DRY DOCKING JOB SPECI

Name TB. CALISTA I


Gross Tonnage 251 ton
Net Tonnage 76 ton
LOA 30.0 mtr
Breadth 9.0 mtr
Draft 3.60 mtr
Port Registry Batam
Class BKI
Owner PT. Pelayaran Samudera Layar sentosa
Survey Intermediate
Docking date 20TH FEB 2020

NO. JOB SCOPE

G GENERAL SERVICE

G1 Tugs
Berthing/unberthing, move
Dock/undock, move

G2 Mooring/Un mooring
Berth/un-berth
Dock/undock

G3 Dry Dock
Block Preparation
Ist Dock day
Subsequent dock day

G4 Berth /Alongside
Wharf Days

G5 Shore Power
Supply - 380V, 3 PH, 50 Hz, 50-60 Amps
Connect/disconnect
kwhr
G6 Fire Protection
Fire line with pressure
Connect/disconnect
Fire Safety Watch,day
Security Watch, day

G7 Gas Free Inspection


1st Day on arrival
Subsequent days
Mechanical Ventilation, set/day

G8 Garbage/sewage disposal
Garbage Disposal,day
Sewage Collection in dock, day

G9 Oily Sludge Disposal


Sludge
Oily water/dirty water
Muds

G10 Supplies
Fresh water
Connect/disconnect

Potable water
Connect/disconnect

Ballast water
Connect/disconnect

G11 Cooling water for Machinery


Connect/disconnect
Line/day

G12 Crane Usage


Wharf Crane, hrs
Dock Crane, hrs

G13 High Access


Cherry Picker, hrs
Movable Staging, set/day
Fixed staging, m3
For rudder /propeller works
For hull markings/painting
For main mast
For COT/BWT
For Main deck areas
For Accommodation

H HULL - PREPARATION
H1 Tyre Fenders
To remove/install tyre fenders
To install tyre fenders with new chain and shackles with
owner supply

To repair tyre fender hanging curve bracket

To supply and fabricate new tyre hanging curve baracket

To repair bent eye brackets


To crop out /install new eye brackets
To supply new tyre fenders
To renewed chain with owner supply
To renewed shackles with owner supply
To make holes for fender
H2 Hull Cleaning
Flat Bottom (FB)
Vertical Top ( VT)
Top side ( TS)

High Pessure water wash, m2


Mechanical scraping, m2
Chemical cleaning, m2

H3 Hull protection against GB & painting


Install/remove scupper drain cones
Masking of hull - transducers, anodes, etc
Cover protection for accommodation

P HULL - PAINTING
P1 Grit/Sand Blasting
Under water area, Flat Bottom + Vertical Side = 395 m2
Above water, Top side only = 170 m2

Grit Blast SA2.0 , Under Water area


Grit Blast SA1.0, Under water area

Grit Blast SA 2.0, Above Water area


Grit Blast SA 1.0, Above water area

P2 Painting ( Paint Owner supply)


Under water area, 3 Full Coat ( FC)
Under water area, 3 Touch up Coat (TU)

Above water area, 2 FC


Above water area, 2 TU

Standard Hull markings- Names, Drafts, POR, Plimsoll, etc


Special Rescue Zone

U HULL - UNDERWATER WORKS


U1 Rudder
Uncouple/couple rudder from rudder stock
Remove/refit rudder drain plug to check for leak
Air test rudder for leak
Measure the lower pintle bush for weardown

U2 Rudder stock
Measure rudder stock lower bush for weardown
Measure rudder stock upper bush for weardown

Renew rudder stock grease packings

U3 Rudder stock repairs


Remove and refit new bush ( owner supply)
U4 Propeller

Remove/refit propeller lock nut


Remove propeller to workshop
Clean and polish
NDT check for crack

U5 Propeller Repairs
Cut/Grind/round off the blade edge
Bent/curve back blade to original shape
Build-up/grind smooth cavitation holes
Carry out static balancing

U6 Tailshaft Survey

Remove/refit rope guard


Supply/fabricate new rope guard
Uncouple /re-couple shaft coupling
Pull out/Reinstall tailshaft

