Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Tide Line Inc.

m/v SARONIC SPIRE Place: AT SEA


NASSAU / BAHAMAS Date/Time: 22.04.2020 16:45

Bunkers Sounding Statement

Draft Foreward: 8.86 mtrs Trim at PP: 1.32 by stern

Draft Aftward: 10.12 mtrs Heel: 0.6° "-"if to port

Apparent trim 1.26 mtrs


IFO HS
TANK SNDG G.O.V. API 60F FACTOR G.S.V. M³ W.C.F.
TEMP MT
NAME (M) M³ ρ = 15°C T-54B 15° T-56

FOT 1 (s) 1.280 271.648 0.9621 11 1.0028 272.409 0.9610 261.785

FOT 2 (c) 1.740 369.048 0.9621 30 0.9894 365.136 0.9610 350.896

FOT 3 (c) 1.790 381.138 0.9619 30 0.9894 377.098 0.9608 362.316

FOT 4 (c) 0.870 129.343 0.9621 11 1.0028 129.705 0.9610 124.647

SETT 11.000 0.9619 80 0.9534 10.487 0.9608 10.076

SERV 9.500 0.9619 91 0.9455 8.982 0.9608 8.630

TOTAL 1118.349

MGO LS
TANK SNDG G.O.V. API 60F FACTOR G.S.V. M³ W.C.F.
TEMP MT
NAME (M) M³ ρ = 15°C T-54B 15° T-56

FOT 1 (p) 1.260 273.25 0.8220 11 1.0035 274.202 0.8209 225.093

DOT 1.970 72.43 0.8220 11 1.0035 72.684 0.8209 59.666

SETT 5.60 0.8220 30 0.9869 5.527 0.8209 4.537

SERV 6.50 0.8220 30 0.9869 6.415 0.8209 5.266

TOTAL 294.561

3rd Engineer

Compiled by Capt. E.Artemenkov


Tide Line Inc.

Chief Engineer

Compiled by Capt. E.Artemenkov

You might also like