Docu - Tips Technical Proposalpart II Work Programs
Docu - Tips Technical Proposalpart II Work Programs
)
g y
r Post –Construction
n
i a s
n n l
i
and Project Closure
n a n n
a m s g
i g
i n
l i
l o s s o
P e p e e i
t Construction Stage
r o c
y
t P r D D
i
l ( P e d A
i e n r
b
i m e
l e
s n g
i e i d
l
t i a
t Defects Liability Period
a u s h n
e e c e e
F O d S D T
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
150
schedule,
Assess existing drawings and
buildings in order to establish
requirements for proposed
works,
Preparation of concept and
detailed designs,
Technical specifications,
Contract administration,
Project management and
documentation and
construction supervision
Twenty (20)
Arch. Enock Project Assisting the team Leader in Months
KIBBAMU Architect
directing and coordinating the
(Building)
activities of all consultancy Subtotal
(20)
and liaison with the client
Data collection and analysis,
Physical Survey,
Concept and scheme design
development and presentation
to the client,
Report on scheme drawings,
Report on the tasks outlined
above for the Client’s
approval,
Preparation of design and
tender documents and
supervision of work
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
151
schedule,
Assess existing drawings and
buildings in order to establish
requirements for proposed
works,
Preparation of concept and
detailed designs,
Technical specifications,
Contract administration,
Project management and
documentation and
construction supervision
Twenty (20)
Arch. Enock Project Assisting the team Leader in Months
KIBBAMU Architect
directing and coordinating the
(Building)
activities of all consultancy Subtotal
(20)
and liaison with the client
Data collection and analysis,
Physical Survey,
Concept and scheme design
development and presentation
to the client,
Report on scheme drawings,
Report on the tasks outlined
above for the Client’s
approval,
Preparation of design and
tender documents and
supervision of work
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
151
Twenty (20)
Arch. Charlotte Landscape Preparation of landscaping Months
KICONCO
Architect designs,
Subtotal
specifications and (20)
supervision of planting and
maintenance
Attend consequent
consultation meetings;
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
152
Twenty (20)
Arch. Charlotte Landscape Preparation of landscaping Months
KICONCO
Architect designs,
Subtotal
specifications and (20)
supervision of planting and
maintenance
Attend consequent
consultation meetings;
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
152
Twenty (20)
Simon NYANZI Quantity Prepare initial cost estimates, Months
Surveyor
Prepare Bills of Quantities for Subtotal
(20)
phased construction of works
depending on funds available
Preparation of specification,
Twenty (20)
Eng. Anthony Civil / Preparation of Civil and Months
KUSEMERERWA
Structural Structural design drawings,
Engineer detailing and specifications, Subtotal
(20)
design of drainage systems,
Review previously
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
153
Twenty (20)
Simon NYANZI Quantity Prepare initial cost estimates, Months
Surveyor
Prepare Bills of Quantities for Subtotal
(20)
phased construction of works
depending on funds available
Preparation of specification,
Twenty (20)
Eng. Anthony Civil / Preparation of Civil and Months
KUSEMERERWA
Structural Structural design drawings,
Engineer detailing and specifications, Subtotal
(20)
design of drainage systems,
Review previously
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
153
undertaken Soil
investigations,
Fourteen
Eng. Samuel Building Review the conditions of the (14) Months
SEDIDE Services
existing Electrical
SENTONGO Engineer
connections and services, Subtotal
(14)
(Electrical)
Carryout design of Electrical
installations,
Preparation of electrical
Specifications, quantities and
cost estimates for all power,
distributions and electrical
works
Fourteen
Eng. Judah Building Review the conditions of the (14) Months
MAWUBE Services
existing mechanical services,
Engineer
Subtotal
(Mechanical) Carryout Mechanical design, (14)
Preparation of mechanical
Specifications, quantities and
cost estimates for mechanical
works
Fourteen
Eng. Sunday ICT Design and supervision of IT (14) Months
SHEM Specialist
installations, Specification,
and; Subtotal
(IT Networks)
(14)
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
154
undertaken Soil
investigations,
Fourteen
Eng. Samuel Building Review the conditions of the (14) Months
SEDIDE Services
existing Electrical
SENTONGO Engineer
connections and services, Subtotal
(14)
(Electrical)
Carryout design of Electrical
installations,
Preparation of electrical
Specifications, quantities and
cost estimates for all power,
distributions and electrical
works
Fourteen
Eng. Judah Building Review the conditions of the (14) Months
MAWUBE Services
existing mechanical services,
Engineer
Subtotal
(Mechanical) Carryout Mechanical design, (14)
Preparation of mechanical
Specifications, quantities and
cost estimates for mechanical
works
Fourteen
Eng. Sunday ICT Design and supervision of IT (14) Months
SHEM Specialist
installations, Specification,
and; Subtotal
(IT Networks)
(14)
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
154
Nine (9)
Eng. Gumisiriza Resident Site management and Months
Gideon LWANGA Engineer/
supervision ;
Clerk of
Works Subtotal (9)
coordination of construction
activities on site,
Signature: …………………………………………………….
