Design report of OFF TAKE SLUICE at K.M 0.

640

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M 0.640 to irrigate an ayacut of 110.510 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.440 0.064
3
2 Discharge Deisgned m /sec 0.441 0.068
3 Ayacut Acres 988 110.510
4 Bed width meters 1.600 0.450
5 FSD meters 0.550 0.375
6 Velocity m/s 0.373 0.219
7 Bed Level meters 118.780 118.875
8 FSL meters 119.400 119.250
9 TBL meters 119.900 119.750
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2800 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 120.560
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 300
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 110.51
Discharge required = aycut / duty
Discharge required wet = 40.88 /36 = 1.136
Discharge required dry = 69.63 /75 = 0.928
Additional 10% for Transmission loss = 0.206
2.270
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 2.270 cusec


3
0.064 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.064 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.058 m
Diameter of pipe = 4 x ( 0.058 )2 = 0.271 m

Provide 300mm diameter R.C.C hume pipe

Assuming a section of 0.45m x 0.375 m with side slopes 1:1 and bed fall of 1:4000

width = 0.450 m
depth = 0.375 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.45+0.45+0.375+0.375)x0.375 = 0.309 m
wetted perimeter ( P) = 0.45+ 2 x 0.375 x SQRT(1+1) = 1.511 m
Hydraulic mean depth( 'R) = A /P = 0.205 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.205^2/3x (1/4000)^1/ = 0.219 m/s
3
Discharge designed = AxV = 0.309 x 0.219 = 0.068 m /sec
3
Discharge required = 0.064 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 119.400 - 0.15 = 119.250 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 119.25 - 0.375 = 118.875 m
RESULTS

3
Discharge designed = 0.068 m /sec
3
Discharge required = 0.064 m /sec
Section = 0.45 m x 0.375 m
velocity = 0.219 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 119.400 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 119.250 m
Deduct FSD of O.T Sluice = -0.375 m
= 118.875 m
Hence Sill Level of O.T Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.441 m /sec
3
Discharge of O.T Sluice = 0.068 m /sec
Percentage of discharge = 0.068 / 0.441 x 100 = 15.33%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 118.780 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 118.850 + 0.375
Rear FSL of O.T.Sluice = 119.225 m

RESULTS OF SILL LEVELS

A) As per full supply level = 118.875 OT Discharge = 0.068


B) As per percentage discharge = 119.225 Add 20% = 0.014
C) Height of flood level = 119.385 Total Discharge 0.081

However the sill level of O.T.Sluice will be fixed at 118.850 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 118.850 m rear FSL of O.T.Sluice +119.225 m
VENT WAY
+119.9 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1.025 m
A = Area of vent way required +118.875
0.08 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.072 m L= 1.00 + 2 x 3/2 x 1.025 = 4.075
Hence provide (L) = 4.1 m

Hence provide 300mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
=
f = silt factor 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 119.4 - 1
= 118.400 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.15^2/1.1)^(1/3) r = 0.150
= 0.557 m

Maximum scour level = FSL - Max. scour depth


= 119.25 - 0.557
= 118.693 m

However provide downstream cut off same as upstream


OF A NDHRA
T PR
EN

NM

AD
ER

ES
GOV

H
FORMATION OF RESERVOIR a/c KONDALAYAGEDDA
Design report of OFF TAKE SLUICE at K.M 1.190

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M 1.190 to irrigate an ayacut of 342.760 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.440 0.149
3
2 Discharge Deisgned m /sec 0.441 0.084
3 Ayacut Acres 800 342.760
4 Bed width meters 1.600 0.600
5 FSD meters 0.550 0.375
6 Velocity m/s 0.373 0.229
7 Bed Level meters 106.580 106.605
8 FSL meters 107.130 106.980
9 TBL meters 107.630 107.480
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2800 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 107.966
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 450
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 342.760
Discharge required = aycut / duty
Discharge required wet = 16.85 /36 = 0.468
Discharge required dry = 325.91 /75 = 4.345
Additional 10% for Transmission loss = 0.481
5.295
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 5.295 cusec


3
0.149 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.149 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.135 m
Diameter of pipe = 4 x ( 0.135 )2 = 0.414 m

