G GENERAL SERVICE
G1 Tugs
Berthing/unberthing, move
Dock/undock, move
G2 Mooring/Un mooring
Berth/un-berth
Dock/undock
G3 Dry Dock
Block Preparation
Ist Dock day
Subsequent dock day
G4 Berth /Alongside
Wharf Days
G5 Shore Power
Supply - 380V, 3 PH, 50 Hz, 50-60 Amps
Connect/disconnect
kwhr
G6 Fire Protection
Fire line with pressure
Connect/disconnect
Fire Safety Watch,day
Security Watch, day
G8 Garbage/sewage disposal
Garbage Disposal,day
Sewage Collection in dock, day
G10 Supplies
Fresh water
Connect/disconnect
Potable water
Connect/disconnect
Ballast water
Connect/disconnect
H HULL - PREPARATION
H1 Tyre Fenders
To remove/install tyre fenders
To install tyre fenders with new chain and shackles with
owner supply
P HULL - PAINTING
P1 Grit/Sand Blasting
Under water area, Flat Bottom + Vertical Side = 395 m2
Above water, Top side only = 170 m2
U2 Rudder stock
Measure rudder stock lower bush for weardown
Measure rudder stock upper bush for weardown
U5 Propeller Repairs
Cut/Grind/round off the blade edge
Bent/curve back blade to original shape
Build-up/grind smooth cavitation holes
Carry out static balancing
U6 Tailshaft Survey
U7 Tailshaft Repairs
Pull out aft bush and renew with owner supply
Pull out fwd bush and renew with owner supply
Machining of bush to size and fit.
Build-up/machine down pitted areas
Carry out crack detection
U8 Sea Chest Gratings
Remove/refit sea chest gratings
Scrape clean and HP wash
To be painted as hull standard
To replace zinc anodes
Secure grating by SS bolts/nuts/locking wires
D3 Chain Locker
Open /close manhole cover with new gasket
Clean and remove mud
HP water wash to clean
Touch up and spot repairs 1.50 mtr height, 2 TU coats
Test, check and repair the bilge pumping system
Check chain is properly secure in bitter end
D4 Fwd Anchor Windlass
Remove/refit brake lining.
Renew brake lining in workshop with yard supply.
Renew all the brake lining studs/nuts
The brake band to clean from rust and scales
The brake band to roughen with emery cloth for better
grip
FW Ballast
Fuel Oil Tank
FO Service Tank
Sea Chest
Coffer dam
Fresh Water Tank
Fore Peak FW BWT
Dirty Oil Tank
L.O.S.T
D8 Mooring Bits
Supply/fabricate/weld new mooring bit
D9 Roller Fairlaids
Supply/fabricate/weld new fairlaid
Main Engine
Aux engine
ER Ventilation Fan
S1 Bulwark
Bulward steel plates
Bulwark Side stifferner plate
Bulwark Top side plate
S3 Platform stand
Platform stand for Windlass
S4 Staircase
Staircase hand rail
Stair case steps
S7 Sounding Plug/Pipe
To crop/renew sounding pipe
S8 Manhole covers
To supply/fabricate covers with handles and jack screws
M20 threads.
Handles, 2 pc per cover
To repair and renew studs/nuts- Material GI
T TANKS CLEANING
T3 ER Bilges Cleaning
Provide pump to pump out and dispose the bilge water
High pressure hose down to wash down oil stains.
Dispose the slugde at bottom.
Clean the tank top
A ACCOMMODATION
A1 Watertight Dooors/Hatchways
To dismantle/fit back
To repairand free up.
Grease before installation.
ER Entrance door
Steering Gear Compartment
Crew Emergency Escape Hatch
ER Crew Emergency Escape Hatch
Deckhouse Entance
Wheel house Entrance
A2 Plumbing Works
Pipe size, GI pipe
A3 Cabins/Toilets
Remove and install new washbasin
Remove floor tiles and put new tiles
A4 Pantry/Kitchen
Repair wash basin
Repair /renew water faucets
A6 Lights/Power Points
Pull and install new cable light points
Pull and install new cable for power points
Gears - Check all the gears teeth for crack with NDT
Hydraulic Pump- Dismantle and overhaul
M3 Aux Engine
All spares parts are to be provided by owner
Yard to supply all the consumables.
M4 Heat Exchangers
Dismantle to workshop.
Clean the tubes with mechanical brushing and chemical
Pressure test to 10 % above its working pressure for
shell & tube type.
Renew the zinc anodes.
M5 Steering Gear
Dismantle the ram to renew the seals.
Yard to source and supply the seals.
Yard to quote for chroming the hyd ram.
To check/service the angle transmitter.
Check/adjust the angle transmitter to sychronize with
bridge rudder indicator.
P3 Isolation Valve
P4 ER Valves Service/Overhaul
Dismantle to workshop.
Repair and overhaul the valve
Clean/de-rust/paint
Must able to operate freely and close tight.
Grease/renew gasket /renew packings
Pressure test for ship side valve above its WP. For BKI
survey.
Install wih new GI bolts/nuts supply by yard
P5 ER Ship side valve/Overboard valve
Main Engine overboard valve
Aux Engine overboard valve
OBS Overboard Valve
GS /Bilge Overboard
Emcy Fire Pump Overboard
WC Overboard
Galley Drain Overboard
P8 ER SW Pipes Renewal
Main engine sw cooling pipe. Sch 80, Dia - 75A
Aux Engine sw cooling pipe. Sch 80, Dia- 32A
Stern Tube sw cooling, Sch 80, Dia - 20A
Main SC Line, Sch 80, Dia - 250A
GS Pump sw line, Sch 80, Size - 75 A
Sw cooling line for propeller shaft bush. Sch 80, Size- 20
A
Gear Box sw cooling port and stbd ME
SW cooling pipe for Air Cooiler sw line
E ELECTRICALS
E1 Alternators Overhaul
Take mega readings before and after.
