Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

TRANSMITTAL

Project: Construction of Missing Link with Viaduct from Km


0+000 to 13+300 and up gradation to 8 lane from Km 32+800 to
Km 38+700 under capacity augmentation of Mumbai Pune
M/s AFCONS INFRASTRUCTURE LIMITED. Expressway in the state of Maharashtra under EPC mode,
MPEW Link Project - Job No – 3453, Package – II.
Block No. A-4, Flat No. 301 & 302,
Arihant Arshiya, Vill – Dahiwali, Ref. No : AFCS-E1000-DES-CIV-DSM-DRW-0196
Pali Phata, Taluka – Khalapur ( Khopoli ),
Dist – Raigad, 410202, Maharashtra Date : 25-04-2020
The Authority's Engineer,
To: Team Leader Enclosed : √ Document
M/s. Geodata Louis Berger Consortium, √ Drawing
Unit No. 401- 402, 4th floor, Other
NDM-1, Netaji Subhash Place,
Pitampura New Delhi – 110034.
Issued for: Information
K.A.: Mr. N. P. Mundo Comments
√ Approval
Construction
As Built

Sub: Drawings of dimensional details of Piers for Viaduct I.

PURPOSE /
SR. NO. QTY. DOCUMENT NO. SIZE REV. DESCRIPTION
CATEGORY

1 5+2 2120-TT-V1-XX-CFD-CB-10018 A1 & A3 R1 DIMENSIONAL DETAILS OF PIER FOR VIADUCT-1 Approval

2 5 TTS-2120-CRS-235 A4 Comment Resolution Sheet

3 5 REL/STR-2019/3453/0194 A4 Proof Checker's Certificate

1. Soft copy sent by Email.


Note :
2. On approval one set of A1 & one set of A3 duely approved design and drawings to be returned to the contractor for reference and records.

For M/s AFCONS INFRASTRUCTURE LIMITED Receipt Acknowledged

MR. RANJIT JHA DATE RECEIVED:


AUTHORISED SIGNATORY Company Name : M/s. Geodata Louis Berger JV,

Copy To :
Maharashtra State Road Development Corporation Ltd., Bandra Worli (Rajiv Gandhi) Sea Link Project Office,
Opp. Bandra Reclamation Bus Depo, Near Lilavati Hospital, Bandra (W), Mumbai – 400050

Please acknowledge receipt by signing and returning duplicate of this Form.

Sheet 1 of 1

You might also like