Measure aft bush weardown

Measure fwd bush weardown

Carry out NDT to check for crack


Install new shaft seal ( owner supply)

Install new shaft packings ( owner supply)

Supply and install rope cutters

Submit report to owner

U7 Tailshaft Repairs
Pull out aft bush and renew with owner supply
Pull out fwd bush and renew with owner supply
Machining of bush to size and fit.
Build-up/machine down pitted areas
Carry out crack detection
U8 Sea Chest Gratings
Remove/refit sea chest gratings
Scrape clean and HP wash
To be painted as hull standard
To replace zinc anodes
Secure grating by SS bolts/nuts/locking wires

U9 Zinc Anodes ( Owner supply)


Remove /refit hull anodes
Supply and weld protection AB to prevent theft
Supply/weld AB brackets

D DECK MACHINERY & FITTINGS


D1 Anchor chain survey
Lower/re-stow back anchor chain on dock
De-rust the anchor chain
HP fresh water wash
Measure weardown & submit report
Check/inspect for loose/weak linkage
Paint with bitumastic paint ( owner supply)
Reverse end and secure to bitter end.
Anchor chain repair
Renew anchor chain
Renew kenter shackles/swivel/end chain link

D2 Anchor for survey


Lower down/re-stow anchor
Derust/clean/paint bitumastic paint
Check/inspect for weak connection

D3 Chain Locker
Open /close manhole cover with new gasket
Clean and remove mud
HP water wash to clean
Touch up and spot repairs 1.50 mtr height, 2 TU coats
Test, check and repair the bilge pumping system
Check chain is properly secure in bitter end
D4 Fwd Anchor Windlass
Remove/refit brake lining.
Renew brake lining in workshop with yard supply.
Renew all the brake lining studs/nuts
The brake band to clean from rust and scales
The brake band to roughen with emery cloth for better
grip

D5 Windlass Steel Repairs


Crop/renew foundation base plate
Crop/renew casing plate
Repair the gypsy wheel by welding build up.
Repair the warping drum
Supply/fabricate a new chain stopper
Supply/fabricate chain center bar

D6 Windlass Complete Overhaul


Remove and lift the whole unit to workshop for repair
Dismantle complete for repair
Renew the shaft bush with Yard supply
Repair the drive shaft by welding build up and machine
down to original size
Repair the clutch plate by welding and maching
Check / inspect the gears for defect

D7 Tank Vent Heads Repair


To remove to workshop for repair for survey
To dismantle, derust, clean and inspect
Repair corroded steel body.
Check/Repair ball valve closing tightness
Renew screen mesh- Material SS 304
Install back with new gasket.
Install with new bolts/nuts of GI material.
All consumable materials supply by yard.

FW Ballast
Fuel Oil Tank
FO Service Tank
Sea Chest
Coffer dam
Fresh Water Tank
Fore Peak FW BWT
Dirty Oil Tank
L.O.S.T

D8 Mooring Bits
Supply/fabricate/weld new mooring bit

D9 Roller Fairlaids
Supply/fabricate/weld new fairlaid

D10 Funnel Spark Arrester


Provide staging for access.
Remove and installl new spark arrester gauze
Material SS 304
To be firmly secure by welding if necessary

Main Engine
Aux engine

D11 Ventilation Fans


Provide staging access (if necessary)
Dismantle fan and motor complete to workshop
Repair the fan blade
Overhaul the motor.
Renew all the shaft bearings
Clean and repair the packing joint
Suply and renew the rubber packing
De-rust/clean and paint before installation

ER Ventilation Fan

Galley Exhaust Fan


Crew's Space Fan

"W" fender renewal

D12 To renew 2 no's of "W" fender on fwd side


S DECK - STEEL RENEWALS
To crop out steel and renew the following with yard
supply.