Provide 450mm diameter R.C.C hume pipe

Assuming a section of 0.6m x 0.375 m with side slopes 1:1 and bed fall of 1:4000

width = 0.600 m
depth = 0.375 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.6+0.6+0.375+0.375)x0.375 / 2 = 0.366 m
wetted perimeter ( P) = 0.6+ 2 x 0.375 x SQRT(1+1) = 1.661 m
Hydraulic mean depth( 'R) = A /P = 0.220 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.22^2/3x (1/4000)^1/2) = 0.229 m/s
3
Discharge designed = AxV = 0.366 x 0.229 = 0.084 m /sec
3
Discharge required = 0.149 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 107.130 - 0.15 = 106.980 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 106.98 - 0.375 = 106.605 m
RESULTS

3
Discharge designed = 0.084 m /sec
3
Discharge required = 0.149 m /sec
Section = 0.6 m x 0.375 m
velocity = 0.229 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 107.130 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 106.980 m
Deduct FSL of O.T Sluice = -0.375 m
Hence Sill Level of O.T = 106.605 m
Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.441 m /sec
3
Discharge of O.T Sluice = 0.084 m /sec
Percentage of discharge = 0.084 / 0.441 x 100 = 19.02%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 106.580 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 106.650 + 0.375
Rear FSL of O.T.Sluice = 107.025 m

RESULTS OF SILL LEVELS

A) As per full supply level = 106.605 OT Discharge = 0.084


B) As per percentage discharge = 107.025 Add 20% = 0.017
C) Height of flood level = 107.115 Total Discharge 0.101

However the sill level of O.T.Sluice will be fixed at 106.650 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 106.650 m rear FSL of O.T.Sluice +107.025 m
VENT WAY
+107.63 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1.025 m
A = Area of vent way required +106.605
0.1 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.090 m L= 1.00 + 2 x 3/2 x 1.025 = 4.075
Hence provide (L) = 4.1 m

Hence provide 300mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
=
f = silt factor 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 107.13 - 1
= 106.130 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.14^2/1.1)^(1/3) r = 0.140
= 0.531 m

Maximum scour level = FSL - Max. scour depth


= 106.98 - 0.531
= 106.449 m

However provide downstream cut off same as upstream


OF A NDHRA
T PR
EN

NM

AD
ER

ES
GOV

H
FORMATION OF RESERVOIR a/c KONDALAYAGEDDA
Design report of OFF TAKE SLUICE at K.M 1.560

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M 1.560 to irrigate an ayacut of 99.590 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.259 0.066
3
2 Discharge Deisgned m /sec 0.2756 0.068
3 Ayacut Acres 300 99.590
4 Bed width meters 1.300 0.450
5 FSD meters 0.450 0.375
6 Velocity m/s 0.350 0.219
7 Bed Level meters 105.810 105.735
8 FSL meters 106.260 106.110
9 TBL meters 106.760 106.610
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2600 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 106.818
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 300
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 99.59
Discharge required = aycut / duty
Discharge required wet = 55.59 /36 = 1.544
Discharge required dry = 44 /75 = 0.587
Additional 10% for Transmission loss = 0.213
2.344
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 2.344 cusec


3
0.066 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.066 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.060 m
Diameter of pipe = 4x( 0.060 )2 = 0.276 m

Provide 300mm diameter R.C.C hume pipe

Assuming a section of 0.45m x 0.375 m with side slopes 1:1 and bed fall of 1:4000

width = 0.450 m
depth = 0.375 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.45+0.45+0.375+0.375)x0.375 /2 = 0.309 m
wetted perimeter ( P) = 0.45+ 2 x 0.375 x SQRT(1+1) = 1.511 m
Hydraulic mean depth( 'R) = A /P = 0.205 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.205^2/3x (1/4000)^1/2) = 0.219 m/s
3
Discharge designed = AxV = 0.309 x 0.219 = 0.068 m /sec
3
Discharge required = 0.066 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 106.260 - 0.15 = 106.110 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 106.11 - 0.375 = 105.735 m
RESULTS

3
Discharge designed = 0.068 m /sec
3
Discharge required = 0.066 m /sec
Section = 0.45 m x 0.375 m
velocity = 0.219 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 106.260 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 106.110 m
Deduct FSL of O.T Sluice = -0.375 m
Hence Sill Level of O.T = 105.735 m
Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.276 m /sec
3
Discharge of O.T Sluice = 0.068 m /sec
Percentage of discharge = 0.068 / 0.2756 x 100 = 24.54%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 105.810 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 105.880 + 0.375
Rear FSL of O.T.Sluice = 106.255 m

RESULTS OF SILL LEVELS

A) As per full supply level = 105.735 OT Discharge = 0.07


B) As per percentage discharge = 106.255 Add 20% = 0.01
C) Height of flood level = 106.245 Total Discharge 0.08

