquid
Nitrogen
distributed
Ii Provision and 2m -No of M&E CO/CDV COGK ON-
distribution of Doses of S GOIN
quality Bull semen G
Semen. received
Location: All -Doses of
wards semen
distributed
Training of 9m Number of Reports CO/CDV COGK new
farmers on farmers Listing of S
veterinary trained training
services
SP5.3Food safety and animal products development
188 | P a g e
Location: all sub Tendering
counties and
delivery
distributio
n to
beneficiari
es
ii)Disease search 4m -tender M&E CO/CDV COGK ON-
and surveillance documents S GOIN
Location: All sub Sample G
counties collections
for
laboratory
analysis
-Reports
iii)Provision of 2.5m -Tender M&E CO/CDV COGK ON-
acaricide documents S GOIN
(Synthetic Delivery G
Pyrethroids) for -
dipping Distributio
programmes in n
tsetse/tick control
iv)Provision of 2.5m -Tender M&E CO/CDV COGK ON-
pour ons for tsetse documents S GOIN
control to areas -Delivered G
with no cattle dips acaricide
to be used in -
spraying of Distributio
animals n to
beneficiari
es
v)Provision of 5m -tender M&E CO/CDV COGK ON-
Vaccines for documents S GOIN
Vaccination of Delivery G
animals(FMD Vaccines
vaccine, LSD, -No. of
CCPP, Blanthrax, Vaccinatio
RVF, NCD, Fowl ns.
Typhoid, No of
Gumboro, Fowl animals
Pox and Rabies Vaccinated
Location: ALL
wards
vi)Carryout 2,000,0 No of M&E CO/CDV COGK ON-
two(2) 00 Vaccinatio S GOIN
Vaccination and n G
Baiting campaigns
campaigns and
Location: All Baiting of
wards Dogs
189 | P a g e
&Cats
Carried out
Site
inspection
Reports,
handing
Construction of over
10 workshops minutes, Department of
with classrooms Number of Photos, education , County
and hotels costructed Completion youth affairs governme
across 10 wards 150m workshops certificates and sports nt of Kilifi Proposed
Site
inspection
Reports,
Number of handing Department of
Construction of costructed over education , County
15 new Youth youth minutes, youth affairs governme
Polytechnics 150M polytechnics Photos, and sports nt of Kilifi Proposed
190 | P a g e
Completion
certificates
Procurement of
modern tools Reports,
and equipment Number of Photos, Department of
for training in youth delivery education , County
13 Youth polytechnics notesS13and youth affairs governme
Polytechnics. 26M equipped S11 and sports nt of Kilifi Proposed
Site
inspection
Construction of Reports,
computer labs handing
for 7youth Number of over
polytechnics of ICT labs minutes, Department of
7wards and constructed Photos, education , County
equipping them and Completion youth affairs governme
in 42M equipped certificates and sports nt of Kilifi Proposed
Site
inspection
Reports,
handing
over
minutes, Department of
Serviceable Photos, education , County
Fumbini resource Completion youth affairs governme
Resource centre 20M centre certificates and sports nt of Kilifi Ongoing
P.2.2: Technical Accreditation And Quality Assurance
Schedule of
Number of assessment, Department of
youth filled education , County
Quality polytechnic questionnair youth affairs governme
Assurance 2M assessed es, reports and sports nt of Kilifi Proposed
P.3: Sports Training And Competitions
Conduction of
county Youth Department of
Polytechnic Photos, education , County
sports Number of Schedule of youth affairs governme
championship. 2M attendees activities and sports nt of Kilifi Proposed
P.4: Early Childhood Development Education Programme
Site
inspection
Reports,
handing
over
minutes, Department of
Construction of Number of Photos, education , County
50 ECD centres ECD centres Completion youth affairs governme
across all wards 200M constructed certificates and sports nt of Kilifi Proposed
Number of Site
centres inspection
Fix outdoor supplied/inst Reports, Department of
play materials alled with handing education , County
to 35 model playing over youth affairs governme
centres 70M equipment, minutes, and sports nt of Kilifi Proposed
191 | P a g e
Photos,
Completion
certificates
Reports,
Purchase of Photos, Department of
furniture for Number of delivery education , County
completed ECD centres notesS13and youth affairs governme
projects 30M equipped S11 and sports nt of Kilifi Proposed
Site
inspection
Reports,
handing
over
minutes, Department of
Construction of Number of Photos, education , County
toilets for 35 ECD centres Completion youth affairs governme
ecd centers 70M constructed certificates and sports nt of Kilifi Proposed
Site
inspection
Reports,
handing
over
Fencing of Ecd minutes, Department of
centers Number of Photos, education , County
detached from ecd centers Completion youth affairs governme