S1 Bulwark
Bulward steel plates
Bulwark Side stifferner plate
Bulwark Top side plate

S2 Hand Rails on Main deck


Big round bar
Small round bar
Stanchion

S3 Platform stand
Platform stand for Windlass

S4 Staircase
Staircase hand rail
Stair case steps

S5 Angle bar supports


Liferaft P/S
Light supports

S6 Tank Vent head standpipe


To crop/renew stand pipe

S7 Sounding Plug/Pipe
To crop/renew sounding pipe

S8 Manhole covers
To supply/fabricate covers with handles and jack screws
M20 threads.
Handles, 2 pc per cover
To repair and renew studs/nuts- Material GI

S9 Main deck plating


Hot works preparation
Removal/Fix back access for hotworks
Crop and renew , Plate thickness- xx

S10 Poop Deck Plating


Hot works preparation
Removal/Fix back access for hotworks
Crop and renew , Plate thickness- xx

S11 Main Mast


Provide staging for access
Crop/renew rung
Crop/renew Navigation Light Seatings

S12 Bollard -Cruciform


Supply, fabricate and welf new bollard

S13 Aft fender housing


Remove aft fender
Croop and repair aft fender housing
Refit back fender

T TANKS CLEANING

T1 FW & BW Tanks Cleaning


Open/close manhole cover
Provide mechanical ventilation
Provide temporary lights
High Pressure hose down bulkheads
Pump out water and dispose mud/debris/sludge

For the following tanks :


Fore Peak Tank
BWT No. I P & 1 S
BWT No. 2P & 2 S
Aft Peak Tank

T2 Fuel Oil Tanks Cleaning


Open/close manhole cover
Provide mechanical ventilation
Provide temporary lights
Pump and dispose the sludge.
Wipe clean the tank of sludge at the bottom.
Provide temporarily fuel storage
Fuel Oil No.1 P & S
Fuel Oil No.1 C
No.2 FO Wing - P & S
No.2 FO Tank - P & S
No.3 FO Tank - P & S
No.3 FO Tank - C

T3 ER Bilges Cleaning
Provide pump to pump out and dispose the bilge water
High pressure hose down to wash down oil stains.
Dispose the slugde at bottom.
Clean the tank top

A ACCOMMODATION
A1 Watertight Dooors/Hatchways
To dismantle/fit back
To repairand free up.
Grease before installation.

ER Entrance door
Steering Gear Compartment
Crew Emergency Escape Hatch
ER Crew Emergency Escape Hatch
Deckhouse Entance
Wheel house Entrance

A2 Plumbing Works
Pipe size, GI pipe

A3 Cabins/Toilets
Remove and install new washbasin
Remove floor tiles and put new tiles
A4 Pantry/Kitchen
Repair wash basin
Repair /renew water faucets

A5 Split Unit Air Cond Servicing


General servicing
Clean condenser
Dismantle evaporator to clean
Charge oil and gas.

A6 Lights/Power Points
Pull and install new cable light points
Pull and install new cable for power points

A7 Bulkhead/Port holes Repair

A8 Air Cond Unit Support


Crop and renew angle bar support
Crop and renew base plate.

A9 Sofa chair for salon accomodation

To repair existing sofa

M MACHINERY - ENGINE ROOM

M1 Main Engine Major Overhaul

All spares parts are to be provided by owner

Yard to supply all the consumables.


Dismantle/install all the pipes and fittings for access
Cylinder heads - dismantle, overhaul and repair in
workshop
Piston/Con rod assy - Renew piston rings, crankpin
bearings, cond- rod
Cylinder Liner bolts,
Renew allgudgeon pin bush
the seal rings. Measure bore
weardown. Renew only if worn out.
Turbocharger- dismantled, clean, inspect and replace
wear /tear parts. Dynamic balancing of the rotor assy.
Charge air cooler- Dismantle clean air and water side
with chemicals. Optional -clean with ultrasonic. Renew
CFW cooler - dismantled, clean, carry out pressure test
zinc anodes.
to 10% above working pressure. Renew zinc anodes.
Water Tank - drain and flush clean inside.
LO Cooler - Clean and pressur test to 10% above working
pressure. Renew zinc anodes.
FW Pump - dismanle and overhaul.
SW Pump - dismantle and overhaul.
Fuel Inhection Pump - Dismantle to workshop for
performance
Speed Governor test- and overhaul.
Dismantle to workshop for servicing,
test and repair.
Alternator - Dismantle and overhaul.
Startor Motor - Dismantle and overhaul.
Carry out wear tear measumrents and submit report.
Clean, decarbonize and assemble all components as per
original.
Carry out performance test.
Test all the safety shutdown and alarms
To Crop and fabricate exhaust pipe port and stbd
Submit a completion report.
-
M2 Main Engine Gearbox Overhaul
All spares parts are to be provided by owner
Yard to supply all the consumables.

