Professional Documents
Culture Documents
4-1-1 Calculation of Required Number of Spots (Loading Apron)
4-1-1 Calculation of Required Number of Spots (Loading Apron)
4-1-1 Calculation of Required Number of Spots (Loading Apron)
I+J+T
Required number of apron
U: 6.441 0.685 2.284 3.472 0.000 6.888 0.675 2.251 3.962 0.000 7.113 0.900 3.152 3.061 0.000 (T is zero in this case as per the pre-
spots
condition, p-4 of question sheet)
4-1-2 Calculation of the area of the GSE yard (passenger terminal area)
2007 2012 2017
Aircraft → Total JJ LJ MJ SJ PR Total JJ LJ MJ SJ PR Total JJ LJ MJ SJ PR
A: Number of peak hour 0.138 0.277 1.384 2.630 0.000 0.136 0.273 1.364 3.001 0.000 0.136 0.409 1.910 2.319 0.000 Same as 'F' of table 4-2-1
aircraft landing by type
b: Required GSE yard area per 1600 1250 1250 450 1600 1250 1250 450 1600 1250 1250 450 Given 'b' values
aircraft landing (m2)
c: Airline increase rate 1.2 1.2 1.2 Given Values
D: Required area for the GSE 4178.044 4338.429 4993.286 Summation of (AxbxC)
yard (m2) (p-14 of textbook)
Number of spots calculated 0.208 0.415 2.077 3.156 0.000 0.205 0.409 2.046 3.602 0.000 0.205 0.614 2.865 2.783 0.000
e: Area available for GSE yard 200 200 200 160 100 200 200 200 160 100 200 200 200 160 100
in shoulder per spot
F: Usable GSE yard area in the 1044.926 1108.346 1182.017 Summation of (no. of spots by a/c
apron shoulder type x e)
G: Area of GSE yard in the 3133.118 3230.083 3811.269 G = D-F
passenger terminal area
4-1-3 Calculation of the area of the GSE yard (cargo terminal area)
2007 2012 2017
Aircraft → Total JJ LJ MJ SJ PR Total JJ LJ MJ SJ PR Total JJ LJ MJ SJ PR
A: Number of peak hour 0.138 0.277 1.384 2.630 0.000 0.136 0.273 1.364 3.001 0.000 0.136 0.409 1.910 2.319 0.000 Same as 'A' of Table 4-1-2
aircraft landing by type
h: Required GSE yard area per 1600 1600 950 70 50 1600 1600 950 70 50 1600 1600 950 70 50 Given
aircraft landing
c: Airline increase rate 1.2 1.2 1.2 Given