Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

400

200 200

PAD-EYES, CAP. = 55t


(SEE DETAIL 4)

245
3000
250 1250 1250 250 PL3000x400x20

20
2
- 10
PAD-EYES, CAP. = 55t

245
GROOVE WELD
(SEE DETAIL 4)
PL3000x400x20 (SEE DETAIL 3)
20

BEAM WEB

PL3000x484x10 0 TO 1/8
?? ?? ?? ?? ?? ??

45°

45°
1014
BEAM FLANGE
484
524

524

1014
484
524

524
STIFFENERS

20
PL484x185x10
DOUBLE BEVEL
20

PL3000x400x20 GROOVE WELD

245
PAD-EYES, CAP. = 55t GROOVE WELD
(SEE DETAIL 4) (SEE DETAIL 3)

25 450 2050 450 25

20
3000 PL3000x400x20
3 GROOVE WELD DETAILS

245
PAD-EYES, CAP. = 55t
---
SCALE NTS
(SEE DETAIL 4)
1 SPREADER BEAM (HOOK LOAD CAP. = 95t)
---
SCALE 1 : 20

2 SPREADER BEAM SECTION


---
SCALE 1 : 10

117 217 117 95 NOTES


25 50 25 · ALL STRUCTURAL STEEL SHALL CONFORM TO
ASTM A709/A709M-16a WITH MINIMUM YIELD
STRENGTH OF 345MPa.

35
??
· WELDING PROCESS SHALL CONFORM TO
25

63

63
?? AWSD1.1 UNLESS OTHERWISE NOTED.
R1

ELECTRODES SHALL BE SERIES E70XX.

52
R

· ALL PAD-EYES SHALL BE WELDED AT THE


162

90

MIDDLE OF THE TOP FLANGE PARALLEL TO ITS


63
8

LONGITUDINAL AXIS (LOCATION AND

99
R3
245

245
76
ORIENTATION SHOWN IN DRAWINGS).
10 10 · SHEAR STUDS THAT WILL BE AFFECTED
STIFFENERS DURING INSTALLATION OF PAD EYES WILL BE
STIFFENERS WELDED ON SITE AFTER ERECTION OF
120

52
GIRDERS.
68

73
?? ??
· PAINTING OF PAD EYES SHALL BE IN
ACCORDANCE WITH ITEM 403.3.23 "PAINTING
30

30
?? ?? ?? ?? ??
15

10
TOP OF FLANGE TOP OF FLANGE METAL SURFACES", PAINT SYSTEM 3 -
INORGANIC ZINC-RICH COATING SYSTEM.
48 25 153 153 25 48 50 50 250
25 450 125 150 125
PL484x185x10 400
4 PL3000x484x10
-

4 PAD-EYE DETAILS (CAP. = 55t)


---
SCALE 1:5 REFERENCE:
SHOP DRAWING
IFC DWG No. : ---

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC.
STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT NLEX CORPORATION DESIGNED: SCIC
REV. DATA DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
NLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG
0 21 April 2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) _JAD_---
CADD: RDV
INTERNATIONAL CORPORATION
CHECKED: RDV 1 13 May 2020 CHANGE IN DESIGN
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES APPROVED: KSD
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO JADJAD BRIDGE
Project Manager Project Manager Design Engineer Project Manager License Engineer Employer's Representative SPREADER BAR FOR GIRDERS 1 OF 1 1

You might also like