Dismantle/install all the pipes and fittings for access.


Drive shaft assy- Dismantle and replace the shaft
bearings
Drive shaft assy- Dismantle and replace the shaft
bearings
Ahead clutch assy- dismantle, check and renew all the
wear/tear parts.

Astern clutch assy - dismantle, check and renew all the


wear /tear parts.

Gears - Check all the gears teeth for crack with NDT
Hydraulic Pump- Dismantle and overhaul

Clean all parts and assemble back as per original.


Test performance.

M3 Aux Engine
All spares parts are to be provided by owner
Yard to supply all the consumables.

Dismantle/install all the pipes and fittings for access

Cylinder heads - dismantle, overhaul and repair in


workshop
Piston/Con rod assy - Renew piston rings, crankpin
bearings, cond- rod
Cylinder Liner bolts,
Renew allgudgeon pin bush
the seal rings. Measure bore
weardown. Renew
Turbocharger- only if worn
dismantled, out.
clean, inspect and replace
Charge air cooler- Dismantle clean
wear /tear parts. Dynamic balancing airofand
thewater side
rotor assy.
with chemicals. Optional -clean with ultrasonic. Renew
CFW cooler - dismantled, clean, carry out pressure test
zinc anodes.
to 10% above working pressure. Renew zinc anodes.
Water Tank - drain and flush clean inside.
LO Cooler - Clean and pressur test to 10% above working
pressure. Renew zinc anodes.
FW Pump - dismanle and overhaul.

SW Pump - dismantle and overhaul.


Fuel Inhection Pump - Dismantle to workshop for
performance
Speed test- and
Governor overhaul.
Dismantle to workshop for servicing,
test and repair.
Carry out wear tear measumrents and submit report.
Clean, decarbonize and assemble all components as per
original.
Carry out performance test.
Test all the safety shutdown and alarms
Submit a completion report.

M4 Heat Exchangers
Dismantle to workshop.
Clean the tubes with mechanical brushing and chemical
Pressure test to 10 % above its working pressure for
shell & tube type.
Renew the zinc anodes.

Gearbox hydraulic Oil coolers


Main engine charge air coolers
Main engine FW coolers
Main engine Oil coolers
Aux Engine FW coolers
Aux Engine Oil coolers

M5 Steering Gear
Dismantle the ram to renew the seals.
Yard to source and supply the seals.
Yard to quote for chroming the hyd ram.
To check/service the angle transmitter.
Check/adjust the angle transmitter to sychronize with
bridge rudder indicator.

P PIPES & VALVES


P1 Deck Pipes
Crop and renew pipes
Fire hyrant pipe, Sch 80, Dia - 60A

P2 Service and repair valve


Fire hydrant Valve

P3 Isolation Valve

P4 ER Valves Service/Overhaul
Dismantle to workshop.
Repair and overhaul the valve
Clean/de-rust/paint
Must able to operate freely and close tight.
Grease/renew gasket /renew packings
Pressure test for ship side valve above its WP. For BKI
survey.
Install wih new GI bolts/nuts supply by yard
P5 ER Ship side valve/Overboard valve
Main Engine overboard valve
Aux Engine overboard valve
OBS Overboard Valve
GS /Bilge Overboard
Emcy Fire Pump Overboard
WC Overboard
Galley Drain Overboard

P6 ER Sea Chest -P & S


Main suction valve
After SC Strainer
Air Vent

P7 Pump SW Suction & Discharge Valves


GS /Fire Pump
Bilge /Ballast Pump
Emergency Fire Pump
Main Sw Cooling Pump
Aux Cooling SW Pump