(Authorized Representative)
Full Name: Arch. Kibbamu Enock
Designation: Managing Director
Bidder: Plantek Consultants
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
155
quantities and cost estimates
of IT installation works
Nine (9)
Eng. Gumisiriza Resident Site management and Months
Gideon LWANGA Engineer/
supervision ;
Clerk of
Works Subtotal (9)
coordination of construction
activities on site,
Signature: …………………………………………………….
(Authorized Representative)
Full Name: Arch. Kibbamu Enock
Designation: Managing Director
Bidder: Plantek Consultants
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo
Ring Road, Kampala.
TECHNICAL PROPOSAL
155
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of
New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
156
A. Technical Input
DURATION
TASK DESCRIPTION (WEEKS)
1ST 2ND 3RD 4TH 5TH 6TH 7TH 8TH 9TH 10TH 11TH 12TH 13TH 14TH 15TH 16TH 17TH 18TH 19TH 20TH
DESIGN AND TENDER
5 MONTHS
ACTION
1 Stage 1: Feasibility Planning
1.1 Consultant Mobilization 3 days
Site visit and Project
1.2 3 days
appreciation
Topographic and cadastral
1.3 survey, Geo-technical 1 week
investigations
1.4 Preliminary Project Brief 1 week
Approval of design concept in
1.5 1 week
Preliminary project brief
Preparation of Final Project
1.6 1 week
brief
Approval of Final Project
1.7 1 week
brief
Preparation and approval of
1.8 Comprehensive Plan for 2 weeks
construction implementation
Preparation and submission of
1.9 1 week
a feasibility Planning Report
Stage 2: Outline
2 (Preliminary) Design
Proposals
Preparation of Outline
2.1 (Preliminary) Drawings for 2 weeks 23
client approval
Preparation and Submission of
2.2 1 week
Preliminary Design Report
3 Stage 3: Scheme Design
Preparation of Scheme design
3.1 drawings and Draft Bills of 3 weeks
Quantities
3.2 Planning Permissions 2 weeks
Preparation and submission of
3.3 1 week
scheme design report
Stage 4: Detailed Design
4
Stage
Preparation of Final Detailed
4.1 Drawings, specifications, Bills 2 weeks
of Quantities
Preparation and Submission of
4.2 2 weeks
Final Design Report
5 Stage 5: Tender action
Preparation of Bid/Tender
documents
5.1 a) Invitation of Bids 7 days
5.2 b) Pre-Bid Conference 1 day
c) Preparation,
5.3 submission and 2 days
opening of Bids
5.4 d) Evaluations of Bids 3 days
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
157
& Recommendations
5.5 e) Contract Documents 1 week
5.6 f) Contract signing 1 day
MONITORING & 15
SUPERVISION WORKS MONTHS
6 Stage 6: Construction Stage
Handing over/possession of site
6.1 2 days
to the contractor
Mobilization by Contractor /
6.2 2 weeks
Suppliers
New Construction /
6.3 42 weeks
Installations
Stage 7: Post-construction
7
and Project Closure stage
Maintenance / Defects liability
7.1 26 weeks
period
Post-construction evaluation,
7.2 inspections, preparation of final 2 weeks
accounts and closure activities
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
158
& Recommendations
5.5 e) Contract Documents 1 week
5.6 f) Contract signing 1 day
MONITORING & 15
SUPERVISION WORKS MONTHS
6 Stage 6: Construction Stage
Handing over/possession of site
6.1 2 days
to the contractor
Mobilization by Contractor /
6.2 2 weeks
Suppliers
New Construction /
6.3 42 weeks
Installations
Stage 7: Post-construction
7
and Project Closure stage
Maintenance / Defects liability
7.1 26 weeks
period
Post-construction evaluation,
7.2 inspections, preparation of final 2 weeks
accounts and closure activities
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
158
Reports Date
(week from commencement)
MONTHLY REPORTS
Reports Date
(week from commencement)
MONTHLY REPORTS
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and
construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
159
16. Post-Project evaluation report End of Defects Liability Period
Consultancy service for Design and Construction Supervision of Proposed Extension to the Existing Office Block and
construction of New Store Block and perimeter wall on plot.no. 8 - 13, Kyambogo Ring Road, Kampala.
TECHNICAL PROPOSAL
160