Kenneth Severn Award thestructuralengineer.org

Kenneth Severn Award 2018


What will structural
engineering practice Radu-Valentin Trancau
BEng(Hons)
Structural Engineer, CCL (GB) LTD

look like in 10–15 years’ Synopsis


The Institution of Structural

time and how can our Engineers’ Kenneth Severn Award


is an annual essay competition
for young engineers in which the

professional community question is set by the President.


In this essay, 2018 winner Radu
Trancau looks ahead to a rosy future

help us prepare for this? and considers what steps structural


engineers must take to get there.

FOREWORD

Faith Wainwright Paul Jackson


MBE, FREng, DEng (Hon), FIStructE, FICE PhD, BSc(Eng), CEng, FIStructE, MICE
2018 President of The Institution of Structural Engineers Chair of the Papers Awards Judging Panel

As an industry, we know that there The general standard of entries this


are many global challenges which year was high and seems to me to have
mean that how we typically practise substantially and progressively improved
as engineers now is definitely not since I was first a judge. The winners have
how we will be practising in years to always been good, but the first year I was
come. This is the case whether your involved we had to identify the winner from
interest is in social or demographic some 30 entries, which was easy and we
changes, or in digital change – from had unanimity among the panel. This year,
machine learning and artificial we had more entries (over 40) and the
intelligence to blockchain technology judging was much more difficult: the winner
and how we work in a data-first was not at all obvious even when the
environment. These challenges are judges’ marks were in and there was much
now coming at us thick and fast, and discussion in the panel. We had many good
we must be as forward-thinking as entries, with several considered worthy of
possible if we are to do more than an award, and there was a split decision,
simply react. leading to the award of the commendation.
We have an unprecedented opportunity to be able to shape our future The award is unique among those we
roles as engineers, and it matters – especially in the built environment, which on the Paper Awards Judging Panel judge
fundamentally affects quality of life and sustainability on this planet. We must in that it is not a technical paper. The
be future seekers, wanting to bring our best thinking to what we need to do as winner took advantage of this to use a
individuals, as firms, as communities of practice and as an industry, to better novel presentation which many of us found
meet society’s needs. refreshing and we hope readers will too.
This year one of my presidential themes is to encourage members to ‘lead
to inspire’. I believe that leadership can be given by people at any career stage
and it is our profession’s collective responsibility to help shape the future by KENNETH SEVERN AWARD 2018
always looking ahead, thinking about the challenges and how we turn them to Winner: Radu-Valentin Trancau
opportunities. As you read the winning essay selected by the judging panel, Commendation: Michael Minehane
why not use this as a prompt to debate this question with your own colleagues?

10 September 2018 | TheStructuralEngineer

TSE80_10-12_Kenneth Severn award.indd 10 23/08/2018 11:13


Feature
thestructuralengineer.org Kenneth Severn Award

"EVERYTHING IS HAPPENING
RIGHT NOW, LIVE ON THE 3D
HOLOGRAM"

into calculation software straight from the


federated model, which gives him the optimum
solution in terms of material consumption. He
says that the embedded CO2 of the building
is within the limits, but that it can be improved.
He decides to allocate the detailing to one
of his colleagues in another partner office
before investigating a method to reduce the
embedded CO2. Holo-goggles time again.
We meet the team’s detailing task force.
After a short chat about future holiday plans,
the brief for the task is clarified using the 3D
model, with sketches and notations made
straight on the 3D foundation of the building.
The communication is flawless, saves time
GETTY