P8 ER SW Pipes Renewal
Main engine sw cooling pipe. Sch 80, Dia - 75A
Aux Engine sw cooling pipe. Sch 80, Dia- 32A
Stern Tube sw cooling, Sch 80, Dia - 20A
Main SC Line, Sch 80, Dia - 250A
GS Pump sw line, Sch 80, Size - 75 A
Sw cooling line for propeller shaft bush. Sch 80, Size- 20
A
Gear Box sw cooling port and stbd ME
SW cooling pipe for Air Cooiler sw line

E ELECTRICALS

E1 Alternators Overhaul
Take mega readings before and after.
Mark before dismantle the cable terminations.
Carry insitu cleaning and overhaul.
Clean the stator and rotor windings with electric cleaner
Re-varnish and heat up.
Check the bearing housing for weardown
Renew all the bearings. Install with induction heater.
Check and realign the coupling.

Check and clean the control panel.

Re-connect back all the cable terminations.


Carry out performance test.
Optional to quote for housing repair.

E2 Main Switch Board servicing


Open the covers to clean inside by vacuum.
Check all the busbar connections are tight.
Clean and de-rust the connectors.
Check the earth fault connection is working
Optional- Fault finding/rectify MSW eart fault

E3 Circuit Breakers
Remove the circuit breakers to check/clean the contact
points.
Check/re-tighten the connectors.
Simulate check the overcurrent trip.

Meters Re-calibration
Remove the voltmeter for re-calibration
Remove the ammeter for re-calibration
Remove the frquency meter for re-calibration
Remove the KW meter for re-calibration.

E4 Overhaul electric motor


Un-couple the motor to workshop
Measure the ohms reading before and after repair
Dismantle the rotor assy.
Clean and re-varnish the windings
Heat up to cure the varnish
Renew the bearings. Install with induction heater.
Check the bearing housing for weardown.

Optional to quote for bearing casing repair.

Test run.

GS/Fire Pump Motor


Bilge/Ballast Motor
Windlass Hyraulic Pack Motor
ER Ventilation Fan Motor
Steering Gear Motor
FO Transfer Pump Motor
Dirty Oil Pump Motor
Galley Vent Fan

E5 Megger Readings
To carry out motor megger ohm readings and submit
report for BKI.
To carry out measurement with all terminations
disconnected.

N NEW INSTALLATIONS

N1
Fuel Oil Flowmeter for Main Engine
Supply/fabricate and install new pipes to install new
` flowmeter to main engine.
Flowmeter and quick closing valve supply by owner.
Supply globe valve for the flowmeter and bypass line
O OPERATION REQUIREMENT ITEMS
O1 Sigh Glass for FO Service tank
Supply and install new sigh glass

Fuel Oil Tank Vent Head flange bolts to secure from


O2
dismantling
To drill holes to the stud so that locking seal can be
installed. To prevent from dismantling by ship crew.
Y DOCKING JOB SPECIFICATIONS - 30 M TUG BOAT

X = Not Required

QUOTE
SPECIFICATION UNITREQ QTY UNIT
PRICE

Specifications

move 2
move 2

move 2
move 2

lsum 1
day 1
day 12

day 12

day 24
time 2
Estimated 400 kwhr/day kwhr 9,600
at 5 kg/cm2, min dia 3.5 inch hose day 12
time 2
day 12
day 24

Certificate issue by authority lsum 1


per tank/day day 8
per tank/day/set day 8

day 22
day -

Provide pump, hose and receptacle to dispose.


m3 2
m3 3
m3 0

Provide hose and connection supply m3 100


time 2

m3 0
time 0

m3 0
time 0

Provide hose with connection to supply time 0


day 0

hr 0
hr 10

hr x
day x
2.0 m x 2.0 x ht 3.0 m/stage m3 12
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 36
2.0 m x 2.0 x ht 3.0 m/stage m3 36
2.0 m x 2.0 x ht 3.0 m/stage m3 36

Specifications
Dia - 600mm , Width - 1000mm Nos 50

Dia - 600mm , Width - 1000mm Nos 50

L-140mm, Width-85mm, thickness- 10mm

L-140mm, Width-85mm, thickness- 10mm

W -140mm, Ht- 85mm , t - 14mm set 25


W -140mm, Ht- 85mm , t - 14mm set 50
Outer dia - xx, W- xx pc 0
Dia - 5/8" , L-1900mm/set set 110
Dia - 5/8" pc 130
pcs 40