primary schools 150M fenced certificates and sports nt of Kilifi Proposed
Attendance
sheets,
Photos,
Certificates
of
Capacity attendance,
building of Schedule of Department of
parents and Number of activities, education , County
other trained Minutes and youth affairs governme
stakeholders 35M stakeholders reports and sports nt of Kilifi Proposed
P.5: School Health , Nutrition And Meals
Reports,
Photos, Department of
delivery education , County
School feeding Number of notesS13and youth affairs governme
programme 140M beneficiaries S11 and sports nt of Kilifi Proposed
P.6: Development And Management Of Sports Facilities
Site
inspection
Reports,
handing
over
minutes, Department of
Upgrade sports Serviceable Photos, education , County
fields one in sports Completion youth affairs governme
each sub county 35M ground certificates and sports nt of Kilifi Proposed
Renovation of Serviceable Site Department of County
Karisa Maitha sports inspection education , governme
Stadium 25M ground Reports, youth affairs nt of Kilifi Proposed
192 | P a g e
handing
over
minutes,
Photos,
Completion
certificates and sports
Site
inspection
Reports,
handing
over
minutes, Department of
Construct Serviceable Photos, education , County
modern sports sports Completion youth affairs governme
stadium 100M ground certificates and sports nt of Kilifi Proposed
P.7: Youth Training And Development
Site
inspection
Reports,
Number of handing
2 Wings youth programme over
empowerment rolled out, minutes, Department of
centre at Kilifi Number of Photos, education , County
North Sokoni youth Completion youth affairs governme
Ward 30M empowered certificates and sports nt of Kilifi Proposed
Site
inspection
Reports,
Number of handing
Youth Talent programme over
Academy phase rolled minutes, Department of
2 at Mtwapa out,Number Photos, education , County
Shimo la Tewa of youth Completion youth affairs governme
Ward 30M empowered certificates and sports nt of Kilifi Proposed
Site
inspection
Reports,
Number of handing
programmes over
1 Wing youth rolled out, minutes, Department of
empowerment Number of Photos, education , County
centre Ganze youth Completion youth affairs governme
Sub-County 30M empowered certificates and sports nt of Kilifi Proposed
193 | P a g e
Location e Kshs Frame Indicators g Tools Agency Funds ion Status
Renovation of Dept of
existing revenue Buildings Finance &
30M 2017/18 Minutes Economic CGK Proposed
offices Mariakani, renovated
Kaloleni, Magarini Reports Planning
195 | P a g e
Construction 2M Physical Site Dept of CGK -Awarded
of a market market Meeting Trade,
-Site
shade at s Industrial
- handed
Tsangatsini ization,
Document Reports over and
Co-op
ation constructi
Devpt,
on on-
Tourism
going
&
Wildlife
Construction 1M -Physical Site Dept of CGK -Awarded
of a 4 door toilet block Meeting Trade, and
toilet block s Industrial handed
-
at ization, over
Document Reports
Mijomboni Co-op
ation -
Devpt,
market Constructi
Tourism
on on-
&
going
Wildlife
Construction 5M Physical Site Dept of CGK -Awarded
of Charo market Meeting Trade, and
Ngoma s Industrial handed
-
market ization, over
Document Reports
Co-op
ation -
Devpt,
Constructi
Tourism
on on-
&
going
Wildlife
Rehabilitatio 2M Physical Site Dept of CGK -At
n of Sosoni market Meeting Trade, document
open air s Industrial ation stage
-
market ization,
Document Reports
Co-op
ation
Devpt,
Tourism
&
Wildlife
Fencing of 2M -Perimeter Site Dept of CGK -At
Mariakani fence Meeting Trade, procureme
open air s Industrial nt stage
-
market ization,
Document Reports
Co-op
ation
Devpt,
196 | P a g e
Tourism
&
Wildlife
Construction 1M -1 Toilet Site Dept of CGK -
of a 4 door constructe Meeting Trade, Practically
toilet block d s Industrial complete,
at Mjanaheri ization, awaiting
- Reports
market Co-op last
Document
Devpt, inspecetio
ation
Tourism n and
& subsequen
Wildlife t issue of
completio
n
certificate.
Construction 1.4M -1 Toilet Site Dept of CGK -Awarded
of a 4 door constructe Meeting Trade,
-
public toilet d s Industrial
Constructi
at ization,
- Reports on on-
Mtondia/Ma Co-op
Document going
Devpt,
jaoni trading ation
Tourism
centre &
Wildlife
Garashi 2M -Physical Site Dept of CGK -At
open air market Meeting Trade, procureme
market s Industrial nt stage
-
ization,
Document Reports
Co-op
ation
Devpt,
Tourism
&
Wildlife
Construction 5M -Toilet Site Dept of CGK -
of a toilet block in Meeting Trade, Practically
block and place s Industrial complete
rehabilitatio ization, awaiting
- Reports
n of Co-op inspection.
