MCGM-137/MALWANI-
Rev. : R1 FOB/SUP/13702
Temperature Analysis

Temperature Analysis

Calculation of stresses due to temperature gradient- Mid Span

Average thickness of deck slab = 250.00 mm


Coeifficient of thermal expansion a = 12.00 x 10-6
Modulus of Elasticity = 200000 Mpa

Temperautre Rise
1
19.25 0.17
2
0.250
0.15
4 0.012
0.30
0.50

0.012

3
0
0.576
0.00

0
4
0 0.30
0.012
0

Temperature Gradient Equivalent Girder Dimension in (m)

Zone b d A (m2) y (m) Ay (m3) Ay2 (m4) t(c) At Aty


1 0.167 0.15 0.025 0.075 0.002 0.0001 11.63 0.291 0.022
0.167 0.100 0.017 0.200 0.003 0.001 3.60 0.060 0.012
2 0.300 0.012 0.004 0.256 0.001 0.000 3.15 0.011 0.003
0.012 0.388 0.005 0.456 0.002 0.0010 1.55 0.007 0.003
0.012 0.00 0.000 0.650 0.000 0.000 0 0 0
3 0.012 0.19 0.002 0.744 0.002 0.001 0.00 0.000 0.000
4 0.300 0.012 0.004 0.844 0.003 0.003 0 0.000 0.000
Summation S 0.056 0.013 0.006 0.369 0.040

Simultaneous equation

e0 S A - q S Ay = a S At ----------- Equn 1
e0S Ay - q S Ay2 = a S Ayt ----------- Equn 2

0.056 e0 - 0.01 q = 12.00 x 10-6 x 0.369


0.013 e0 - 0.006 q = 12.00 x 10 -6
x 0.040

By Solving we get,
0.056 e0 - 0.01 q = 4.43 x 10-6
0.056 e0 - 0.025 q = 2.06 x 10-6
TPF ENGINEERING PVT. LTD.
4th Floor, Pudhari Bhavan, Sector - 30A, Near Sanpada Rly. Stn., Vashi, Navi Mumbai – 400 705, INDIA.
Tel.: +91 987-060-2416/24 Fax: +91 22 4127 3306 Web: www.tpfepl.com www.tpf.eu
Name of work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI, Design Note No.:
Date: 5/27/2020 MALAD (W) IN P/N WARD, MUMBAI
MCGM-137/MALWANI-
Rev. : R1 FOB/SUP/13702
Temperature Analysis

0.000 e0 - 0.012 q = 2.37 x 10-6

q = 1.96E-04 rad/m
e0 = 0.000125

Stresses at various section Sign Convention +ve = Tension


-ve = Compression
y y.q t at fci = Es (e0 -yq - at) Remark
0 0 19.25 2.31E-04 -21.20 Compression
0.250 4.90E-05 3.02 3.63E-05 7.94 Tension
0.85 1.67E-04 0 0.00E+00 -8.31 Compression

Temperautre Fall

5.6
1 0.17

2 0.250
0.15
0 0.012
0.30
0.10

0.012
0.40
8
3
0.576

0.200

4 0.30
0.012
8
Temperature Gradient Equivalent Girder Dimension in (m)

Zone b d A (m2) y (m) Ay (m3) Ay2 (m4) t(c) At Aty


1 0.167 0.15 0.025 0.075 0.002 0.0001 -2.80 -0.070 -0.005
0.167 0.100 0.017 0.200 0.003 0.0007 0.00 0.000 0.000
2 0.300 0.012 0.004 0.256 0.001 0.0002 -0.12 0.000 0.000
0.012 0.388 0.005 0.456 0.002 0.0010 -4.12 -0.0192 -0.0087
0.012 0.19 0.002 0.744 0.002 0.0012 -8.00 -0.018 -0.013
3 0.012 0.000 0.000 0.838 0.000 0.0000 -8.00 0.000 0.000
0.012 0.000 0.000 0.838 0.000 0.0000 -8.00 0.000 0.000
4 0.300 0.012 0.004 0.844 0.003 0.0026 -8.00 -0.029 -0.024
Summation S 0.056 0.013 0.006 -0.136 -0.052

Simultaneous equation

e0S A - q S Ay = a S At ----------- Equn 1

e0S Ay - q S Ay2 = a S Ayt ----------- Equn 2


TPF ENGINEERING PVT. LTD.
4th Floor, Pudhari Bhavan, Sector - 30A, Near Sanpada Rly. Stn., Vashi, Navi Mumbai – 400 705, INDIA.
Tel.: +91 987-060-2416/24 Fax: +91 22 4127 3306 Web: www.tpfepl.com www.tpf.eu
Name of work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI, Design Note No.:
Date: 5/27/2020 MALAD (W) IN P/N WARD, MUMBAI
MCGM-137/MALWANI-
Rev. : R1 FOB/SUP/13702
Temperature Analysis

0.056 e0 - 0.01 q = 12.00 x 10-6 -x 0.136

0.013 e0 - 0.006 q = 12.00 x 10-6 -x 0.052

By Solving we get,
0.056 e0 - 0.01 q = -1.64 x 10-6
0.056 e0 - 0.025 q = -2.68 x 10-6
0.000 e0 - 0.012 q = 1.04 x 10-6

q = 8.59E-05 rad/m
e0 = -9.38E-06

Stresses at various section

Sign Convention +ve = Tension


-ve = Compression
y y.q t at fci = Es (e0 -yq- at) Remark
0 0 -5.6 -6.72E-05 11.56 Tension
0.250 2.15E-05 0 0.00E+00 -6.17 Compression
0.85 7.30E-05 -8 -9.60E-05 2.72 Tension

Summary of temperature stresses at various location

Temperature Rise Temperature Fall

s top
sGirder top sbottom s top sGirder top sbottom
-21.20 7.94 -8.31 11.56 -6.17 2.72

Summary of stresses
DL+SIDL+LL+Temp Rise
At top of slab 24.04 + -21.20 = 2.84 Mpa
At top of girder 44.77 + 7.94 = 52.71 Mpa
At bottom of girder 44.77 + -8.31 = 36.46 Mpa

DL+SIDL+LL+Temp fall
At top of slab 24.04 + 11.56 = 35.60 Mpa
At top of girder 44.77 + -6.17 = 38.60 Mpa
At bottom of girder 44.77 + 2.72 = 47.49 Mpa
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 INDEX

INDEX

1.0 Introduction

2.0 Material

3.0 Load Calculations

4.0 Design of section at Mid span

5.0 Design of section at x = 3.0m

6.0 Design of section at support section

7.0 Design of Intermediate Stiffener

8.0 Design of Shear connector

Annexure 1 STAAD File

Annexure 2 Calculation of Mfd

Annexure 3 Calculation of Lateral torsion buckling in construction stages

Page 17
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note

Job : Cable stay bridge, Kamla Park Prepared by AMT Note No: 475 /E/Dn-7
Checked by NVM Revision: R0
Title : Design of Cross Girder
Date 27-May

10.0 FORCES IN MAIN & CROSS GIRDER Location - at face of pylon P1

ULS SLS CASE - Main Girder P VL VT Mtors M-Trans M-Long


1.35 1.00 DL+SF 1228.90 118.73 -23.66 87.98 2973.98 -1437.04
1.50 1.00 SIDL 2190.60 -98.69 -492.29 10.07 -5575.52 1884.58
0.00 0.38 C+S 5452.70 -133.84 -229.35 -4.39 -6220.08 4033.47
1.50 1.00 FOOTH PATH 347.10 -16.03 -85.80 1.76 -885.50 298.52
0.45 0.50 TEMP 488.00 21.17 -2.71 0.54 -1317.97 442.55
0.90 1.00 WIND 449.90 -58.08 130.03 2.52 -1396.18 -251.92
1.35 0.90 Live Load 1702.90 -76.17 -335.36 7.12 -4715.90 1624.67
One cable snap condition DL+SF+SIDL 3392.50 135.98 -1205.47 -118.38 -6081.37 -1400.02

ULS SLS CASE - Cross Girder P VL VT Mtors M-Trans M-Long


1.35 1.00 DL+SF -47.00 58.25 -0.76 0.78 773.27 -31.03
1.50 1.00 SIDL -26.30 28.34 -7.50 0.71 283.02 69.11
1.50 1.00 Live Load 30.80 3.77 -111.57 9.18 1134.11 -296.90

CASE - Main Girder P VL VT Mtors M-Trans M-Long


1.0 DL+1.0SDL+CS+1.0(LF,PED,LL) 7371.24 -115.40 -990.73 104.55 -10094.98 3740.98
SLS
1.0 DL+1.0SDL+CS+1.0(LF,PED,LL) + W 7821.14 -173.48 -860.70 107.07 -11491.16 3489.06

1.35 DL+1.75 SIDL+ 0.45T +1.35 LL 7984.08 -105.10 -1353.03 146.37 -12636.21 3727.10
ULS
1.35 DL+1.75 SIDL+ 0.9w +1.04 LL 7481.83 -135.91 -1091.36 145.38 -11430.43 2660.26

CASE - Cross Girder P VL VT Mtors M-Trans M-Long


SLS 1.0 DL+1.0SDL+CS+1.0(LF,PED,LL) -42.50 90.36 -119.83 10.67 2190.40 -258.82
ULS 1.35 DL+1.75 SIDL+ 1.35 LL -56.70 126.80 -179.63 15.89 3169.61 -383.58
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note

Job : Cable stay bridge, Kamla Park Prepared by AMT Note No: 475 /E/Dn-7
Checked by NVM Revision: R0
Title : Design of Cross Girder
Date 27-May
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI
MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 Design of Typical Cross Girder

Introduction

This report pertains to design of Typical cross girder.

Cross girder is analyzed as simply supported beam spanning between main girder. Moment is
released at each end of cross girder. Cross girder is supported by main girder through framed
connection at web of girders. Connection is designed for transfer of end reaction from cross
girder.

Material

Grade of Concrete Deck slab = M 40


Grade of structural steel (Fe 410) Fy = 250 N/mm2

Modulus of elasticity of concrete = 31623 N/mm2


Modulus of elasticity of steel = 2.0E+05 N/mm2

For Bolt of grade 6.8: Fub = 600 N/mm2

Load Calculations

Forces on Cross Girder

Geometry Input
Clear Span L = 13.00 m

Width (m) b = 2.000 m


Overall Depth of Slab (m) D = 0.000 m
Thickness of wearing coat (m) = 0.17 m

Density of concrete (kN/m3 ) g = 25 kN/m3


Density of Wearing coat (kN/m 3 ) g = 22 kN/m3
SIDL 8 kN/m2

Dead load due to Girder = 1.1 kN/m


Dead load due to slab = 8.5 kN/m
Load due to SIDL = 16.00 kN/m
Dead load of Girder, Slab & SIDL = 26.5 kN/m
Impect factor due to Live load = 1.47 (9+(13.5+5.5))
Lane reduction factor (for 3 lane) = 1.0
Max. Shear force due to Live load with impact = 400*1.47*1
= 588.0 kN
Max. Bending moment due to Live load with impact = 1380*1.47*1
= 1825.7 kNm

Summary of forces
X= 3 X=4.5 X=3
Load Type BM (kN) SF (kN) BM (kN) SF (kN) BM (kN) SF (kN)
Girder +Deck slab 189.7 10.0 405.0 36.0 324.0 72.0
SIDL 369.7 5.0 146.8 13.1 117.5 26.1
Live Load (Impect) 1825.7 111.7 647.5 133.1 481.1 162.8
SLS 2385.1 126.7 1199.3 182.2 922.6 260.9
ULS 3493.8 187.8 1716.1 265.9 1317.7 376.6

X= 1.5 X=0
Load Type BM (kN) SF (kN) BM (kN) SF (kN)
Girder +Deck slab 189.0 108.0 0.0 58.4
SIDL 68.5 39.2 0.0 113.8
Live Load (Impect) 285.1 174.6 0.0 588.0
SLS 542.6 321.8 0.0 760.1
ULS 775.3 460.7 0.0 1114.4

Construction stage
Bm due to slab = 189.7 kNm
BM due to constuction load 3.6 kN/m2 = 152.1 kNm
408.2 kNm
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Design of section at Mid span X= 2.75 m


E = 200000 N/mm2
Yield stress in steel = 250 N/mm2
Grade of concrete = 40 N/mm2

With modular ratio m = 7.5 for short term load


Section Properties (x = 2.75)

2500 Effective width of flange (IRC 22 2008)


y beff = L/4 < B
Transformed Steel = 12/ 4
250mm 333 = 3 m <3 m
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
600 576 x 12mm thk web plate 3

300mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
300
y
Depth of the Girder = 600mm
Overall depth of the section = 850mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.300 0.012 0.00360 0.006 2.16E-05 1.30E-07 4.32E-08
Web Plate 3 0.012 0.576 0.00691 0.300 2.07E-03 6.22E-04 1.91E-04
Bot Flange 4 0.300 0.012 0.00360 0.594 2.14E-03 1.27E-03 4.32E-08
Bot Flange 5 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00423 0.00189 0.000191

y = Ʃ Ay = 0.004 = 0.300000m Ytop = 0.300m Zxt 0.002712


Ʃ A 0.014 Ybot = 0.300m Zxb 0.002712

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00271 m3 rxx = 0.240 m


= 0.00189 + 0.00019 - 0.00127 Zxb = 0.00271 m 3

= 0.00081 m4
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.333 0.250 0.08333333 0.1250 1.04E-02 1.30E-03 4.34E-04
Girder 0.014112 0.5500 7.76E-03 4.27E-03 8.14E-04
Total 0.097445 0.01818 0.00557 0.00125

y = Ʃ Ay = 0.018 = 0.187m Yslab top = 0.187m Ybot = 0.6635m


Ʃ A 0.097 Yslab bottom = -0.063m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.01837 m3 rxx = 0.188 m


= 0.00557 + 0.00125 - 0.00339 Zxb = 0.00517 m3
= 0.003427 m4

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.576 0.00691 0.000 0.00E+00 0.00E+00 8.29E-08
Bot Flange 4 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00000 0.00000 0.00005

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.014 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00036 m3 ryy = 0.0619 m


= 0.00E+00 + 5.4E-05 - 0.0E+00 Zyr = 0.00036 m3
= 0.0000541 m4

Composite Section properties @ Y - Y


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web (m) m3 m4 m4
Deck slab 0.333 0.250 0.08333333 0.000 0.00000 0.00000 7.72E-04
Top flange pl1 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.576 0.007 0.000 0.00E+00 0.00E+00 8.29E-08
Bot Flange 4 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Bot Flange 5 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.09745 0.00000 0.00000 0.00083

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.097 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00550 m3 ryy = 0.0921 m


= 0.00E+00 + 8.3E-04 - 0.0E+00 Zyr = 0.00550 m 3

= 0.0008257 m4
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

With modular ratio m = 15 for Permanent load (DL+SIDL)


Section Properties (Steel Girder)

2500
y
Transformed Steel 250mm
167
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
600 576 x 12mm thk web plate 3

300mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
0
y
Depth of the Girder = 600mm
Overall depth of the section = 850mm

Girder properties @ X-X

y = Ʃ Ay = 0.004 = 0.300000m Ytop = 0.300m Zxt 0.002712


Ʃ A 0.014 Ybot = 0.300m Zxb 0.002712

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00271 m3 rxx = 0.240 m


= 0.00189 + 0.00019 - 0.00127 Zxb = 0.00271 m3
= 0.00081 m4

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.167 0.250 0.04166667 0.1250 5.21E-03 6.51E-04 2.17E-04
Girder 0.014112 0.5500 7.76E-03 4.27E-03 8.14E-04
Total 0.055779 0.01297 0.00492 0.00103

y = Ʃ Ay = 0.013 = 0.233m Yslab top = 0.233m Ybot = 0.6175m


Ʃ A 0.056 Yslab bottom = -0.017m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.01262 m3 rxx = 0.229 m


= 0.00492 + 0.00103 - 0.00302 Zxb = 0.00475 m3
= 0.002935 m4
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Positive moment capacity of composite section with full shear Interaction


(As Per IRC22-2008 ANNEXURE-I)

fy = Yield stress in steel = 250 N/mm2


fck = Grade of concrete = 40 N/mm2
Af = Area of top flange of steel beam of composite section = 3600 mm2
14112 mm
2
As = Cross sectional area of steel beam of composite section =
beff = Effective width of concrete section = 2500 mm
bf = Width of top flange of steel section = 300 mm
ds = Overall depth of concrete slab = 250 mm
dc = vertical dist. Between centroid of slab and centroid of steel beam = 425 mm
tf = Thickness of top flange of steel section = 12 mm
tw = Thickness of web of steel section = 12 mm

gm = Material safety factor for structural steel = 1.1


gc = Material safety factor for concrete = 1.5

xu = Depth of neutral axis from top of slab

fy / g m
a =
0.36 fck

a = 15.783

if, beff ds > a.As Plastic Neutral axis in slab Case - 1


beff ds < a.As < beff ds + 2a.Af Plastic Neutral axis in steel flange Case - 2
beff ds + 2a.Af < a.As Plastic Neutral axis in steel web Case - 3

a.As = 222727
beff ds = 625000
beff ds + 2a.Af = 738636

Hence, beff ds > a. As Plastic Neutral axis in slab Case - 1

Depth of Neutral axis xu = a As / beff

= 89.09 mm

Moment Capacity
Mp = As fy (dc + 0.5ds - 0.42 xu)/gm

= 1643989686 Nmm
= 1643.99 kN.m > 3493.79 kN.m Hence safe
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Shear resistance of beam

fyw = yield strength of web = 250 N/mm2


young's modules = 2E+05 N/mm2
Poissions ratio of steel = 0.3

Depth of section = 576 mm d/tw = 48


Thickness of web = 12 mm
Partial safety factor against shear = 1.25
Partial safety factor against plastic shear capacity = 1.1

d /tw/e = 48 < 67 hence check for plastic shear resistance

Vp = 0.58 . Av. fyw

= 997056 N
= 997.06 kN
Vd = 906.41 kN
0.6 Vd = 543.85 kN
V = 265.87 kN Hence V<0.6Vd Hence safe

Shear Buckling resistance

K p2 E
t cr,e = 12 (1- vm2) (d/t )2
w

Kv = 5.35 for unstiffened web


tcr,e = 419.7

lw = sqre (0.58 fyw / tcr,e)


lw = 0.5862

tb = Shear stress corresponding to web buckling


= 144.25 N/mm2

Vcr = Av tb
= 997056 N
= 997.06 kN
Vd = 797.64 kN
0.6 Vd = 478.59 kN > V = 265.869 kN
Hence section is safe at x=2.75

Reduction of Bending moments under High shear (if V>0.6Vd)


V = 265.87 kN
Mvd = Md - β (Md-Mfd) < 1.2 Ze Fy / γm

β = (2 V / Vd - 1)^2 = 0.1111
Mfd = 1644 … (Mfd excluding contribution of web - refer Annx. 2)
Mvd = ###
Mvd = 1644 kNm < 1409 kNm > 3493.787 Hence safe
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Check for deflection moduler ratio m (as per IRC 22:2008)


Span = 5500
Ixx Girder alon = 0.000814 m4
Ixx With modular ratio m = 7.5 (For LL) = 0.003427 m4
Ixx With modular ratio m = 15 (for DL+SIDL) = 0.002935 m4
young's modules = 200000 N/mm2

Total dead load UDL = 9.60 kN/m


Total SIDL UDL = 16.00 kN/m
Total LL UDL = 36.36364 kN/m

Deflection due to DL = 0.703004 mm


Deflection due to SIDL = 0.324808 mm

Deflection due to LL = 2.662895 mm


Deflection due to LL including impact and lad factor of 0.75 as per IRC 6:2014
= 2.663*1.47*1*0.75 = 2.935842 mm
Total =### = 2.9406 mm

Permissible deflection for Live load L/800 = 6.875 mm > 2.9358 Hence safe
Permissible deflection Total L/600 = 9.1667 mm > 2.9406 Hence safe

Diffrential Shrinkage
Ultimate shrinkage strain of concrete = 0.0002
Reduction factor for creep = 0.5
Diffrential shrinkage (ϵs) = 0.0001
Modulus of elasticity of concrete = 31622.78 (N/mm2)
Force due to shrinkage in concrete (ϵs x Ec x b x ds) = 1976424 N
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
R1 Design of section at Mid span FOB/SUP/13702

Summary of Bending Moments and shear force at MID SPAN

Load Type Bending Moment


kN-m
Girder load 23.40
Deck slab 166.30
Construction Loads 228.15
SIDL 369.69
Live Load 1825.74

Stress checkat MID SPAN (Girders and Deck Slab)

Stress Location
LOADS Moment (kN-m) Slab Top Slab Bottom Girder Top Girder bottom
N/mm 2
N/mm 2
N/mm 2
N/mm2

CONSTRUCTION STAGE
(Slab casted, but slab has not achieved its strength only girders will resist all the moment)
Dead Girder 23 0.00 0.00 8.63 -8.6
Loads Deck slab 166 0.00 0.00 61.33 -61.3
Construction Load 228 0.00 0.00 84.13 -84.1
Resultant 0.00 0.00 154.09 -154.1
Check for Girder stresses
Per. Stress 217.50 -217.50
Check OK OK
As per Table 1 IRC 6-2010 permissible sresses in erection case are increased by 33%

WORKING STAGE
Dead Girder 0 0.00 0.00 8.63 -8.6
Loads Deck slab 0 0.00 0.00 61.33 -61.3
SIDL 370 2.68 -0.91 -6.84 -77.8
Resultant 2.68 -0.91 63.11 -147.74
Differential Shrinkage
Axial Force (KN) 1976.424 -3.16 -3.16
Axial Force (KN) 1976.424 2.70 2.70 20.282 20.282
Moment (KN-m) 121.646 0.88 -0.30 -2.252 -23.547
Resultant 3.11 -1.67 81.14 -151.01
LIVE LOADS
Live Load 1826 13.25 -4.51 -33.80 -353.4
Resultant 16.36 -6.18 47.34 -504.4

Check for Composite Girder and Slab stresses


Per. Stress 13.33 13.33 217.50 -217.50
Check Revise OK OK Revise
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

E = 200000 N/mm2
Yield stress in steel = 350 N/mm2
Grade of concrete = 40 N/mm2

Section Properties (Steel Girder)

3725
y
Transformed Steel 240mm
497
250
0mm x 0mm thk flange plate 1
250mm x 12mm thk flange plate 2

x x
1000 968 x 12mm thk web plate 3

300mm x 20mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
0
y
Depth of the Girder = 1000mm
Overall depth of the section = 1240mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m 3
m 4
m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.250 0.012 0.00300 0.006 1.80E-05 1.08E-07 3.60E-08
Web Plate 3 0.012 0.968 0.01162 0.496 5.76E-03 2.86E-03 9.07E-04
Bot Flange 4 0.300 0.020 0.00600 0.990 5.94E-03 5.88E-03 2.00E-07
Bot Flange 5 0.000 0.000 0.00000 1.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 1.000 0.00E+00 0.00E+00 0.00E+00
Total 0.02062 0.01172 0.00874 0.000907

y = Ʃ Ay = 0.012 = 0.568468m Ytop = 0.568m Zxt 0.005248


Ʃ A 0.021 Ybot = 0.432m Zxb 0.006914

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00525 m3 rxx = 0.380 m


SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

= 0.00874 + 0.00091 - 0.00666 Zxb = 0.00691 m3


= 0.00298 m4

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.497 0.240 0.1192 0.1200 1.43E-02 1.72E-03 5.72E-04
Girder 0.020616 0.8085 1.67E-02 1.35E-02 2.98E-03
Total 0.139816 0.03097 0.01519 0.00356

y = Ʃ Ay = 0.031 = 0.222m Yslab top = 0.222m Ybot = 1.0185m


Ʃ A 0.140 Yslab bottom = -0.018m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.05366 m3 rxx = 0.292 m


= 0.01519 + 0.00356 - 0.00686 Zxb = 0.01167 m3
= 0.011887 m4

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.250 0.012 0.00300 0.000 0.00E+00 0.00E+00 1.56E-05
Web Plate 3 0.012 0.968 0.01162 0.000 0.00E+00 0.00E+00 1.39E-07
Bot Flange 4 0.300 0.020 0.00600 0.000 0.00E+00 0.00E+00 4.50E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.02062 0.00000 0.00000 0.00006

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.125m


Ʃ A 0.021 Xright = 0.125m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00049 m3 ryy = 0.0543 m


= 0.00E+00 + 6.1E-05 - 0.0E+00 Zyr = 0.00049 m3
= 0.0000608 m4

Composite Section properties @ Y - Y


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web (m) m3 m4 m4
Deck slab 0.497 0.240 0.1192 0.000 0.00000 0.00000 2.45E-03
Top flange pl1 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.250 0.012 0.003 0.000 0.00E+00 0.00E+00 1.56E-05
Web Plate 3 0.012 0.968 0.012 0.000 0.00E+00 0.00E+00 1.39E-07
Bot Flange 4 0.300 0.020 0.006 0.000 0.00E+00 0.00E+00 4.50E-05
Bot Flange 5 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.13982 0.00000 0.00000 0.00251

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.125m


Ʃ A 0.140 Xright = 0.125m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.02009 m3 ryy = 0.1340 m


SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

= 0.00E+00 + 2.5E-03 - 0.0E+00 Zyr = 0.02009 m3


= 0.0025111 m4

Positive moment capacity of composite section with full shear Interaction


(As Per IRC22-2008 ANNEXURE-I)

fy = Yield stress in steel = 350 N/mm2


fck = Grade of concrete = 40 N/mm2
Af = Area of top flange of steel beam of composite section = 3000 mm2
As = Cross sectional area of steel beam of composite section = 20616 mm2
beff = Effective width of concrete section = 3725 mm
bf = Width of top flange of steel section = 250 mm
ds = Overall depth of concrete slab = 240 mm
dc = vertical dist. Between centroid of slab and centroid of steel beam = 688.47 mm
tf = Thickness of top flange of steel section = 12 mm
tw = Thickness of web of steel section = 12 mm

gm = Material safety factor for structural steel = 1.1


gc = Material safety factor for concrete = 1.5

xu = Depth of neutral axis from top of slab

f y / gm
a =
0.36 fck

a = 22.096

if, beff ds > a.As Plastic Neutral axis in slab Case - 1


beff ds < a.As < beff ds + 2a.Af Plastic Neutral axis in steel flange Case - 2
beff ds + 2a.Af < a.As Plastic Neutral axis in steel web Case - 3

a.As = 455530
beff ds = 894000
beff ds + 2a.Af = 1026576

Hence, beff ds > a. As Plastic Neutral axis in slab Case - 1

Depth of Neutral axis xu = a As / beff

= 122.29 mm

Moment Capacity
Mp = As fy (dc + 0.5ds - 0.42 xu)/gm

= 4966341230 Nmm
= 4966.341 kN.m
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Shear resistance of beam

fyw = yield strength of web = 350 N/mm2


young's modules = 2E+05 N/mm2
Poissions ratio of steel = 0.3

Depth of section = 968 mm d/tw = 81


Thickness of web = 12 mm
Partial safety factor against shear = 1.25
Partial safety factor against plastic shear capacity = 1.1

d /tw/e = 95 > 67 hence check for buckling shear resistance

Vp = 0.58 . Av. fyw

= 2345851 N
= 2346 kN
Vd = 2133 kN
0.6 Vd = 1280 kN
V = 1114 kN Hence V<0.6Vd

Shear Buckling resistance

K p2 E
tcr,e = 12 (1- vm2) (d/t )2
w

Kv = 5.35 for unstiffened web


tcr,e = 148.6

lw = sqre (0.58 fyw / t cr,e)


lw = 1.1657

tb = Shear stress corresponding to web buckling


= 142.87 N/mm2

Vcr = Av tb
= 1659555 N
= 1660 kN
Vd = 1328 kN
0.6 Vd = 796.59 kN
V = 1114 kN

Reduction of Bending moments under High shear (V>0.6Vd)


SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20
Mvd = Md - β (Md-Mfd) < 1.2 Ze Fy / γm

β = (2 V / Vd - 1)^2 = 0.4606
Mfd = 1644
Mvd = 3436 kNm < 4456 kNm

Check for deflection


Span = 14900
moduler ratio m
Ixx With modular ratio m = 7.5 = 0.011887 m4
Ixx With modular ratio m = 15 0.010530 m4
young's modules = 200000 N/mm2

Total dead load UDL = 26.48 kN/m


Total Live load on girder = 522 kN

Deflection due to DL+SIDL = 8.069482 mm


Deflection due to LL = 15.13218 mm
Total =### = 21.552 mm

Permissible deflection L/600 = 24.833

Diffrential Shrinkage
Ultimate shrinkage strain of concrete = 0.0002
Reduction factor for creep = 0.5
Diffrential shrinkage (ϵs) = 0.0001
Modulus of elasticity of concrete = 31622.78 (N/mm2)
Force due to shrinkage in concrete (ϵs x Ec x b x ds) = 2827076 N
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

6.4 Summary of Bending Moments and shear force at MID SPAN

Load Type Bending Moment


kN-m
Girder load 34.19
Deck slab 189.70
Construction Loads 311.81
SIDL 369.69
Live Load 1825.74

6.5 Stress checkat MID SPAN (Girders and Deck Slab)

Stress Location
LOADS Moment (kN-m) Slab Top Slab Bottom Girder Top Girder bottom
N/mm 2
N/mm 2
N/mm 2
N/mm2

CONSTRUCTION STAGE
(Slab casted, but slab has not achieved its strength only girders will resist all the moment)
Dead Girder 34 0.00 0.00 6.51 -4.9
Loads Deck slab 190 0.00 0.00 36.15 -27.4
Construction Load 312 0.00 0.00 59.41 -45.1
Resultant 0.00 0.00 102.07 -77.5
Check for Girder stresses
Per. Stress 304.50 -304.50
Check OK OK
As per Table 1 IRC 6-2010 permissible sresses in erection case are increased by 33%

WORKING STAGE
Dead Girder 0 0.00 0.00 6.51 -4.9
Loads Deck slab 0 0.00 0.00 36.15 -27.4
SIDL 370 0.92 -0.08 -0.57 -31.7
Resultant 0.92 -0.08 42.08 -64.06
Differential Shrinkage
Axial Force (KN) 2827.076 -3.16 -3.16
Axial Force (KN) 2827.076 2.70 2.70 20.220 20.220
Moment (KN-m) 286.991 0.71 -0.06 -0.446 -24.590
Resultant 1.17 -0.60 61.86 -68.43
LIVE LOADS
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20
Live Load 1826 4.54 -0.38 -2.84 -156.4
Resultant 5.70 -0.98 59.02 -224.9

Check for Composite Girder and Slab stresses


Per. Stress 13.33 13.33 304.50 -304.50
Check OK OK OK OK

7.0 Design of web & flange connection

7.1 Check for weld at junction of the Top Flange Plate 2 and Web plate 3

Total shear force due to Self Wt + Slab Load = S = 78.8 kN

Horizontal Shear at the Junction of Top Flange Plate 2 and web Plate 3 (only girder properties)

= S.A.Y = 78.80 x 0.003 x 0.562 = 44.6 kN / m


Icg.g 0.0030

Total shear force due to SIDL + LL = S = 1035.6 kN

Horizontal Shear at the Junction of Top Flange Plate 2 and Web Plate (comp. section properties)

= S.A.Y = 1035.56 x 0.122 x 0.024 = 260.7 kN / m


Icg.comp 0.0119

Total horizontal shear at the junction of Top Flange and Web = 305.2 kN / m

Size of the weld required = 305.2 = 2.00 mm


2 x 0.707 x 108

Providing 6 mm fillet weld on both side of the web with length of 150 mm

Strength of the weld = 68.72 kN

Pitch of the weld required = 450.28 mm Say 400.0 mm

7.4 Check for weld at junction of the Bot Flange Plate 4 and Web Plate 3

Total shear force due to Self Wt + Slab Load = S = 78.8 kN

Horizontal Shear at the Junction of Bot Flange 4 and Web (Girder section properties)

= S.A.Y = 78.80 x 0.006 x 0.42 = 66.8 kN / m


Icg.g 0.0030
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Total shear force due to SIDL + LL = S = 1035.6 kN

Horizontal Shear at the Junction of bot Flange 4 and Web (comp. section properties)

= S.A.Y = 1035.56 x 0.006 x 1.008 = 527.2 kN / m


Icg.comp 0.0119

Total horizontal shear at the junction of bottom Flange 4 and Web = 594.0 kN / m

Size of the weld required for the above force = 594.0 = 3.89 mm
2 x 0.707 x 108

Providing 6 mm fillet weld on both side of the web with length of 150 mm

Strength of the weld = 68.72 kN

Pitch of the weld required = 231.4 mm Say 200 mm

Design of Bolted connection - Cross Girder To Main Girder

Maximum Shear to be transferred through connection = 1114 kN

For fe 490 grade steel Fu = 490 Mpa


For fe 490 grade steel Fy = 350 Mpa
For Bolt of grade 6.8: Fub = 600 Mpa
Dia of bolt = 20 mm
For 20 mm dia bolt Anb = 245 mm2
dh = d0 = 22 mm2
Partial safty factor for material of bolt = 1.25

Strength of bolt in double shear


Vds = 2 * Anb * Fub*0.578/1.25
=###
= 135.9 kN

Strength of bolt in Bearing


Vdp = 2.5*kb*d*t*fu/1.25 kb = e/3d0 = 0.6061
=### = p/3d0-0.25 = 0.6591
= 142.5 kN

Strength of bolt in single shear


Vs = 67.973 kN

Number of bolt required for angle to web of cross girder connection Double shear
= ### = 8.1971 = 8 Nos.

Number of bolt required for angle Main girder connection Single shear
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20
= ### = 8.1971 = 8 Nos.

Provide framing angle as ISA 150 x 150 x 12 (width required 40+60+40=140)


Depth of framing angle =### = 290 mm

Shear strength of framing angle


=###
= 1280 kN > 1114 kN Hence safe

Hence provide 20 mm dia 6.8 grade bolt 4 Nos. in 2 Layer each


CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

5.0 Design of section at Curtailment X= 3.0 m


E = 200000 N/mm2
Yield stress in steel = 350 N/mm2
Grade of concrete = 40 N/mm2

With modular ratio m = 7.5 for short term load


Section Properties (x = 3.0)

3000
y
Transformed Steel 300mm
400
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
936 912 x 12mm thk web plate 3

325mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
325
y
Depth of the Girder = 936mm
Overall depth of the section = 1236mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.300 0.012 0.00360 0.006 2.16E-05 1.30E-07 4.32E-08
Web Plate 3 0.012 0.912 0.01094 0.468 5.12E-03 2.40E-03 7.59E-04
Bot Flange 4 0.325 0.012 0.00390 0.930 3.63E-03 3.37E-03 4.68E-08
Bot Flange 5 0.000 0.000 0.00000 0.936 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.936 0.00E+00 0.00E+00 0.00E+00
Total 0.01844 0.00877 0.00577 0.000759

y = Ʃ Ay = 0.009 = 0.475515m Ytop = 0.476m Zxt 0.00496


Ʃ A 0.018 Ybot = 0.460m Zxb 0.005122

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00496 m3 rxx = 0.358 m


= 0.00577 + 0.00076 - 0.00417 Zxb = 0.00512 m 3

= 0.00236 m4

Page 39
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.400 0.300 0.12 0.1500 1.80E-02 2.70E-03 9.00E-04
Girder 0.018444 0.7755 1.43E-02 1.11E-02 2.36E-03
Total 0.138444 0.03230 0.01379 0.00326

y = Ʃ Ay = 0.032 = 0.233m Yslab top = 0.233m Ybot = 1.0027m


Ʃ A 0.138 Yslab bottom = -0.067m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.04077 m3 rxx = 0.262 m


= 0.01379 + 0.00326 - 0.00754 Zxb = 0.00949 m3
= 0.009514 m4

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.912 0.01094 0.000 0.00E+00 0.00E+00 1.31E-07
Bot Flange 4 0.325 0.012 0.00390 0.000 0.00E+00 0.00E+00 3.43E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.01844 0.00000 0.00000 0.00006

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.018 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00041 m3 ryy = 0.0577 m


= 0.00E+00 + 6.1E-05 - 0.0E+00 Zyr = 0.00041 m3
= 0.0000615 m4

Composite Section properties @ Y - Y


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web (m) m3 m4 m4
Deck slab 0.400 0.300 0.12 0.000 0.00000 0.00000 1.60E-03
Top flange pl1 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.912 0.011 0.000 0.00E+00 0.00E+00 1.31E-07
Bot Flange 4 0.325 0.012 0.004 0.000 0.00E+00 0.00E+00 3.43E-05
Bot Flange 5 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.13844 0.00000 0.00000 0.00166

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.138 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.01108 m3 ryy = 0.1095 m


= 0.00E+00 + 1.7E-03 - 0.0E+00 Zyr = 0.01108 m 3

= 0.0016615 m4

Page 40
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

With modular ratio m = 15 for Permanent load (DL+SIDL)


Section Properties (Steel Girder)

3000
y
Transformed Steel 300mm
200
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
936 912 x 12mm thk web plate 3

325mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
325
y
Depth of the Girder = 936mm
Overall depth of the section = 1236mm

Girder properties @ X-X

y = Ʃ Ay = 0.009 = 0.475515m Ytop = 0.476m Zxt 0.00496


Ʃ A 0.018 Ybot = 0.460m Zxb 0.005122

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00496 m3 rxx = 0.358 m


= 0.00577 + 0.00076 - 0.00417 Zxb = 0.00512 m3
= 0.00236 m4

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.200 0.300 0.06 0.1500 9.00E-03 1.35E-03 4.50E-04
Girder 0.018444 0.7755 1.43E-02 1.11E-02 2.36E-03
Total 0.078444 0.02330 0.01244 0.00281

y = Ʃ Ay = 0.023 = 0.297m Yslab top = 0.297m Ybot = 0.9389m


Ʃ A 0.078 Yslab bottom = -0.003m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.02803 m3 rxx = 0.326 m


= 0.01244 + 0.00281 - 0.00692 Zxb = 0.00887 m3
= 0.008328 m4

Page 41
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

Positive moment capacity of composite section with full shear Interaction


(As Per IRC22-2008 ANNEXURE-I)

fy = Yield stress in steel = 350 N/mm2


fck = Grade of concrete = 40 N/mm2
Af = Area of top flange of steel beam of composite section = 3600 mm2
As = Cross sectional area of steel beam of composite section = 18444 mm2
beff = Effective width of concrete section = 3000 mm
bf = Width of top flange of steel section = 300 mm
ds = Overall depth of concrete slab = 300 mm
dc = vertical dist. Between centroid of slab and centroid of steel beam = 625.51 mm
tf = Thickness of top flange of steel section = 12 mm
tw = Thickness of web of steel section = 12 mm

gm = Material safety factor for structural steel = 1.1


gc = Material safety factor for concrete = 1.5

xu = Depth of neutral axis from top of slab

f y / gm
a =
0.36 fck

a = 22.096

if, beff ds > a.As Plastic Neutral axis in slab Case - 1


beff ds < a.As < beff ds + 2a.Af Plastic Neutral axis in steel flange Case - 2
beff ds + 2a.Af < a.As Plastic Neutral axis in steel web Case - 3

a.As = 407538
beff ds = 900000
beff ds + 2a.Af = 1059091

Hence, beff ds > a. As Plastic Neutral axis in slab Case - 1

Depth of Neutral axis xu = a As / beff

= 135.85 mm

Moment Capacity
Mp = As fy (dc + 0.5ds - 0.42 xu)/gm

= 4216311270 Nmm
= 4216.311 kN.m > 1317.74 Hence safe

Page 42
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

Shear resistance of beam

fyw = yield strength of web = 350 N/mm2


young's modules = 2E+05 N/mm2
Poissions ratio of steel = 0.3

Depth of section = 912 mm d/tw = 76


Thickness of web = 12 mm
Partial safety factor against shear = 1.25
Partial safety factor against plastic shear capacity = 1.1

d /tw/e = 90 > 67 hence check for buckling shear resistance

Vp = 0.58 . Av. fyw

= 2210141 N
= 2210 kN
Vd = 2009 kN
0.6 Vd = 1206 kN
V = 376.57 kN Hence V<0.6Vd

Shear Buckling resistance

K p2 E
tcr,e = 12 (1- vm2) (d/t )2
w

Kv = 11.265 for stiffened web


tcr,e = 352.5

lw = sqre (0.58 fyw / t cr,e)


lw = 0.7569

tb = Shear stress corresponding to web buckling


= 201.95 N/mm2

Vcr = Av tb
= 2210141 N
= 2210 kN
Vd = 1768 kN
0.6 Vd = 1061 kN > V = 376.569 kN
Hence section is safe at x=3.0m

Reduction of Bending moments under High shear (if V>0.6Vd) At support section
V = 376.57 kN
Mvd = Md - β (Md-Mfd) < 1.2 Ze Fy / γm

β = (2 V / Vd - 1)^2 = 0.3295
Mfd = 1644 … (Mfd excluding contribution of web - refer Annx. 2)
Mvd = ###
Mvd = 3369 kNm < 3623 kNm > 1317.735 kNm Hence safe

Page 43
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at x = 3.0m FOB/SUP/13702

Summary of Bending Moments and shear force at 3.0m of SPAN

Load Type Bending Moment


Girder load kN-m
30.59
Deck slab 293.41
Construction Loads 311.81
SIDL 117.50
Live Load 481.14

Stress checkat at 3.0 of SPAN (Girders and Deck Slab)

Stress Location
LOADS Moment (kN-m) Slab Top Slab Bottom Girder Top Girder bottom
N/mm2 N/mm2 N/mm2 N/mm2

CONSTRUCTION STAGE
(Slab casted, but slab has not achieved its strength only girders will resist all the moment)
Dead Girder 31 0.00 0.00 6.17 -6.0
Loads Deck slab 293 0.00 0.00 59.16 -57.3
Construction Load 312 0.00 0.00 62.87 -60.9
Resultant 0.00 0.00 128.19 -124.1
Check for Girder stresses
Per. Stress 304.50 -304.50
Check OK OK
As per Table 1 IRC 6-2010 permissible sresses in erection case are increased by 33%

WORKING STAGE
Dead Girder 0 0.00 0.00 6.17 -6.0
Loads Deck slab 0 0.00 0.00 59.16 -57.3
SIDL 118 0.38 -0.11 -0.82 -13.2
Resultant 0.38 -0.11 64.50 -76.51
Differential Shrinkage
Axial Force (KN) 2846.050 -3.16 -3.16
Axial Force (KN) 2846.050 2.74 2.74 20.557 20.557
Moment (KN-m) 237.171 0.78 -0.22 -1.662 -24.996
Resultant 0.74 -0.75 83.40 -80.95
LIVE LOADS
Live Load 481 1.57 -0.45 -3.37 -50.7
Resultant 2.31 -1.20 80.03 -131.7

Check for Composite Girder and Slab stresses


Per. Stress 13.33 13.33 304.50 -304.50
Check OK OK OK OK

Page 44
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

6.0 Design of section at Curtailment X= 0 m & X= 1.5 m


E = 200000 N/mm2
Yield stress in steel = 350 N/mm2
Grade of concrete = 40 N/mm2

With modular ratio m = 7.5 for short term load


Section Properties ( X = 0)

3000
y
Transformed Steel 300mm
400
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
887 863 x 12mm thk web plate 3

325mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
325
y
Depth of the Girder = 887mm
Overall depth of the section = 1187mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.300 0.012 0.00360 0.006 2.16E-05 1.30E-07 4.32E-08
Web Plate 3 0.012 0.863 0.01036 0.444 4.59E-03 2.04E-03 6.43E-04
Bot Flange 4 0.325 0.012 0.00390 0.881 3.44E-03 3.03E-03 4.68E-08
Bot Flange 5 0.000 0.000 0.00000 0.887 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.887 0.00E+00 0.00E+00 0.00E+00
Total 0.01786 0.00805 0.00506 0.000643

y = Ʃ Ay = 0.008 = 0.450850m Ytop = 0.451m Zxt 0.004608


Ʃ A 0.018 Ybot = 0.436m Zxb 0.004763

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00461 m3 rxx = 0.341 m


= 0.00506 + 0.00064 - 0.00363 Zxb = 0.00476 m 3

= 0.00208 m4

Page 45
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.400 0.300 0.12 0.1500 1.80E-02 2.70E-03 9.00E-04
Girder 0.017856 0.7509 1.34E-02 1.01E-02 2.08E-03
Total 0.137856 0.03141 0.01277 0.00298

y = Ʃ Ay = 0.031 = 0.228m Yslab top = 0.228m Ybot = 0.9592m


Ʃ A 0.138 Yslab bottom = -0.072m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.03770 m3 rxx = 0.250 m


= 0.01277 + 0.00298 - 0.00716 Zxb = 0.00895 m3
= 0.008589 m4

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.863 0.01036 0.000 0.00E+00 0.00E+00 1.24E-07
Bot Flange 4 0.325 0.012 0.00390 0.000 0.00E+00 0.00E+00 3.43E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.01786 0.00000 0.00000 0.00006

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.018 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00041 m3 ryy = 0.0587 m


= 0.00E+00 + 6.1E-05 - 0.0E+00 Zyr = 0.00041 m3
= 0.0000615 m4

Composite Section properties @ Y - Y


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web (m) m3 m4 m4
Deck slab 0.400 0.300 0.12 0.000 0.00000 0.00000 1.60E-03
Top flange pl1 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.863 0.010 0.000 0.00E+00 0.00E+00 1.24E-07
Bot Flange 4 0.325 0.012 0.004 0.000 0.00E+00 0.00E+00 3.43E-05
Bot Flange 5 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.13786 0.00000 0.00000 0.00166

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.138 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.01108 m3 ryy = 0.1098 m


= 0.00E+00 + 1.7E-03 - 0.0E+00 Zyr = 0.01108 m 3

= 0.0016615 m4

Page 46
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

With modular ratio m = 15 for Permanent load (DL+SIDL)


Section Properties (Steel Girder)

3000
y
Transformed Steel 300mm
200
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
887 863 x 12mm thk web plate 3

325mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
325
y
Depth of the Girder = 887mm
Overall depth of the section = 1187mm

Girder properties @ X-X

y = Ʃ Ay = 0.008 = 0.450850m Ytop = 0.451m Zxt 0.004608


Ʃ A 0.018 Ybot = 0.436m Zxb 0.004763

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00461 m3 rxx = 0.341 m


= 0.00506 + 0.00064 - 0.00363 Zxb = 0.00476 m3
= 0.00208 m4

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.200 0.300 0.06 0.1500 9.00E-03 1.35E-03 4.50E-04
Girder 0.017856 0.7509 1.34E-02 1.01E-02 2.08E-03
Total 0.077856 0.02241 0.01142 0.00253

y = Ʃ Ay = 0.022 = 0.288m Yslab top = 0.288m Ybot = 0.8992m


Ʃ A 0.078 Yslab bottom = -0.012m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.02604 m3 rxx = 0.310 m


= 0.01142 + 0.00253 - 0.00645 Zxb = 0.00834 m3
= 0.007495 m4

Page 47
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

Positive moment capacity of composite section with full shear Interaction


(As Per IRC22-2008 ANNEXURE-I)

fy = Yield stress in steel = 350 N/mm2


fck = Grade of concrete = 40 N/mm2
Af = Area of top flange of steel beam of composite section = 3600 mm2
As = Cross sectional area of steel beam of composite section = 17856 mm2
beff = Effective width of concrete section = 3000 mm
bf = Width of top flange of steel section = 300 mm
ds = Overall depth of concrete slab = 300 mm
dc = vertical dist. Between centroid of slab and centroid of steel beam = 600.85 mm
tf = Thickness of top flange of steel section = 12 mm
tw = Thickness of web of steel section = 12 mm

gm = Material safety factor for structural steel = 1.1


gc = Material safety factor for concrete = 1.5

xu = Depth of neutral axis from top of slab

f y / gm
a =
0.36 fck

a = 22.096

if, beff ds > a.As Plastic Neutral axis in slab Case - 1


beff ds < a.As < beff ds + 2a.Af Plastic Neutral axis in steel flange Case - 2
beff ds + 2a.Af < a.As Plastic Neutral axis in steel web Case - 3

a.As = 394545
beff ds = 900000
beff ds + 2a.Af = 1059091

Hence, beff ds > a. As Plastic Neutral axis in slab Case - 1

Depth of Neutral axis xu = a As / beff

= 131.52 mm

Moment Capacity
Mp = As fy (dc + 0.5ds - 0.42 xu)/gm

= 3952099929 Nmm
= 3952.1 kN.m > 775.305 Hence safe

Page 48
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

Shear resistance of beam

fyw = yield strength of web = 350 N/mm2


young's modules = 2E+05 N/mm2
Poissions ratio of steel = 0.3

Depth of section = 863 mm d/tw = 72


Thickness of web = 12 mm
Partial safety factor against shear = 1.25
Partial safety factor against plastic shear capacity = 1.1

d /tw/e = 85 > 67 hence check for buckling shear resistance

Vp = 0.58 . Av. fyw

= 2091394 N
= 2091 kN
Vd = 1901 kN
0.6 Vd = 1141 kN
V = 1114 kN Hence V<0.6Vd

Shear Buckling resistance

K p2 E
tcr,e = 12 (1- vm2) (d/t )2
w

Kv = 10.646 for stiffener with spacing C = 0.75 m


tcr,e = 372.1

lw = sqre (0.58 fyw / t cr,e)


lw = 0.7367

tb = Shear stress corresponding to web buckling


= 201.95 N/mm2

Vcr = Av tb
= 2091394 N
= 2091 kN
Vd = 1673 kN > 1114 kN Hence safe at X = 0m
0.6 Vd = 1004 kN

Reduction of Bending moments under High shear (V>0.6Vd) At x = 2m


V = 460.67 kN
Mvd = Md - β (Md-Mfd) < 1.2 Ze Fy / γm

β = (2 V / Vd - 1)^2 = 0.2019
Mfd = 1644 … (Mfd excluding contribution of web - refer Annx. 2)
Mvd = ###
Mvd = 3486 kNm < 3419 kNm > 775.305 Hence safe

Page 49
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

Design of web & flange connection


Shear stresngth of weld = ### = 162.4 N/mm2
Check for weld at junction of the Top Flange Plate 2 and Web plate 3

Total shear force due to Self Wt + Slab Load = S = 78.8 kN

Horizontal Shear at the Junction of Top Flange Plate 2 and web Plate 3 (only girder properties)

= S.A.Y = 78.80 x 0.004 x 0.445 = 60.7 kN / m


Icg.g 0.0021

Total shear force due to SIDL + LL = S = 1035.6 kN

Horizontal Shear at the Junction of Top Flange Plate 2 and Web Plate (comp. section properties)

= S.A.Y = 1035.56 x 0.124 x 0.078 = 1165.0 kN / m


Icg.comp 0.0086

Total horizontal shear at the junction of Top Flange and Web = 1225.7 kN / m

Size of the weld required = 1225.7 = 5.34 mm


2 x 0.707 x 162

Providing 6 mm fillet weld on both side of the web with length of 150 mm

Strength of the weld = 206.67 kN

Pitch of the weld required = 168.61 mm Say 150.0 mm

Check for weld at junction of the Bot Flange Plate 4 and Web Plate 3

Total shear force due to Self Wt + Slab Load = S = 78.8 kN

Horizontal Shear at the Junction of Bot Flange 4 and Web (Girder section properties)

= S.A.Y = 78.80 x 0.004 x 0.43 = 63.6 kN / m


Icg.g 0.0021

Total shear force due to SIDL + LL = S = 1035.6 kN

Horizontal Shear at the Junction of bot Flange 4 and Web (comp. section properties)

= S.A.Y = 1035.56 x 0.004 x 0.953 = 448.2 kN / m


Icg.comp 0.0086

Total horizontal shear at the junction of bottom Flange 4 and Web = 511.8 kN / m

Size of the weld required for the above force = 511.8 = 2.23 mm
2 x 0.707 x 162

Page 50
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
Revision: R0 Design of section at support section FOB/SUP/13702

Providing 6 mm fillet weld on both side of the web with length of 150 mm

Strength of the weld = 206.67 kN

Pitch of the weld required = 403.78 mm Say 375 mm

Page 51
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 Design of Intermediate Stiffener

Design of Intermediate Stiffener (As Per IS 800 - 2007)

Dimensions

d = 0.576 d /tw/e = 48 < 200 Provide intermediate stiffener


tw = 0.012
Maximum permitted spacing for stiffener (IRC 24:2001 Cl. 508.11.2)
= 1.5 x d1 or = 270 x t
= 0.864 m or 2160 mm
Minimum permitted spacing for stiffner
= 0.33 x d1
= 0.19 m

Provide Spacing (c) = 0.750 m

c/d = 1.30 < 1.41 kv = 7.7093

Required Moment of inetria of Web stiffner is,


= 1.5 x d1 x t / c
3 3 2
(IRS 5.10.2.1)

d1 = 0.576 m
t = 0.012 m
c = 0.75 m

Ireq = 1.5 x 0.191 x 1.73E-06 / 0.563


= 8.806E-07 m4
y
12

488 8

100

Properties @ Y - Y
Description b d Area (A) Y from top Ay Ay2 Icg
m m m² m m 3
m 4
m4
Web 0.012 0.488 0.0059 0.106 6.21E-04 6.58E-05 1.16E-04
Stiffeners 1 0.008 0.100 0.0008 0.050 4.00E-05 2.00E-06 6.67E-07
Total 0.0067 6.61E-04 6.78E-05 1.17E-04
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 Design of Intermediate Stiffener

IPro = Moment of Inertia of a stiffener at face of web


= 2.67E-06 m4 > 8.806E-07 m4 Ok

ryy = SQRT(Ipro/A) = 0.020 m

Check for buckling resistance of stiffener


Buckling force Fq = (V - Vcr) /1.1

V = 1114
Vcr = 797.64

Fq = 287.92 kN

Slenderness ratio of stiffener


λ = 0.7*d/ryy
= 20.144
for λ = 20.144 , fy = 250 Mpa
and buckling curve c, the design compressive stress from table 9c IS800

fcd = 224 Mpa

Buckling resistance Fqd = Ae*fcd =


= 1491 kN > 287.92 kN Hence safe

Connection Between Stiffener and Web

Thickness of weld = 6
Strength of weld = 6*0.7*250*0.58/1.25/1000 = 0.4872 kN/mm
Required strength = t2 12 2
= = 0.288 kN/mm
5h 5x 100 Hence OK
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of connection with Main girder

Design of connection with Main girder

Main girder
Connecting plate Cross girder

Page 54
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of connection with Main girder

Shear resistance of Connecting plate

fyw = yield strength of web = 250 N/mm2


young's modules = 2E+05 N/mm2
Poissions ratio of steel = 0.3

Depth of section = 576 mm d/tw = 48


Thickness of plate = 12 mm
Partial safety factor against shear = 1.25
Partial safety factor against plastic shear capacity = 1.1

d /tw/e = 48 < 67 hence check for plastic shear resistance

Vp = 0.58 . Av. fyw

= 997056 N
= 997.06 kN
Vd= 906.41 kN
0.6 Vd = 543.85 kN
V = 1114 kN Hence V<0.6Vd

Shear Buckling resistance

K v p2 E
tcr,e =
12 (1- m2) (d/tw)2

Kv = 20.096 for stiffener with spacing C = 0.300 m


tcr,e = 1577

lw = sqre (0.58 fyw / t cr,e)


lw = 0.3025

tb = Shear stress corresponding to web buckling


= 144.25 N/mm2

Vcr = Av tb
= 997056 N
= 997.06 kN
Vd = 797.64 kN
0.6 Vd = 478.59 kN > 1114 kN Hence safe at X = 0m

Page 55
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of connection with Main girder

Design of shear connection

Design of Bolted connection - Cross Girder To Main Girder HSFG BOLT

Maximum Shear to be transferred through connection = 1114 kN

For fe 410 grade steel Fu = 410 Mpa


For fe 410 grade steel Fy = 250 Mpa
For Bolt of grade 8.8: Fub HSFG = 830 Mpa
Dia of bolt = 24 mm
For 24 mm dia bolt Anb = 352.86 mm2
dh = d0 = 26 mm
Partial safty factor for material of bolt gm = 1.25

Strength of bolt in double shear


Vds = 2 * Anb * Fub*0.578/1.25
= 2*352.9*830*0.578/1.25
= 270.9 kN

Strength of bolt in Bearing


Vdp = 2.5*kb*d*t*fu/1.25 kb = e/3d0 = 0.3846
= 2.5*MIN(0.385)*24*(10+12)*490/1.25 = p/3d0-0.25 = 0.4551
= 166.5 kN

Slip resistance of bolt = μ n K F / gm


= 0.48*2*1*256/1.25
= 196.61 kN

Botlt value for 24mm dia = 196.61 kN

Vertical force = 1114 kN

Horizontal component of force = 111.44 kN

Moment on connection = 0.30*311


= 334.31 kNm
Number of bolt

Providing 4 + 4 nos of bolt total 8 nos

Spacing 150 mm

Page 56
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of connection with Main girder

fx =
Bolt Fy = V/n
X Y r r2
ɵ fm= MXr/ P/n + Fresultant
No. + fmy
(Σr2) fmx

1 100 75 125.0 15625 53.13 2.8 29.6 280.9 282.41


2 100 225 246.2 60625 23.962 5.6 33.0 280.9 282.79
3 100 375 388.1 150625 14.931 8.8 36.4 280.9 283.21
4 100 525 534.4 285625 10.784 12.1 39.8 280.9 283.67
5 100 675 682.4 465625 8.427 15.5 43.2 280.9 284.16
6 100 825 831.0 690625 6.9112 18.9 46.6 280.9 284.70
7 100 975 980.1 960625 5.856 22.3 50.0 280.9 285.28
8 100 1125 1129.4 1275625 5.0796 25.7 53.4 280.9 285.90
9 100 1275 1278.9 1635625 4.4846 29.0 56.8 280.9 286.55
10 100 1425 1428.5 2040625 4.0142 32.4 60.2 280.9 287.25

1 50 50 70.7 5000 45 1.6 29.0 279.7 281.22


2 50 200 206.2 42500 14.036 4.7 32.4 279.7 281.60
3 50 350 353.6 125000 8.1301 8.0 35.8 279.7 282.01
4 50 500 502.5 252500 5.7106 11.4 39.2 279.7 282.46
5 50 650 651.9 425000 4.3987 14.8 42.6 279.7 282.95
6 50 800 801.6 642500 3.5763 18.2 46.0 279.7 283.49
7 50 950 951.3 905000 3.0128 21.6 49.4 279.7 284.06
8 50 1100 1101.1 1212500 2.6026 25.0 52.8 279.7 284.67
9 50 1250 1251.0 1565000 2.2906 28.4 56.3 279.7 285.33
10 50 1400 1400.9 1962500 2.0454 31.8 59.7 279.7 286.02

1.5E+07 Fmax = 287.25 < 196.61

Hence safe

Page 57
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of connection with Main girder

Design of weld for connection of connecting plate to main girder

350

CG of weld in y direction = (1820*300+300*300/2*2)/(1820+300*2)


= 265.5 mm
CG of weld in x direction = 375.0 mm

Angle of extreme edge of weld = ATAN(910/255)*180/3.14


= 54.727

Redial distance of extreme edge of weld = SQRT(262.8^2+910^2)


750
= 459.48

Ixx = 1820*262.8^2+(300^3/12+300*(300/2-262.8)^2)*2
= 6.6E+07
Iyy = 300*910^2*2+1820^3/12
= 1.3E+08

shear stress 350


due to vertical force = 590*1000/(1820+300*2)
= 768.5255 N/mm
due to horizontal force = 230*1000/(300+300+1820)
= 158.62 N/mm

due to bending = 489*10^6/(1.4E+08+1E+09)*947.2


= 1469.068 N/mm

Total vertical shear stress = 407.325*COS(73.93*PI()/180)+243.824


= 1616.862 N/mm
TotalHorizontalshear stress = 407.325*SIN(73.93*PI()/180)+95.04
= 1357.99 N/mm

Resultant shear = SQRT(356.586^2+486.447^2)


= 2111.487 N/mm

Providing 8mm both side fillet weld


Shear strength of weld = fu*0.577/gm*0.707*t*2
= 490*0.577/1.25*8*0.707*2
= 2559 N/mm > 2111 Hence safe

Page 58
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of Shear connector

8.0 Design of shear connector for x= 0 to X= 3 m

Shear Connector 4 nos. 20 mm dia


Hight of shear connector = 100 mm

Qu Ultimate Static Strength = 93 kN

Qu for 4 nos. = 372 kN 75


Ultimate Static Strength
(Table 7 IRC 22-2008)

Longitudinal shear (IRC 22-2008) At section near to support

V1 = 160.92 kN Shear Force due to DL+SIDL ULS


Ac = 0.04167 m2 Ac= Equivalent effective area of concrete
y = -0.02 m
I = 0.0029 m4
VL = V x Ac x y/I
= -39.93 kN/m

V1 = 261.95 kN Shear Force due to LL ULS


Ac = 0.08333 m2
y = 0.06 m
I = 0.0034 m4
VL = V x Ac x y/I
= 404.13 kN/m

VL = 364.20 kN/m

V3 = 751.04 kN/m Shear Force due to Diffrential shrinkage

VL = 1115.246 kN/m

Spacing of shear connector


S = Qu/VL = 334 mm (For Stud)

Page 59
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Design of Shear connector

Design from fatigue consideration

Vr = VR x Ac x y/I ; Where, VR = Shear force due to live load


VR = 261.95 kN
Vr = 261.95*0.12*-0.06/0.0108 = 404.13 kN/m
Fatigue strength of shear connector

Qr = 23*4 for 5X105 cycles


= 92 kN (IRC 22:2008 ) (Per row of stud)

Spacing of shear connectors based on fatigue criteria


s = Qr/Vr = 227.6 m (For stud)

Max Longitudinal force due to bending (IRC 22-2008)

H1 = 0.87 fy As1 10
-3

As1 = Area of tensile steel in longitudinal direction


= 0.0 (As there is no tensile reinforcement in longitudinal direction)

H1 = 0.36 fck Aec 10


-3

Aec = effective area of concrete

H1 = 0.36*40*300*0.241 = 6716 kN
H2 = 0.87*350*0.01951*1000 = 3069 kN
H = Minimum of H1 and H2 = 3069 kN

Spacing of connectors
s = Qu x L / H

s = 787.79 mm (For for channels)

Hence for full shear connection, required spacing = 227.6 mm

Hence provideshear connector at 150.0 mm c/c

Maximum spacing of shear connector as per IRC 22:2008 cl. 606.9


= 21*tf*0.85
= 214.2 mm

Page 60
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 Design of Shear connector

Design of shear connector X = 2.75 m

Shear Connector 2 nos. 20 mm dia


Hight of shear connector = 100 mm

Qu Ultimate Static Strength = 93 kN

Qu for 2 nos. = 186 kN 150


Ultimate Static Strength
(Table 7 IRC 22-2008)

Longitudinal shear (IRC 22-2008) At section near to support

V1 = 107.24 kN Shear Force due to DL+SIDL ULS


Ac = 0.04167 m2 Ac= Equivalent effective area of concrete
y = -0.02 m
I = 0.0029 m4
VL = V x Ac x y/I
= -26.61 kN/m

V1 = 244.13 kN Shear Force due to LL ULS


Ac = 0.08333 m2
y = 0.06 m
I = 0.0034 m4
VL = V x Ac x y/I
= 376.64 kN/m

VL = 350.03 kN/m

V3 = 751.04 kN/m Shear Force due to Diffrential shrinkage

VL = 1101.074 kN/m

Spacing of shear connector


S = Qu/VL = 169 mm (For Stud)
Design Note No.
Name of Work: RECONSTRUCTION OF FOOT OVER BRIDGE AT EVERSHINE NAGAR, MALWANI,
MALAD (W) IN P/N WARD, MUMBAI MCGM-
Date:- 09/09/2017 137/MALWANI-
FOB/SUP/13702
R1 Design of Shear connector

Design from fatigue consideration

Vr = VR x Ac x y/I ; Where, VR = Shear force due to live load


VR = 244.13 kN
Vr = 244.13*0.12*0.06/0.0108 = 376.64 kN/m
Fatigue strength of shear connector

Qr = 23*2 for 5X105 cycles


= 46 kN (IRC 22:2008 ) (Per row of stud)

Spacing of shear connectors based on fatigue criteria


s = Qr/Vr = 122.1 mm (For stud)

Max Longitudinal force due to bending (IRC 22-2008)

H1 = 0.87 fy As1 10
-3

As1 = Area of tensile steel in longitudinal direction


= 0.0 (As there is no tensile reinforcement in longitudinal direction)

H1 = 0.36 fck Aec 10


-3

Aec = effective area of concrete

H1 = 0.36*40*300*0.241 = 6716 kN
H2 = 0.87*350*0.01951*1000 = 3069 kN
H = Minimum of H1 and H2 = 3069 kN

Spacing of connectors
s = Qu x L / H

s = 393.89 mm (For for channels)

Hence for full shear connection, required spacing = 122.1 mm

Hence provideshear connector at 150.0 mm c/c

Maximum spacing of shear connector as per IRC 22:2008 cl. 606.9


= 21*tf*0.85
= 214.2 mm
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0

ANNEXURE -

Page 63
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

Annexure 1 STAAD File


STAAD FLOOR
START JOB INFORMATION
ENGINEER DATE 18-Feb-10
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER MTON
JOINT COORDINATES
2 5.8 0 -1.25; 4 5.8 0 8.75; 11 8.8 0 -1.25; 13 8.8 0 8.75; 57 5.8 0 9.75;
58 8.8 0 9.75; 59 11.8 0 9.75; 60 14.8 0 9.75; 61 17.8 0 9.75; 62 20.8 0 9.75;
63 23.8 0 9.75; 64 26.8 0 9.75; 65 29.8 0 9.75; 66 32.8 0 9.75; 68 5.8 0 -2.25;
69 8.8 0 -2.25; 70 11.8 0 -2.25; 71 14.8 0 -2.25; 72 17.8 0 -2.25;
73 20.8 0 -2.25; 74 23.8 0 -2.25; 75 26.8 0 -2.25; 76 29.8 0 -2.25;
77 32.8 0 -2.25; 127 5.8 0 7.5; 128 5.8 0 7; 129 5.8 0 6.5; 130 5.8 0 6;
131 5.8 0 5.5; 132 5.8 0 5; 133 5.8 0 4.5; 136 5.8 0 4; 137 5.8 0 3.5;
138 5.8 0 3; 139 5.8 0 2.5; 140 5.8 0 2; 141 5.8 0 1.5; 142 5.8 0 1;
143 5.8 0 0.5; 144 5.8 0 0; 145 8.8 0 7.5; 146 8.8 0 7; 147 8.8 0 6.5;
148 8.8 0 6; 149 8.8 0 5.5; 150 8.8 0 5; 151 8.8 0 4.5; 154 8.8 0 4;
155 8.8 0 3.5; 156 8.8 0 3; 157 8.8 0 2.5; 158 8.8 0 2; 159 8.8 0 1.5;
160 8.8 0 1; 161 8.8 0 0.5; 162 8.8 0 0; 307 7.3 0 9.75; 308 7.3 0 -2.25;
309 7.3 0 -1.25; 310 7.3 0 8.75; 311 7.3 0 0; 312 7.3 0 0.5; 313 7.3 0 1;
314 7.3 0 1.5; 315 7.3 0 2; 316 7.3 0 2.5; 317 7.3 0 3; 318 7.3 0 3.5;
319 7.3 0 4; 322 7.3 0 4.5; 323 7.3 0 5; 324 7.3 0 5.5; 325 7.3 0 6;
326 7.3 0 6.5; 327 7.3 0 7; 328 7.3 0 7.5; 329 11.8 0 -1.25; 330 11.8 0 8.75;
331 11.8 0 7.5; 332 11.8 0 7; 333 11.8 0 6.5; 334 11.8 0 6; 335 11.8 0 5.5;
336 11.8 0 5; 337 11.8 0 4.5; 340 11.8 0 4; 341 11.8 0 3.5; 342 11.8 0 3;
343 11.8 0 2.5; 344 11.8 0 2; 345 11.8 0 1.5; 346 11.8 0 1; 347 11.8 0 0.5;
348 11.8 0 0; 349 10.3 0 9.75; 350 10.3 0 -2.25; 351 10.3 0 -1.25;
352 10.3 0 8.75; 353 10.3 0 0; 354 10.3 0 0.5; 355 10.3 0 1; 356 10.3 0 1.5;
357 10.3 0 2; 358 10.3 0 2.5; 359 10.3 0 3; 360 10.3 0 3.5; 361 10.3 0 4;
364 10.3 0 4.5; 365 10.3 0 5; 366 10.3 0 5.5; 367 10.3 0 6; 368 10.3 0 6.5;
369 10.3 0 7; 370 10.3 0 7.5; 371 14.8 0 -1.25; 372 14.8 0 8.75;
373 14.8 0 7.5; 374 14.8 0 7; 375 14.8 0 6.5; 376 14.8 0 6; 377 14.8 0 5.5;
378 14.8 0 5; 379 14.8 0 4.5; 382 14.8 0 4; 383 14.8 0 3.5; 384 14.8 0 3;
385 14.8 0 2.5; 386 14.8 0 2; 387 14.8 0 1.5; 388 14.8 0 1; 389 14.8 0 0.5;
390 14.8 0 0; 391 13.3 0 9.75; 392 13.3 0 -2.25; 393 13.3 0 -1.25;
394 13.3 0 8.75; 395 13.3 0 0; 396 13.3 0 0.5; 397 13.3 0 1; 398 13.3 0 1.5;
399 13.3 0 2; 400 13.3 0 2.5; 401 13.3 0 3; 402 13.3 0 3.5; 403 13.3 0 4;
406 13.3 0 4.5; 407 13.3 0 5; 408 13.3 0 5.5; 409 13.3 0 6; 410 13.3 0 6.5;
411 13.3 0 7; 412 13.3 0 7.5; 413 17.8 0 -1.25; 414 17.8 0 8.75;
415 17.8 0 7.5; 416 17.8 0 7; 417 17.8 0 6.5; 418 17.8 0 6; 419 17.8 0 5.5;
420 17.8 0 5; 421 17.8 0 4.5; 424 17.8 0 4; 425 17.8 0 3.5; 426 17.8 0 3;
427 17.8 0 2.5; 428 17.8 0 2; 429 17.8 0 1.5; 430 17.8 0 1; 431 17.8 0 0.5;
432 17.8 0 0; 433 16.3 0 9.75; 434 16.3 0 -2.25; 435 16.3 0 -1.25;
436 16.3 0 8.75; 437 16.3 0 0; 438 16.3 0 0.5; 439 16.3 0 1; 440 16.3 0 1.5;
441 16.3 0 2; 442 16.3 0 2.5; 443 16.3 0 3; 444 16.3 0 3.5; 445 16.3 0 4;
448 16.3 0 4.5; 449 16.3 0 5; 450 16.3 0 5.5; 451 16.3 0 6; 452 16.3 0 6.5;
453 16.3 0 7; 454 16.3 0 7.5; 455 20.8 0 -1.25; 456 20.8 0 8.75;

Page 64
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

457 20.8 0 7.5; 458 20.8 0 7; 459 20.8 0 6.5; 460 20.8 0 6; 461 20.8 0 5.5;
462 20.8 0 5; 463 20.8 0 4.5; 466 20.8 0 4; 467 20.8 0 3.5; 468 20.8 0 3;
469 20.8 0 2.5; 470 20.8 0 2; 471 20.8 0 1.5; 472 20.8 0 1; 473 20.8 0 0.5;
474 20.8 0 0; 475 19.3 0 9.75; 476 19.3 0 -2.25; 477 19.3 0 -1.25;
478 19.3 0 8.75; 479 19.3 0 0; 480 19.3 0 0.5; 481 19.3 0 1; 482 19.3 0 1.5;
483 19.3 0 2; 484 19.3 0 2.5; 485 19.3 0 3; 486 19.3 0 3.5; 487 19.3 0 4;
490 19.3 0 4.5; 491 19.3 0 5; 492 19.3 0 5.5; 493 19.3 0 6; 494 19.3 0 6.5;
495 19.3 0 7; 496 19.3 0 7.5; 497 23.8 0 -1.25; 498 23.8 0 8.75;
499 23.8 0 7.5; 500 23.8 0 7; 501 23.8 0 6.5; 502 23.8 0 6; 503 23.8 0 5.5;
504 23.8 0 5; 505 23.8 0 4.5; 508 23.8 0 4; 509 23.8 0 3.5; 510 23.8 0 3;
511 23.8 0 2.5; 512 23.8 0 2; 513 23.8 0 1.5; 514 23.8 0 1; 515 23.8 0 0.5;
516 23.8 0 0; 517 22.3 0 9.75; 518 22.3 0 -2.25; 519 22.3 0 -1.25;
520 22.3 0 8.75; 521 22.3 0 0; 522 22.3 0 0.5; 523 22.3 0 1; 524 22.3 0 1.5;
525 22.3 0 2; 526 22.3 0 2.5; 527 22.3 0 3; 528 22.3 0 3.5; 529 22.3 0 4;
532 22.3 0 4.5; 533 22.3 0 5; 534 22.3 0 5.5; 535 22.3 0 6; 536 22.3 0 6.5;
537 22.3 0 7; 538 22.3 0 7.5; 539 26.8 0 -1.25; 540 26.8 0 8.75;
541 26.8 0 7.5; 542 26.8 0 7; 543 26.8 0 6.5; 544 26.8 0 6; 545 26.8 0 5.5;
546 26.8 0 5; 547 26.8 0 4.5; 550 26.8 0 4; 551 26.8 0 3.5; 552 26.8 0 3;
553 26.8 0 2.5; 554 26.8 0 2; 555 26.8 0 1.5; 556 26.8 0 1; 557 26.8 0 0.5;
558 26.8 0 0; 559 25.3 0 9.75; 560 25.3 0 -2.25; 561 25.3 0 -1.25;
562 25.3 0 8.75; 563 25.3 0 0; 564 25.3 0 0.5; 565 25.3 0 1; 566 25.3 0 1.5;
567 25.3 0 2; 568 25.3 0 2.5; 569 25.3 0 3; 570 25.3 0 3.5; 571 25.3 0 4;
574 25.3 0 4.5; 575 25.3 0 5; 576 25.3 0 5.5; 577 25.3 0 6; 578 25.3 0 6.5;
579 25.3 0 7; 580 25.3 0 7.5; 581 29.8 0 -1.25; 582 29.8 0 8.75;
583 29.8 0 7.5; 584 29.8 0 7; 585 29.8 0 6.5; 586 29.8 0 6; 587 29.8 0 5.5;
588 29.8 0 5; 589 29.8 0 4.5; 592 29.8 0 4; 593 29.8 0 3.5; 594 29.8 0 3;
595 29.8 0 2.5; 596 29.8 0 2; 597 29.8 0 1.5; 598 29.8 0 1; 599 29.8 0 0.5;
600 29.8 0 0; 601 28.3 0 9.75; 602 28.3 0 -2.25; 603 28.3 0 -1.25;
604 28.3 0 8.75; 605 28.3 0 0; 606 28.3 0 0.5; 607 28.3 0 1; 608 28.3 0 1.5;
609 28.3 0 2; 610 28.3 0 2.5; 611 28.3 0 3; 612 28.3 0 3.5; 613 28.3 0 4;
616 28.3 0 4.5; 617 28.3 0 5; 618 28.3 0 5.5; 619 28.3 0 6; 620 28.3 0 6.5;
621 28.3 0 7; 622 28.3 0 7.5; 623 32.8 0 -1.25; 624 32.8 0 8.75;
625 32.8 0 7.5; 626 32.8 0 7; 627 32.8 0 6.5; 628 32.8 0 6; 629 32.8 0 5.5;
630 32.8 0 5; 631 32.8 0 4.5; 634 32.8 0 4; 635 32.8 0 3.5; 636 32.8 0 3;
637 32.8 0 2.5; 638 32.8 0 2; 639 32.8 0 1.5; 640 32.8 0 1; 641 32.8 0 0.5;
642 32.8 0 0; 643 31.3 0 9.75; 644 31.3 0 -2.25; 645 31.3 0 -1.25;
646 31.3 0 8.75; 647 31.3 0 0; 648 31.3 0 0.5; 649 31.3 0 1; 650 31.3 0 1.5;
651 31.3 0 2; 652 31.3 0 2.5; 653 31.3 0 3; 654 31.3 0 3.5; 655 31.3 0 4;
658 31.3 0 4.5; 659 31.3 0 5; 660 31.3 0 5.5; 661 31.3 0 6; 662 31.3 0 6.5;
663 31.3 0 7; 664 31.3 0 7.5;
MEMBER INCIDENCES
15 57 307; 16 68 308; 21 58 349; 22 69 350; 27 59 391; 28 70 392; 33 60 433;
34 71 434; 39 61 475; 40 72 476; 45 62 517; 46 73 518; 51 63 559; 52 74 560;
57 64 601; 58 75 602; 63 65 643; 64 76 644; 65 57 4; 66 58 13; 75 2 68;
76 11 69; 85 2 309; 94 4 310; 206 4 127; 207 127 128; 208 128 129; 209 129 130;
210 130 131; 211 131 132; 212 132 133; 213 133 136; 216 136 137; 217 137 138;
218 138 139; 219 139 140; 220 140 141; 221 141 142; 222 142 143; 223 143 144;
224 144 2; 225 13 145; 226 145 146; 227 146 147; 228 147 148; 229 148 149;

Page 65
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

230 149 150; 231 150 151; 232 151 154; 235 154 155; 236 155 156; 237 156 157;
238 157 158; 239 158 159; 240 159 160; 241 160 161; 242 161 162; 243 162 11;
244 144 311; 245 143 312; 246 142 313; 247 141 314; 248 140 315; 249 139 316;
250 138 317; 251 137 318; 252 136 319; 255 133 322; 256 132 323; 257 131 324;
258 130 325; 259 129 326; 260 128 327; 261 127 328; 558 307 58; 559 308 69;
560 309 11; 561 310 13; 562 311 162; 563 312 161; 564 313 160; 565 314 159;
566 315 158; 567 316 157; 568 317 156; 569 318 155; 570 319 154; 573 322 151;
574 323 150; 575 324 149; 576 325 148; 577 326 147; 578 327 146; 579 328 145;
580 307 310; 581 309 308; 582 310 328; 583 328 327; 584 327 326; 585 326 325;
586 325 324; 587 324 323; 588 323 322; 589 322 319; 592 319 318; 593 318 317;
594 317 316; 595 316 315; 596 315 314; 597 314 313; 598 313 312; 599 312 311;
600 311 309; 601 349 59; 602 350 70; 603 59 330; 604 329 70; 605 11 351;
606 13 352; 607 330 331; 608 331 332; 609 332 333; 610 333 334; 611 334 335;
612 335 336; 613 336 337; 614 337 340; 617 340 341; 618 341 342; 619 342 343;
620 343 344; 621 344 345; 622 345 346; 623 346 347; 624 347 348; 625 348 329;
626 162 353; 627 161 354; 628 160 355; 629 159 356; 630 158 357; 631 157 358;
632 156 359; 633 155 360; 634 154 361; 637 151 364; 638 150 365; 639 149 366;
640 148 367; 641 147 368; 642 146 369; 643 145 370; 644 351 329; 645 352 330;
646 353 348; 647 354 347; 648 355 346; 649 356 345; 650 357 344; 651 358 343;
652 359 342; 653 360 341; 654 361 340; 657 364 337; 658 365 336; 659 366 335;
660 367 334; 661 368 333; 662 369 332; 663 370 331; 664 349 352; 665 351 350;
666 352 370; 667 370 369; 668 369 368; 669 368 367; 670 367 366; 671 366 365;
672 365 364; 673 364 361; 676 361 360; 677 360 359; 678 359 358; 679 358 357;
680 357 356; 681 356 355; 682 355 354; 683 354 353; 684 353 351; 685 391 60;
686 392 71; 687 60 372; 688 371 71; 689 329 393; 690 330 394; 691 372 373;
692 373 374; 693 374 375; 694 375 376; 695 376 377; 696 377 378; 697 378 379;
698 379 382; 701 382 383; 702 383 384; 703 384 385; 704 385 386; 705 386 387;
706 387 388; 707 388 389; 708 389 390; 709 390 371; 710 348 395; 711 347 396;
712 346 397; 713 345 398; 714 344 399; 715 343 400; 716 342 401; 717 341 402;
718 340 403; 721 337 406; 722 336 407; 723 335 408; 724 334 409; 725 333 410;
726 332 411; 727 331 412; 728 393 371; 729 394 372; 730 395 390; 731 396 389;
732 397 388; 733 398 387; 734 399 386; 735 400 385; 736 401 384; 737 402 383;
738 403 382; 741 406 379; 742 407 378; 743 408 377; 744 409 376; 745 410 375;
746 411 374; 747 412 373; 748 391 394; 749 393 392; 750 394 412; 751 412 411;
752 411 410; 753 410 409; 754 409 408; 755 408 407; 756 407 406; 757 406 403;
760 403 402; 761 402 401; 762 401 400; 763 400 399; 764 399 398; 765 398 397;
766 397 396; 767 396 395; 768 395 393; 769 433 61; 770 434 72; 771 61 414;
772 413 72; 773 371 435; 774 372 436; 775 414 415; 776 415 416; 777 416 417;
778 417 418; 779 418 419; 780 419 420; 781 420 421; 782 421 424; 785 424 425;
786 425 426; 787 426 427; 788 427 428; 789 428 429; 790 429 430; 791 430 431;
792 431 432; 793 432 413; 794 390 437; 795 389 438; 796 388 439; 797 387 440;
798 386 441; 799 385 442; 800 384 443; 801 383 444; 802 382 445; 805 379 448;
806 378 449; 807 377 450; 808 376 451; 809 375 452; 810 374 453; 811 373 454;
812 435 413; 813 436 414; 814 437 432; 815 438 431; 816 439 430; 817 440 429;
818 441 428; 819 442 427; 820 443 426; 821 444 425; 822 445 424; 825 448 421;
826 449 420; 827 450 419; 828 451 418; 829 452 417; 830 453 416; 831 454 415;
832 433 436; 833 435 434; 834 436 454; 835 454 453; 836 453 452; 837 452 451;
838 451 450; 839 450 449; 840 449 448; 841 448 445; 844 445 444; 845 444 443;

Page 66
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

846 443 442; 847 442 441; 848 441 440; 849 440 439; 850 439 438; 851 438 437;
852 437 435; 853 475 62; 854 476 73; 855 62 456; 856 455 73; 857 413 477;
858 414 478; 859 456 457; 860 457 458; 861 458 459; 862 459 460; 863 460 461;
864 461 462; 865 462 463; 866 463 466; 869 466 467; 870 467 468; 871 468 469;
872 469 470; 873 470 471; 874 471 472; 875 472 473; 876 473 474; 877 474 455;
878 432 479; 879 431 480; 880 430 481; 881 429 482; 882 428 483; 883 427 484;
884 426 485; 885 425 486; 886 424 487; 889 421 490; 890 420 491; 891 419 492;
892 418 493; 893 417 494; 894 416 495; 895 415 496; 896 477 455; 897 478 456;
898 479 474; 899 480 473; 900 481 472; 901 482 471; 902 483 470; 903 484 469;
904 485 468; 905 486 467; 906 487 466; 909 490 463; 910 491 462; 911 492 461;
912 493 460; 913 494 459; 914 495 458; 915 496 457; 916 475 478; 917 477 476;
918 478 496; 919 496 495; 920 495 494; 921 494 493; 922 493 492; 923 492 491;
924 491 490; 925 490 487; 928 487 486; 929 486 485; 930 485 484; 931 484 483;
932 483 482; 933 482 481; 934 481 480; 935 480 479; 936 479 477; 937 517 63;
938 518 74; 939 63 498; 940 497 74; 941 455 519; 942 456 520; 943 498 499;
944 499 500; 945 500 501; 946 501 502; 947 502 503; 948 503 504; 949 504 505;
950 505 508; 953 508 509; 954 509 510; 955 510 511; 956 511 512; 957 512 513;
958 513 514; 959 514 515; 960 515 516; 961 516 497; 962 474 521; 963 473 522;
964 472 523; 965 471 524; 966 470 525; 967 469 526; 968 468 527; 969 467 528;
970 466 529; 973 463 532; 974 462 533; 975 461 534; 976 460 535; 977 459 536;
978 458 537; 979 457 538; 980 519 497; 981 520 498; 982 521 516; 983 522 515;
984 523 514; 985 524 513; 986 525 512; 987 526 511; 988 527 510; 989 528 509;
990 529 508; 993 532 505; 994 533 504; 995 534 503; 996 535 502; 997 536 501;
998 537 500; 999 538 499; 1000 517 520; 1001 519 518; 1002 520 538;
1003 538 537; 1004 537 536; 1005 536 535; 1006 535 534; 1007 534 533;
1008 533 532; 1009 532 529; 1012 529 528; 1013 528 527; 1014 527 526;
1015 526 525; 1016 525 524; 1017 524 523; 1018 523 522; 1019 522 521;
1020 521 519; 1021 559 64; 1022 560 75; 1023 64 540; 1024 539 75; 1025 497 561;
1026 498 562; 1027 540 541; 1028 541 542; 1029 542 543; 1030 543 544;
1031 544 545; 1032 545 546; 1033 546 547; 1034 547 550; 1037 550 551;
1038 551 552; 1039 552 553; 1040 553 554; 1041 554 555; 1042 555 556;
1043 556 557; 1044 557 558; 1045 558 539; 1046 516 563; 1047 515 564;
1048 514 565; 1049 513 566; 1050 512 567; 1051 511 568; 1052 510 569;
1053 509 570; 1054 508 571; 1057 505 574; 1058 504 575; 1059 503 576;
1060 502 577; 1061 501 578; 1062 500 579; 1063 499 580; 1064 561 539;
1065 562 540; 1066 563 558; 1067 564 557; 1068 565 556; 1069 566 555;
1070 567 554; 1071 568 553; 1072 569 552; 1073 570 551; 1074 571 550;
1077 574 547; 1078 575 546; 1079 576 545; 1080 577 544; 1081 578 543;
1082 579 542; 1083 580 541; 1084 559 562; 1085 561 560; 1086 562 580;
1087 580 579; 1088 579 578; 1089 578 577; 1090 577 576; 1091 576 575;
1092 575 574; 1093 574 571; 1096 571 570; 1097 570 569; 1098 569 568;
1099 568 567; 1100 567 566; 1101 566 565; 1102 565 564; 1103 564 563;
1104 563 561; 1105 601 65; 1106 602 76; 1107 65 582; 1108 581 76; 1109 539 603;
1110 540 604; 1111 582 583; 1112 583 584; 1113 584 585; 1114 585 586;
1115 586 587; 1116 587 588; 1117 588 589; 1118 589 592; 1121 592 593;
1122 593 594; 1123 594 595; 1124 595 596; 1125 596 597; 1126 597 598;
1127 598 599; 1128 599 600; 1129 600 581; 1130 558 605; 1131 557 606;
1132 556 607; 1133 555 608; 1134 554 609; 1135 553 610; 1136 552 611;

Page 67
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

1137 551 612; 1138 550 613; 1141 547 616; 1142 546 617; 1143 545 618;
1144 544 619; 1145 543 620; 1146 542 621; 1147 541 622; 1148 603 581;
1149 604 582; 1150 605 600; 1151 606 599; 1152 607 598; 1153 608 597;
1154 609 596; 1155 610 595; 1156 611 594; 1157 612 593; 1158 613 592;
1161 616 589; 1162 617 588; 1163 618 587; 1164 619 586; 1165 620 585;
1166 621 584; 1167 622 583; 1168 601 604; 1169 603 602; 1170 604 622;
1171 622 621; 1172 621 620; 1173 620 619; 1174 619 618; 1175 618 617;
1176 617 616; 1177 616 613; 1180 613 612; 1181 612 611; 1182 611 610;
1183 610 609; 1184 609 608; 1185 608 607; 1186 607 606; 1187 606 605;
1188 605 603; 1189 643 66; 1190 644 77; 1191 66 624; 1192 623 77; 1193 581 645;
1194 582 646; 1195 624 625; 1196 625 626; 1197 626 627; 1198 627 628;
1199 628 629; 1200 629 630; 1201 630 631; 1202 631 634; 1205 634 635;
1206 635 636; 1207 636 637; 1208 637 638; 1209 638 639; 1210 639 640;
1211 640 641; 1212 641 642; 1213 642 623; 1214 600 647; 1215 599 648;
1216 598 649; 1217 597 650; 1218 596 651; 1219 595 652; 1220 594 653;
1221 593 654; 1222 592 655; 1225 589 658; 1226 588 659; 1227 587 660;
1228 586 661; 1229 585 662; 1230 584 663; 1231 583 664; 1232 645 623;
1233 646 624; 1234 647 642; 1235 648 641; 1236 649 640; 1237 650 639;
1238 651 638; 1239 652 637; 1240 653 636; 1241 654 635; 1242 655 634;
1245 658 631; 1246 659 630; 1247 660 629; 1248 661 628; 1249 662 627;
1250 663 626; 1251 664 625; 1252 643 646; 1253 645 644; 1254 646 664;
1255 664 663; 1256 663 662; 1257 662 661; 1258 661 660; 1259 660 659;
1260 659 658; 1261 658 655; 1264 655 654; 1265 654 653; 1266 653 652;
1267 652 651; 1268 651 650; 1269 650 649; 1270 649 648; 1271 648 647;
1272 647 645;
START GROUP DEFINITION
MEMBER
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 3.21467e+006
POISSON 0.17
DENSITY 2.40262
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.09042e+007
POISSON 0.3
DENSITY 7.83341
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
15 16 21 22 27 28 33 34 39 40 45 46 51 52 57 58 63 64 558 559 601 602 685 -
686 769 770 853 854 937 938 1021 1022 1105 1106 1189 -
1190 PRIS AX 0.098 IX 1e-006 IY 0.0018 IZ 0.0694 YD 2 ZD 0.65 YB 0.65 ZB 0.85
66 76 207 TO 213 216 TO 223 225 TO 232 235 TO 243 603 604 607 TO 614 -
617 TO 625 692 TO 698 701 TO 708 771 772 775 TO 782 785 TO 793 855 856 859 -

Page 68
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

860 TO 866 869 TO 877 944 TO 950 953 TO 960 1023 1024 1027 TO 1034 -
1037 TO 1045 1107 1108 1111 TO 1118 1121 TO 1129 1196 TO 1202 1205 TO 1211 -
1211 -
1212 PRIS AX 0.13779 IX 1e-005 IY 5.41e-005 IZ 0.008675 YD 1.2 ZD -
0.5 YB 1.2 ZB 0.5
MEMBER PROPERTY AMERICAN
85 94 560 561 605 606 644 645 689 690 728 729 773 774 812 813 857 858 896 -
897 941 942 980 981 1025 1026 1064 1065 1109 1110 1148 1149 1193 1194 1232 -
1233 PRIS YD 0.3 ZD 2
MEMBER PROPERTY AMERICAN
244 TO 252 255 TO 261 562 TO 570 573 TO 579 626 TO 634 637 TO 643 646 TO 654 -
657 TO 663 710 TO 718 721 TO 727 730 TO 738 741 TO 747 794 TO 802 -
805 TO 811 814 TO 822 825 TO 831 878 TO 886 889 TO 895 898 TO 906 -
909 TO 915 962 TO 970 973 TO 979 982 TO 990 993 TO 999 1046 TO 1054 1057 -
1058 TO 1063 1066 TO 1074 1077 TO 1083 1130 TO 1138 1141 TO 1147 1150 TO 1158 -
1161 TO 1167 1214 TO 1222 1225 TO 1231 1234 TO 1242 1245 TO 1250 -
1251 PRIS YD 0.3 ZD 0.5
580 TO 589 592 TO 600 664 TO 673 676 TO 684 748 TO 757 760 TO 768 832 TO 841 -
844 TO 852 916 TO 925 928 TO 936 1000 TO 1009 1012 TO 1020 1084 TO 1093 1096 -
1097 TO 1104 1168 TO 1177 1180 TO 1188 1252 TO 1261 1264 TO 1271 -
1272 PRIS YD 0.3 ZD 0.375
MEMBER PROPERTY AMERICAN
65 75 206 224 687 688 691 709 939 940 943 961 1191 1192 1195 -
1213 PRIS AX 0.135 IX 1e-005 IY 0.007 IZ 0.00767
CONSTANTS
MATERIAL STEEL MEMB 15 16 21 22 27 28 33 34 39 40 45 46 51 52 57 58 -
63 TO 66 75 76 206 TO 213 216 TO 232 235 TO 243 558 559 580 TO 589 -
592 TO 604 607 TO 614 617 TO 625 664 TO 672 676 TO 688 691 TO 698 -
701 TO 709 748 TO 756 760 TO 772 775 TO 782 785 TO 793 832 TO 840 -
844 TO 856 859 TO 866 869 TO 877 916 TO 924 928 TO 940 943 TO 950 -
953 TO 961 1000 TO 1008 1012 TO 1024 1027 TO 1034 1037 TO 1045 1084 TO 1092 -
1096 TO 1108 1111 TO 1118 1121 TO 1129 1168 TO 1176 1180 TO 1192 -
1195 TO 1202 1205 TO 1213 1252 TO 1260 1264 TO 1272
MATERIAL CONCRETE MEMB 85 94 244 TO 252 255 TO 261 560 TO 570 573 TO 589 592 -
593 TO 600 605 606 626 TO 634 637 TO 654 657 TO 673 676 TO 684 689 690 710 -
711 TO 718 721 TO 738 741 TO 757 760 TO 768 773 774 794 TO 802 805 TO 822 -
825 TO 841 844 TO 852 857 858 878 TO 886 889 TO 906 909 TO 925 928 TO 936 -
941 942 962 TO 970 973 TO 990 993 TO 1009 1012 TO 1020 1025 1026 -
1046 TO 1054 1057 TO 1074 1077 TO 1093 1096 TO 1104 1109 1110 1130 TO 1138 -
1141 TO 1158 1161 TO 1177 1180 TO 1188 1193 1194 1214 TO 1222 1225 TO 1242 -
1245 TO 1261 1264 TO 1272
SUPPORTS
57 60 63 66 68 71 74 77 PINNED
MEMBER RELEASE
65 66 580 603 664 687 748 771 832 855 916 939 1000 1023 1084 1107 1168 1191 -
1252 START MX MZ
75 76 581 604 665 688 749 772 833 856 917 940 1001 1024 1085 1108 1169 1192 -
1253 END MX MZ

Page 69
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

DEFINE MOVING LOAD


****70 R wheeled load****
TYPE 1 LOAD 8.5 8.5 8.5 8.5 6 6 4
DIST 1.37 3.05 1.37 2.13 1.52 3.96 WID 1.93
*****Class A load*****
TYPE 2 LOAD 3.4 3.4 3.4 3.4 5.7 5.7 1.35 1.35
DIST 3 3 3 4.3 1.2 3.2 1.1 WID 1.8
LOAD 1 LOADTYPE Dead TITLE DL+SIDL
MEMBER LOAD
65 66 75 76 206 TO 213 216 TO 232 235 TO 243 586 TO 589 592 TO 597 603 604 -
607 TO 614 617 TO 625 670 TO 673 676 TO 681 687 688 691 TO 698 701 TO 709 -
754 TO 757 760 TO 765 771 772 775 TO 782 785 TO 793 838 TO 841 844 TO 849 -
855 856 859 TO 866 869 TO 877 922 TO 925 928 TO 933 939 940 943 TO 950 953 -
954 TO 961 1006 TO 1009 1012 TO 1017 1023 1024 1027 TO 1034 1037 TO 1045 1090 -
1091 TO 1093 1096 TO 1101 1107 1108 1111 TO 1118 1121 TO 1129 1174 TO 1177 -
1180 TO 1185 1191 1192 1195 TO 1202 1205 TO 1213 1258 TO 1261 1264 TO 1268 -
1269 UNI GY -3.572
JOINT LOAD
2 4 11 13 329 330 371 372 413 414 455 456 497 498 539 540 581 582 623 -
624 FY -4.1
LOAD GENERATION 10
TYPE 1 8 0 3.56 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 4 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 4.5 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 5 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 5 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 6 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 6.5 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 7 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 5.8 XINC 0.5
TYPE 2 -1 0 9.47 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 6.1 XINC 0.5
TYPE 2 -1 0 9.77 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 6.4 XINC 0.5
TYPE 2 -1 0 10.07 XINC 0.5
LOAD GENERATION 10
TYPE 1 8 0 6.7 XINC 0.5
TYPE 2 -1 0 10.37 XINC 0.5

Page 70
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

LOAD GENERATION 10
TYPE 1 8 0 7.1 XINC 0.5
TYPE 2 -1 0 10.67 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 9.3 XINC 0.5
TYPE 2 -1 0 5.8 XINC 0.5
TYPE 2 -1 0 2.3 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 9.6 XINC 0.5
TYPE 2 -1 0 6.1 XINC 0.5
TYPE 2 -1 0 2.6 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 9.9 XINC 0.5
TYPE 2 -1 0 6.4 XINC 0.5
TYPE 2 -1 0 2.9 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 10.2 XINC 0.5
TYPE 2 -1 0 6.7 XINC 0.5
TYPE 2 -1 0 3.2 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 10.5 XINC 0.5
TYPE 2 1 0 7 XINC 0.5
TYPE 2 -1 0 3.5 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 5.8 XINC 0.5
TYPE 2 -1 0 2.3 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 6.1 XINC 0.5
TYPE 2 -1 0 2.6 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 6.4 XINC 0.5
TYPE 2 -1 0 2.9 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 6.7 XINC 0.5
TYPE 2 -1 0 3.2 XINC 0.5
LOAD GENERATION 10
TYPE 2 -1 0 7 XINC 0.5
TYPE 2 -1 0 3.5 XINC 0.5
PERFORM ANALYSIS
FINISH
TYPE 2 3.6 0 2.3 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 6.1 XINC 0.5
TYPE 2 3.6 0 2.6 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 6.4 XINC 0.5
TYPE 2 3.6 0 2.9 XINC 0.5
LOAD GENERATION 5

Page 71
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 STAAD File

TYPE 2 3.6 0 6.7 XINC 0.5


TYPE 2 3.6 0 3.2 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 7 XINC 0.5
TYPE 2 3.6 0 3.5 XINC 0.5
PERFORM ANALYSIS
FINISH

Page 72
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Mfd
Annexure 2 Calculation of Mfd
For calculating Mfd (Plastic moment capacity excluding web)
E = 200000 N/mm2
Yield stress in steel = 250 N/mm2
Grade of concrete = 40 N/mm2

Section Properties (Steel Girder)

2500
y
Transformed Steel 250mm
333
300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
600 576 x 12mm thk web plate 3

300mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
300
y
Depth of the Girder = 600mm
Overall depth of the section = 850mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m 3
m 4
m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.300 0.012 0.00360 0.006 2.16E-05 1.30E-07 4.32E-08
Web Plate 3 0.012 0.576 0.00691 0.300 2.07E-03 6.22E-04 1.91E-04
Bot Flange 4 0.300 0.012 0.00360 0.594 2.14E-03 1.27E-03 4.32E-08
Bot Flange 5 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00423 0.00189 0.000191

y = Ʃ Ay = 0.004 = 0.300000m Ytop = 0.300m Zxt 0.002712


Ʃ A 0.014 Ybot = 0.300m Zxb 0.002712

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00271 m3 rxx = 0.240 m


= 0.00189 + 0.00019 - 0.00127 Zxb = 0.00271 m 3

= 0.00081 m4

Page 73
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Mfd

Composite Section properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m3 m4 m4
Deck slab 0.333 0.250 0.08333333 0.1250 1.04E-02 1.30E-03 4.34E-04
Girder 0.014112 0.5500 7.76E-03 4.27E-03 8.14E-04
Total 0.097445 0.01818 0.00557 0.00125

y = Ʃ Ay = 0.018 = 0.187m Yslab top = 0.187m Ybot = 0.6635m


Ʃ A 0.097 Yslab bottom = -0.063m

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.01837 m3 rxx = 0.188 m


= 0.00557 + 0.00125 - 0.00339 Zxb = 0.00517 m3
= 0.003427 m4

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.576 0.00691 0.000 0.00E+00 0.00E+00 8.29E-08
Bot Flange 4 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00000 0.00000 0.00005

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.014 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00036 m3 ryy = 0.0619 m


= 0.00E+00 + 5.4E-05 - 0.0E+00 Zyr = 0.00036 m 3

= 0.0000541 m4

Composite Section properties @ Y - Y


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web (m) m3 m4 m4
Deck slab 0.333 0.250 0.08333333 0.000 0.00000 0.00000 7.72E-04
Top flange pl1 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.576 0.007 0.000 0.00E+00 0.00E+00 8.29E-08
Bot Flange 4 0.300 0.012 0.004 0.000 0.00E+00 0.00E+00 2.70E-05
Bot Flange 5 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.09745 0.00000 0.00000 0.00083

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.097 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00550 m3 ryy = 0.0921 m


= 0.00E+00 + 8.3E-04 - 0.0E+00 Zyr = 0.00550 m 3

= 0.0008257 m4

Page 74
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Mfd

Positive moment capacity of composite section with full shear Interaction


(As Per IRC22-2008 ANNEXURE-I)

fy = Yield stress in steel = 250 N/mm2


fck = Grade of concrete = 40 N/mm2
Af = Area of top flange of steel beam of composite section = 3600 mm2
14112 mm
2
As = Cross sectional area of steel beam of composite section =
beff = Effective width of concrete section = 2500 mm
bf = Width of top flange of steel section = 300 mm
ds = Overall depth of concrete slab = 250 mm
dc = vertical dist. Between centroid of slab and centroid of steel beam = 425 mm
tf = Thickness of top flange of steel section = 12 mm
tw = Thickness of web of steel section = 12 mm

gm = Material safety factor for structural steel = 1.1


gc = Material safety factor for concrete = 1.5

xu = Depth of neutral axis from top of slab

f y / gm
a =
0.36 fck

a = 15.783

if, beff ds > a.As Plastic Neutral axis in slab Case - 1


beff ds < a.As < beff ds + 2a.Af Plastic Neutral axis in steel flange Case - 2
beff ds + 2a.Af < a.As Plastic Neutral axis in steel web Case - 3

a.As = 222727
beff ds = 625000
beff ds + 2a.Af = 738636

Hence, beff ds > a. As Plastic Neutral axis in slab Case - 1

Depth of Neutral axis xu = a As / beff

= 89.09 mm

Moment Capacity
Mp = As fy (dc + 0.5ds - 0.42 xu)/gm

= 1643989686 Nmm
= 1643.99 kN.m

Page 75
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Lateral torsion buckling in construction stages
Annexure 3 Calculation of Lateral torsion buckling in construction stages
Maximum moment = 408.1984 kNm
E = 200000 N/mm2
Yield stress in steel = 250 N/mm2
Grade of concrete = 40 N/mm2

Section Properties (Steel Girder)

300
0mm x 0mm thk flange plate 1
300mm x 12mm thk flange plate 2

x x
600 576 x 12mm thk web plate 3

300mm x 12mm thk flange plate 4


0mm x 0mm thk flange plate 5
0mm x 0mm thk flange plate 6
300
y
Depth of the Girder = 600mm
Overall depth of the section = 600mm

Girder properties @ X-X


Description b d Area (A) y from top Ay Ay2 Icg
m m m² m m 3
m 4
m4
Top flange pl 1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl 2 0.300 0.012 0.00360 0.006 2.16E-05 1.30E-07 4.32E-08
Web Plate 3 0.012 0.576 0.00691 0.300 2.07E-03 6.22E-04 1.91E-04
Bot Flange 4 0.300 0.012 0.00360 0.594 2.14E-03 1.27E-03 4.32E-08
Bot Flange 5 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.600 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00423 0.00189 0.000191

y = Ʃ Ay = 0.004 = 0.300000m Ytop = 0.300m Zxt 0.002712


Ʃ A 0.014 Ybot = 0.300m Zxb 0.002712

Ixx = Ʃ Ay2 + Ʃ Icg - y Ʃ Ay Zxt = 0.00271 m3 rxx = 0.240 m


= 0.00189 + 0.00019 - 0.00127 Zxb = 0.00271 m 3

= 0.00081 m4

Page 76
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Lateral torsion buckling in construction stages

Girder Properties @ Y-Y :


Description b d Area (A) x from c/l of Ax Ax2 Icg
m m m² web in m m3 m4 m4
Top flange pl1 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Top flange pl2 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Web Plate 3 0.012 0.576 0.00691 0.000 0.00E+00 0.00E+00 8.29E-08
Bot Flange 4 0.300 0.012 0.00360 0.000 0.00E+00 0.00E+00 2.70E-05
Bot Flange 5 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Bot Flange 6 0.000 0.000 0.00000 0.000 0.00E+00 0.00E+00 0.00E+00
Total 0.01411 0.00000 0.00000 0.00005

x = Ʃ Ax = 0.000 = 0.000m Xleft = 0.150m


Ʃ A 0.014 Xright = 0.150m

Iyy = Ʃ Ax2 + Ʃ Icg - x S Ax Zyl = 0.00036 m3 ryy = 0.0619 m


= 0.00E+00 + 5.4E-05 - 0.0E+00 Zyr = 0.00036 m 3

= 0.0000541 m4

Providing 4nos lateral supports


F-2) Laterally Unsupported Beams 1100 Length As per IS 800-2007
Section Descripti =
G = 76923
I-Section Channel Angle
D = 600 0 0
Bt = 300 0 0
tw = 10 0 0
tft = 12 0 0
d' = 588.0 0 0
Bb 300.0 0 0
tfb 12.0 0 0
Bb2 0.0 0 0
tfb2 0.0 0 0
Itf 27000000.0 0 0
Ibf 27000000.0 0 0
Iy = 54082944 0 0
Bf = 0.500 0.0000 NA
It = 541600 0 0
Iw = 4674713347584 0 0
Mcr = 26009684490.8 kN.m
lLTx = 0.16

Section is Welded
aLT = 0.49
FLTx = 0.50

cLTx = 1.00

Fbdx = 227.27 N/sq.mm


Zp/Ze = 0.87
Mdx = 616.31 kN.m < 408.20 Hence safe

Page 77
CONSULTANCY SERVICE FOR DETAILED DESIGN FOR CONSTRUCTION OF Design Note No.
Name of Work: MAJOR BRIDGE ACROSS BANKOT CREEK BETWEEN VILLAGE KOLMANDLA IN
RAIGAD DISTRICT AND VILLAGE VESHVI IN RATNAGIRI DISTRICT ON MAJOR MCGM-
Date:13/10/2015 STATE HIGHWAY NO. 4 IN RAIGAD DISTRICT 137/MALWANI-
FOB/SUP/13702
Revision: R0 Calculation of Lateral torsion buckling in construction stages

Moment due to slab weight

Spacing of restrain member = 4 m


Span of restrain member = 3.00 m
Load due to slab weight = 24.00 kN/m
Load due to construction load 3.6 kN/m2 = 14.40 kN/m

Total load = 38.40 kN/m


Moment due to load = 43.20 kNm

Providing ISWB 225 A = 2880 mm2


tw = 5.8 mm H = 175
tf = 7.4 mm Bf = 175 Buckling class b
rxx = 73.3 mm Ixx = 15090000
ryy = 25.9 mm IYY = 1886000 zxx 2E+05

Maximum moment due to Construction stage = 408.1984 kNm


Stress in compression flang = 150.53 N/mm2
Maximum force in compression flange = 541.90 kN
1% of the force = 5.42 kN

Length of restrain member = 3 m

KL/rmin = 115.83 < 180

Permissible compressive stress = 57.5 N/mm2


Permissible axial load = 165.6 kN

Page 78
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

8.0 Design of shear connector for x= 0 to X = 3.2 m

Shear connector = ISMC 125


Length of channel = 200 mm

Properties of ISMC 125


A = 1619 mm2
tw = 5 mm
t = 8.1 mm F = 65 mm
Length = 0.200 m

Qu = 324 kN for 5X105 cycles


Ultimate Static Strength
(Table 7 IRC 22-2008)

Longitudinal shear (IRC 22-2008) At section near to support

V1 = 232.36 kN Shear Force due to DL+SIDL ULS


Ac = 0.06000 m2 Ac= Equivalent effective area of concrete
y = 0.14 m
I = 0.0075 m4
VL = V x Ac x y/I
= 256.32 kN/m

V1 = 882.00 kN Shear Force due to LL ULS


Ac = 0.12000 m2
y = 0.08 m
I = 0.0086 m4
VL = V x Ac x y/I
= 959.05 kN/m

VL = 1215.37 kN/m

V3 = 152.03 kN/m Shear Force due to Diffrential shrinkage

VL = 1367.402 kN/m

Spacing of shear connector


S = Qu/VL = 237 mm (For Channel)
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Design from fatigue consideration

Vr = VR x Ac x y/I ; Where, VR = Shear force due to live load


VR = 613.00 kN
Vr =### = 666.55 kN/m
Fatigue strength of shear connector (channel)

Qr =### for 5X105 cycles


= 93.333 kN (IRC 22:2008 ) (Per channel capacity)

Spacing of shear connectors based on fatigue criteria


s = Qr/Vr = 140.0 m (For Channels)

Max Longitudinal force due to bending (IRC 22-2008)

H1 = 0.87 fy As1 10
-3

As1 = Area of tensile steel in longitudinal direction


= 0.0 (As there is no tensile reinforcement in longitudinal direction)

H1 = 0.36 fck Aec 10


-3

Aec = effective area of concrete

H1 =### = 6716 kN
H2 =### = 3069 kN
H = Minimum of H1 and H2 = 3069 kN

Spacing of connectors
s = Qu x L / H

s = 686.14 mm (For for channels)

Hence for full shear connection, required spacing = 140.0 mm


SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Providing partial shear connection

M - Mps
np ns
= Mp - Mps
At X = 2 m
M = Moment at section = 775.305
Mp = Plastic moment resistance of composit section = 3486.12
Mps = Plastic moment resistance of girder = 1929.79
np =###
= -0.7

Hence required spacing = -189 mm

Provide shear connector of 220 mm c/c with 200 mm length ISMC 125 channel section
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

8.0 Design of shear connector for x= 3.2 to X= 11.7 m

Shear connector = ISMC 125


Length of channel = 200 mm

Properties of ISMC 125


A = 1619 mm2
tw = 5 mm
t = 8.1 mm
Length = 0.200 m

Qu =### for 5X105 cycles


= 324 kN

Ultimate Static Strength


(Table 7 IRC 22-2008)

Longitudinal shear (IRC 22-2008) At section near to support

V1 = 132.44 kN Shear Force due to DL+SIDL ULS


Ac = 0.06000 m2 Ac= Equivalent effective area of concrete
y = 0.15 m
I = 0.0083 m4
VL = V x Ac x y/I
= 140.33 kN/m

V1 = 244.13 kN Shear Force due to LL ULS


Ac = 0.12000 m2
y = 0.08 m
I = 0.0095 m4
VL = V x Ac x y/I
= 256.62 kN/m

VL = 396.94 kN/m

V3 = 152.03 kN/m Shear Force due to Diffrential shrinkage

VL = 689.299 kN/m

Spacing of shear connector


S = Qu/VL = 470 mm (For Channel)
SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Design from fatigue consideration

Vr = VR x Ac x y/I ; Where, VR = Shear force due to live load


VR = 162.76 kN
Vr =### = 171.08 kN/m
Fatigue strength of shear connector (channel)

Qr =### for 5X105 cycles


= 93.333 kN (IRC 22:2008 ) (Per channel capacity)

Spacing of shear connectors based on fatigue criteria


s = Qr/Vr = 545.6 m (For Channels)

Max Longitudinal force due to bending (IRC 22-2008)

H1 = 0.87 fy As1 10
-3

As1 = Area of tensile steel in longitudinal direction


= 0.0 (As there is no tensile reinforcement in longitudinal direction)

H1 = 0.36 fck Aec 10


-3

Aec = effective area of concrete

H1 =### = 6716 kN
H2 =### = 3069 kN
H = Minimum of H1 and H2 = 3069 kN

Spacing of connectors
s = Qu x L / H

s = 686.14 mm (For for channels)

Hence for full shear connection, required spacing = 545.6 mm


SPECTRUM TECHNO-CONSULTANTS PVT. LTD. Calculation Note
0 Prepared by AMT Note No: 475 /E/Dn-0
Checked by NVM Revision: R0
0 Date May-20

Providing partial shear connection

M - Mps
np ns
= Mp - Mps
At X = 3.2 m
M = Moment at section = 1317.74
Mps = Plastic moment resistance of composit section = 4216.31
Mp = Plastic moment resistance of girder = 2085.42
np =###
= -0.4
Hence required spacing = -1514 mm

Provide shear connector of 350 mm c/c with 200 mm length ISMC 125 channel section
STAAD FLOOR
START JOB INFORMATION
ENGINEER DATE 18-Feb-10
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER MTON
JOINT COORDINATES
2 5.8 0 0; 4 5.8 0 11; 11 9.9 0 0; 13 9.9 0 11; 57 5.8 0 12.95; 58 9.9 0 12.95;
59 14 0 12.95; 60 18.1 0 12.95; 61 22.2 0 12.95; 62 26.3 0 12.95;
63 30.4 0 12.95; 64 34.5 0 12.95; 65 38.6 0 12.95; 66 42.7 0 12.95;
68 5.8 0 -1.95; 69 9.9 0 -1.95; 70 14 0 -1.95; 71 18.1 0 -1.95;
72 22.2 0 -1.95; 73 26.3 0 -1.95; 74 30.4 0 -1.95; 75 34.5 0 -1.95;
76 38.6 0 -1.95; 77 42.7 0 -1.95; 127 5.8 0 9.75; 128 5.8 0 9.25;
129 5.8 0 8.75; 130 5.8 0 8.25; 131 5.8 0 7.75; 132 5.8 0 7.25; 133 5.8 0 6.75;
134 5.8 0 6.25; 135 5.8 0 5.75; 136 5.8 0 5.25; 137 5.8 0 4.75; 138 5.8 0 4.25;
139 5.8 0 3.75; 140 5.8 0 3.25; 141 5.8 0 2.75; 142 5.8 0 2.25; 143 5.8 0 1.75;
144 5.8 0 1.25; 145 9.9 0 9.75; 146 9.9 0 9.25; 147 9.9 0 8.75; 148 9.9 0 8.25;
149 9.9 0 7.75; 150 9.9 0 7.25; 151 9.9 0 6.75; 152 9.9 0 6.25; 153 9.9 0 5.75;
154 9.9 0 5.25; 155 9.9 0 4.75; 156 9.9 0 4.25; 157 9.9 0 3.75; 158 9.9 0 3.25;
159 9.9 0 2.75; 160 9.9 0 2.25; 161 9.9 0 1.75; 162 9.9 0 1.25;
307 7.85 0 12.95; 308 7.85 0 -1.95; 309 7.85 0 0; 310 7.85 0 11;
311 7.85 0 1.25; 312 7.85 0 1.75; 313 7.85 0 2.25; 314 7.85 0 2.75;
315 7.85 0 3.25; 316 7.85 0 3.75; 317 7.85 0 4.25; 318 7.85 0 4.75;
319 7.85 0 5.25; 320 7.85 0 5.75; 321 7.85 0 6.25; 322 7.85 0 6.75;
323 7.85 0 7.25; 324 7.85 0 7.75; 325 7.85 0 8.25; 326 7.85 0 8.75;
327 7.85 0 9.25; 328 7.85 0 9.75; 329 14 0 0; 330 14 0 11; 331 14 0 9.75;
332 14 0 9.25; 333 14 0 8.75; 334 14 0 8.25; 335 14 0 7.75; 336 14 0 7.25;
337 14 0 6.75; 338 14 0 6.25; 339 14 0 5.75; 340 14 0 5.25; 341 14 0 4.75;
342 14 0 4.25; 343 14 0 3.75; 344 14 0 3.25; 345 14 0 2.75; 346 14 0 2.25;
347 14 0 1.75; 348 14 0 1.25; 349 11.95 0 12.95; 350 11.95 0 -1.95;
351 11.95 0 0; 352 11.95 0 11; 353 11.95 0 1.25; 354 11.95 0 1.75;
355 11.95 0 2.25; 356 11.95 0 2.75; 357 11.95 0 3.25; 358 11.95 0 3.75;
359 11.95 0 4.25; 360 11.95 0 4.75; 361 11.95 0 5.25; 362 11.95 0 5.75;
363 11.95 0 6.25; 364 11.95 0 6.75; 365 11.95 0 7.25; 366 11.95 0 7.75;
367 11.95 0 8.25; 368 11.95 0 8.75; 369 11.95 0 9.25; 370 11.95 0 9.75;
371 18.1 0 0; 372 18.1 0 11; 373 18.1 0 9.75; 374 18.1 0 9.25; 375 18.1 0 8.75;
376 18.1 0 8.25; 377 18.1 0 7.75; 378 18.1 0 7.25; 379 18.1 0 6.75;
380 18.1 0 6.25; 381 18.1 0 5.75; 382 18.1 0 5.25; 383 18.1 0 4.75;
384 18.1 0 4.25; 385 18.1 0 3.75; 386 18.1 0 3.25; 387 18.1 0 2.75;
388 18.1 0 2.25; 389 18.1 0 1.75; 390 18.1 0 1.25; 391 16.05 0 12.95;
392 16.05 0 -1.95; 393 16.05 0 0; 394 16.05 0 11; 395 16.05 0 1.25;
396 16.05 0 1.75; 397 16.05 0 2.25; 398 16.05 0 2.75; 399 16.05 0 3.25;
400 16.05 0 3.75; 401 16.05 0 4.25; 402 16.05 0 4.75; 403 16.05 0 5.25;
404 16.05 0 5.75; 405 16.05 0 6.25; 406 16.05 0 6.75; 407 16.05 0 7.25;
408 16.05 0 7.75; 409 16.05 0 8.25; 410 16.05 0 8.75; 411 16.05 0 9.25;
412 16.05 0 9.75; 413 22.2 0 0; 414 22.2 0 11; 415 22.2 0 9.75;
416 22.2 0 9.25; 417 22.2 0 8.75; 418 22.2 0 8.25; 419 22.2 0 7.75;
420 22.2 0 7.25; 421 22.2 0 6.75; 422 22.2 0 6.25; 423 22.2 0 5.75;
424 22.2 0 5.25; 425 22.2 0 4.75; 426 22.2 0 4.25; 427 22.2 0 3.75;
428 22.2 0 3.25; 429 22.2 0 2.75; 430 22.2 0 2.25; 431 22.2 0 1.75;
432 22.2 0 1.25; 433 20.15 0 12.95; 434 20.15 0 -1.95; 435 20.15 0 0;
436 20.15 0 11; 437 20.15 0 1.25; 438 20.15 0 1.75; 439 20.15 0 2.25;
440 20.15 0 2.75; 441 20.15 0 3.25; 442 20.15 0 3.75; 443 20.15 0 4.25;
444 20.15 0 4.75; 445 20.15 0 5.25; 446 20.15 0 5.75; 447 20.15 0 6.25;
448 20.15 0 6.75; 449 20.15 0 7.25; 450 20.15 0 7.75; 451 20.15 0 8.25;
452 20.15 0 8.75; 453 20.15 0 9.25; 454 20.15 0 9.75; 455 26.3 0 0;
456 26.3 0 11; 457 26.3 0 9.75; 458 26.3 0 9.25; 459 26.3 0 8.75;
460 26.3 0 8.25; 461 26.3 0 7.75; 462 26.3 0 7.25; 463 26.3 0 6.75;
464 26.3 0 6.25; 465 26.3 0 5.75; 466 26.3 0 5.25; 467 26.3 0 4.75;
468 26.3 0 4.25; 469 26.3 0 3.75; 470 26.3 0 3.25; 471 26.3 0 2.75;
472 26.3 0 2.25; 473 26.3 0 1.75; 474 26.3 0 1.25; 475 24.25 0 12.95;
476 24.25 0 -1.95; 477 24.25 0 0; 478 24.25 0 11; 479 24.25 0 1.25;
480 24.25 0 1.75; 481 24.25 0 2.25; 482 24.25 0 2.75; 483 24.25 0 3.25;
484 24.25 0 3.75; 485 24.25 0 4.25; 486 24.25 0 4.75; 487 24.25 0 5.25;
488 24.25 0 5.75; 489 24.25 0 6.25; 490 24.25 0 6.75; 491 24.25 0 7.25;
492 24.25 0 7.75; 493 24.25 0 8.25; 494 24.25 0 8.75; 495 24.25 0 9.25;
496 24.25 0 9.75; 497 30.4 0 0; 498 30.4 0 11; 499 30.4 0 9.75;
500 30.4 0 9.25; 501 30.4 0 8.75; 502 30.4 0 8.25; 503 30.4 0 7.75;
504 30.4 0 7.25; 505 30.4 0 6.75; 506 30.4 0 6.25; 507 30.4 0 5.75;
508 30.4 0 5.25; 509 30.4 0 4.75; 510 30.4 0 4.25; 511 30.4 0 3.75;
512 30.4 0 3.25; 513 30.4 0 2.75; 514 30.4 0 2.25; 515 30.4 0 1.75;
516 30.4 0 1.25; 517 28.35 0 12.95; 518 28.35 0 -1.95; 519 28.35 0 0;
520 28.35 0 11; 521 28.35 0 1.25; 522 28.35 0 1.75; 523 28.35 0 2.25;
524 28.35 0 2.75; 525 28.35 0 3.25; 526 28.35 0 3.75; 527 28.35 0 4.25;
528 28.35 0 4.75; 529 28.35 0 5.25; 530 28.35 0 5.75; 531 28.35 0 6.25;
532 28.35 0 6.75; 533 28.35 0 7.25; 534 28.35 0 7.75; 535 28.35 0 8.25;
536 28.35 0 8.75; 537 28.35 0 9.25; 538 28.35 0 9.75; 539 34.5 0 0;
540 34.5 0 11; 541 34.5 0 9.75; 542 34.5 0 9.25; 543 34.5 0 8.75;
544 34.5 0 8.25; 545 34.5 0 7.75; 546 34.5 0 7.25; 547 34.5 0 6.75;
548 34.5 0 6.25; 549 34.5 0 5.75; 550 34.5 0 5.25; 551 34.5 0 4.75;
552 34.5 0 4.25; 553 34.5 0 3.75; 554 34.5 0 3.25; 555 34.5 0 2.75;
556 34.5 0 2.25; 557 34.5 0 1.75; 558 34.5 0 1.25; 559 32.45 0 12.95;
560 32.45 0 -1.95; 561 32.45 0 0; 562 32.45 0 11; 563 32.45 0 1.25;
564 32.45 0 1.75; 565 32.45 0 2.25; 566 32.45 0 2.75; 567 32.45 0 3.25;
568 32.45 0 3.75; 569 32.45 0 4.25; 570 32.45 0 4.75; 571 32.45 0 5.25;
572 32.45 0 5.75; 573 32.45 0 6.25; 574 32.45 0 6.75; 575 32.45 0 7.25;
576 32.45 0 7.75; 577 32.45 0 8.25; 578 32.45 0 8.75; 579 32.45 0 9.25;
580 32.45 0 9.75; 581 38.6 0 0; 582 38.6 0 11; 583 38.6 0 9.75;
584 38.6 0 9.25; 585 38.6 0 8.75; 586 38.6 0 8.25; 587 38.6 0 7.75;
588 38.6 0 7.25; 589 38.6 0 6.75; 590 38.6 0 6.25; 591 38.6 0 5.75;
592 38.6 0 5.25; 593 38.6 0 4.75; 594 38.6 0 4.25; 595 38.6 0 3.75;
596 38.6 0 3.25; 597 38.6 0 2.75; 598 38.6 0 2.25; 599 38.6 0 1.75;
600 38.6 0 1.25; 601 36.55 0 12.95; 602 36.55 0 -1.95; 603 36.55 0 0;
604 36.55 0 11; 605 36.55 0 1.25; 606 36.55 0 1.75; 607 36.55 0 2.25;
608 36.55 0 2.75; 609 36.55 0 3.25; 610 36.55 0 3.75; 611 36.55 0 4.25;
612 36.55 0 4.75; 613 36.55 0 5.25; 614 36.55 0 5.75; 615 36.55 0 6.25;
616 36.55 0 6.75; 617 36.55 0 7.25; 618 36.55 0 7.75; 619 36.55 0 8.25;
620 36.55 0 8.75; 621 36.55 0 9.25; 622 36.55 0 9.75; 623 42.7 0 0;
624 42.7 0 11; 625 42.7 0 9.75; 626 42.7 0 9.25; 627 42.7 0 8.75;
628 42.7 0 8.25; 629 42.7 0 7.75; 630 42.7 0 7.25; 631 42.7 0 6.75;
632 42.7 0 6.25; 633 42.7 0 5.75; 634 42.7 0 5.25; 635 42.7 0 4.75;
636 42.7 0 4.25; 637 42.7 0 3.75; 638 42.7 0 3.25; 639 42.7 0 2.75;
640 42.7 0 2.25; 641 42.7 0 1.75; 642 42.7 0 1.25; 643 40.65 0 12.95;
644 40.65 0 -1.95; 645 40.65 0 0; 646 40.65 0 11; 647 40.65 0 1.25;
648 40.65 0 1.75; 649 40.65 0 2.25; 650 40.65 0 2.75; 651 40.65 0 3.25;
652 40.65 0 3.75; 653 40.65 0 4.25; 654 40.65 0 4.75; 655 40.65 0 5.25;
656 40.65 0 5.75; 657 40.65 0 6.25; 658 40.65 0 6.75; 659 40.65 0 7.25;
660 40.65 0 7.75; 661 40.65 0 8.25; 662 40.65 0 8.75; 663 40.65 0 9.25;
664 40.65 0 9.75;
MEMBER INCIDENCES
15 57 307; 16 68 308; 21 58 349; 22 69 350; 27 59 391; 28 70 392; 33 60 433;
34 71 434; 39 61 475; 40 72 476; 45 62 517; 46 73 518; 51 63 559; 52 74 560;
57 64 601; 58 75 602; 63 65 643; 64 76 644; 65 57 4; 66 58 13; 75 2 68;
76 11 69; 85 2 309; 94 4 310; 206 4 127; 207 127 128; 208 128 129; 209 129 130;
210 130 131; 211 131 132; 212 132 133; 213 133 134; 214 134 135; 215 135 136;
216 136 137; 217 137 138; 218 138 139; 219 139 140; 220 140 141; 221 141 142;
222 142 143; 223 143 144; 224 144 2; 225 13 145; 226 145 146; 227 146 147;
228 147 148; 229 148 149; 230 149 150; 231 150 151; 232 151 152; 233 152 153;
234 153 154; 235 154 155; 236 155 156; 237 156 157; 238 157 158; 239 158 159;
240 159 160; 241 160 161; 242 161 162; 243 162 11; 244 144 311; 245 143 312;
246 142 313; 247 141 314; 248 140 315; 249 139 316; 250 138 317; 251 137 318;
252 136 319; 253 135 320; 254 134 321; 255 133 322; 256 132 323; 257 131 324;
258 130 325; 259 129 326; 260 128 327; 261 127 328; 558 307 58; 559 308 69;
560 309 11; 561 310 13; 562 311 162; 563 312 161; 564 313 160; 565 314 159;
566 315 158; 567 316 157; 568 317 156; 569 318 155; 570 319 154; 571 320 153;
572 321 152; 573 322 151; 574 323 150; 575 324 149; 576 325 148; 577 326 147;
578 327 146; 579 328 145; 580 307 310; 581 309 308; 582 310 328; 583 328 327;
584 327 326; 585 326 325; 586 325 324; 587 324 323; 588 323 322; 589 322 321;
590 321 320; 591 320 319; 592 319 318; 593 318 317; 594 317 316; 595 316 315;
596 315 314; 597 314 313; 598 313 312; 599 312 311; 600 311 309; 601 349 59;
602 350 70; 603 59 330; 604 329 70; 605 11 351; 606 13 352; 607 330 331;
608 331 332; 609 332 333; 610 333 334; 611 334 335; 612 335 336; 613 336 337;
614 337 338; 615 338 339; 616 339 340; 617 340 341; 618 341 342; 619 342 343;
620 343 344; 621 344 345; 622 345 346; 623 346 347; 624 347 348; 625 348 329;
626 162 353; 627 161 354; 628 160 355; 629 159 356; 630 158 357; 631 157 358;
632 156 359; 633 155 360; 634 154 361; 635 153 362; 636 152 363; 637 151 364;
638 150 365; 639 149 366; 640 148 367; 641 147 368; 642 146 369; 643 145 370;
644 351 329; 645 352 330; 646 353 348; 647 354 347; 648 355 346; 649 356 345;
650 357 344; 651 358 343; 652 359 342; 653 360 341; 654 361 340; 655 362 339;
656 363 338; 657 364 337; 658 365 336; 659 366 335; 660 367 334; 661 368 333;
662 369 332; 663 370 331; 664 349 352; 665 351 350; 666 352 370; 667 370 369;
668 369 368; 669 368 367; 670 367 366; 671 366 365; 672 365 364; 673 364 363;
674 363 362; 675 362 361; 676 361 360; 677 360 359; 678 359 358; 679 358 357;
680 357 356; 681 356 355; 682 355 354; 683 354 353; 684 353 351; 685 391 60;
686 392 71; 687 60 372; 688 371 71; 689 329 393; 690 330 394; 691 372 373;
692 373 374; 693 374 375; 694 375 376; 695 376 377; 696 377 378; 697 378 379;
698 379 380; 699 380 381; 700 381 382; 701 382 383; 702 383 384; 703 384 385;
704 385 386; 705 386 387; 706 387 388; 707 388 389; 708 389 390; 709 390 371;
710 348 395; 711 347 396; 712 346 397; 713 345 398; 714 344 399; 715 343 400;
716 342 401; 717 341 402; 718 340 403; 719 339 404; 720 338 405; 721 337 406;
722 336 407; 723 335 408; 724 334 409; 725 333 410; 726 332 411; 727 331 412;
728 393 371; 729 394 372; 730 395 390; 731 396 389; 732 397 388; 733 398 387;
734 399 386; 735 400 385; 736 401 384; 737 402 383; 738 403 382; 739 404 381;
740 405 380; 741 406 379; 742 407 378; 743 408 377; 744 409 376; 745 410 375;
746 411 374; 747 412 373; 748 391 394; 749 393 392; 750 394 412; 751 412 411;
752 411 410; 753 410 409; 754 409 408; 755 408 407; 756 407 406; 757 406 405;
758 405 404; 759 404 403; 760 403 402; 761 402 401; 762 401 400; 763 400 399;
764 399 398; 765 398 397; 766 397 396; 767 396 395; 768 395 393; 769 433 61;
770 434 72; 771 61 414; 772 413 72; 773 371 435; 774 372 436; 775 414 415;
776 415 416; 777 416 417; 778 417 418; 779 418 419; 780 419 420; 781 420 421;
782 421 422; 783 422 423; 784 423 424; 785 424 425; 786 425 426; 787 426 427;
788 427 428; 789 428 429; 790 429 430; 791 430 431; 792 431 432; 793 432 413;
794 390 437; 795 389 438; 796 388 439; 797 387 440; 798 386 441; 799 385 442;
800 384 443; 801 383 444; 802 382 445; 803 381 446; 804 380 447; 805 379 448;
806 378 449; 807 377 450; 808 376 451; 809 375 452; 810 374 453; 811 373 454;
812 435 413; 813 436 414; 814 437 432; 815 438 431; 816 439 430; 817 440 429;
818 441 428; 819 442 427; 820 443 426; 821 444 425; 822 445 424; 823 446 423;
824 447 422; 825 448 421; 826 449 420; 827 450 419; 828 451 418; 829 452 417;
830 453 416; 831 454 415; 832 433 436; 833 435 434; 834 436 454; 835 454 453;
836 453 452; 837 452 451; 838 451 450; 839 450 449; 840 449 448; 841 448 447;
842 447 446; 843 446 445; 844 445 444; 845 444 443; 846 443 442; 847 442 441;
848 441 440; 849 440 439; 850 439 438; 851 438 437; 852 437 435; 853 475 62;
854 476 73; 855 62 456; 856 455 73; 857 413 477; 858 414 478; 859 456 457;
860 457 458; 861 458 459; 862 459 460; 863 460 461; 864 461 462; 865 462 463;
866 463 464; 867 464 465; 868 465 466; 869 466 467; 870 467 468; 871 468 469;
872 469 470; 873 470 471; 874 471 472; 875 472 473; 876 473 474; 877 474 455;
878 432 479; 879 431 480; 880 430 481; 881 429 482; 882 428 483; 883 427 484;
884 426 485; 885 425 486; 886 424 487; 887 423 488; 888 422 489; 889 421 490;
890 420 491; 891 419 492; 892 418 493; 893 417 494; 894 416 495; 895 415 496;
896 477 455; 897 478 456; 898 479 474; 899 480 473; 900 481 472; 901 482 471;
902 483 470; 903 484 469; 904 485 468; 905 486 467; 906 487 466; 907 488 465;
908 489 464; 909 490 463; 910 491 462; 911 492 461; 912 493 460; 913 494 459;
914 495 458; 915 496 457; 916 475 478; 917 477 476; 918 478 496; 919 496 495;
920 495 494; 921 494 493; 922 493 492; 923 492 491; 924 491 490; 925 490 489;
926 489 488; 927 488 487; 928 487 486; 929 486 485; 930 485 484; 931 484 483;
932 483 482; 933 482 481; 934 481 480; 935 480 479; 936 479 477; 937 517 63;
938 518 74; 939 63 498; 940 497 74; 941 455 519; 942 456 520; 943 498 499;
944 499 500; 945 500 501; 946 501 502; 947 502 503; 948 503 504; 949 504 505;
950 505 506; 951 506 507; 952 507 508; 953 508 509; 954 509 510; 955 510 511;
956 511 512; 957 512 513; 958 513 514; 959 514 515; 960 515 516; 961 516 497;
962 474 521; 963 473 522; 964 472 523; 965 471 524; 966 470 525; 967 469 526;
968 468 527; 969 467 528; 970 466 529; 971 465 530; 972 464 531; 973 463 532;
974 462 533; 975 461 534; 976 460 535; 977 459 536; 978 458 537; 979 457 538;
980 519 497; 981 520 498; 982 521 516; 983 522 515; 984 523 514; 985 524 513;
986 525 512; 987 526 511; 988 527 510; 989 528 509; 990 529 508; 991 530 507;
992 531 506; 993 532 505; 994 533 504; 995 534 503; 996 535 502; 997 536 501;
998 537 500; 999 538 499; 1000 517 520; 1001 519 518; 1002 520 538;
1003 538 537; 1004 537 536; 1005 536 535; 1006 535 534; 1007 534 533;
1008 533 532; 1009 532 531; 1010 531 530; 1011 530 529; 1012 529 528;
1013 528 527; 1014 527 526; 1015 526 525; 1016 525 524; 1017 524 523;
1018 523 522; 1019 522 521; 1020 521 519; 1021 559 64; 1022 560 75;
1023 64 540; 1024 539 75; 1025 497 561; 1026 498 562; 1027 540 541;
1028 541 542; 1029 542 543; 1030 543 544; 1031 544 545; 1032 545 546;
1033 546 547; 1034 547 548; 1035 548 549; 1036 549 550; 1037 550 551;
1038 551 552; 1039 552 553; 1040 553 554; 1041 554 555; 1042 555 556;
1043 556 557; 1044 557 558; 1045 558 539; 1046 516 563; 1047 515 564;
1048 514 565; 1049 513 566; 1050 512 567; 1051 511 568; 1052 510 569;
1053 509 570; 1054 508 571; 1055 507 572; 1056 506 573; 1057 505 574;
1058 504 575; 1059 503 576; 1060 502 577; 1061 501 578; 1062 500 579;
1063 499 580; 1064 561 539; 1065 562 540; 1066 563 558; 1067 564 557;
1068 565 556; 1069 566 555; 1070 567 554; 1071 568 553; 1072 569 552;
1073 570 551; 1074 571 550; 1075 572 549; 1076 573 548; 1077 574 547;
1078 575 546; 1079 576 545; 1080 577 544; 1081 578 543; 1082 579 542;
1083 580 541; 1084 559 562; 1085 561 560; 1086 562 580; 1087 580 579;
1088 579 578; 1089 578 577; 1090 577 576; 1091 576 575; 1092 575 574;
1093 574 573; 1094 573 572; 1095 572 571; 1096 571 570; 1097 570 569;
1098 569 568; 1099 568 567; 1100 567 566; 1101 566 565; 1102 565 564;
1103 564 563; 1104 563 561; 1105 601 65; 1106 602 76; 1107 65 582; 1108 581 76;
1109 539 603; 1110 540 604; 1111 582 583; 1112 583 584; 1113 584 585;
1114 585 586; 1115 586 587; 1116 587 588; 1117 588 589; 1118 589 590;
1119 590 591; 1120 591 592; 1121 592 593; 1122 593 594; 1123 594 595;
1124 595 596; 1125 596 597; 1126 597 598; 1127 598 599; 1128 599 600;
1129 600 581; 1130 558 605; 1131 557 606; 1132 556 607; 1133 555 608;
1134 554 609; 1135 553 610; 1136 552 611; 1137 551 612; 1138 550 613;
1139 549 614; 1140 548 615; 1141 547 616; 1142 546 617; 1143 545 618;
1144 544 619; 1145 543 620; 1146 542 621; 1147 541 622; 1148 603 581;
1149 604 582; 1150 605 600; 1151 606 599; 1152 607 598; 1153 608 597;
1154 609 596; 1155 610 595; 1156 611 594; 1157 612 593; 1158 613 592;
1159 614 591; 1160 615 590; 1161 616 589; 1162 617 588; 1163 618 587;
1164 619 586; 1165 620 585; 1166 621 584; 1167 622 583; 1168 601 604;
1169 603 602; 1170 604 622; 1171 622 621; 1172 621 620; 1173 620 619;
1174 619 618; 1175 618 617; 1176 617 616; 1177 616 615; 1178 615 614;
1179 614 613; 1180 613 612; 1181 612 611; 1182 611 610; 1183 610 609;
1184 609 608; 1185 608 607; 1186 607 606; 1187 606 605; 1188 605 603;
1189 643 66; 1190 644 77; 1191 66 624; 1192 623 77; 1193 581 645; 1194 582 646;
1195 624 625; 1196 625 626; 1197 626 627; 1198 627 628; 1199 628 629;
1200 629 630; 1201 630 631; 1202 631 632; 1203 632 633; 1204 633 634;
1205 634 635; 1206 635 636; 1207 636 637; 1208 637 638; 1209 638 639;
1210 639 640; 1211 640 641; 1212 641 642; 1213 642 623; 1214 600 647;
1215 599 648; 1216 598 649; 1217 597 650; 1218 596 651; 1219 595 652;
1220 594 653; 1221 593 654; 1222 592 655; 1223 591 656; 1224 590 657;
1225 589 658; 1226 588 659; 1227 587 660; 1228 586 661; 1229 585 662;
1230 584 663; 1231 583 664; 1232 645 623; 1233 646 624; 1234 647 642;
1235 648 641; 1236 649 640; 1237 650 639; 1238 651 638; 1239 652 637;
1240 653 636; 1241 654 635; 1242 655 634; 1243 656 633; 1244 657 632;
1245 658 631; 1246 659 630; 1247 660 629; 1248 661 628; 1249 662 627;
1250 663 626; 1251 664 625; 1252 643 646; 1253 645 644; 1254 646 664;
1255 664 663; 1256 663 662; 1257 662 661; 1258 661 660; 1259 660 659;
1260 659 658; 1261 658 657; 1262 657 656; 1263 656 655; 1264 655 654;
1265 654 653; 1266 653 652; 1267 652 651; 1268 651 650; 1269 650 649;
1270 649 648; 1271 648 647; 1272 647 645;
START GROUP DEFINITION
MEMBER
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 3.21467e+006
POISSON 0.17
DENSITY 2.40262
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.09042e+007
POISSON 0.3
DENSITY 7.83341
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
15 16 21 22 27 28 33 34 39 40 45 46 51 52 57 58 63 64 558 559 601 602 685 -
686 769 770 853 854 937 938 1021 1022 1105 1106 1189 -
1190 PRIS AX 0.0216 IX 1e-006 IY 7.2e-005 IZ 0.022 YD 0.65 ZD 0.21 -
YB 0.65 ZB 0.21
66 76 207 TO 223 225 TO 243 603 604 607 TO 625 692 TO 708 771 772 775 TO 793 -
855 856 859 TO 877 944 TO 960 1023 1024 1027 TO 1045 1107 1108 1111 TO 1129 -
1196 TO 1211 -
1212 PRIS AX 0.1386 IX 1e-005 IY 0.00085 IZ 0.01 YD 1.2 ZD 0.5 YB 1.2 ZB 0.5
MEMBER PROPERTY AMERICAN
85 94 560 561 605 606 644 645 689 690 728 729 773 774 812 813 857 858 896 -
897 941 942 980 981 1025 1026 1064 1065 1109 1110 1148 1149 1193 1194 1232 -
1233 PRIS YD 0.24 ZD 2
MEMBER PROPERTY AMERICAN
244 TO 261 562 TO 579 626 TO 643 646 TO 663 710 TO 727 730 TO 747 794 TO 811 -
814 TO 831 878 TO 895 898 TO 915 962 TO 979 982 TO 999 1046 TO 1063 1066 -
1067 TO 1083 1130 TO 1147 1150 TO 1167 1214 TO 1231 1234 TO 1250 -
1251 PRIS YD 0.24 ZD 0.5
580 TO 600 664 TO 684 748 TO 768 832 TO 852 916 TO 936 1000 TO 1020 -
1084 TO 1104 1168 TO 1188 1252 TO 1272 PRIS YD 0.24 ZD 0.375
MEMBER PROPERTY AMERICAN
65 75 206 224 687 688 691 709 939 940 943 961 1191 1192 1195 -
1213 PRIS AX 0.135 IX 0.007 IY 0.007 IZ 0.00767
CONSTANTS
MATERIAL STEEL MEMB 15 16 21 22 27 28 33 34 39 40 45 46 51 52 57 58 -
63 TO 66 75 76 206 TO 243 558 559 580 TO 604 607 TO 625 664 TO 688 -
691 TO 709 748 TO 772 775 TO 793 832 TO 856 859 TO 877 916 TO 940 -
943 TO 961 1000 TO 1024 1027 TO 1045 1084 TO 1108 1111 TO 1129 1168 TO 1192 -
1195 TO 1213 1252 TO 1272
MATERIAL CONCRETE MEMB 85 94 244 TO 261 560 TO 600 605 606 626 TO 684 689 -
690 710 TO 768 773 774 794 TO 852 857 858 878 TO 936 941 942 962 TO 1020 -
1025 1026 1046 TO 1104 1109 1110 1130 TO 1188 1193 1194 1214 TO 1272
SUPPORTS
57 60 63 66 68 71 74 77 PINNED
MEMBER RELEASE
65 66 580 603 664 687 748 771 832 855 916 939 1000 1023 1084 1107 1168 1191 -
1252 START MX MZ
75 76 581 604 665 688 749 772 833 856 917 940 1001 1024 1085 1108 1169 1192 -
1253 END MX MZ
DEFINE MOVING LOAD
****70 R wheeled load****
TYPE 1 LOAD 8.5 8.5 8.5 8.5 6 6 4
DIST 1.37 3.05 1.37 2.13 1.52 3.96 WID 1.93
*****Class A load*****
TYPE 2 LOAD 3.4 3.4 3.4 3.4 5.7 5.7 1.35 1.35
DIST 3 3 3 4.3 1.2 3.2 1.1 WID 1.8
LOAD 1 LOADTYPE Dead TITLE DL+SIDL
MEMBER LOAD
65 66 75 76 206 TO 243 603 604 607 TO 625 687 688 691 TO 709 771 772 -
775 TO 793 855 856 859 TO 877 939 940 943 TO 961 1023 1024 1027 TO 1045 1107 -
1108 1111 TO 1129 1191 1192 1195 TO 1213 UNI GY -3.572
JOINT LOAD
2 4 11 13 329 330 371 372 413 414 455 456 497 498 539 540 581 582 623 -
624 FY -4.1

LOAD GENERATION 5
TYPE 1 13.68 0 3.56 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 4.0 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 4.50 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 5.0 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 5.0 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 6.0 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 6.5 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 7.0 XINC 0.5

LOAD GENERATION 5
TYPE 1 13.68 0 5.8 XINC 0.5
TYPE 2 3.6 0 9.47 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 6.1 XINC 0.5
TYPE 2 3.6 0 9.77 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 6.4 XINC 0.5
TYPE 2 3.6 0 10.07 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 6.7 XINC 0.5
TYPE 2 3.6 0 10.37 XINC 0.5
LOAD GENERATION 5
TYPE 1 13.68 0 7.1 XINC 0.5
TYPE 2 3.6 0 10.67 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 9.3 XINC 0.5
TYPE 2 3.6 0 5.8 XINC 0.5
TYPE 2 3.6 0 2.3 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 9.6 XINC 0.5
TYPE 2 3.6 0 6.1 XINC 0.5
TYPE 2 3.6 0 2.6 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 9.9 XINC 0.5
TYPE 2 3.6 0 6.4 XINC 0.5
TYPE 2 3.6 0 2.9 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 10.2 XINC 0.5
TYPE 2 3.6 0 6.7 XINC 0.5
TYPE 2 3.6 0 3.2 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 10.5 XINC 0.5
TYPE 2 3.6 0 7 XINC 0.5
TYPE 2 3.6 0 3.5 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 5.8 XINC 0.5
TYPE 2 3.6 0 2.3 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 6.1 XINC 0.5
TYPE 2 3.6 0 2.6 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 6.4 XINC 0.5
TYPE 2 3.6 0 2.9 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 6.7 XINC 0.5
TYPE 2 3.6 0 3.2 XINC 0.5
LOAD GENERATION 5
TYPE 2 3.6 0 7.0 XINC 0.5
TYPE 2 3.6 0 3.5 XINC 0.5
PERFORM ANALYSIS
FINISH

You might also like