170 m2 m2 170
225 m2 m2 225
170 m2 m2 170

Entire Hull m2 565


Undewrwater area m2 395
TBA m2 0.00

pc 4
Ls 1
Ls 1

Specifications

35% m2 138.00
65% m2 257.00

40% m2 68.00
60% m2 102.00

65% m2 771 m²
35% m2 414 m²

60% m2 204 m²
40% m2 136 m²

msoll, etc Ls 1
x

Specifications Unit x

Railko, OD-145 mm, ID-132 mm

Bronze unit 1
Bronze unit 1
4 pcs/set, Size : B mm x W mm x L mm ,
set 1
Yard supply

x
Dia- 2260 mm, P-1880 mm, 4 Blades, Mtl -
Unit
Cu, 805 kg, Keyed with locknut.
set 2
set 2
set 2
set 2

set 2
Quote standard repair set 2
Quote standard repair set 2
Quote Area = 30 % surface area set 2
set 2

Material - SS 316, Dia- 176.5 mm, LOA -


x
6805 mm
Dia- 300mm, L-200 mm, t-15 mm pc 2
pc x
Hydraulic Coupling sleeve x

BIC, Rubber bearing ID 7" x OD 9 5/8 " x L


28" (Flange OD - 400mm, t-31.76 mm, PCD pc 2
295 mm, 17mm dia holes x 8 holes)
BIC, Rubber bearing flanged - ID 7" x OD 9
5/8 " x L 14" (Flange OD -400 mm, t-31.76
pc x
mm, PCD 295 mm , 17mm dia holes x 8
holes)
set x
set x
dia-7/8 inch, 3500 mm( aft), dia 7/8 inch x
pc 2
3000 mm
Stanless steel 100mm x 50mm x 20mm ,
pc 8
yard supply

2
2
2
2
L-700 mm x W- 320 mm pc 2
pc 2
pc 2
pc 2
pc 2
pc 2

pc 54

AB 75 mm x 75 mm x t 8 mm, L -180 mm pc 108


2 pc/set pc 108

Specifications Lsum 1
2 Chain Length /each, 2 sets

x
Owner supply lth
Owner supply pc

Lsum 1
set 2
set 2
set 2

Lsum 1

Allow for I m3

Owner supply paint.


pc 2
W50 x L1500x thk 10 mm pc 2
Material brass, M6 x L30 mm sets 60
W60 x L 1800 mm pc 2

pc 2

L/sum x

Yard supply steel material

Yard supply
tk 3.0 mm
M12 x 50 mm- qty 4 pc/set, M8 x 25-Qty 8 pc/set

Dia - 65 mm 2
Dia - 65 mm 8
Dia - 50 mm 1
Dia - 40 mm 2
Dia- 50 mm 4
Dia - 65 mm 2
Dia - 65 mm 1
Dia - 50 mm 1
Dia - 50 mm 1

Supply by yard : ø 900 x 2000mm

OD-6", L-550mm pc 2
OD-3", L-450mm pc 2

2 pc/shaft
FB 20 mm x 6 mm, 2pc/set
28 mmx 12.7 thickness, 2pc/set
Inside the casing and outside

