Abhishek Chauhan provided a daily report summarizing his work for the date. The report included 6 items describing updates received from the contractor representative about the current situation at the construction site, including dewatering of tunnels, materials stock, food availability, staff movement restrictions, panic levels, and tunnel inspections. The report was approved by the line manager.
Abhishek Chauhan provided a daily report summarizing his work for the date. The report included 6 items describing updates received from the contractor representative about the current situation at the construction site, including dewatering of tunnels, materials stock, food availability, staff movement restrictions, panic levels, and tunnel inspections. The report was approved by the line manager.
Abhishek Chauhan provided a daily report summarizing his work for the date. The report included 6 items describing updates received from the contractor representative about the current situation at the construction site, including dewatering of tunnels, materials stock, food availability, staff movement restrictions, panic levels, and tunnel inspections. The report was approved by the line manager.
NO. Following are the updates I am taking on regular basis from Contractor representative about current situation at site 1 Dewatering is going on inside the Yes tunnel 2 Discussing stock of materials on Yes site to start of work after lockdown 3 Aviliability of food materials at Yes 9 to 9:30 am labour and staff camp 4 Movement of staff and labours No movement given by contractor outside the allowed camp 5 Is there any panic situation No between staff and workers 6 Regularly one person from Yes contractor side going to site for visual inspection of tunnels