Professional Documents
Culture Documents
Scour Depth Calculation PDF
Scour Depth Calculation PDF
Calculations
2
Effective surface area of basin As 920.00 m Deposition criteria
Side slope of hopper 45 degrees B = 7.2*Q0.5
Depth of hopper Dhopper 1.88 m Width of basin
2
Area of hopper Ahopper 12.69 m B 24.4 m
Total height of settling basin Hsettling 7.88 OK
2
Cross sectional area of the basin Ai W*H+0.5*A hopper 75.35 m
Wetted perimeter Pi 23.50 m
Hydraulic radius R 3.21 m
Hydraulic gradient Se Se = Q2/(M2*A2*R4/3) 0.000001
Shear velocity v* v* = (gRSe)0.5 0.006
Velocity in the uniform section Vbasin 0.16 m/s
100%
90%
80%
Efficiency h(%)
70%
60%
50%
40%
20%
0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55
Particle size (Standard Fall diameter) (mm)
Check for efficiency according to Camp Ok
100%
90%
80%
Efficiency h(%)
70%
60%
50%
40%
20%
0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55
Particle size (Standard Fall diameter) (mm)