SUBCONTRACTOR'S TECHNICAL SUBMITTAL (STS)


ELECTRIFIED DOUBLE TRACK FROM Ref. No.: CRJGR-LHSB-STS-INF-
GEMAS TO JOHOR BAHRU S2.0-ARC-FLR-00002
INFRA TRACKWORK SYSTEMS STATION DEPOT GENERAL
Location: SECTION 2 –LABIS, BEKOK & PALOH STATION Element: ARC FLR

To: SPYTL Attention: Section Head S2

Subject: SUBMISSION OF METHOD OF STATEMENT FOR TEE-OFF CONNECTION WORKS


TICK THE APPROPRIATE BOX FOR THIS SUBMITTAL For: Approval Information

Survey Information Revised Works Programme


Authority Approval Monthly Progress Report
Subcontractor's Facility Handover Documentation
Request for Removal of Plant & Material As-built Drawings/ Records
Programme/ Schedule Organisation Chart

Also Tick the Box for the Type of Documents/ Information


Method Statement
Calculation Material Certification Brochure/ Catalogue
Sample Test Report/ Result Warranty Manual:
Shop Drawings Company Profile Specification Others:

Description:
Information included in transmitted documents. Refer to Aconex Document Ref:
As per comment in STS Ref. No CRJGR-LHSB-STS-INF-S2.0-ARC-FLR-00002 Rev 00, herewith we attached
Submission of Method Statement for Floor Hardener Application Works

Submitted by Subcontractor: Received by Section Head:


Name: YOGESWARAN SEGAR Name:
Signature: Date: Signature: Date:

Circulation within SPYTL to Responsible Parties:


(Refer to Ditribution Matrix)

Are Consultant Comments/ Endorsement required? Yes No

Comments by Responsible Party: Approved Approved with comments Rejected Not Applicable
Attachments: Yes Resubmission required
Response included in Submittal Response Form

Endorsed by Responsible Party: Responded by Section Head:


Name: Name:
Signature: Date: Signature: Date: