Static calibration procedure

1. Do the zero correction in the menu

Project Cemengal : C-LEVER static calibration


2. Remove the cross handles and the C-Lever door

Project Cemengal : C-LEVER static calibration


3. Mount the comparison weight in the middle of the chute

Project Cemengal : C-LEVER static calibration


4. Close the door and fix it with some cross handles every time, to defeat influences on the
measurement.

5. Wait until the flowrate is constant

Project Cemengal : C-LEVER static calibration


6. Enter the flowrate of the EVA, the calculated value from the presetting and do the correction.

7. When the new gain is calculated open the C-Lever door and take off the weight.
8. Close the door and do the zero correction.
9. Open the door and hang in the static weight.
10. Close the door and wait until the flowrate is constant.
11. Check if the tolerance of the flowrate is ok.
12. If not, go on with the correction, otherwise take off the static weight and do a zero correction.

Project Cemengal : C-LEVER static calibration


13. At the end set the counter to zero.

Pre-Calibration:

Calibration
procedure
Signal Weight Weight Toleranc
Gain difference EVA meter e
1. 47,903 104,3776 0,43 t 0,019 t -95,58%
2. 1084,1204 4,612 0,038 t 0,018 t -52,63%
3. 1525,799 3,277 0,017 t 0,018 t 5,88%

Project Cemengal : C-LEVER static calibration


Parameters:

Calibration data of EVA Date: 13.10.2015

Portlandpuzzolan-
Zero: 0,6410 mV Bulk good: Cement
Tare time: 5s EN 197-1
Gain: 1525,799 CEM II/B-P 32,5R
Signal difference: 3,277 mV
Max point: 3,918 mV
Full scale: 150 t/h
Tare window: 10,0%
Damping: 0,1 s
Filter: 2
Flow format: 0,003
Counter format: 0,003
Unit: t
Zero suppression: 0,02 t/h

Calculated static weight and Flowrate:


5,065kg = 35,4t/h