Refurbishe
Devpt,
Kagombani d market
Tourism
market
-Water &
tank Wildlife
197 | P a g e
-
Document
ation
Rehabilitatio 2.5M -New Site Dept of CGK -At
n of Marafa Toilet Meeting Trade, procureme
market block s Industrial nt stage
ization,
- Reports
Co-op
Refurbishe
Devpt,
d market
Tourism
- &
Document Wildlife
ation
Construction 40M -Main Site Dept of CGK -Awarded
of Mtwapa market Meeting Trade,
-
market block s Industrial
Constructi
ization,
-Offices Reports on-going
Co-op
-Ablution Devpt,
block Tourism
&
- Wildlife
Loading/of
floading
bay
Completion 7.5M -Perimeter Site Dept of CGK -At
of fence Meeting Trade, procureme
Matanoman s Industrial nt stage
-
ne market ization,
Completed Reports
Co-op
main
Devpt,
market
Tourism
block,
&
toilets,
Wildlife
receptacle
and offices
Construction 6.8M -Main Site Dept of CGK -Awarded
of Ganze market Meeting Trade,
-
market block s Industrial
Constructi
ization,
- Reports on on-
Co-op
Refurbishe going
Devpt,
d toilet
Tourism
198 | P a g e
block &
Wildlife
-
Receptacle
Construction 4.75M - Site Dept of CGK -Awarded
of a Laboratory Meeting Trade,
-
Calibration s Industrial
Constructi
laboratory in ization,
Reports on on-
Malindi Co-op
going
Devpt,
office
Tourism
&
Wildlife
Construction 4M -Physical Site Dept of CGK -At
of Cassava market Meeting Trade, document
market s Industrial aion stage
-
ization,
Document Reports
Co-op
ation
Devpt,
Tourism
&
Wildlife
Construction 1.6M -Workshop Site Dept of CGK -Awarded
of a Meeting Trade,
- -
Tailoring s Industrial
Document Constructi
workshop at ization,
ation Reports on on-
Buni Co-op
going
Devpt,
Tourism
&
Wildlife
Construction 4M -Physical Site Dept of CGK -At
of Malanga market Meeting Trade, document
open air s Industrial ation
-
market ization,
Document Reports
Co-op
ation
Devpt,
Tourism
&
Wildlife
Acquisition 1M -Posho - Dept of CGK -At
and Trade, procument
199 | P a g e
installation mill Reports Industrial stage
of a Posho ization,
-
Mill at Co-op
Document
Shikaadabu Devpt,
ation
Tourism
&
Wildlife
Acquisition 1.5M -LPOs - Dept of CGK -Process
of market Reports Trade, Complete
-
tents for Industrial d
Document
Kakuyuni ization,
ation
Co-op
Devpt,
Tourism
&
Wildlife
Acquisition 0.5M -LPOs - Dept of CGK -Process
of market Reports Trade, Complete
-
tents for Industrial d
Document
Marafa ization,
ation
Co-op
Devpt,
Tourism
&
Wildlife
Acquisition 0.28M -LPOs - Dept of CGK -Process
of market Reports Trade, Complete
-
tents for Industrial d
Document
Gongoni ization,
ation
Co-op
Devpt,
Tourism
&
Wildlife
Construction 4M -Physical - Dept of CGK -
of market Reports Trade, Complete
Mjanaheri Industrial d
-
market ization,
Document
Co-op
ation
Devpt,
Tourism
&
200 | P a g e
Wildlife
Capacity 20M -No of - Dept of CGK -
building for groups Attenda Trade, Concluded
Mbegu Fund trained nce lists Industrial
ization,
-
Co-op
Trainin
Devpt,
g
Tourism
reports
&
Wildlife
Construction 4.9M -Perimeter -Site Dept of CGK -98%
of Charo Wa wall meeting Trade, complete
Mae market s Industrial
-
phase I ization,
Refurbishe -
Co-op
d sanitary Reports
Devpt,
facility
Tourism
&
Wildlife
Construction 3.8M -Market -Site Dept of CGK -
of stalls meeting Trade, Practically
Mariakani s Industrial complete
market stalls ization,
-
Co-op
Reports
Devpt,
Tourism
&
Wildlife
Construction 4M -Market -Site Dept of CGK -90%
of meeting Trade, complete
Mariakani s Industrial
Highrise ization,
-
market Co-op
Reports
Devpt,
Tourism
&
Wildlife
Grading of 1.25M -Graded -Site Dept of CGK -98%
access road, and meeting Trade, complete
spot patching patchedroa s Industrial
and toilet d ization,
Co-op
201 | P a g e
units at -Toilet - Devpt,
Watamu block Reports Tourism
Market &
Wildlife
Construction 10M Cultural Site Dept of Count
of a cultural and Meeting Trade, y
and tourism tourism s Industrial Gove
market- market ization, rnme
Reports
Watamu constructe Co-op nt of
d Devpt, Kilifi
Tourism
&
Wildlife
Refurbishme 10M Office Site Dept of Count Tendering
nt of Kilifi Refurbishe Meeting Trade, y process on
Co- d s Industrial Gove
operative ization, rnme
Reports
Building Co-op nt of
Devpt, Kilifi
Tourism
&
Wildlife
Revival of 20M -No of Quarterl Dept of Count
dry produce Active Dry y and Trade, y
marketing Produce Annual Industrial Gove
co- Co- Reports ization, rnme
operatives operatives Co-op nt of
Audited
(All sub Devpt, Kilifi
-No of Accoun
counties) Tourism
Active ts
&
Members
Membe Wildlife
-Amount rs
of produce register
marketed
M&E
through
Reports
co-
operatives
Capacity 5M -No of Reports Dept of Count
building of cooperator Trade, y
M&E
Co- s trained Industrial Gove
Visits
operatives in on value ization, rnme
the Honey, addition Co-op nt of
202 | P a g e
Chilli, -No of Devpt, Kilifi
Dairy, Coops Tourism
cassava, doing &
Horticulture value Wildlife
to do Value addition-
addition in No of
(All sub value
counties) added
product
206 | P a g e
Implementation, Monitoring and Evaluation Matrix
207 | P a g e
Building on building training reports nt govern
environmen ment,
tal matters Stakeho
lders
Rehabilitati 90M 3 years No. of trees Reports, Departme County Ongoing
on of planted Photos, Videos nt, Govern
Degraded Quarry ment,
Areas No. of Quarries owners Quarry
Rehabilitated associatio owners
n associati
on
Annual 30M 3 years No. of Reports Departme County Ongoing
county competition held nt, Govern
environmen NEMA, ment
t No. of awards Stakehol
competition given ders
Environmen 30M 3 Years No of awareness Reports Departme County Ongoing
tal sessions held nt, govern
Education Stakehol ment,
and ders Stakeho
awareness lders
Annual 9M 3 Years 1 Plan developed Plan Departme County Ongoing
Environmen nt, Other Govern
tal Action line ment,
