Scope of Works:
1. Mobilization / Demobilization
3. Permits
a. Building Permit
1. Based on the conceptual drawings/lay-out provided, design and develop
drawings and submit complete drawings and documents as required by
PEZA.
1 of 3
b. Occupancy Permit
1. Submit As-built Drawings and documents as required by PEZA.
a. The contractor shall prepare the structural design and drafting of building and
structures as mentioned above, in compliance with NSCP 2015, National
Building Code, National Plumbing Code, Fire Code of the Philippines, and
Philippine Mechanical Code.
b. All construction plans and drawings shall be approved by DMPI before
implementation.
c. Loads:
Wind
2 of 3
Earthquake
d. Values to be used in designing for the following structures are as follows:
Fc’ = 28 Mpa (4000 psi) for slab and column.
Fc’ = 24 Mpa (3500 psi) for footing and wall.
Reinforcement steel bars shall be deformed and shall conform to
ASTM 615
Main Bars, (16mm or larger) Fy = 276 MPa (Grade 40)
Secondary Bars, (<12mm) Fy = 228 MPa (Grade 33)
Structural Steel = A36 Structural Steel Shapes
Anchor bolts shall conform to ASTM A-141.
Cross bracing with turn buckles shall conform to ASTM A-307.
Welding electrodes shall conform to AWS A-5.1 or A-5.5; E70
electrodes.
Machine bolts shall conform to ASTM A-307. Each bolt shall be
provided with standard nuts and washers.
Scope will include site clearing, excavation, earth works, and surface
preparations.
a. Excavation:
The contractor shall make all necessary excavation for foundation to
grade as indicated in the drawings.
No footing and columns shall rest in the fill. Where excavations for
foundations reveal that footing will rest on fill, it shall be carried deeper
until the desired stratum for safe bearing power is reached.
Whenever water is encountered in any excavations, the same shall be
removed using pail of pump. Care being taken that the surrounding
earth is not disturbed.
All excavation for drainage, water service systems and septic tanks
and such excavation as may be necessary for the completion of the
project are included.
3. Construction of Building
Lay-out and Excavation for Foundation
Construction of concrete foundation and pedestal
Fabrication, Manufacturing and Erection of steel columns
Fabrication of Trusses, Girders, Strut and cross brace