CPM Problems With Solution: Solving Network Problem On Computer Using TORA (Input Screen)
CPM Problems With Solution: Solving Network Problem On Computer Using TORA (Input Screen)
CPM Problems With Solution: Solving Network Problem On Computer Using TORA (Input Screen)
Now select SOLVE MENU and GO TO OUTPUT SCREEN. There are two options for output,
select CPM calculations. For step-by-step calculation of earliest time and latest time using
forward pass and backward pass procedure click NEXT STEP button. To get all the values
instantly, then press ALL STEPS button. The screen gives all the required values to analyze
the problem. You may note that at the bottom of the table, the critical activities are
highlighted in red colour. The output screen is shown in the below figure, below:
Solving Network Problem on Computer Using TORA (Output Screen)
Example: The following table gives the activities in construction project and time duration.
Project Schedule with Time Duration
b. The total and free floats for each activity are calculated as shown in table
Example: Draw the network for the following project given in the table.
Project Schedules
Number the events by Fulkerson’s rule and find the critical path. Also find the time for
completing the project.
Solution: The network is drawn as shown in the following figure using the data provided.
Number the events using Fulkerson’s rule and find the Earliest and Latest time and total
float is computed for each activity to find out the critical path as given the following table.
TL, TL and TFij Calculated
Activity Network Diagram
The critical path is a – c – f – h– j and the minimum time for the completion of the project
is 42 weeks.
« Previous Topics
Project
Determination
EvaluationOf
Review
Float And
Technique,
Slack Times
Pert
Solving
Critical
Pert
Path
Problems
Analysis
Using Computer
International Business
Quantitative Techniques for
management Related Interview
Questions
Management Interview
Questions
List of Tutorials
Developers Best Practices Tutorial
YAML Tutorial
Salesforce Tutorial
Adobe Robohelp Tutorial
Sublime Text Tutorial
GItlab Tutorial
Adobe InDesign CC Tutorial
SaltStack Tutorial
Read More
List of Topics
Summary
Career Planning in best practice
Managing Managers
Stress Management
Eager to Learn
Handy Tools & Techniques
Keep the Assets Safely
Testing is the Religion
Read More
Interview Questions
Ravendb Interview Questions
Cobertura Interview Questions
Java Quartz Interview Questions
Cheque Truncation System Interview Questions
ECS Interview Questions
RTGS Interview Questions
Private Equity Interview Questions
Excel Formulas Interview Questions
Read More
☰
Login
Our Portals :
Gulf Jobs
Canada Jobs
USA Jobs
Italy Jobs
UK Jobs
Malaysia Jobs
Singapore Jobs
Australia Jobs