Plan ministries NEMA
,
stakehold
ers
Livelihood 120M 3 years No. of procured Procurement Dept, County On going
improveme and training NRM Govern
nt of No. of Trainings Reports Cooperati ment,
Artisinal done ves NRM
and small Coopera
scale tives,
miners Private
Investor
s
Natural 140M 3 Years No. of Trainings Training County County New
Resources done Reports Governm Govern Project
Investors ent, ment,
Support PPP Developed Functional PPP
Project Private Private
NRM NRM
208 | P a g e
Investors Investor
s
Capacity 30M 3 years No. of trainings Training Departme County On going
Building on Held reports nt Govern
waste ment
managemen
t
PPEs for 30M 3 Years No. of PPEs Procurement Departme County On going
Waste Procured report nt Govern
managemen ment
t
Upgrading 90M 3 years No. of landfills Reports Departme County New
of developed nt Govern project
dampsites ment
to landfill
Solid Waste 150M 3 Years No of Procurement Departme County On going
Collection infrastructure reports nt Govern
Infrastructu acquired ment
re
Community 60M 3 years No. of equipments Procurement Departme County On going
Waste procured and reports nt Govern
handling shared to groups ment
Groups
Support Legislation
developed
Establishme 35m 2yrs Public Procurement Departme County New
nt of public recreational parks reports nt Govern project
recreational developed ment
parks
Constructio 10m 1yr 2No. forest guards Procurement Departme County New
n of forest houses in place reports nt Govern project
guards ment
houses
Improveme 16M 2Year No. of Tree Progress Departme County On going
nt of Nurseries reports, Photos, nt Govern project
County Improved Items procured ment
Tree
Nurseries
River bank 60M 3 Years River Bank area No. of Departme County On going
protection protected nurseries nt Govern project
established, ment
209 | P a g e
Areas planted
with vertiver,
sensitization
meetings
reports
Marine 30M 3 Years Marine areas No. of Departme County On going
Conservatio conserved mangroves nt Govern Project
n seedlings ment
planted, no. of
community
members
sensitized
Developme 1.3m 2 years 1 master plan Procurement Departme County On going
nt of developed reports nt govern project
County ment
Outdoor
advertiseme
nt and
signage
master plan
Conduct 45 M 3 years EIA reports for all Progress Departme County On going
Environmen county projects reports nt govern project
tal Impact ments
Assessment
for all
county
projects
Ganze Dam 18m 1year 43,000m3 Procurement Departme County New
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Rima rapera 6m 1year Solar driver fitted Procurement Departme County New
bore hole with RO unit reports nt Govern project
developed completion ment
Inspection and
acceptance
certificates
Dooni bore 6m 1year Solar driver fitted Procurement Departme County New
hole with RO unit reports nt Govern project
developed completion ment
Inspection and
210 | P a g e
acceptance
certificates
Kibaokiche- 35m 3years Water Procurement Departme County New
masaaniMik Accessibility reports nt Govern project
omani through pipeline completion ment
pipeline water storage tank Inspection and
water and water kiosks acceptance
project, certificates
Rabai
Vishakani- 7m 1 year Water Procurement Departme County New
Mleji Accessibility reports nt Govern project
pipeline through pipeline completion ment
water water storage tank Inspection and
project, and water kiosks acceptance
Rabai. certificates
Fumbini 2m 1 year Water Procurement Departme County New
water Accessibility reports nt Govern project
project - through pipeline completion ment
kilifi North water storage tank Inspection and
and water kiosks acceptance
certificates
Kisimachak 5m 1 year Water Procurement Departme County New
ufa - Watala Accessibility reports nt Govern project
water through pipeline completion ment
project - water storage tank Inspection and
Magarini and water kiosks acceptance
sub county certificates
Watamu- 15m 1 year Water Procurement Departme County New
Kanani Accessibility reports nt Govern project
pipeline through pipeline completion ment
water water storage tank Inspection and
project and water kiosks acceptance
phase II. certificates
Malindi
Marafa- 20m 1 year Water Procurement Departme County New
Chanjalo Accessibility reports nt Govern project
pipeline through pipeline completion ment
water water storage tank Inspection and
project, and water kiosks acceptance
Bungale. certificates
Magarini
213 | P a g e
water through pipeline completion ment
system water storage tank Inspection and
Rabai and water kiosks acceptance
certificates
Water 41.6m 2 years Water resources Procurement Departme County New
Resources map in place reports nt Govern project
Developme completion ment
nt Inspection and
acceptance
certificates
Mwijo- 16.2m 2 years Water Procurement Departme County New
Makomboa Accessibility reports nt Govern project
ni Water through pipeline completion ment
Project water storage tank Inspection and
and water kiosks acceptance
certificates
Kizurini 4.5m 1 year Water Procurement Departme County New
Water Accessibility reports nt Govern project
Project through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Katolani- 30m 2 years Water Procurement Departme County New
Tsangatsini Accessibility reports nt Govern project
Water through pipeline completion ment
project water storage tank Inspection and
and water kiosks acceptance
certificates
Kakunaa 5m 1 year Water Procurement Departme County New
water Accessibility reports nt Govern project
pipeline through pipeline completion ment
with 50m3 water storage tank Inspection and
storage tank and water kiosks acceptance
certificates
Mwareni 25m 2 years Water Procurement Departme County New
