Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project: ETAP Page: 1

Location: 16.0.0C Date: 18-05-2020

Contract: SN: 4359168

Engineer: Revision: Base


Study Case: SM
Filename: jonathan Config.: Normal

Sequence-of-Operation Event Summary Report

Symmetrical 3-Phase Fault at Bus36.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


13.3 CB59 2.542 1,0 13,3

23.2 CB71 2.181 1,0 23,2

40.1 CB1 2.050 1,0 40,1

13182 CB60 0.193 7879 13182

16748 CB58 0.089 9704 16748

66062 CB55 0.036 34691 66062

71133 CB74 0.138 37192 71133

1933733 CB69 0.138 202163 1933733

10178320 CB54 0.022 225776 >10178320

10178320 CB56 0.020 389842 >10178320

You might also like