Professional Documents
Culture Documents
General Detail For Lap Splice of Spiral A Section: Notes
General Detail For Lap Splice of Spiral A Section: Notes
S
T
O
P
S T
O
P
S
T
FRICTION (mm)
O
P
S T
O
P
S T O P
S
T
O
P
S
T
O
P
S
T
O
P
S
T
O
P
P
O
S T
P
O
T
S
S T O P
P
O
T
S
P
O
S T P
O
T
S
P
O
T
S
P
O
T
S
P
O
T
S
BIAXIAL
BH-J115-544 PLT-J-03 1500 271216.970 2111280.144 +3.16 +3.00 1038.5 20900 9000 9000 8500 2885 -17.90
(O-CELL) TEST
NOTES:-
3.16
+3.00
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS WITH
N.G.L PILE CUTOFF LEVEL RESPECT TO MEAN SEA LEVEL UNLESS NOTED OTHERWISE.
(150M)
BRIDGE
CHANNEL
CABLE STAYED
NAVIGATION
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS
425 75
SHALL BE FOLLOWED.
3. TEST PILES ARE BORED CAST -IN -SITU PILES OF 1500mm DIA.
4. CONCRETE IN THE PILE SHALL BE CAST TO FULL DEPTH IN SINGLE POUR.
5. CONCRETE SHALL BE DESIGN MIX AND HAVE A MINIMUM 28 DAYS
/ RESCUSE (180M)
MEDIAN OPENING
CHARACTERISTIC STRENGTH OF M50 FOR BORED CAST -IN -SITU PILES.
RESCUE/FIRST AID
STORE
AID
FIRST
26 Y25
A 6. SLUMP OF CONCRETE SHOULD BE 150mm TO 180mm AT THE TIME OF
4 SONIC PIPES 50mm DIA.
0682
1mm THICK.
POURING.
7. MINIMUM COVER TO MAIN REINFORCEMENT OF PILES SHALL NOT BE
LESS THAN 75mm. END STA: 7+170.166
N GT
1.5mm THICK.
SPIRAL Y16
H OF SOUND AND THE MATRIX HAS NO HONEYCOMBING OR OTHER DEFECTS.
LA 9. MINIMUM LAP LENGTH SHALL BE 55XD WHERE "D" IS THE DIAMETER OF
PITCH 150 P
SMALLER BAR.THE SPACING OF TRANSVERSE REINFORCEMENT
26 Y25 SHALL NOT BE MORE THAN 150mm AT THE LOCATIONS WHERE BARS
L=12000 ARE LAPPED.
10. LAP LENGTH SHALL BE SUITABLY STAGGERED AND MINIMUM C/C
SPIRAL Y16 DISTANCE BETWEEN ADJACENT LAP SHALL BE 1.3 TIMES OF LAP LENGTH.
9840
S T
O
P
S
T
O
P
S
T
O
P
S T O P
S T O P
28 Y 12- 150C/C
S T O P
S T O P
S T O P
S T O P
S T O P
P
O
T
S
S T O P
PERMANENT
GENERAL DETAIL FOR
STEEL CASING L = 8500 NUMBER OF TYPE OF DIA OF BAR SPACING
SECTION A LAP SPLICE OF SPIRAL BARS BAR BAR
1 : 25 0682
02 1:25
14000
Ø 12 LAP = 650
Ø 16 LAP = 875 MPa. REINFORCEMENT SHALL COMPLY WITH THE REQUIREMENTS AS PER
CLAUSE 1009.3.1 AND 1009.3.2.1 OF MORTH SPECIFICATIONS (FIFTH
REVISION 2013).
26 Y20
13. THE LOAD TEST SHALL BE CARRIED OUT AFTER MINIMUM OF 28 DAYS OF
CASTING OF PILES.
4 SONIC PIPES 50mm DIA. 14. THE METHOD OF BORING AND INSTALLATION FOR TEST PILE SHALL BE
1mm THICK.
SAME FOR THE APPROVED METHOD OF WORKING PILE AND SHALL
FURTHER CONFIRM TO IS 2911 (PART 1 SECTION 2) 2013.
1 SONIC PIPE 100mm DIA.
SPIRAL Y12
15. PILE LOAD TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH
1.5mm THICK.
PITCH 150
PROJECT SPECIFICATIONS AND SHALL FURTHER CONFIRM TO IS 2911
(PART 4) 2013.
20900
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
S T O P
16. THE EXTERNAL SURFACE OF MS LINER SHALL BE PROPERLY GREASED
S T O P
BEFORE INSERTING IT INTO THE GROUND.
1485
SECTION B S
T
O
P S T O P
S T O P S
T
O
P S T O P
S T O P S T
O
P
S T O P
S T O P S
T
O
P S T O P
S T O P
P
O
T
S S T O P
S T O P
P
S T
O
S T O P
S T O P P
O
T
S S T O P
S T O P
P
S T
O
S T O P
S T O P
HW TUFF GR IV
26 Y20 1 : 25 0682
RETAINING WALL
RETAINING WALL
1500
STRAIN GAUGE
0682
0 500 1000 2500M 500 1000 2500M
MW TUFF GR III
SPIRAL Y12
PITCH 150 BH-J115-277
BH-J114-275
1500
BH-J115-544
LOADING JACK / CELL PLT-J-03 BH-J116-279
(FOR LOCATION REFER
NOTE 18)
500 500 500 500
–
SW TUFF GR II
STRAIN GAUGE
BH-J115-278
BH-J117-280 –‘ ’
-17.90
TOE LEVEL –
BH-J114-276
75
75 75
1500
LD
REVISED AS PER AE COMMENTS G.H. A.R. J.M. 01 23-01-2020 J.M. A.N. AS SHOWN
DIRECTOR
*R