The document requests that nozzle load data be checked according to allowable piping load data, which shows a load of 375 kgf. It also notes that all baffles should be extended as per baffle cut specifications.
The document requests that nozzle load data be checked according to allowable piping load data, which shows a load of 375 kgf. It also notes that all baffles should be extended as per baffle cut specifications.
The document requests that nozzle load data be checked according to allowable piping load data, which shows a load of 375 kgf. It also notes that all baffles should be extended as per baffle cut specifications.
Nozzle load data shall be as per Allowable Piping load data, It is shown 375 Kgf. Kindly Check.
All baffle shall
be extended as per baffle cut
Nozzle load data shall
be as per Allowable Piping load data, It is shown 375 Kgf. Kindly Check. Nozzle load data shall be as per Allowable Piping load data, It is shown 253 Kgf. Kindly Check.
2 18.03.2020 RE-ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK
1 05.02.2020 RE-ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK 0 29.04.2019 ISSUED FOR APPROVAL & FABRICATION ASR KAK KAK
REV DATE DESCRIPTION PREP CHKD APPD. *
EPC CONSTRUCTIONS INDIA LIMITED
(FORMERLY KNOWN AS ESSAR PROJECTS (INDIA) LIMITED ) ENGINEERING & PROJECT MANAGEMENT DIVISION