and builds a strong working relationship


between all the team members. I really do
like these glasses. Maybe I can borrow some
 Figure 1
In the future, projects will be discussed
at holo-meetings
perspective. It is one of the floating cities
(Figure 2) being constructed in the Indian
to get in touch with all the friends I’ve made
so far today. The next step: the engineer
Ocean. I’m so lucky to attend this meeting. I’ve invites me to the department of research and
It’s almost nine o’clock in the morning and I’m always wanted to get an insight into one of sustainability where he is planning to outline
getting ready to start my guided tour inside these wonders of engineering. his concern.
one of the well-established engineering In turn, each discipline’s representative
practices of the year 2030. I arrived on the leans over the federated model, pinches the 12:00: Meeting the research team
driverless electrical train, I’ve registered my hologram to zoom in on a specific area and The research team is made up of the most
visit by using a retina scan signature and writes down a task or draws a sketch to be senior structural engineers who perform
a little robot has brewed me a nice coffee. passed on to the task teams. Once a task has simulations about every topic that needs to
From the reception area I can see the entire been discussed and approved, the task team be looked at in detail. The engineer’s request
floorplan of this practice. There are small are alerted and they all start working on their is to reduce the embedded CO2 of the
rooms for hologram meetings, big meeting piece. I can even see how, from our side of foundation. After receiving all the details, the
rooms with structural glass walls that can be the project, a shear wall is being modelled and research team introduces the input data into
dimmed when the meeting room is busy, and reinforced. Everything is happening right now, some super-fast analysis computers that are
many leisure rooms with ergonomic seating live on the 3D hologram. running simulations to see which is the best
facilities. A lot of people have already started All the meeting attendees discuss the concrete mix, how the steel composition can
to come to work and meet up to discuss the progress of the project and how to optimise be adjusted and what the optimum shapes
day’s plans. the tasks and implementation into the and sizes are. It’s going to be a long process,
federated model. It is amazing to see how but by tomorrow morning the results will
09:00: Meeting the project information quickly people get around from all over the be produced and interpreted by the senior
managers world and collaborate in such a clean and engineers and the project will in this way be
As it’s the beginning of the day, the fast environment to deliver a project. I have optimised even from the early stage of design.
information managers and consultants are been impressed by how these cutting-edge Engineering has seen very fast
getting together to set up the plan for the technologies and holo-meetings manage to development in the last decade in relation to
upcoming phase of the project. I am invited to save time, optimise the entire workflow and materials and optimised shapes, all due to
join their morning briefing in one of the holo- lead to great satisfaction for everybody. the development of technology. We now have
meeting rooms (Figure 1). I am sitting next elegant shapes with a minimal impact on the
to the project engineers and we all wear our 11:00: Meeting the task teams environment thanks to all the research teams
hologram glasses (this reminds me of an old I have been assigned to shadow one of the and mathematical simulations that are being
movie called ‘Kingsman: The Secret Service’). structural engineers responsible for designing run throughout the ‘cradle-to-grave’ life of
The attendees are starting to appear one next a high-rise residential building in one of the cutting-edge projects.
to the other with their names, disciplines and central parts of the floating city. His task, as
locations above their heads. assigned by the information managers for the 15:00: Meeting the graduates
The project appears in the middle of the upcoming phase, is to design the foundation. My lunch break, followed by an hour of social
room with a full three-dimensional (3D) He has all the details of the building inserted activities, has been very welcome. I’ve met

TheStructuralEngineer | September 2018 11

TSE80_10-12_Kenneth Severn award.indd 11 23/08/2018 11:13


Feature
Kenneth Severn Award thestructuralengineer.org
VINCENT CALLEBAUT ARCHITECTURES

 Figure 2
Lilypad project
by Vincent Callebaut
Architectures Paris

a structural engineering practice is; how engineering environments that have emerged
collaborative and how people are mentored in parallel with regional architecture. I’m
and encouraged to follow engineering right referring to Asian architecture and structural
from their studies. engineering, the Middle East with its record-
I have seen how technology has evolved: it breaking shapes and sizes, European
evolved naturally, but how people learned to architecture and with its long history of
use it to shape the future and to forge new structural engineering, and so on. The answer
ideas is something that was taught. It was a is to bring people together from different
collaborative process that happened around structural engineering environments, to share
the world, connecting cultures and sharing ideas and concepts, and to bridge cultures.
knowledge. It was a call for action that led We are problem-solvers. We are shaping
people to join together and fight challenges this planet’s future. For that we must come
a group of fresh graduates while wandering such as climate change, housing problems, together.
around the office and I’ve decided to sit down poverty and pollution.
with them and ask them their opinions about What can the professionals of 2018 do to Tailoring the education system
structural engineering. They say they are very achieve such a work environment? There are It is no secret that the education system has
happy to continue their careers in structural many answers to this question, but I believe changed little or not at all in recent decades.
engineering. They are not strangers among they can all be condensed into three broad There is a need for a more modern way of
the company employees, as they were actively categories: educating engineers. More bridges should
involved in the practical learning process be built between industry and academia. We
within the industry and some of their university Collaboration professionals are responsible for this action
mentors are even their colleagues now. We must come together under this profession. and for making sure we contribute to it. The
They say that the need to find alternatives We must help each other as professionals. We temporal bracket ‘10–15 years’ is not that far
to the climate and social challenges that need to act now and to mentor the younger away. We should look towards tackling these
started almost two decades ago has inspired generations. Part of our work programme challenges today, as tomorrow may be too late.
their whole generation towards all branches should be directed towards inspiring and
of engineering and the built environment. attracting new members to our profession. HAVE YOUR SAY
They have been part of a reformed way of A failure to help each other, not sharing
learning in university. Education was combined knowledge with each other and not realising To comment on this article:
with practice and with active roles inside that the biggest challenge of 2018 for Eemail Verulam at tse@istructe.org
companies starting from Year 1. Now they are structural engineering is the shortage of Etweet @IStructE #TheStructuralEngineer
working to share their experience and they young people who choose engineering must
are encouraging the following generations to be the concerns that spark a big change
follow the same path. There was too little time among the engineering community. In the REFERENCE
to find out more, as they had to attend the words of Lindsley Ruth, ‘We have to start with
initial meeting for the timber residential project promoting technology and engineering as an E 1) Ruth L. (2017) ‘Engineering skills
shortage: overcoming the fear and
due to start next week. exciting and rewarding career to school-aged uncertainty’, The Engineer [Online]
children’1. Available at: www.theengineer.co.uk/
16:00: Time for conclusions engineering-skills-shortage-overcoming-
the-fear-and-uncertainty/ (Accessed:
The experience I had in the year 2030 has Bridging the gap between cultures
August 2018)
been amazing. I have seen how fast-paced There are so many different structural

12 September 2018 | TheStructuralEngineer