However the sill level of O.T.Sluice will be fixed at 105.880 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 105.880 m rear FSL of O.T.Sluice +106.255m
VENT WAY
+106.76 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1.025 m
A = Area of vent way required +105.735
0.08 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.072 m L= 1.00 + 2 x 3/2 x 1.025 = 4.075
Hence provide (L) = 4.1 m

Hence provide 300mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
f = silt factor = 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 106.26 - 1
= 105.260 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.15^2/1.1)^(1/3) r = 0.150
= 0.557 m

Maximum scour level = FSL - Max. scour depth


= 106.11 - 0.557
= 105.553 m

However provide downstream cut off same as upstream


OF A NDHRA
T PR
EN

NM

AD
ER

ES
GOV

H
FORMATION OF RESERVOIR a/c KONDALAYAGEDDA
Design report of OFF TAKE SLUICE at K.M 1.800

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M to irrigate an ayacut of 89.680 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.259 0.056
3
2 Discharge Deisgned m /sec 0.2756 0.059
3 Ayacut Acres 300 89.680
4 Bed width meters 1.300 0.450
5 FSD meters 0.450 0.350
6 Velocity m/s 0.350 0.211
7 Bed Level meters 101.610 101.560
8 FSL meters 102.060 101.910
9 TBL meters 102.560 102.410
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2600 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 103.920
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 300
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 89.68
Discharge required = aycut / duty
Discharge required wet = 41 /36 = 1.139
Discharge required dry = 48.68 /75 = 0.649
Additional 10% for Transmission loss = 0.179
1.967
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 1.967 cusec


3
0.056 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.056 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.050 m
Diameter of pipe = 4x( 0.050 )2 = 0.253 m

Provide 300mm diameter R.C.C hume pipe

Assuming a section of 0.45m x 0.35 m with side slopes 1:1 and bed fall of 1:4000

width = 0.450 m
depth = 0.350 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.45+0.45+0.35+0.35)x0.35 / 2 = 0.280 m
wetted perimeter ( P) = 0.45+ 2 x 0.35 x SQRT(1+1) = 1.440 m
Hydraulic mean depth( 'R) = A /P = 0.194 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.194^2/3x (1/4000)^1/2) = 0.211 m/s
3
Discharge designed = AxV = 0.28 x 0.211 = 0.059 m /sec
3
Discharge required = 0.056 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 102.060 - 0.15 = 101.910 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 101.91 - 0.35 = 101.560 m
RESULTS

3
Discharge designed = 0.059 m /sec
3
Discharge required = 0.056 m /sec
Section = 0.45 m x 0.35 m
velocity = 0.211 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 102.060 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 101.910 m
Deduct FSL of O.T Sluice = -0.35 m
Hence Sill Level of O.T = 101.560 m
Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.276 m /sec
3
Discharge of O.T Sluice = 0.059 m /sec
Percentage of discharge = 0.059 / 0.2756 x 100 = 21.45%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 101.610 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 101.680 + 0.350
Rear FSL of O.T.Sluice = 102.030 m

RESULTS OF SILL LEVELS

A) As per full supply level = 101.560 OT Discharge = 0.059


B) As per percentage discharge = 102.030 Add 20% = 0.012
C) Height of flood level = 102.045 Total Discharge 0.071

However the sill level of O.T.Sluice will be fixed at 101.680 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 101.680 m rear FSL of O.T.Sluice +102.055 m
VENT WAY
+102.56 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1m
A = Area of vent way required +101.56
0.07 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.063 m L= 1.00 + 2 x 3/2 x 1.025 = 4
Hence provide (L) = 4.1 m

Hence provide 300mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
=
f = silt factor 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 102.06 - 1
= 101.060 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.131^2/1.1)^(1/3) r = 0.131
= 0.509 m

Maximum scour level = FSL - Max. scour depth


= 101.91 - 0.509
= 101.401 m

However provide downstream cut off same as upstream


OF A NDHRA
T PR
EN

NM

AD
ER

ES
GOV

H
FORMATION OF RESERVOIR a/c KONDALAYAGEDDA
Design report of OFF TAKE SLUICE at K.M 0.020