water Accessibility reports nt Govern project
pipeline through pipeline completion ment
project with water storage tank Inspection and
100m3 tank and water kiosks acceptance
certificates
Tsongoni- 35m 2 years Water Procurement Departme County New
Kitsaumbi- Accessibility reports Govern
214 | P a g e
Mwabayany through pipeline completion nt ment project
undo water water storage tank Inspection and
project and water kiosks acceptance
certificates
Kanyumbun 20m 1 year Solar driver fitted Procurement Departme County New
i Borehole with RO unit reports nt Govern project
developed completion ment
Inspection and
acceptance
certificates
Tsangalawe 8m 1 year 43,000m3 Procurement Departme County New
ni Water reservoir and reports nt Govern project
Pan related civil works completion ment
developed Inspection and
acceptance
certificates
HademuNg 8m 1yr Water Procurement Departme County New
uluweni- Accessibility reports nt Govern project
Kizurini through pipeline completion ment
water water storage tank Inspection and
project and water kiosks acceptance
certificates
Maboyani- 35m 3yrs Water Procurement Departme County New
Kabateni Accessibility reports nt Govern project
Water through pipeline completion ment
Project water storage tank Inspection and
and water kiosks acceptance
certificates
Gotani- 43m 3yrs Water Procurement Departme County New
Miyani- Accessibility reports nt Govern project
Kasemeni through pipeline completion ment
water water storage tank Inspection and
project and water kiosks acceptance
certificates
Hademu- 25m 2yrs Water Procurement Departme County New
Kilonga Accessibility reports nt Govern project
Water through pipeline completion ment
Project water storage tank Inspection and
and water kiosks acceptance
certificates
Juhudi- 7m 1 Water Procurement Departme County New
Kakomani Accessibility reports Govern
215 | P a g e
Water through pipeline completion nt ment project
Project water storage tank Inspection and
and water kiosks acceptance
certificates
Juhudi- 9.8m 1 Water Procurement Departme County New
Kithengwan Accessibility reports nt Govern project
i water through pipeline completion ment
project water storage tank Inspection and
and water kiosks acceptance
certificates
10m 1yr Water Procurement Departme County New
Accessibility reports nt Govern project
Tsanzuni- through pipeline completion ment
Migumomir water storage tank Inspection and
i- Mtsengo and water kiosks acceptance
water certificates
pipeline
Mida/Matsa 25m 2yrs Water Procurement Departme County New
ngoni water Accessibility reports nt Govern project
project through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Kaembeni- 190m 3yrs Water Procurement Departme County New
Matsangoni Accessibility reports nt Govern project
, through pipeline completion ment
Matsangoni water storage tank Inspection and
-Tezo, and water kiosks acceptance
Matsangoni certificates
-Uyombo
water
project
Maweya 52m 3yrs Water Procurement Departme County New
Kati- Accessibility reports nt Govern project
Timboni- through pipeline completion ment
Watamu water storage tank Inspection and
and water kiosks acceptance
certificates
Kadzinuni- 27m 2yrs Water Procurement Departme County New
Tandia Accessibility reports nt Govern project
pipeline through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
216 | P a g e
Mwanzai 4.4m 1yr Protected spring Procurement Departme County New
spring developed reports nt Govern project
water completion ment
project Inspection and
acceptance
certificates
Chengoni 26.3m 1yr 53,000m3 Procurement Departme County New
dam reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Kizingo 2.8m 1yr Solar driver fitted Procurement Departme County New
borehole with RO unit reports nt Govern project
rehabilitatio developed completion ment
n Inspection and
acceptance
certificates
ChasimbaM 12m 3yr Water Procurement Departme County New
bomboniph Accessibility reports nt Govern project
aseII through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Lutsangani 16m 3yr 43,000m3 Procurement Departme County New
dam reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Matandale 22m 2yr Water Procurement Departme County New
– Junju – Accessibility reports nt Govern project
Chodari through pipeline completion ment
pipeline water storage tank Inspection and
extension and water kiosks acceptance
water certificates
project
Kilifi south
Panga 33m 2yr Water Procurement Departme County New
Moshi Accessibility reports nt Govern project
water through pipeline completion ment
project, water storage tank Inspection and
Kilifi and water kiosks acceptance
217 | P a g e
South. certificates
Adu- 47m 3yr Water Procurement Departme County New
Ramada- Accessibility reports nt Govern project
Maziachend through pipeline completion ment
a pipeline water storage tank Inspection and
and water kiosks acceptance
certificates
Sosoni 116m 2yr Water Procurement Departme County New
-Kirosa- Accessibility reports nt Govern project
Chamari through pipeline completion ment
water water storage tank Inspection and
project and water kiosks acceptance
certificates
Ramada 300m 3yr Water Procurement Departme County New
Bora Accessibility reports nt Govern project
ImaniMarer through pipeline completion ment
eniVibaoVii water storage tank Inspection and
ri and water kiosks acceptance
certificates
Kadzandani 20.5m 3yrs Water Procurement Departme County New
-Mogole- Accessibility reports nt Govern project
Chamari through pipeline completion ment
pipeline water storage tank Inspection and
and water kiosks acceptance
certificates
Constructio 40m 1yr 4no.250m3 Procurement Departme County New
