Schedule of Rates

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

SI.

No Items Unit

% Increase/decrease

1 Cement MT 28% Tax


2 Steel MT 18% Tax
3 Sand Cum
4 M-Sand Cum 5%Tax
5 P-Sand Cum
6 Gravel Cum 5% Tax
7 Annexure- I Rates of Labour
I Skilled Category
(i) Bitumen Heat Master Operator Day
(ii) Bitumen Raker Man Day
(iii) Mini Hot Mix Plant Operator Day
(iv) Bitumen Sprayer Man Day
(v) Guniting Gun Operator Day
II Semi-Skilled Category
(vi) Head Mazdoor Day
(vii) Guniting Plant Operator Day
(viii) Mazdoor I Day
III Un-Skilled Category
(ix) Mazdoor II Day
8 Annexure- II Rates of Materials
8.A. Rates of Hard Broken Stone (IRC)
(i) 90 mm size Cum
(ii) 75 mm size Cum
(iii) 63 mm size Cum
(iv) 53 mm size Cum
(v) 46.50 mm size Cum
(vi) 45 mm size Cum
(vii) 37.50 mm size Cum
(viii) 26.50 mm size Cum
(ix) 25 mm size Cum
(x) 22.40 mm size Cum 5%Tax
(xi) 13.20 mm size Cum 5%Tax
(xii) 11.20 mm size Cum
(xiii) 6.7/5.6mm size Cum
(xiv) 4.75 mm size & Above Cum
8.B Bricks and Tile products
a. Bricks -
b. Fly ash Bricks -
c. Pressed Tiles -
8.C Timber and roofing materials -
8.D Metal and Iron Works -

8.E -
All other items under Annexure II of SOR
9 Annexure III Rates Of Works
a. Using Machinery -
b. Using Manual labour -
10 Annexure IV Head load -
11 Annexure V
a. Conveyance table -
b. Loading, Unloading -
12 Annexure VI Rates of other construction materials
a. MS, flat & MS Square -
b. All Aluminum items -
c. All PVC items -
d. All other items -
13 Annexure VII Rates of Electrical items of Works
a. Copper involving items -
b. All other electrical items -
14 Additional Items for Highways Department included in PWD SOR 2019-2020
Supplying and installation of Strip
Seal Expansion Joint system
confirming to specifications for
road and bridge works in the
40mm wide expansion gap
provided in between decks over
piers and in between deck and dirt
wall over abutments with fatigue
tested structurals steel section at
the nosing and achorage
1 assembly, including labour, RM 18% Tax
equipment incidetal charges for
fixing the joints complete in all
respects, as per specifications
2600 of MORT&H specification (V
Revision)

Supply and fixing PVC


EXPANSION JOINT in the 20mm
expansion gap provided on
between decks over piers and in
between deck and dirt wall over
abutment as shown in the drawing
2 RM
including cost and conveyance of
expansion joints including Shalimar
pad and joint sealant etc,.
complete

Supplying and fixing G.I Drainage


spouts of 100mm Dia as per GOI
drawing No. SD/205 with grating
arrangements at top as shown in
the drawing and 100mm dia
drainage spouts projecting atleast
300mm beyond bottom of deck
slab including cost and conveyance
3 of Galvanised iron pipes and flats each
and fixing them in position etc.,
complete as per MORT&H
specification 2705 of MORT&H
specification

Supplying and fixing KRAFT PAPER


for full width of seating of deck slab
and including cost and conveyance
to worksite, labour for fixing the
bearing in position and all other
incidental charges etc , complete
4 as per section 2000 MORT&H Sq.m.
specification (V Revision)

Supply and fixing of Elastomeric


bearing of respective size shown
in the drawing including cost and
conveyance to worksite, labour for
fixing the bearing in correct
5 position and all other incidental 18%Tax
charges etc as per drawing and as
per section 2000 MORT&H
specification (V Revision)

Cu.Cm
Supply of NP3 Class RCC Pipe
confirming to IS 458/2003 including
6 cost of pipe as a finished work
including all other incidental
charges, testing charges including
loading, unloading, transport and
delivery in good condition at work
site etc, complete as directed by
the Department Officers as per
standard specifications
6.a 1200mm dia RM
6.b 1000mm dia RM
6.c 900mm dia RM
Hoisiting and fixing of NP3 Class
7 RCC Pipe and collars to proper
gradiet including all labour charges
and all other incidental charges etc
7.a ,1200mm
completedia as directed by the RM
7.b Departmental
1000mm dia Officers, as per RM
7.c Standard
900mm dia Specifications RM
Additional Items if any which requires new
15 inclusion in SOR*

Notes:
* If any additionalitems are
recomemmended the rates for the same
shall be mentioned, substaining with
necessary
** If any ofsupporting
the above documents.
items found not applicable, it shall be menationed as "Not Applicable"