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M to irrigate an ayacut of 196.720 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.602 0.116
3
2 Discharge Deisgned m /sec 0.630 0.118
3 Ayacut Acres 988 196.720
4 Bed width meters 2.000 0.575
5 FSD meters 0.600 0.455
6 Velocity m/s 0.404 0.251
7 Bed Level meters 125.000 124.995
8 FSL meters 125.600 125.450
9 TBL meters 126.100 125.950
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2800 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 126.720
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 300
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 196.72
Discharge required = aycut / duty
Discharge required wet = 76.72 /36 = 2.131
Discharge required dry = 120 /75 = 1.600
Additional 10% for Transmission loss = 0.373
4.104
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 4.104 cusec


3
0.116 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.116 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.105 m
Diameter of pipe = 4x( 0.105 )2 = 0.365 m

Provide 450mm diameter R.C.C hume pipe

Assuming a section of 0.575m x 0.455 m with side slopes 1:1 and bed fall of 1:4000

width = 0.575 m
depth = 0.455 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.575+0.575+0.455+0.455)x0.455 = 0.469 m
wetted perimeter ( P) = 0.575+ 2 x 0.455 x SQRT(1+1) = 1.862 m
Hydraulic mean depth( 'R) = A /P = 0.252 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.252^2/3x (1/4000)^1/2) = 0.251 m/s
3
Discharge designed = AxV = 0.469 x 0.251 = 0.118 m /sec
3
Discharge required = 0.116 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 125.600 - 0.15 = 125.450 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 125.45 - 0.455 = 124.995 m
RESULTS

3
Discharge designed = 0.118 m /sec
3
Discharge required = 0.116 m /sec
Section = 0.575 m x 0.455 m
velocity = 0.251 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 125.600 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 125.450 m
Deduct FSL of O.T Sluice = -0.455 m
Hence Sill Level of O.T = 124.995 m
Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.630 m /sec
3
Discharge of O.T Sluice = 0.118 m /sec
Percentage of discharge = 0.118 / 0.63 x 100 = 18.67%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 125.000 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 125.070 + 0.455
Rear FSL of O.T.Sluice = 125.525 m

RESULTS OF SILL LEVELS

A) As per full supply level = 124.995 OT Discharge = 0.1176


B) As per percentage discharge = 125.525 Add 20% = 0.0235
C) Height of flood level = 125.585 Total Discharge 0.1411

However the sill level of O.T.Sluice will be fixed at 125.070 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 125.070 m rear FSL of O.T.Sluice +125.525 m
VENT WAY
+126.1 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1.105 m
A = Area of vent way required +124.995
0.141 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.127 m L= 1.00 + 2 x 3/2 x 1.025 = 4.315
Hence provide (L) = 4.1 m

Hence provide 450mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
f = silt factor= 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 125.6 - 1
= 124.600 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.205^2/1.1)^(1/3) r = 0.205
= 0.684 m

Maximum scour level = FSL - Max. scour depth


= 125.45 - 0.684
= 124.766 m

However provide downstream cut off same as upstream


OF A NDHRA
T PR
EN

NM

AD
ER

ES
GOV

H
FORMATION OF RESERVOIR a/c KONDALAYAGEDDA
Design report of OFF TAKE SLUICE at K.M 0.150 - 1L Distributory

In the approved Hydraulic particulars Distributory and off - taking sluice minor is proposed on
left/right side at K.M 0.150 to irrigate an ayacut of 149.450 Acres.

S.No PARTICULARS Units Parent Canal OT Sluice


3
1 Discharge Required m /sec 0.173 0.087
3
2 Discharge Deisgned m /sec 0.177 0.090
3 Ayacut Acres 200 149.450
4 Bed width meters 0.700 0.475
5 FSD meters 0.450 0.425
6 Velocity m/s 0.343 0.235
7 Bed Level meters 125.090 124.965
8 FSL meters 125.540 125.390
9 TBL meters 126.040 125.890
10 Free Board meters 0.450 0.5
11 Bed Fall 1 in 2200 1 in 4000.00
12 Top width of banks meters 1.00 1.00
13 A.G.L 126.450
14 co-efficient of rugosity 0.025 0.025
15 Size of Barrel milli meters 300
16 Side Slopes 1.5:1 1:1

DESIGN OF CHANNEL SECTION


Aycut = 149.45
Discharge required = aycut / duty
Discharge required wet = 55.41 /36 = 1.539
Discharge required dry = 94.04 /75 = 1.254
Additional 10% for Transmission loss = 0.279
3.072
Duty (adopted) = 36 / cusec wet
75 / cusec dry