n of elevated tanks at reports nt Govern project
4no.250m3 kisima Cha Kufa completion ment
elevated developed Inspection and
tanks at acceptance
kisima Cha certificates
Kufa
3500m3 buffer
storage
Borehole 15m 1yr Solar driver fitted Procurement Departme County New
drillling at with RO unit reports nt Govern project
Madzayani developed completion ment
Inspection and
acceptance
certificates
40000m3 15m 1yr 43,000m3 Procurement Departme County New
Water pan reservoir and reports nt Govern project
218 | P a g e
Kanyumbun related civil works completion ment
i developed Inspection and
Adu( Mnag acceptance
oWa Shibe) certificates
Timboni 60m 3yr Solar driver fitted Procurement Departme County New
Gongoni with RO unit reports nt Govern project
Wells developed completion ment
Inspection and
acceptance
certificates
Constructio 200m 1yr 3500m3 buffer Procurement Departme County New
n of storage in place reports nt Govern project
3500m3 completion ment
buffer Inspection and
storage for acceptance
the certificates
Kakuyuni-
Watamu
system &
Improveme
nt of Mida-
Matsangoni
Pipeline
system
Constructio 15m 1yr 43,000m3 Procurement Departme County New
n of Earth reservoir and reports nt Govern project
Dam at related civil works completion ment
Sosobora, developed Inspection and
Girimacha acceptance
certificates
Constructio 15m 1yr 43,000m3 Procurement Departme County New
n of Water reservoir and reports nt Govern project
Pan at related civil works completion ment
Raukani, developed Inspection and
Chakama acceptance
Location certificates
Mazeras- 41m 3yrs Water Procurement Departme County New
BuniKisima Accessibility reports nt Govern project
niMwatsam through pipeline completion ment
a water water storage tank Inspection and
pipeline and water kiosks acceptance
certificates
Manoloni 7.7m 1yr Water Procurement Departme County New
219 | P a g e
water Accessibility reports nt Govern project
pipeline through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Baramare 6.6m 1yr Water Procurement Departme County New
water Accessibility reports nt Govern project
pipeline through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Mwandoni 6.5m 1yr Water Procurement Departme County New
Pipeline Accessibility reports nt Govern project
through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Mtandikeni 2.5m 1yr Water Procurement Departme County New
Masaani Accessibility reports nt Govern project
through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Colorado- 20m 1yr Water Procurement Departme County New
BwagaMoy Accessibility reports nt Govern project
o through pipeline completion ment
rehabilitatio water storage tank Inspection and
n and water kiosks acceptance
certificates
Kibao- 30m 1yr Water Procurement Departme County New
KicheMasa Accessibility reports nt Govern project
aniKadzuyu through pipeline completion ment
ni water storage tank Inspection and
Mwanjama and water kiosks acceptance
certificates
Dzivo- 6m 1yr Water Procurement Departme County New
Mwamruu Accessibility reports nt Govern project
through pipeline completion ment
water storage tank Inspection and
and water kiosks acceptance
certificates
Jeuri Pan 10m 1yr 43,000m3 Procurement Departme County New
220 | P a g e
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Jimba Pan 10m 1yr 43,000m3 Procurement Departme County New
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Mwanjama 10m 1yr 43,000m3 Procurement Departme County New
Pan reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Katumbiri 10m 1yr 43,000m3 Procurement Departme County New
Pan reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Kaliangomb 10m 1yr 43,000m3 Procurement Departme County New
e Pan reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
acceptance
certificates
Ribe Girls 15m 1yr Solar driver fitted Procurement Departme County New
Borehole with RO unit reports nt Govern project
developed completion ment
Inspection and
acceptance
certificates
Ribe Boys 51m 1yr Solar driver fitted Procurement Departme County New
Borehole with RO unit reports nt Govern project
developed completion ment
Inspection and
acceptance
certificates
Pumping 10m 1yr Pumping units in Procurement Departme County New
221 | P a g e
units for place reports nt Govern project
Mazeras completion ment
Pump Inspection and
House acceptance
certificates
15 1yr 43,000m3 Procurement Departme County New
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
Chapungu acceptance
earth dam- certificates
Bamba
15m 1yr 43,000m3 Procurement Departme County New
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
Gwaseni acceptance
earth dam – certificates
Bamba
15m 1yr 43,000m3 Procurement Departme County New
reservoir and reports nt Govern project
related civil works completion ment
developed Inspection and
Kajiri earth acceptance
dam- certificates
Bamba
222 | P a g e
Kanamai (Majengo) 32,000,000 2016/201 Km of road Survey, Department of Gok proposed
- Animo road 7 upgraded inspection Roads Transport
reports,billl and Public works
of quantities
Kizurini Kwa Demu 40,000,000 2017/201 Km of road Survey, Department of Gok Proposed
Road 8 upgraded inspection Roads Transport
reports,billl and Public works
of quantities
Upgrade and Expand 40,000,0000 2017/201 Km of road Survey, Department of Gok proposed
Road Network (county 8 upgraded inspection Roads Transport
wide road) reports,billl and Public works
of quantities
Rural Access Roads 40,000,0000 2017/201 Km of road Survey, Department of Gok Proposed
County wide 8 upgraded inspection Roads Transport
reports,billl and Public works
of quantities
225 | P a g e
4.7 County Health Services
226 | P a g e
facilities (Kilifi/Malindi / Rabai &
Vipingo)
