Static Calibration Procedure: 1. Do The Zero Correction in The Menu
Static Calibration Procedure: 1. Do The Zero Correction in The Menu
7. When the new gain is calculated open the C-Lever door and take off the weight.
8. Close the door and do the zero correction.
9. Open the door and hang in the static weight.
10. Close the door and wait until the flowrate is constant.
11. Check if the tolerance of the flowrate is ok.
12. If not, go on with the correction, otherwise take off the static weight and do a zero correction.
Pre-Calibration:
Calibration
procedure
Signal Weight Weight Toleranc
Gain difference EVA meter e
1. 47,903 104,3776 0,43 t 0,019 t -95,58%
2. 1084,1204 4,612 0,038 t 0,018 t -52,63%
3. 1525,799 3,277 0,017 t 0,018 t 5,88%
Portlandpuzzolan-
Zero: 0,6410 mV Bulk good: Cement
Tare time: 5s EN 197-1
Gain: 1525,799 CEM II/B-P 32,5R
Signal difference: 3,277 mV
Max point: 3,918 mV
Full scale: 150 t/h
Tare window: 10,0%
Damping: 0,1 s
Filter: 2
Flow format: 0,003
Counter format: 0,003
Unit: t