Nozzle load data shall be as per Allowable Piping load data, It is shown 375 Kgf. Kindly Check.

All baffle shall


be extended as
per baffle cut

Nozzle load data shall


be as per Allowable
Piping load data, It is
shown 375 Kgf. Kindly
Check.
Nozzle load data shall
be as per Allowable
Piping load data, It is
shown 253 Kgf. Kindly
Check.

2 18.03.2020 RE-ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK


1 05.02.2020 RE-ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK
0 29.04.2019 ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK

REV DATE DESCRIPTION PREP CHKD APPD. *