Construct and Equip a Trauma 30m 2017/2018 Report on the Health CGK Proposed
Centre at Mariakani Hospital established Services
Trauma centre
227 | P a g e
Construct and equip eye centre in 20m 2017/2018 Progress Health CGK Proposed
Kilifi County Hospital reports and Services
completion
reports
Construction and equipping of 25m 2017/2018 Progress Health CGK Proposed
Cancer Diagnostic Centre at Kilifi reports and Services
County Hospital completion
reports
Purchase of Oxygen Plant for 45m 2017/2018 Progress Health CGK Proposed
Malindi and Mariakani Sub reports and Services
County Hospital completion
reports
Construct and equip 4 new 40m 2017/2018 Progress Health CGK Proposed
mortuaries at Mariakani, Bamba reports and Services
Marafa & Rabai completion
reports
Expand Mariakani sub county 30m 2017/2018 Progress Health CGK Proposed
hospital by construction of a reports and Services
paediatric ward, female and male - completion
surgical and medical wards, reports
casualty and a new-born unit
Construct Maternity wing and ICU 50m 2017/2018 Progress Health CGK Proposed
at Malindi county hospital. reports and Services
completion
reports
Construct Dispensaries in all the 7 255m 2017/2018 Progress Health CGK Proposed
Sub Counties reports and Services
completion
reports
Upgrade dispensaries to be health 30m 2017/2018 Reports on Health CGK Proposed
centres,Makanzani,,Dzikunze,Jarib Dispensaries Services
uni,Mtepeni ,Garashi, Marereni, upgraded to
Adu, Ziani, Jilole, Kakuyuni, Health Centres
Mambrui, Marikebuni, and Sosoni
Upgrade and expand Gede to be 20m 2017/2018 Progress Health CGK Proposed
sub county health referral hospitals reports and Services
and construction of male and completion
female wards, laundry, and kitchen report
in the hospital.
Construct and equip laboratories 50m 2017/2018 Progress Health CGK Proposed
at health facilities: Jila, Gotani, reports and Services
Rabai, Matsangoni, Chasimba, completion
Ganze, Vitengeni, Gede, Muyeye, report
Marafa, Gongoni, Jilole,
Chasimba, Vipingo, Mtwapa,
228 | P a g e
Kizingo, Makanzani
Construct accident and emergency 30m 2017/2018 Progress Health CGK Proposed
department at Vipingo reports and Services
,Mtwapa ,Rabai) completion
report
Upgrade storage facilities for 13m 2017/2018 Progress Health CGK Proposed
primary healthcare facilities in the reports and Services
Jila, Gotani, Rabai, Matsangoni, completion
Chasimba, Ganze, Vitengeni, report
Gede, Muyeye, Marafa, Gongoni,
Jilole, Chasimba, Vipingo,
Mtwapa, Kizingo
Procure resuscitators 4m 2017/2018 Progress Health CGK Proposed
For hospitals. reports and Services
(Kilifi, Malindi, Mariakani, Bamba delivery report
& Jibana, Gede)
Purchase EPI refrigerators for all 10m 2017/2018 Progress Health CGK Proposed
the 7 Sub Counties reports and Services
delivery report
Purchase of 600 patients beds for 7m 2017/2018 Progress Health CGK Proposed
hospitals and health centres. reports and Services
County wide. delivery report
Procure anaesthetic machines for 20m 2017/2018 Progress Health CGK Proposed
hospitals, Bamba & Jibana, Rabai reports and Services
and Gede). delivery report
Purchase of 9 X-ray machines for 6m 2017/2018 Progress Health CGK Proposed
Gede, Bamba, Rabai, Marafa, reports and Services
Jibana, Vipingo, Mariakani, Kilifi delivery report
and Malindi
Purchase 6 Ultra Sound machines 4.4m 2017/2018 Progress Health CGK Proposed
Gede, Bamba, Rabai, Marafa, reports and Services
Jibana, Vipingo delivery report
Purchase 2 CT Scan (Malindi & 60m 2017/2018 Progress Health CGK Proposed
Mariakani) reports and Services
delivery report
Procure 20 incubators at Jila, 10m 2017/2018 Progress Health CGK Proposed
Gotani, Rabai, Matsangoni, reports and Services
Chasimba, Ganze, Vitengeni, delivery report
Gede, Muyeye, Marafa, Gongoni,
Jilole, Chasimba, Vipingo,
Mtwapa, Kizingo, Kilifi,
Mariakani, Malindi
Purchase assorted medical 50m 2017/2018 Progress Health CGK Proposed
equipment’s for all sub County reports and Services
hospitals delivery report
Purchase of medical gases – 6m 2017/2018 Progress Health CGK Proposed
229 | P a g e
portable 45kgs and 25kgs reports and Services
cylinders-All Health Facilities delivery report
Purchase assorted medical 50m 2017/2018 Progress Health CGK Proposed
equipment for all primary care reports and Services
facilities delivery report
Purchase 72 portable oxygen 4.8m 2017/2018 Progress Health CGK Proposed
concentrators reports and Services
delivery report
Purchase patient monitors (Kilifi, 4m 2017/2018 Progress Health CGK Proposed
Mariakani, Malindi, Bamba , reports and Services
Gede, Jibana, Rabai, Marafa) delivery report
Establish drug rehabilitation centre 20m 2017/2018 Progress Health CGK Proposed
at Kilifi, Mtwapa, and Mariakani. reports and Services
completion
report
P.3: Promotive and Preventive Health Services
230 | P a g e
Construct three maternity Homes 27m 2017/2018 Progress Health CGK Proposed
in Kilifi, Malindi and Mariakani. reports and Services
completion
report
Construct and equip maternity 50m 2017/2018 Progress Health CGK Proposed
wards in health facilities at reports and Services
Bagamoyo, Mrima wa Ndege, completion
Uwanja wa ndege, Chasimba, report
Mtwapa, Mitsajeni,Ndingiria
Dispensary, Ganze, Kizingo,
Mitangani/ Rimarapera, Magarini
Dispensary, Ndatani Dispensary,
Garashi
P.5: Health Research and Development
231 | P a g e
Annex 1: Project Proposals from Ward Development Committees
Health Services
Toilet construction at Madzimbani dispensary
Fencing of Madzimbani,Kamkomani and Shangia dispensary to prevent encroachment
Land,Energy,Housing and Physical Planning
Grading and gravelling of Misufini primary to ChibandaHassara road.
