Existing PCCP - 1.50 % Existing PCCP - 1.50 %: C 3.00 M. L L C 0.60 M. 1.60 M. 1.50 M. 3.00 M. 0.60 M. 1.60 M

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.60 m. 0.60 m. CL 0.60 m. 1.60 m.

NATURAL GROUND LINE 1.50 m. 3.00 m. 3.00 m. 1.50 m. NATURAL GROUND LINE

GUTTER

GUTTER
CURB &

CURB &
SIDEWALK -1.50 % -1.50 % SIDEWALK

EXISTING PCCP EXISTING PCCP

SEE 'DETAILS OF WIDENING'


ITEM 311 PCCP, thk. = 0.15 m.
ITEM 200 AGG. SUB-BASE COURSE, thk. = 0.20 m.

TYPICAL SECTION OF ROAD PAVEMENT


SCALE: 1:60 MTS

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS


(3.2mm. thk. x 150mm, WHITE, SUB-CENTER BROKEN LINE)

ROAD EDGE

3.00 m. 6.00 m. 3.00 m. 6.00 m. 3.00 m. 6.00 m. 3.00 m.


0.10 m.

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS


(3.2mm. thk. x 100mm, WHITE, EDGE CONTINUOUS LINE)
0.10 m.

ROAD EDGE

ROAD EDGE

TYPICAL DETAIL OF THERMOPLASTIC


PAVEMENT MARKING (4 - LANE)
SCALE: 1:200 MTS

I NEER ' S
Republic of the Philippines PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: CONCURRED: APPROVED FOR IMPLEMENTATION: SHEET NO.
NG Province of Davao del Sur
E

OF

CITY OF DIGOS CONCRETING OF ROAD SHOULDERING WITH SIDEWALK ENGR. TEMOTEO L. PUPA III ENGR. FRANCES A. SANOY
C ITY

F ICE

INCLUDING CONSTRUCTION OF DRAINAGE SYSTEM ALONG

4
DRAFTSMAN II
CEO STAFF ENGR. SALVADOR L. DUMOGHO IV ENP. OJELA MAE M. ENTERO, MBA, DBA HON. JOSEF F. CAGAS
DEL PILAR ST. (JNC. BIAK-NA-BATO ST. - BATAAN ST. - ROXAS
OFFICE OF THE CITY ENGINEER ST. - FIRST CRUMB ST.) , DIGOS CITY (K0+157 TO K0+935)
SUBMITTED BY: OIC-CITY ENGINEER CITY PLANNING AND DEVELOPMENT OFFICER CITY MAYOR

IT
City Hall Compound, Digos City ENGR. CHLOUI GLINE B. SAPLAGIO ENGR. DENNIS C. ALMACIN , SR.
S
C

Y O D I GO CEO STAFF
F LOCATION: DEL PILAR ST., BRGY ZONE III, DIGOS CITY ENGINEER I

You might also like