Professional Documents
Culture Documents
Cyclone Cones and Bracing Bar Replacement Works
Cyclone Cones and Bracing Bar Replacement Works
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
FA L KO R E N G I N E E R I N G S E R V I C E S P T E LT D
TA N A H T E M A S I K S D N B H D
GUSTEAM CORP SDN BHD
D M C M I D D L E C O . , LT D
TECHNICAL PROPOSAL
BSRTA4-MS02
REV NO DATE PREPARED BY: REVIEWED BY: APPROVED BY: REMARKS/ STATUS
02
03
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 1/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Table of Contents
1. Purpose.......................................................................................................................... 3
2. Scope............................................................................................................................. 3
3. Location......................................................................................................................... 3
4. Competent Person.........................................................................................................3
5. Permit To Work.............................................................................................................3
6. Material, Machineries, Equipment...............................................................................3
7. WORK PROCEDURE........................................................................................................3
7.1. Pre-shutdown works.....................................................................................................3
7.2. Shutdown Works...........................................................................................................4
8. Final acceptance for the work.....................................................................................10
8.1. Final inspection............................................................................................................ 10
8.2. Completion:.................................................................................................................11
9. Emergency And Rescue Operation..............................................................................11
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 2/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
1. Purpose
This method statement explains the safe work method of replacing the Cyclone dust cones and
bracing bars of 2nd Regenerator.
2. Scope
The scope of this method statement is applicable to 2nd Regenerator internal works.
3. Location
Binh son Refinery - Vietnam
4. Competent Person
A person who has such practical and theoretical knowledge and actual experience of the
respective operation he is assigned to. If applicable he shall have obtained the approval from
the government bodies or certification as a certified and approved person.
5. Permit To Work
A written or printed document from the owner to allow the person to perform the mention
work.
7. WORK PROCEDURE
7.1. Pre-shutdown works
Prepare custom made size of scaffolding for Regenerator 2 internal scaffolding to replace
cyclone dust cone and bracing brackets.
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 3/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Prepare air conditioning facilities for speed up cooling for Regenerator 2 for man entry
during shutdown.
Plan View
Side View
Fig 1: Internal
scaffold
requirement in
Regenerator 2
Remove the lining, and thereafter remove the diplegs brace around the lugs at
shell, as shown below.
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 4/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D Plan View
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Fig 3 : Diplegs
to be
remove
d in
Regene
rator 2
Fig 2: Internal
removal in
Regenerator 2
Remove the 4 vertical diplegs, as shown below for one of the fours
Fig 3: Diplegs to
be removed in
Regenerator 2
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 5/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Method 2 – By Gouging
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 6/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Prior to welding back new cones, hack the refractory as per figure 5.
Weld back the new cones as per figure 6.
Erect internal scaffold inside cyclone.
Weld hex mesh and reinstate refractory.
Reinstate diplegs as per figure 7.
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 7/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Fig 6:
Fig 7:
Installing
Reinstate
new dust
diplegs
cones on the
cyclones
Plan View
Side View
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 8/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Fig 9: Welding
bracing lugs details
Install refractory on those welded lugs, and the cone area, as per figure 11.
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 9/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
NOTE: Refractory lining repair shall be covered under refractory method statement.
When Cyclone dust cone and bracing bar installed, properly completed in full compliance
with all applicable procedures, Site Supervisor shall arrange for final inspection with
present of all related BSR disciplines and third parties (where applicable).
8.2. Completion:
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 10/ 11
TECHNICAL PROPOSAL
F A L K O R E N G I N E E R I N G S E R V I C E S P T E L T D
T A N A H T E M A S I K S D N B H D
G U S T E A M C O R P S D N B H D
D M C M I D D L E C O . , L T D
Upon arrival of emergency assistance, explain the current emergency situation and cause of
emergency.
REV NUMBER:BSRTA4-MS02-
Technical Proposal
01
BSRTA4-MS02 Cyclone cones and bracing bar replacement works
BSR 4TH PACKAGE 1
Page 11/ 11
TECHNICAL PROPOSAL