Hison, Dia 22 inch axial flow x 2 HPx 2800


set 2
rpm , 14690 m3/hr, 10 mmWG
set 1
set 1

no 2
Specifications

kg 500
kg 200
kg 200

lth 100
lth 100
lth 100

AB Size x Length pc 2
MS plate L x B x t pc 2

Sch 40, Dia 1" x 5 mtr, pipe Dia 1/2" x 3 mtr lth 1
MS 500L x W300 x t8 mm pc 4

L75mm x 75mm x 7mm , L- 3 mtr Unit 2


L75mm x 75mm x 7mm , L- 3 mtr Unit 2

Dia 2" x L- 1 mtr, flange 2" pc 6

20

MS -748 mmx 598 mm x 9.5 mm pc 4


RB 16 mm x L100 mm. pc 8
M20 x 60 L -SS, 24 nos/cover set 4

m2 x
m2 x

square bar 19 mm x L 150 mm pc 4

set 1
API Sch 80, 200A, H-1550 mm

l/sum

Specifications
Total capacity FW- 84 m3
Total capacity BW- 75 m3

`
M3 Unit 1
M3 Unit 2
M3 Unit 2
M3 Unit 1

Total Ca[acity - 225 m3


M3 Unit 2
M3 Unit 1
M3 Unit 2
M3 Unit 2
M3 Unit 2
M3 Unit 1

Estimated floor area = 6.0 mtr x 9.0 mtr


Lsum 1
Bilges water m3 m3 15

Specifications

8 locks/door, Qty-2 pc 16
4 lock/door, Qty- 2 pc 8
4 locks/cover, Qty-1 pc 4
4 locks/cover, Qty-1 pc 4
8 locks/door, Qty-1 pc 8
8 locks/door, Qty-2 pc 16

x
Size -xx, L-xx, Elbows-xx

Change new closet pc 1


m2
x
pc
pc

set 5
2.0 Kw/set

cable size-xx, L-xx


cable size-xx, L-xx

75 mm x 75 mm x t-7 mm, L- 2.0 mtr pc 6


L-150 mm x B-100 mm x t-8mm pc 6

l/sum

Specifications

Mitsubishi, 6SR-T2MPTK, 1406 RPM, 593 KW,


sets 2
Bore-170 mm, Stroke- 220 mm, 6 Units
sets 2
Mitxubishi, S4K-T, 1500 RPM, 59 KW sets 2
set 2
set 2
set 2
set 2
set 2
set 2

2 rams/set set 4
pc 8
pc 4

Specifications

LOA-10000mm, Flg-2.5", Elbows-2.5",


Lsum 1
branch-2.5"

5K 40A pc 4

10K 50A, Screw Down Bronze 1


10K 75 A, S.D.N.R pc 2
10K 32A, S.D.N.R pc 2
10K 20A, S.D.N.R pc 1
10K 65A, S.D.N.R pc 2
10K 65A, S.D.N.R pc 1
5K 80A, Angle Storm Valve pc 2
5K 65A, Angle Storm Valve pc 1

10K 250 A, Screw down pc 2


10K 250 A, Screw down pc 2
10K 40A pc 2

Globe v/v 10K - 50 pc 2


Globe v/v 10K - 50 pc 2
Globe v/v 10K - 50 pc 1
Gate v/v 5K - 65, Globe v/v 5K - 80 pc 2
Gate v/v 5K - 40, Globe v/v 5K - 40 pc 2

L-5000mm, Flg-3", Elbow-3", Branch-3" set 2


L-5000mm, Flg-1, Elbow-2, Branch-2 x dia 1"
set 2
x L20 cm
L-2000mm, Flg-3/4", Elbow-3/4", Branch-3/4" set 2
L-xx, Flg-xx, Elbow-xx, Branch-xx
L-3000mm, Flg-3", Elbow-3", Branch-3" set 1
L-2500mm, Flg-3/4", Elbow-3/4", Branch-3/4" set 2
L-3300mm, Flg-1", Elbow-1" set 2
L-300mm, Flg-2", Elbow-2" set 2

Specifications
Self excitation, 50 KVA, 415 VAC, 50 Hz , 3 Ph unit 2
415 VAC, 3 Ph, 50 Hz unit 1

bus bar 75 mmx 7 mm

100 A MCCB set 2

unit 1
pc 2
pc 2
pc 2
pc 2

AC Induction , 415 VAC, 3Ph, 50 Hz.


4.0 kw pc 1
4.0 kw pc 1
5.5 kw pc 1
4 kw pc 2
2.2 kw pc 1
0.75 kw pc 1
Na pc 0
0.37 kw pc 1

pc 10

Specifications

Sch 40, 40A, L-xx -


-
Service Quick closing valve 5k40 pc 4
3 SD glove valves -
Specifications
Dia 1/2 inch , Length- 2 mtr Lsum 1

M12 x 50 mm- 4 pcs per set, 9 sets pc 36


Locking seal is supply by Owner.