Discharge required = 3.072 cusec


3
0.087 m /sec
Q= 2.86 x A x h ^ 2 Where, n = minimum driving head
= 0.150 m
Area = Discharge required = 0.087 / ( 2.86 x ( 0.15)^2)
2
2.86 x 0.15 = 0.078 m
2
Diameter of pipe = 4x( 0.078 ) = 0.316 m

Provide 450mm diameter R.C.C hume pipe

Assuming a section of 0.475m x 0.425 m with side slopes 1:1 and bed fall of 1:4000

width = 0.475 m
depth = 0.425 m
side slopes = 1:1
n = 0.025
Bed Slope = 4000
2
cross sectional area(A) = (0.475+0.475+0.425+0.425)x0.425 / 2 = 0.383 m
wetted perimeter ( P) = 0.475+ 2 x 0.425 x SQRT(1+1) = 1.677 m
Hydraulic mean depth( 'R) = A /P = 0.228 m
velocity (v) = 1/n x R 2/3 x( 1/S) 1/2
= (1/0.025x0.228^2/3x (1/4000)^1/2) = 0.235 m/s
3
Discharge designed = AxV = 0.383 x 0.235 = 0.090 m /sec
3
Discharge required = 0.087 m /sec

Rear F.S.L of O.T Sluice = U/s F.S.L - driving head


= 125.540 - 0.15 = 125.390 m
Sill level of O.T Sluice = Rear F.S.L of O.T Sluice - F.S.D of O.T Sluice
= 125.39 - 0.425 = 124.965 m
RESULTS

3
Discharge designed = 0.090 m /sec
3
Discharge required = 0.087 m /sec
Section = 0.475 m x 0.425 m
velocity = 0.235 m/s
Bed fall = 1 in 4000

A) Fixation of Sill Level:- ( As per full supply level)

FSL of the parent canal = 125.540 m


Providing min. driving head = 0.150 m
Rear FSL of O.T Sluice = 125.390 m
Deduct FSL of O.T Sluice = -0.425 m
= 124.965 m
Hence Sill Level of O.T Sluice

B) Percentage of discharge:-

3
Discharge of parent canal = 0.177 m /sec
3
Discharge of O.T Sluice = 0.090 m /sec
Percentage of discharge = 0.09 / 0.177 x 100 = 50.77%

Select the percentage of O.T.Sluice discharge to parent canal discharge is in between above 15% and parent canal
FSD is below 1.22m
Hence the height of the sill level should be fixed at 0.07 m above the bed level of the parent canal.
For Off taking sluice taking of from parent channel of discharge less than 0.71 m 3 /sec upto 0.04 m 3 /sec

Bed level of the parent canal = 125.090 m


Add height of sill = 0.070 m
Add FSD of O.T.Sluice = 125.160 + 0.425
Rear FSL of O.T.Sluice = 125.585 m

RESULTS OF SILL LEVELS

A) As per full supply level = 124.965 OT Discharge = 0.09


B) As per percentage discharge = 125.585 Add 20% = 0.018
C) Height of flood level = 125.525 Total Discharge 0.108

However the sill level of O.T.Sluice will be fixed at 125.160 m considering minimum driving head of 0.15m.
Hence sill level of O.T.Sluice + 125.160 m rear FSL of O.T.Sluice +125.585 m
VENT WAY
+126.04 1.00 m
Q = 2.86 x A x h ^2 Where, Q = Discharge through vent 'h'
h = . minimum driving head 1.075 m
A = Area of vent way required +124.965
0.11 = 2.86 x A x 0.15 ^0.5) L
2
A = 0.099 m L= 1.00 + 2 x 3/2 x 1.025 = 4.225
Hence provide (L) = 4.1 m

Hence provide 450mm RCC hume pipes of NP2 class with aperture
Length of pipe 4.1m and thickness of pipe 25mm

SCOUR DEPTH CALCULATION

Parent canal side R = 1.356 x ( q2 / ft )(1/3) Where, R = depth of scour below water tabel
q = discharge per meter width
f = silt factor = 1.1
factor of safety = 1.50
R= 0.895 = 1.00

Maximum scour level = FSL - R


= 125.54 - 1
= 124.540 m
However provide D/S cut off as provided on U/S

ON OT Sluice SIDE
Maximum scour depth = 1.5 x 1.356 x (0.189^2/1.1)^(1/3) r = 0.189
= 0.649 m

Maximum scour level = FSL - Max. scour depth


= 125.39 - 0.649
= 124.741 m

However provide downstream cut off same as upstream