High mast light at Misufini.
Street lights at Misufinistreet.
Trade,Industrialization,CooperativeDevelopment,Tourism and Wildlife
Construction of toilet at Katolani open air market.
233 | P a g e
Sensitization of small scale business people at Mariakani.
Transport and Infrastructure
Kaloleni-Mariakani stage cabro road
Murrum road from Mariakani stage to Kakunaa
Murrum road from Mariakani primary through Majengo to imam clinic
Gradding and gravelling of shangia-mwakuwawaroaad
Water, Environment, Mineral and Natural Resources
Digging of water pans at Shangia, Mwakuwawa and Katolani,Kitsamini
Beautification of Mariakani town.
234 | P a g e
machine and viral load machine.
3. Construction of 3 – units block for staffs.
4. Construction of administration blocks and board room.
5. Construction of dental unit.
ICT, Culture and social 1. Construction of multipurpose social hall at Rabi & ICT training centre.
services 2. Rehabilitation of Rabai cultural village centre at Kaya Bomu
Lands, Energy, Hosing 1. Installation of mega musk light at Rabai Health centre, WanjaNdege stage
and Physical planning and Kokotoni trading centre.
2. Extension of streets lights from Mazeras town to Kombeni girl’s secondary
school and from Mazeras to Kokotoni Trading Centre.
Trade, Industrialization, 1. Rehabilitation Rabai museum and all Rabi historical sites.
Cooperative 2. Installation of markets tents for Mazeras market and Rabai at large -
Development, Tourism 40 units required.
and Wildlife 3. Construction of Bodaboda shade - 8 shade at Mazeras, Wanja, Kibaoni,
Kokotoni&Bengo stage.
4. Construction of a village bank at Rabai.
Transport & 1. Rehabilitation of Gandani Primary school to KwaMbaji stage road.
Infrastructure & Public 2. Rehabilitation of Rabai Health centre road.
work 3. Rehabilitation of KwaMbaji, MwatsamaJitoni road.
4. Rehabilitation of Bengo to Museum road.
5. Rehabilitation of MwembeNgama to Kaya village road.
6. Rehabilitation of Mwele to Chikobweni road
Water, Environment, 1. Extension of Mazeras – Kombeni main water pipe towards left side to
Minerals & Natural KaloleniGiriama.
Resources 2. Construction of storage tank at Boyani dispensary.
3. Construction of Rabi health Mega water storage tank.
4. Establishment of County tree Nursery at Rabai cultural village.
241 | P a g e
RURUMA WARDPROPOSED PROJECTS 2017/2018
FINACIAL YEAR
County Proposed Project Sub Location
Department
Education Youth Construction Of Polytechnic at Bofu Primary Miyuni
And Sports School
Construction Of 2 classrooms Mutsangamali- ECD Miyuni
Construction of 2 classrooms ECD at Masaani Jimba
Primary School
Construction of an 2 classroomsECD at Mikomani
MIKOMANI PRIMARY SCHOOL
Construction of a YOUTH POLYTECHNIC at Mikomani
KAWALA
Construction of a YOUTH POLYTECHNIC at Jimba
jimba mission
Construction of 2 ECD classrooms at Kasidi Mleji
Primary School
Construction of a YOUTH POLYTECHNIC at Mleji
Mwanjama B
Water Natural
Environment,
Forestry And Solid
Waste
Establishment Of four (4) Tree Nurseries, one Ruruma Ward
each sub location for The Forest Trees;
Mivinjeand other forest trees
Construction Of 3 Water Tanks At- Mtsangamali Miyuni
Maji – Mtsara (Dzanikeni) –Mfereji: Juaje/Kasidi Mleji
Construction of a bore hole at Mikomani Primary Mikomani
School
Construction of a water pipe jimba school to kailo Jimmba
village
CULTURE
SOCIAL
SERVICES AND
TOURISM
Construction of a Rabai cultural village at Kasidi- Mleji
Benesi
243 | P a g e