Mark before dismantle the cable terminations.
Carry insitu cleaning and overhaul.
Clean the stator and rotor windings with electric cleaner
Re-varnish and heat up.
Check the bearing housing for weardown
Renew all the bearings. Install with induction heater.
Check and realign the coupling.
E3 Circuit Breakers
Remove the circuit breakers to check/clean the contact
points.
Check/re-tighten the connectors.
Simulate check the overcurrent trip.
Meters Re-calibration
Remove the voltmeter for re-calibration
Remove the ammeter for re-calibration
Remove the frquency meter for re-calibration
Remove the KW meter for re-calibration.
Test run.
E5 Megger Readings
To carry out motor megger ohm readings and submit
report for BKI.
To carry out measurement with all terminations
disconnected.
N NEW INSTALLATIONS
N1
Fuel Oil Flowmeter for Main Engine
Supply/fabricate and install new pipes to install new
` flowmeter to main engine.
Flowmeter and quick closing valve supply by owner.
Supply globe valve for the flowmeter and bypass line
O OPERATION REQUIREMENT ITEMS
O1 Sigh Glass for FO Service tank
Supply and install new sigh glass
X = Not Required
QUOTE
SPECIFICATION UNITREQ QTY UNIT
PRICE
Specifications
move 2
move 2
move 2
move 2
lsum 1
day 1
day 12
day 12
day 24
time 2
Estimated 400 kwhr/day kwhr 9,600
at 5 kg/cm2, min dia 3.5 inch hose day 12
time 2
day 12
day 24
day 22
day -
m3 0
time 0
m3 0
time 0
hr 0
hr 10
hr x
day x
2.0 m x 2.0 x ht 3.0 m/stage m3 12
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 24
2.0 m x 2.0 x ht 3.0 m/stage m3 36
2.0 m x 2.0 x ht 3.0 m/stage m3 36
2.0 m x 2.0 x ht 3.0 m/stage m3 36
Specifications
Dia - 600mm , Width - 1000mm Nos 50
170 m2 m2 170
225 m2 m2 225
170 m2 m2 170
pc 4
Ls 1
Ls 1
Specifications
35% m2 138.00
65% m2 257.00
40% m2 68.00
60% m2 102.00
65% m2 771 m²
35% m2 414 m²
60% m2 204 m²
40% m2 136 m²
msoll, etc Ls 1
x
Specifications Unit x
Bronze unit 1
Bronze unit 1
4 pcs/set, Size : B mm x W mm x L mm ,
set 1
Yard supply
x
Dia- 2260 mm, P-1880 mm, 4 Blades, Mtl -
Unit
Cu, 805 kg, Keyed with locknut.
set 2
set 2
set 2
set 2
set 2
Quote standard repair set 2
Quote standard repair set 2
Quote Area = 30 % surface area set 2
set 2
2
2
2
2
L-700 mm x W- 320 mm pc 2
pc 2
pc 2
pc 2
pc 2
pc 2
pc 54
Specifications Lsum 1
2 Chain Length /each, 2 sets
x
Owner supply lth
Owner supply pc
Lsum 1
set 2
set 2
set 2
Lsum 1
Allow for I m3
pc 2
L/sum x
Yard supply
tk 3.0 mm
M12 x 50 mm- qty 4 pc/set, M8 x 25-Qty 8 pc/set
Dia - 65 mm 2
Dia - 65 mm 8
Dia - 50 mm 1
Dia - 40 mm 2
Dia- 50 mm 4
Dia - 65 mm 2
Dia - 65 mm 1
Dia - 50 mm 1
Dia - 50 mm 1
OD-6", L-550mm pc 2
OD-3", L-450mm pc 2
2 pc/shaft
FB 20 mm x 6 mm, 2pc/set
28 mmx 12.7 thickness, 2pc/set
Inside the casing and outside
no 2
Specifications
kg 500
kg 200
kg 200
lth 100
lth 100
lth 100
AB Size x Length pc 2
MS plate L x B x t pc 2
Sch 40, Dia 1" x 5 mtr, pipe Dia 1/2" x 3 mtr lth 1
MS 500L x W300 x t8 mm pc 4
20
m2 x
m2 x
set 1
API Sch 80, 200A, H-1550 mm
l/sum
Specifications
Total capacity FW- 84 m3
Total capacity BW- 75 m3
`
M3 Unit 1
M3 Unit 2
M3 Unit 2
M3 Unit 1
Specifications
8 locks/door, Qty-2 pc 16
4 lock/door, Qty- 2 pc 8
4 locks/cover, Qty-1 pc 4
4 locks/cover, Qty-1 pc 4
8 locks/door, Qty-1 pc 8
8 locks/door, Qty-2 pc 16
x
Size -xx, L-xx, Elbows-xx
set 5
2.0 Kw/set
l/sum
Specifications
2 rams/set set 4
pc 8
pc 4
Specifications
5K 40A pc 4
Specifications
Self excitation, 50 KVA, 415 VAC, 50 Hz , 3 Ph unit 2
415 VAC, 3 Ph, 50 Hz unit 1
unit 1
pc 2
pc 2
pc 2
pc 2
pc 10